NAVAL SEA SYSTEMS COMMAND
N00024-16-R-4409
QUESTIONS AND ANSWERS #4
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
34. Work Item 243-80-001: Para 3.1 of Item 243-80-001 requires the materials listed in
2.2 to be installed IAW sheet 7 and 8 of the drawing 633-8304163 rev A. The material in the list of materials on sheet 8 shows 120 deck sockets for piece 118 and
119. In detail 50-A on sheet 7 the quantity is shown as 120 required, however on sheet 7 elevation 51-C shows only 7 locations for these deck sockets to be installed on each side of the bossing covers port and STBD for a total of 28 locations. Also on detail 56-A there is no height dimension for the hull socket. Please provide the location and installation details for all 120 deck sockets. Please Issue a LAR that corrects these discrepancies.
a. The Government clarifies that the most forward of the seven socket installations, at approximately FR 158.5, is described on Sheet (SHT) 5, Elevation 35-C, Detail 34-A, and Section 38-D, using Item 102.
The remaining six socket installations, starting 465mm forward of FR 160 and ending 929mm aft of FR 167.5, are correctly shown on SHT 7 Elevation 51-C, Detail 50-A, and Section 55-D, using Item 119. The Government notes that Revision Note 4, shown in SHT 1, ZN 2-F, provides quantity guidance for legacy items 101, 102, and 108 thru 112, indicating that the quantities of these seven items are for a range of nine (LPD17 thru 25) hulls. LAR 84077_LPD17_16117 has been generated.
For a copy of the LAR please contact Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at Lisa.Carll@navy.mil.
35. Work Item 453-48-002: Reference 2.13, 2.15, 2.16 & 2.17 were not included on the CD provided. Please provide these references.
a. These references are available via the revised CD provided under
Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at robert.c.yates@navy.mil (757-618-5910) (757-675-8356), please cc: Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at Lisa.Carll@navy.mil.
44. Work Item 150-11-010: Please clarify the purpose of para. 3.3? The coating of new and disturbed surfaces is covered in para. 3.5.
a. The Government clarifies that the purpose of 009-32 being called out in Para. 3.3 is to detail the specific paint and coating system whereas Para. 3.5 is more general and refers to any additional areas that may need to be painted as a result of the work being performed.
45. Work Item 524-11-003: Para 3.3.5 states in part to assemble each strainer installing new strainer baskets, seals, packing, gaskets and fasteners IAW manufacturer’s specifications, using 2.2 for guidance and materials listed in 5.1. 5.1 on page 3 shows name of part “Monel 3/16”. This is not enough information to know what the Government is providing. Please provide a description of what “Monel 3/16” is and how many you are providing.
a. The Government clarifies that the number of material kits provided is stated in paragraph 1.3 of the work specification. Monel 3/16 is additional information related to the screen assembly material type. The navy stock number associated with Monel 3/16 is 393-4603.
52. Work Item: 520-11-001: Paragraph 3.5 says to install new each 2 ½” and below valves listed in Attachment A of spec item 520-11-001. Per Attachment A there are a total of 94 - 2 ½” and below valves. Paragraph 5.1 lists a total of 89 valves to be provided as GFM. Please clarify and provide GFM/LLTM list.
a. The Government clarifies that there are 95 valves 2.50 inch and below.
The Government is providing 89 as Long Lead Time Material (LLTM).
The remaining 6 valves, as detailed below, are not being provided as GFM
LLTM.
1) 166B-011H 1.00IN 88A030092 4820-01-506-9986 1.00 IPS GLOBE VALVE
(1) ea.
2) 166B-011H 1.00IN 88A030092 4820-01-506-9986 1.00 IPS GLOBE VALVE
(1) ea.
3) B-102-E-0150 882049886 4820-01-173-1157 1.50 IPS GATE VALVE 150
PSI FLGE BRZ (1) ea.
4) 1146-090t-112 88A030035 4820-01-506-5102 1.50 IPS GATE VALVE 400 PSI SWLDG UN BRZ (1) ea.
