LPD_17_QA_5.pdf

PDF 61 KB Posted

Attached to
USS SAN ANTONIO (LPD 17) FY17 Dry- Docking Phased Maintenance Availability
Solicitation number
N00024-16-R-4409
Issued by

View the file

Other files

File Type Posted
N00024-16-R-4409_Conformed_RFP_through_Amendment_0007.pdf PDF
LPD_17_QA_9.pdf PDF
LPD_17_QA__154_Revised_Answer.pdf PDF
N00024-16-R-4409_Amendment_0007_Released.docx.pdf PDF
ERRATA_4_Available.pdf PDF
LPD_17_QA_8_20161014_FBO.docx DOCX document
N00024-16-R-4409_Conformed_RFP_through_Amendment_0006.pdf PDF
J-4_Pricing_Workbook_Updated_via_Amendment_0006.xlsx XLSX spreadsheet
LPD_17_QA_7.pdf PDF
N00024-16-R-4409_Amendment_0006.pdf PDF
N00024-16-R-4409_Amendment_0005.pdf PDF
LPD_17_QA_6.pdf PDF
N00024-16-R-4409_Conformed_RFP_through_Amendment_0004.pdf PDF
J-3_Execution_Milestones_Updated_via_Amendment_0004.xlsx XLSX spreadsheet
S-5_Eligibility_Criteria_Data_Sheet_Updated_via_Amendment_0004.docx DOCX document
N00024-16-R-4409_Amendment_0004.pdf PDF
LPD_17_QA_4.pdf PDF
J-3_Execution_Milestones_(LPD_17)_updated_via_Amendment_0003.xlsx XLSX spreadsheet
LPD_17_QA_3.pdf PDF
N00024-16-R-4409_Amendment_0003_released.pdf PDF
N00024-16-R-4409_Amendment_0002_released.pdf PDF
Copy_of_J-4_Pricing_Workbook_updated_via_A0002.xlsx XLSX spreadsheet
J-5_QASP_updated_via_Amendment_0002.pdf PDF
LPD_17_QA_2.pdf PDF
J-4_Pricing_Workbook_(Insert_Offeror_Name_Here)_updated_via_A0001.xlsx XLSX spreadsheet
LPD_17_QA_1_Final.pdf PDF
N00024-16-R-4409_Amendment_0001_released.pdf PDF
J-4_Pricing_Workbook_(Insert_Offeror_Name_Here).XLS XLS spreadsheet
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-5_QASP.docx DOCX document
S-3_PPI_Form.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
J A_Directed_Subs_LPD17_Redacted.pdf PDF
N00024-16-R-4409_LPD_17_RFP.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL SEA SYSTEMS COMMAND

N00024-16-R-4409

QUESTIONS AND ANSWERS #5

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

29. Reserved.

48. Reserved

49. Reserved.

51. With the “Combat Systems PCD” milestone date remaining unchanged, will the Navy customer accept and evaluate proposals with a later Docking Milestone date due to either Dock usage conflicts or a Drydock Certificate date that is after the 19 Apr 2017 Dock Milestone date? A similar request was submitted in bidder question #126 on NAVSEA solicitation N00024-16-R-4414. The Government’s response was to remove the “Dock” and “Undock” milestones in Amendment 5 to that solicitation.

a. Offerors shall propose “Dock” and “Undock” milestones on the revised Attachment J-3 to be submitted as part of the technical proposal. Proposals will be evaluated in accordance with Sections L and M of the solicitation to determine if the proposed “Dock” and “Undock” milestones meet the technical requirements.

98. Work Item 520-11-001: Para 4.1 states Sea valve removal and replacement shall be accomplished in conjunction with sea valve waster sleeve replacement. There is no allowance in this work package to replace waster sleeves. Please provide work item or amend this item to include waster sleeves.

a. The Government clarifies that the statement “Sea valve removal and replacement shall be accomplished in conjunction with sea valve waster sleeve replacement” will be deleted from the work item. Revised work item 520-11-001 will be provided in a future errata to the work specification package.

99. Work Item 561-90-002: Para 3.1 requires that the contractor accomplish reference

2.2 which has another reference required to complete this SHIPALT for items F1 & F2 of 2.2 these are JARED drawings 20726JA001 and 20726JB001. Please provide these required references.

