Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1) RFP Section C, Section 3, Schedule, is revised. Accordingly, the PoP on the CLINs are revised in RFP Section F.
2) RFP Section J, Attachment J-1, Specification Package, and J-2, Work Item Plans, Drawings, and Other References, are revised as outlined in Errata 1.
4) RFP Section J, Attachment J-4, Pricing Workbook, is revised. CLIN 0017 description is updated accordingly.
5) RFP Section L is revised to extend the due date for receipt of proposals. Accordingly, block 9 of the SF-33 is also revised to reflect the due date extension.
Naval Sea Systems Command
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376
See Item 6
N00024-16-R-4402
1 21
03/28/2016
03/04/2016
N00024‐16‐R‐4402 Amendment 0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
A. Amendment 0001
1) Section A is amended. Block 9 of the SF‐33 is amended from 3:00 PM, local time Washington DC on 08 April 2016 to 3:00PM, local time Washington DC on 20 April 2016.
2) Section B, CLIN 0017 description is amended.
3) RFP Section C, subsection 3, Schedule, is revised from 29 Sep 2017 to 16 June 2017 (changes shown below in red). Accordingly, the PoP on the CLINs are revised in RFP Section F.
4) RFP Section J, Attachment J‐1, Specification Package, and J‐2, Work Item Plans, Drawings, and
Other References, are revised as outlined in Errata 1.
5) RFP Section J, Attachment J‐4, Pricing Workbook, is revised as outlined in the "notes" tab of
Attachment J‐4. CLIN 0017 description is updated accordingly (changes shown below in red).
6) RFP Section L is revised to extend the due date for receipt of proposals from 08 April 2016 to 20
April 2016 (changes shown below in red).
The following changes are made to the solicitation. Note, due to system error, a conformed copy of the
RFP is not able to be produced.
B. Section B:
1) CLIN 0017 description is changed from:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
SQQ‐89A(V)15 Work Item
FFP
1 Lot
OPTION Work Item: 980‐04‐001
The Contractor shall prepare for and accomplish repair and alterations during the Extended Selected Restricted Availability (ESRA) onboard USS RAMAGE (DDG
61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package Attachment J‐1 drawings, test procedures, and other detailed data as included in Attachments J‐1 and J‐2.
See Notes A, B, & C.
FOB: Destination
To:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
SQQ‐89A(V)15 Work Item
FFP
1 Lot
OPTION Work Item: 980‐11‐006
The Contractor shall prepare for and accomplish repair and alterations during the Extended Selected Restricted Availability (ESRA) onboard USS RAMAGE (DDG
61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package Attachment J‐1 drawings, test procedures, and other detailed data as included in Attachments J‐1 and J‐2.
See Notes A, B, & C.
C. Section C:
SCOPE OF WORK
1. GENERAL REQUIREMENTS
1.1 The Contractor under the direction of the Regional Maintenance Center (RMC) and as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repair and alteration of the Fiscal Year (FY) 16 USS RAMAGE Extended Selected Restricted Availability (ESRA) in accordance with the requirements stated in this Section, the Work Item Specifications and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract. Category I NAVSEA FY16 Standard Items through CHG_2 identified under Attachment J‐1 are applicable to all items without further reference. Category II NAVSEA FY16 Standard Items through CHG_2 are applicable when invoked and/or referenced in individual work items specified in Attachment J‐1.
NAVSEA Standard items may be found at:
http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx
1.2 The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for receipt, storage and installation of Government Furnished Material as identified in work item specifications, and for accomplishment of production work.
1.3 The Contractor shall provide an integrated milestone plan for the availability. These milestones will include a schedule of key events necessary to meet the contract delivery dates. A critical path analysis and a milestone schedule shall be used to measure schedule accomplishment of the functions and elements required to successfully complete the repair and alteration of FY16 USS RAMAGE ESRA within the availability dates herein.
1.4 INTEGRATED PRODUCTION SCHEDULE REVIEW MEETINGS ‐ The Contractor shall formally present its Integrated Production Schedule to the Navy Supervisory Authority at the Work Package Execution Review (WPER), Start Availability, 25% Complete conference, 50% Complete conference and 75% complete conference. The Integrated Production Schedule shall include Alteration Installation Team (AIT), Government‐Contracted Third Party Maintenance Providers, Ship's Force, Commercial Industrial Services (CIS), and Fleet Maintenance Activity (FMA) work to the maximum extent this information is available. At each meeting, the contractor shall present and explain, at minimum, the following information:
1.4.1 The Contractor's most recent, Government approved, Integrated Production
Schedule created in full compliance with Standard Item 009‐60.