5) 714-001T-2.00IN 88A020352 4820-01-503-4231 2.00 IPS GATE VALVE 400
PSI SWLD CSTTITANIUM (1) ea.
6) 1146-069T-200 88A030374 4820-01-510-8576 2.00 IPS GATE VALVE 400
PSI SBU BRZ (1) ea.
53. Work Item 123-10-001: Item 123-10-001 calls for a striker plate to be installed in 8- 33-01-W (FreshWater Tank). However, work item 123-14-003 para 1.2.2 designates 8-33-01-W as SSDG Jacket Water holding tank. Please confirm type of tank 8-33- 01-W.
a. The Government clarifies that the requirement is for an SSDG Jacket Water Holding Tank. Revised work item 123-10-001 will be provided in a future errata to the work specification package.
54. Work Item 634-11-001: Paragraph 1.2.1 identifies the location as Well Deck (5-143- 0-Q). However, paragraph 3.6.10 references the machinery space bilge area. This text in 3.6.10 appears as paragraph 4.1 (NOTES) in several other items. Should paragraph 3.6.10 be in this work item? If so, please explain.
a. The Government clarifies that Para. 3-6-10 will be removed. Revised work item 634-11-001 will be provided in a future errata to the work specification package.
55. Work Item: 245-11-001: Paragraph 3.11.1 directs the contractor to submit a report of results of 3.10 to the Supervisor. However, para 3.10 gave instructions to fill the system with new hydraulic fluid. The test that the results should be based upon was the operational test, which was performed under paragraph 3.11. Should the submit report paragraph be changed to reference 3.11 vice 3.10?
a. The Government clarifies that Paragraph 3.11.1 should reference Paragraph
3.11 vice 3.10. Revised work item 245-11-001 will be provided in a future errata to the work specification package.
56. Work Item: 245-11-003: This paragraph directs the contractor to submit a report of the results of 3.5.4 to the Supervisor. Para 3.5.4 gave instructions for removing, fitting, and installing new OD Box System piping joint gasket and fastener. The test that the results should be based upon was the torqueing of fasteners, which was performed under paragraph 3.5.5. Should the submit report paragraph be changed to reflect 3.5.5 vice 3.5.4?
a. The Government clarifies that Para. 3.5.5.1 should reference 3.5.5 vice Para. 3.5.4 Revised work item 245-11-001 will be provided in a future errata to the work specification package.
57. Work Item: 245-12-003: Paragraph directs the contractor to submit a report of the results of 3.5.4 to Supervisor. However, para 3.5.4 gave instructions for removing, fitting, and installing new OD Box System piping joint gasket and fastener. The test that the results should be based upon was the torqueing of fasteners, which was performed under paragraph 3.5.5. Should the submit report paragraph be changed to reference 3.5.5 ice 3.5.4?
a. The Government clarifies that Para. 3.5.5.1 should reference Para. 3.5.5 vice
3.5.4. Revised work item 245-12-003 will be provided in a future errata to the work specification package.
58. Work Item: 245-12-004: Paragraph 3.2.2 says to submit a report of the results of
3.2.2 to the Supervisor. However, this is the same paragraph for the report. The test that the results should be based upon was the verification of match marking, which was performed under paragraph 3.2.1. Should the submit report paragraph be changed to reference 3.2.1 vice 3.2.2?
a. The Government clarifies that Para. 3.2.2 should reference the requirements of
3.2.1. Revised work item 245-12-004 will be provided in a future errata to the work specification package.
59. Work Item: 331-80-001: In the location of work, there are two identical locations listed. Locations 1.2.9 and 1.2.11 are both listed as Fan Room (2-189-2-Q). Is one of them supposed to be a different fan room or does one of them need to be deleted?
a. The Government clarifies that the correct space number for 1.2.11 should be 2- 189-1-Q. Revised work item 331-80-001 will be provided in a future errata to the work specification package.
60. Work Item: 533-11-003: The Tech Manual listed in Ref. 2.2 was not provided on the CD received. Please provide this reference soonest.