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

618-5910), please cc: Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at Lisa.Carll@navy.mil.

100. Work Item 259-11-002: This specification is written to replace the exhaust gaskets in all four (4) MPDEs in both MMRs. Paragraph 3.2 specifies the use of references

2.4 through 2.9 to accomplish the work, excluding references 2.2 and 2.3, which are the arrangement and detail drawings for MMR #2. In addition, the list of material which immediately follows the paragraph on page 2 lists references 2.2 or 2.3 for every part on the list. Are there supposed to be separate paragraphs for each MMR and pair of MPDEs or do the other references need to be added to the work paragraph and list of material?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

101. Work Item 331-80-001: While reviewing the reference drawings for the work to be performed, there appear to be work locations on the drawing that are not listed on the specification. There are 60 floodlights (item 101) removed and 32 new fluorescent lights (item 3) installed in the Well Deck (5-143-0-Q) and there are two contactors (item 102) removed from the Foul Weather Gear Lkr (2-142-2-A) and neither space is listed on the specification as a location of work. Should these spaces be listed on the specification?

a. The Government confirms that spaces; WEATHER DECK 5-143-0-Q and FOUL WEATHER GEAR LKR 2-142-2-A need to be added to paragraph 1.2 Location of Work, for work item 331-80-001. Revised work item 331-80-001 will be provided in a future errata to the work specification package.

102. Work Item 514-11-001: 1) Ref 2.3 50511-2-001 Rev G, Titanium Piping Electric Isolation Verification. Rev “E” was provided on the CD received by the contractor.

Will Rev “G” be provided or will the spec be revised? 2) Ref 2.4 S9514-DH-MMC- 010, Air Conditioning Plant, HFC-134-A, 200-Ton Capacity; Description, Operation and Maintenance Manual. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. The Government clarifies that the correct reference is Rev “E”. Revised work item 514-11-001 to reflect Rev “E” will be provided in a future errata to the work specification package. Rev “E” is available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-618-5910), please cc: Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at Lisa.Carll@navy.mil.

103. Work Item 531-51-001: 2.2 S9531-DC-MMA-010, Reverse Osmosis Desalination Unit 24,000 Gallons Per Day. 2.3 S9531-CB-MMC-010, Reverse Osmosis Desalination Plant, Model RODU-24. These references were not furnished on the CD provided to the contractor. Will these references be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

104. Reference 2.8 is S9531-CS-MMC-010, Installation, Operation, and Maintenance

Manual for Reverse Osmosis Desalination Plant (2ND Pass); Model RODM-3. This reference was not furnished on the CD provided to the contractor. Will this reference be made available?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

105. Work Item 533-11-003: Reference 2.2 is S9531-CT-MMC-010, Mixed Oxidant

Electrolytic Disinfectant Generator Model 7060 Mark I. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

106. Work Item 556-11-001: Reference 2.2 is S9LPD-AS-SSM-050, LPD 17 Class

Steering System. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

107. Work Item 562-11-001: Reference 2.3 is S9562-A1-MMC-010, Operation, Maintenance, and Repair Instructions for Rudderstock Seal Assembly, General Assembly, Type; ER Part Number US73295. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

108. Work Item 581-11-001: Reference 2.10 is S9AA0-AB-GOS-010/GSO, General

Specifications for Overhaul of Surface Ships (Section 581). This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

109. Work Item: 584-17-002: Reference 2.2 is S9589-AP-MMC-010, Operation, Maintenance, and Installation Instructions with Parts List for Self-Deploying Sideport Ramp, Portable Sideport Ramp, and Shell Doors. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

110. Work Item 584-21-001: Reference 2.3 is S9584-A3-MMC-010, Stern Gate, Model

721, and Operating Equipment SystemThis reference was not furnished on the CD provided to the contractor. Will this reference be made available?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-

111. Work Item 588-11-001: Reference 2.2 is SG811-CK-MMC-010, Maintenance Manual For Aviation Maintenance Folding Boom Crane.This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

112. Work Item 589-11-001: Reference 2.2 is SG811-CF-MMC-010, Boat And Cargo Crane, Knuckleboom, Model K80-65 Volume One, Chapters One Through 8 And Appendices A Through F. Reference 2.3 is SG811-CF-MMC-020, Boat And Cargo Crane, Knuckleboom, Model K80-65 Appendices G Through K. These references were not furnished on the CD provided to the contractor. Will these references be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