1.4.2 The Contractor's current progress in preparing for and/or executing the Availability in accordance with its Integrated Production Schedule. The Contractor shall provide an explanation and mitigation plan for any preparation or execution delays in comparison to its Integrated Production Schedule.
1.4.2.1 The contractor's plan shall describe opportunities for schedule acceleration and potential risks and mitigations to remaining schedule attainment.
1.5 Wherever the term “Job Order” is used in this solicitation/award, it also means
“Contract.”
1.6 The Contractor shall report and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. As found conditions, needed repairs and corrective action reports will be submitted to the Government in the form of a Condition Found Report (CFR). The Contractor's conditions found reporting shall be in accordance with that set forth in Standard Item 009‐01.
1.7 The Navy may send a site inspection team to perform an inspection of the contractor's facility prior to arrival of the vessel
1.8 GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of Government Furnished Material with the Project Manager.
Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator. GFM will be listed in paragraph 5 of the Work Item(s).
1.9 QUALITY ASSURANCE
1.9.1 QUALITY ASSURANCE PROGRAM ‐ The Contractor shall provide and maintain a quality assurance program acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. The Contractor's quality assurance program shall be in accordance with that set forth in Standard Item 009‐04. In addition to its rights under Clause 252.217‐7005, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality assurance program and, as such, the Contractor shall not be entitled to progress payments for said work and material.
1.9.2 Quality Assurance Surveillance Plan (QASP) ‐ The Contractor shall meet the performance/acceptable quality level requirements for each deliverable/assessment area in the QASP, Attachment J‐5. There will be monetary deducts based on unfavorable contractor performance as stated in the QASP. There is no maximum dollar limit to the deducts which can be assessed against the Contractor for failing to meet the performance/acceptable quality level requirements.
1.10 REQUEST FOR CONTRACT CHANGES (RCC) TIMELINE ‐ The contractor shall provide all
Change Order Price Analysis (COPA) proposals in response to Request for Contract Changes (RCC) within three business days. If circumstances arise where the contractor is unable to submit a COPA within three business days, the contractor shall notify the Government in writing of the specific circumstances and provide a date in which a COPA will be submitted. The contractor’s timeliness in submitting COPAs in response to RCCs will be evaluated in CPARS and utilized for past performance ratings on future proposal evaluations. Notification of late submission of COPA does not exempt the contractor from meeting the three business day requirement, but will be considered by the Government when conducting a CPARS evaluation.
1.11 AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER – No order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
1.12 NAVY MAINTENANCE DATABASE (NMDr): The Contractor shall use NMDr for the submission of Condition Found Reports throughout the administration of this contract.
1.13 ORGANIZATION CHART AND EMPLOYEE ROSTER:
1.13.1 ORGANIZATION CHART ‐ Within 30 days of contract award, submit a chart detailing each management, technical, engineering and production position from the highest company level to the lowest supervisory level. Include descriptions of each position describing the duties, responsibilities, authority and names of the individuals filling the positions. The organizational chart must represent the facility that will perform the work.
1.13.2 EMPLOYEE ROSTER: After receipt of award and prior to starting work aboard the vessel, the contractor must submit a list of employees who will work aboard ship to the Commanding Officer of the ship via the NSA Security Office. The list should be on company letterhead, include each employee's name and security clearance when required, and bear the signature of a company official.
2. LOCATION: Government facilities are not available for this requirement. All work shall be completed at the contractor’s facilities.
3. SCHEDULE: USS RAMAGE must be delivered, mission‐ready, no later than 16 June 2017.
3.1: MILESTONES: In addition to the contract completion date of 16 June 2017, the Government has established execution dates for the following milestones:
EVENT A + DAY DATE WEEKDAY REMARKS
Enter Shipyard *** *** *** ***
25% CONFERENCE *** *** *** ***
50% CONFERENCE *** *** *** ***
Turnover 1 to AIT ‐ Sys Res Support Spaces *** *** *** ***
Turnover 2 to AIT ‐ CS Spaces *** *** *** ***
VCHT *** *** *** ***
FIREMAIN/AFFF/HALON *** *** *** ***
SEA WATER SERVICE *** *** *** ***
Turnover 3 to AIT ‐ CS Spaces *** *** *** ***
POTABLE WATER *** *** *** ***
LP/HP AIR *** *** *** ***
EVENT A + DAY DATE WEEKDAY REMARKS
VENT SYSTEM *** *** *** ***
CHILL WATER/AIR CONDITIONING PLANTS *** *** *** ***
400HZ AVAILABLE *** *** *** ***
75% CONFERENCE *** *** *** ***
Turnover 4 to AIT ‐ CS Spaces *** *** *** ***
Start testing of 77052 temp ac Fwd aft IC *** *** *** ***
Turnover 5 to AIT ‐ CS Spaces *** *** *** ***
AEGIS LIGHT OFF *** *** *** ***
HABTURNOVER / MOVE ABOARD COMMENCE *** *** *** ***
FUEL SHIP *** *** *** ***
PCD *** *** *** ***
SHIP LOA PREP *** *** *** ***
LOA *** *** *** ***
DOCK TRIALS *** *** *** ***
FAST CRUISE *** *** *** ***
HM&E SEA TRIALS *** *** *** ***
Transit to NAVSTA *** *** *** ***
SEA TRIALS *** *** *** ***
SEA TRIALS *** *** *** ***
END OF AVAIL *** *** *** ***
3.1.1 ***Offerors (Prime Contractors) shall contact the Procuring Contracting Officer, Elyssa Parana at elyssa.parana@navy.mil and the Contract Specialist, Steve Galer at steven.galer@navy.mil to receive the established dates, included as Attachment J‐3. These milestones will not be distributed publicly on FBO.