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at robert.c.yates@navy.mil (757-618-5910), please cc: Sheila Utz at
61. Work Item: 536-11-002: The Tech Manual listed in Ref. 2.4 was not provided on the CD received. Please provide this reference soonest.
a. These references are available via the revised CD provided in Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at robert.c.yates@navy.mil (757- 618-5910), please cc: Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at
62. Work Items: 541-11-001 and 541-11-002: Item 541-11-001 shows the valve and actuator as GFM, and 541-11-002 doesn’t show the valve and actuator as GFM. If the Government is providing this material for the 541-11-001, it is recommended that they also provide that same material for the 541-11-002 item.
a. The Government confirms that it will provide the same material for the 541-11- 002 work item as on the 541-11-001 work item. Revised work item 541-11-002 will be provided in a future errata to the work specification package.
63. Work Items: 551-52-001 and 551-52-002: Item 551-52-001 shows the Maintenance
Kit as GFM, and 551-52-001 doesn’t show the Maintenance Kit as GFM. If the Government is providing this material for the 551-52-001, it is recommended that they also provide that same material for the 552-52-002 item.
a. The Government confirms that a Maintenance Kit is required and will be provided as Government Furnished Material (GFM) for both Work Items 551- 52-001 and 551-52-002. Revised work item 551-52-002 will be provided in a future errata to the work specification package. However, it is noted that Work Item 552-52-002 does not exist.
64. Work Items 634-11-002 and 634-11-008: Para 3.1 states to accomplish 009-26 including Attachment C to include Wardroom Passage 01-63-1-L. Then Item 634- 11-008 has this same compartment listed to receive Non-Skid. Recommend deleting item 634-11-008.
a. The Government clarifies that the location identified in Para 1.2.4 in work item 634-11-002 should be deleted. The Government also clarifies that the Non-Skid work identified in work item 634-11-008 shall remain. Revised work item 634- 11-002 will be provided in a future errata to the work specification package.
65. Work Item 123-19-001: Reference 2.4, drawing 633-7318228 Tank Anode Schedule does not list the tanks identified in paragraph 1.2 (7-25-0-W & 7-95-0-W). Please modify the work item to include a reference that shows zinc anode replacement in the Plumbing Waste Water Drain tanks and make that reference available.
a. The Government clarifies that the specification does not need revision. The requested references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at
66. Work Item 110-11-001: 2.3 S9086-VD-STM-010/CH-631, Preservation of Ships in Service – General 2.14 T9074-AS-GIB-o1o/271, Requirements for Nondestructive
Testing Methods. These references were not furnished on the CD provided to the contractor. Will these references be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at
67. Work Item 153-11-001: 2.2 S9583-B4-MMC-010, Rescue Boat Handling and Stowage System; Slewing Davit, Hydraulic Power Unit, Towing Boom, Storage Cradles and Controls. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at
68. Work Item 167-11-001: 2.3 S9582-BL-MMC-010, Port Doors, viewing (15931000) and Shore Services (15931100) This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at
69. Work Item 233-11-001: 2.4 S9532-BN-MMC-010, Heat Exchangers. This reference was not furnished on the CD provided to the contractor. Will this reference be provided? 2.6 532-7319016 Rev E, Diagram Central Fresh Water Cooling System:
The drawing provided is a pen and ink change of Rev “D” with a note that it will be Rev “E” at issue. Has the actual Rev “E” been issued? If it has been issued, will a copy be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD, should contact Robert Yates at
70. Work Item 233-11-002: 2.4 S9233-DL-MMM-030, USS San Antonio, (LPD 17 CLASS) Main Propulsion Diesel Engine, Maintenance Manual. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
71. Work Item: 233-11-005: 2.5 SEA05Z/006 Rev A, LPD-17 Class, Propulsion Flexible
Coupling In-Service Alignment Inspection Procedure. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-618-5910), please cc: Sheila Utz at
Additionally, the offeror may locate TP SEA05Z-006 Rev A in NMD.