113. Work Item 589-21-002: Reference 2.2 is SG811-CE-MMC-010, USS San Antonio (LPD 17) Sideport Cargo Crane Part No. 2D5-07736. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

114. Work Item 593-11-001: Reference 2.2 is S9593-DN-SSM-010, Ship Systems

Manual for Sewage Vacuum Collection, Holding and Transfer. Reference 2.3 is S9593-CW-MMC-010, Description, Operation and Maintenance for Sewage Vacuum Collection Holding and Transfer Unit Model 0133. These references were not furnished on the CD provided to the contractor. Will these references be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

115. Work item 612-21-001: Reference 2.3 is TP_ING_61221-3-001 Rev D, Deck Edge Safety Nets Static Load and Operability. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

116. Reserved.

117. Work item 625-11-001: Reference 2.3 is S9625-BA-MMC-010, Operation and

Maintenance Manual for Windows, KS-30000 Series Electrically Heated/Deicing and Non-Heated with Controllers, KS-12000 Series. Reference 2.4 is S9625-BD- MMC-010, Installation and Operation for Wiper, Type 'C' Straight Line with IM- 1001-100-L03 Control System. These references were not furnished on the CD provided to the contractor. Will these references be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

118. Work Item 625-11-002: Reference 2.3 is 600-7318191 Rev E, Outfitting Items Structural unit 4250. This drawing is for Unit 4251, not 4250. Is this a typo in the spec item?

a. The Government confirms that the work item should read Unit 4251 vice 4250. Revised work item 625-11-002 will be provided in a future errata to the work specification package.

119. Reserved.

120. Work Item 633-21-001: Reference 2.2 is S9633-AL-MMC-010, Impressed

Current Cathodic Protection System for LPD-17. Reference 2.7 is MIL-STD-2003, Section 1-5 Electric Plant Installation Standard Methods for Surface Ships and Submarines (note: only section Mil-STD-2003A was furnished, not sections 1- 5).

Reference 2.11 is T4L0 (AP-2), Maintenance Requirement Card (MRC), Impressed Current Cathodic Protection Assessment, Maintenance Index Page (MIP) Series:

6332/001. These references were not furnished on the CD provided to the contractor. Will these references be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

121. Work Item 633-21-003: Reference 2.2 is S9633-AM-MMC-010, LPD 17 Class Active Shaft Grounding System. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

122. Reserved.

123. Work item 643-80-001: Reference 2.9 is listed as 8100-1301-0197 Rev K, HVAC

Ventilation Hangers & Fasteners. However, Rev “M” was included on the CD provided to the contractor. Will the spec be revised to reflect Rev “M”?

a. The Government clarifies that the work specification will be revised to reflect

Rev “M”. Revised work item 643-80-001 will be provided in a future errata to the work specification package.

124. Work Item 992-11-014: Reference 2.2 is UFC 4-152-01, Unified Facilities Criteria (UFC), Design: Piers and Wharves. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

125. Work Item 993-31-002: Reference 2.5 is S9514-DF-MMO-010, Vent Fog Precipitator, 50 CFM Model 441100. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

126. Work Item 993-31-003: Reference 2.2 is SE000-01-IMB-010, Navy Installation and Maintenance Book (NIMB). Reference 2.5 is S9324-DZ-MMO-010, Control Panel, Low-Pressure Air, Model 5642D-G511 Type I. These references were not furnished on the CD provided to the contractor. Will these references be provided?

a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

127. Work Item 324-90-001: On the reference 2.2 drawing (320-8303466), page 2 of the drawing shows the ripout and installation of cabling in VCHT RM NO. 1 (7-25-01-W).

This space is identified as 7-25-01-E on the ship’s configuration drawing. Is this the correct reference drawing? Spaces ending in “W” are normally tanks.

a. The Government confirms that the space identified as 7-23-01-E on the ships configuration drawing is correct. The Government also confirms that the reference drawing is also correct and there is no need to revise the work specification. The Government clarifies that the title on the drawing will need to be revised by the planning yard at a later date.