3.1.2 If any milestone event is not accomplished by the date provided, and the failure to accomplish any such milestone event does not arise from a cause beyond the control and without fault or negligence of the Contractor, such failure may be deemed to constitute a failure to perform this contract in accordance with its terms within the meaning of subparagraph (a)(1)(ii) of the clause of this contract entitled "DEFAULT” (DFARS 252.217‐7009).
3.2. DELAYS / DISRUPTIONS: The contractor shall coordinate the work effort with the Naval Support Activity (NSA) Project Manager on a daily basis to prevent changing situations from causing delays and disruptions. Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight hours or less.
These disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under this contract. If, during contract performance, delays greater than those indicated above are encountered, the Contractor shall immediately verbally notify the Project Manager and Contracting Officer, followed by a written statement within 24 hours after occurrence of delay, stating time of impact, reason for delay, duration of impact, number of people affected, action taken to properly schedule the work, action taken to minimize impact, and the names of the Government person(s) contacted.
3.3 ‐ SCHEDULE AND ASSOCIATED REPORTS: The proposed scheduling of work, resources, key events and milestones submitted by the Contractor in accordance with Standard Item 009‐60 during the course of contract performance shall not be materially different from the Schedule and Associated Reports provided in the Contractor’s technical proposal Factor 3 – USS RAMAGE FY16 ESRA Execution Approach.
3.4 MILESTONES FOR CERTAIN REPORTS: The contractor shall complete the necessary work associated with the following reports and submit to the Government the required reports in the necessary format and containing the required information as specified in the Work Item no later than A+59:
Work Item Description Report
Paragraph Number
Report Type
110‐11‐001 Engine Room Number Two; Vertical Stringer Structural repair 3.2 and 3.3
Visual/Ultrasonic
110‐11‐003 Engine Room Number One, Shell Stringer; replace 3.2 and 3.3
Visual/Ultrasonic
120‐11‐001 Engine Room Number One, Shell Stringer; replace 3.1 Visual
120‐11‐002 Fan Room Structural Repair; accomplish 3.1 Visual
120‐11‐004 Fan Room Structural Repair; accomplish 3.1 Visual
120‐11‐005 Generator Room Structure; inspect, report and preserv 3.3 and 3.4
Visual/Ultrasonic
123‐11‐001 Compensated Fuel Oil Tank; repair and preserve 3.1 Visual
123‐11‐003 Fuel Receiving Tank Group 2; repair 3.1 and 3.2
Visual/Ultrasonic
123‐17‐001 Gas Turbine Waste Drain Collecting Tank; repair 3.1 Visual
251‐32‐001 Propulsion Gas Turbine (GTRB) Intake Plenum; repair 3.3 Visual
259‐11‐003 Gas Turbine (GTRB) Exhaust Duct Collector; repair 3.3 Visual
259‐11‐004 Uptake; repair and preserve 3.2 Visual
262‐10‐001 Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect 3.1 Visual
3.5 Milestone Definitions. The following milestones shall be considered achieved (certified) if all work associated with each of the key events as identified in the Key Event Readiness List
(ERL) are complete. All incomplete ERL line items must be accepted and certified by the
SUPERVISOR
1. For Milestone 1 ‐ (spaces: IC & Gyro Room #1 (FWD), IC & Gyro Room #2 (AFT), Power Supply/Conversion Room, Power Conversion Room and Sonar Cooling Equipment Room) Milestone 1 is considered achieved if all heavy industrial work in the spaces associated with this milestone is complete. Heavy industrial work is hot work, cutting, grinding, deck work (PRC, Terrazzo, NOMEX), and spray painting and any other industrial type of work that would either limit compartment access or limit the availability of services in the compartment.