72. Work Item: 233-11-007: 2.5 SL460-AA-HBK-010, Handbook for Inspection, Packing, Handling, Storage, and Transportation. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
73. Work Item: 233-11-015: 2.3 551-7320837 Rev G, Miscellaneous Small Bore Piping Arrangement for Onboard Installation. A copy of Rev “E” (not Rev “G” as in the specs) was furnished on the CD provided to the contractor. Will a copy of Rev “G” be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
74. Reserved.
75. Work Item 241-90-001: 2.3 S9510-AT-MMA-010, Dehumidifier, Desiccant, Model GC-150. This reference was not on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
76. Work Item: 244-11-002: 2.2 S9244-BD-MMC-010, Installation, Operation, and Maintenance for Propulsion Line Shaft Bearing, 2.3 S6420-AC-HBK-010, Handbook Bearing Measurement of Load. These references were not on the CD provided to the contractor. Will these references be made available?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
77. Work Item 245-11-001: 2.2 S9245-BH-MMC-010, Controllable Pitch Propeller.
This reference was not on the CD provided to the contractor. Will this reference be made available?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
78. Work Item 245-11-002: 2.5 S9245-AR-TSM-010/CH-245, Marine Propeller Inspection, Repair and Certification. This reference was not on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
79. Reserved.
80. Work Item: 259-11-002: 2.2 259-7320098 Rev D, MMR2 Combustion Air & Exhaust System Arrangement & L/M, 2.3 259-7320104 Rev D, MMR2 Combustion
Air & Exhaust System Details & L/M. The titles for these drawings are swapped with one another as compared with the titles on the actual drawings. For clarity, will the spec item be revised?
a. The Government clarifies that the titles for the drawings are incorrectly reversed. Revised work item 259-11-002 will be provided in a future errata to the work specification package.
81. Work Item 261-31-001: 2.2 S9260-AC-MMA-010, Purifier Assembly Model USPX 413 SGD-15CN-60. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
82. Work Item 264-31-001: 2.2 S9261-A5-MMA-010, Technical Manual for Lube Oil
Purifier Assembly, Model USPX 204SGT-11CN-60. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
copy of the revised CD should contact Robert Yates at
83. Work Item: 311-20-001: 2.2 S9512-BJ-MMC-010, Damper, Main Propulsion Diesel Engine Models MRVC-5185-34 Inch and MRVC-5185-18 Inch Installation, Operation and Maintenance. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
copy of the revised CD should contact Robert Yates at
84. Work Item: 311-20-001: 2.2 S9512-BJ-MMC-010, Damper, Main Propulsion Diesel Engine Models MRVC-5185-34 Inch and MRVC-5185-18 Inch Installation, Operation and Maintenance. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided in Q&A #2 and
Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757- 618-5910), please cc: Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at
85. Work Item 311-21-002: 2.2 S9311-D1-MMC-060, 3608 Engine RENR2287 Disassembly and Assembly LPD 17 Class, 2.4 S9311-D1-MMC-020, 3608 Marine Auxiliary Engine SEBP3787, Parts Manual, 2.6 S9311-DV-MMC-010, Turbocharger, Type VTC 254P-16, Operation Manual. These references were not furnished on the CD provided to the contractor. Will these references be provided?
copy of the revised CD should contact Robert Yates at
86. Work Item 311-21-003: 2.3 S9311-D1-HBK-010, Ship Service Diesel Generator Set
Caterpillar Diesel Engine, Model Cat 3608, Standardized Maintenance Procedures Handbook for LPD 17 Class, 2.5 S9311-D1-MMC-070, 3608 Engine RENR2281 Specifications LPD 17 Class, 2.6 S9311-D1-MMC-040, 3608 Engine Model RENR2282 System Operation,Testing and Adjusting. These references were not furnished on the CD provided to the contractor. Will these references be provided?
copy of the revised CD should contact Robert Yates at
87. Work Item 311-21-010: 2.3 S9311-DW-MMC-010, Operation and Maintenance
Manual for Centax CX-250-TFF1 Coupling, Model CX-250-TFF1-50-00-1070, 2.4 S9311-DQ-MMC-010, 3608 Marine Auxiliary Engine, SEBP3787, Parts Manual.