128. Reserved.

129. Reserved.

130. Work Item 524-11-004: Reference 2.5 is 50511-2-001 Rev D, Titanium Piping Electric Isolation Verification. Rev “E” was included on the CD provided to the contractor. Will Rev “D” be provided or will the spec be revised? This document is listed as Rev “E” (ex. 233-11-001), Rev “G” (ex. 514-11-001) and Rev “D” in the spec items.

Which is the correct revision to be used for this bid?

a. The Government clarifies that the correct reference is Rev “E”. Revised work item 524-11-004 to reflect Rev “E” will be provided in a future errata to the work specification package. Rev “E” is available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at

131. Work Item 524-21-001: 1) Reference 2.2 is listed as S6226-LG-MMO-010, Pump, Titanium, 8 x 6 x 15 Commercial/Marine Close-Coupled Drawing No. 803-6962399.

This appears to be a typo in the spec item. (This appears in several items as 8 x 6 x 15 from 524-21-001 – 524-25-001). However, the manual provided is 6 x 5 x 15. Should there be changes made to the spec items or is there a different manual that should be provided? 2) Reference 2.8 is M05241 Rev A, Navy Standard Titanium Pump Auxiliary Seawater Service Post Repair Operational Tests. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?

a. The Government clarifies that 6 x 5 x 15 provided in the manual is correct.

Reference 2.8 will be provided as needed during contract performance.

132. Work Item 521-21-005: Paragraph 1.2.1 identifies 7-128-0-E as Aux Machinery Rm Number 2. Should this be listed as Aux Machinery Rm Number 3?

a. The Government clarifies that paragraph 1.2.1 should read Machinery Room Number 3. Revised work item 524-21-005 will be provided in a future errata to the work specification package.

133. Work Item 631-21-002: Paragraph 1.2.1 identifies the location as being from the Main Deck to the Top of the 40 foot above baseline level. Should this be 40 meters above baseline level?

a. The Government confirms that Paragraph 1.2.1 identifying the location as being from the Main Deck to the Top of the 40 foot above baseline level is correct.

There is no revision needed to work specification 631-21-002.

134. Work Item 521-21-005: Fire Pump and Motor; repair. There are five specifications on FP Motor repairs, all five specs are similar with the exception of work item 521-21- 005 which seems to be missing a paragraph (3.2.2.1) for the foundation inspection. Does this paragraph need to be added to this work item spec?

a. The Government clarifies that paragraph 3.2.2.1 will be added to Work Item 521- 21-005. Revised work item 521-21-005 will be provided in a future errata to the work specification package.

135. Reserved.

136. Work Item 524-90-001: Item 524-90-001 calls for a Nu-Torque tech rep for testing, troubleshooting and repair. However, References 2.2 (8534662) and 2.3 (7318840) states these valves are butterfly valves and the system drawing does not have them as motor operated valves. Please confirm correct operation of valves, whether they are manual or motor operated.

a. The Government clarifies that the valves are motor operated. The Government has requested a change to References 2.2 and 2.3. The LAR will be provided to offerors once it is available.

137. Work Item 153-11-001: It does not appear that Reference 2.2 (Tech Manual) or 2.3 Dwg 600-7318025 Rev E provides information for the thickness/grade of deck plating in the area noted in Para 3.1 . Please provide the correct Reference that includes this information.

a. The Government clarifies that Reference 2.3 should be drawing 00-1381-0002_7 for deck plating size which references deck plate thickness of 10MM. Revised work item 153-11-001 will be provided in a future errata to the work specification package.

138. Work Item 512-90-002: On reference 2.3, drawing 320-8673044, item numbers 5 through 8 (modification kits) are marked as GFM on the drawing, and Note 16 states these kits will be provided as part of the ShipAlt. However, the kits are not listed in paragraph 5 on the work item, and they’re not listed on the 4720. Are these kits going to be provided as GFM?

a. The Government confirms that Items 5 through 8 should be listed as kitted material in para 5.3 of the work item and will be provided GFM. Revised work item 512-90-002 will be provided in a future errata to the work specification package.

139. Due to the size of the SAN ANTONIO work package the offeror requests that the deadline for submission of bidder questions be extended from 30 September to 11 October 2016.

a. The Government does not intend to extend the deadline for submission of bidder’s questions at this time.

140. Reserved.