These references were not furnished on the CD provided to the contractor. Will these references be provided?
copy of the revised CD should contact Robert Yates at
88. Work Item 311-24-005: 2.4 S9311-DS-MMC-010, 3608 Engine Model RENR2282
Systems Operation, Testing, and Adjusting. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
89. Work Item: 422-11-001: 2.4 S9422-AU-MMC-010, Navigation and Signaling Light
System. This reference was not furnished on the CD provided to the contractor.
Will this reference be provided?
copy of the revised CD, interested offerors should contact Robert Yates at
90. Work Item 436-80-002: 2.2 301-8533907 Rev A, ShipAlt LPD17-83386D Misc
Mod to Arr 2.3 320-8533908 Rev A, SHIPALT LPD17-83386D, Lan Receptacle Sys Mod to 60Hz Pwr, 2.4 436-8533909 Rev A, ShipAlt LPD17-83386D, Misc Mod to Ckt FD, Mod to Blk & Elem Wrg Diag
The original revisions of these drawings were furnished on the CD provided to the contractor. Will the Rev “A” version of these references be provided, or will the spec be revised to indicate the original version received?
a. The work specification does not need revision. These references are also available via the revised CD provided under Q&A #2 and Amendment 0002.
Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at robert.c.yates@navy.mil (757-618-5910), please cc: Sheila Utz at Sheila.Utz1@navy.mil and Lisa Carll at
91. Work Item 453-48-001: 2.2 SE213-UE-IEM-020/SPS-48E(V) Rev 3, Radar Set AN/SPS-48E(V) This reference was not furnished on the CD provided to the contractor.
Will this reference be provided?
copy of the revised CD, interested offerors should contact Robert Yates at
92. Work Item 453-48-002: 2.13 SE213-UF-PRO-010, AN/SPS-48 Antenna Pre- Removal Requirements, 2.15 SE213-UJ-PRO-010, AN/SPS-48(V) Shipboard Dockside Antenna Removal/Installation Procedure, 2.16 SW225-CR-CSA-010, Combat System Alignment Manual (CSAM) for LPD 17 Class, 2.17 S9LPD-AS- SIB-010, Ship Information Book for USS San Antonio (LPD 17) Hull and Hull Mechanical Systems. These references were not furnished on the CD provided to the contractor. Will these references be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
93. Work Item 512-11-002: 2.5 S9512-CY-MMC-010, Operation and Maintenance for Fans, Variable Pitch Vanexial, Model: A170A, 2.6 S9512-C9-MMC-010, Operation and Maintenance Manual for Vanexial Fan, Navy Standard (Standard Pressure), Various Models A1-A4, A7, A10-A12, A16, A20 and A30 for LPD-17, 2.7 S9512- C8-MMC-010, Maintenance Manual for Centrifugal Fan, Model Numbers CC3A4W6 and CC4A4W6 Operation and Maintenance. These references were not furnished on the CD provided to the contractor. Will these references be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
94. Work Item 516-11-001: Ref 2.2 is S9516-BS-MMC-010, Ship Service Refrigeration Plant 4.6 Tons, Type 134-A, for LPD. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
95. Work Item 520-11-001: Ref 2.11 is S9505-AG-MMM-010, Rigid Rod Valve Remote Control System. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
96. Work Item 521-21-001: Ref 2.8 is TM-3446, SUPSHIP Portsmouth Test Memo for
Fire and Circulating Centrifugal Pump, Operational Test. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at
97. Work Item 521-21-006: Ref 2.3 is S9555-DR-MMC-010, LPD 17 Class Ship's Systems Manual For Water Mist Fire Fighting System. This reference was not furnished on the CD provided to the contractor. Will this reference be provided?
a. These references are available via the revised CD provided under Q&A #2 and Amendment 0002. Interested offerors who have not already received a copy of the revised CD should contact Robert Yates at