Access routes need not be released but must be passable or alternate routes made available at all times. For Auxiliary Room NR1, Milestone 1 is considered achieved if all work is complete which would prevent the uninterrupted operation of and access to sea water service system, NR 1 Ship's Service Switchboard, NR1 AC plant and associated chilled water system, C&D Cooling Skid and SPY Cooling Skid.
2. For Milestone Turnovers 2, 3, 4 and 5 ‐ The milestone is considered achieved if all heavy industrial work in the spaces associated with each milestone is complete. Heavy industrial work is hot work, cutting, grinding, deck work (PRC, Terrazzo, NOMEX), and spray painting and any other industrial type of work that would either limit compartment access or limit the availability of services in the compartment. Access routes need not be released but must be passable or alternate routes made available at all times.
3. Production Completion Date (PDC)
a) All Prime contractor related production work, as described in the Work
Items listed below, must be complete (and satisfactorily tested with required OQE submitted certified and accepted by the SUPERVISOR (in accordance with NSSAINST 5400.1), in the main propulsion machinery spaces, steering gear rooms, shaft alleys, pump rooms, auxiliary machinery rooms; government designated fuel tanks. The term complete is defined to mean the accomplishment of contractor responsible work that makes it possible to light off the boilers, gas turbine engines, ship service diesel and/or/ steam generators, propulsion steam turbines, and/or propulsion diesel engines. The Prime Contractor shall certify by signature and serialized letter to the ACO that all work specification requirements (production, checkpoints, inspections, testing reports, WAFs) associated with the Key Event milestone have been satisfactorily completed. The availability Event Readiness List (ERL) shall be used to associate work specifications and testing to the specific PCD Key Event.
b) PCD Work Items:
110‐11‐001 Engine Room Number Two; Vertical Stringer Structural repair
110‐11‐003 Engine Room Number One, Shell Stringer; replace
113‐11‐005 Engine Room Number Two; Bilge Structural repair
120‐11‐005 Generator Room Structure; inspect, report and preserve
123‐11‐001 Compensated Fuel Oil Tank; repair and preserve
123‐11‐002 Fuel Oil Service Tank; repair and preserve
123‐15‐001 Lube Oil Tank Bolted Plate Manhole Cover
123‐15‐002 Lube Oil Storage Tank; repair
123‐17‐001 Gas Turbine Waste Drain Collecting Tank
150‐11‐001 Flight Deck Bulkhead; repair
150‐11‐003 Decks and Bulkheads, Levels 01 through 05; repair
167‐11‐001 Bolted Equipment Removal Plate (BERP) Repair; accomplish
167‐80‐001 SHIPALT DDG51‐79662D 1A and 1B Gas Turbine Module (GTM) Access Manhole Relocation Partial; accomplish
185‐11‐001 Reverse Osmosis Desalinator Foundation; inspect and preserve
185‐11‐003 Reverse Osmosis Desalinator and Low Pressure Air Dehydrator Foundation and Deck Area
234‐13‐001 Main Propulsion Gas Turbine Module (GTM) Vibration Damping Tile; replace
234‐14‐001 Main Propulsion Gas Turbine Module (GTM) Vibration Damping Tile; replace
245‐11‐001 Controllable Pitch Propeller (CPP) Oil Sump Tank Heater; inspect and clean
245‐11‐002 Controllable Pitch Propeller (CPP) Standby Hydraulic Pump Mechanical Seal; replace
245‐12‐001 Controllable Pitch Propeller (CPP) Oil Sump Tank Heater; inspect and clean
251‐31‐001 Intake; repair
251‐31‐002 Intake; repair
251‐31‐003 Intake; repair
256‐60‐001 Sea Water Service Valve; replace
259‐11‐001 Gas Turbine (GTRB) Exhaust Duct Collector; repair
259‐11‐002 Boundary Layer Infrared Suppression System (BLISS) Cap; inspect and preserve
259‐11‐003 Uptake; repair and preserve
259‐11‐004 Uptake; repair and preserve
259‐11‐005 SSGTG Exhaust Duct Insulation; replace
262‐10‐001 Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect
262‐11‐001 Flexible Hose Assembly; replace
262‐11‐002 Flexible Hose Assembly and Hanger; replace
262‐21‐001 Lube Oil Settling Tank Heater; inspect and clean
262‐21‐002 Lube Oil Settling Tank Heater; inspect and clean
262‐22‐001 Lube Oil Settling Tank Heater; inspect and clean
262‐22‐002 Lube Oil Settling Tank Heater; inspect and clean
262‐80‐001 SHIPALT DDG51‐76501D, Main Reduction Gear Lube Oil Flexible Hoses; accomplish
264‐90‐001 ShipAlt DDG‐51‐85973K, Lube Oil Purifier Heat Exchanger Modifications; accomplish
311‐32‐001 Gas Turbine Generator Exhaust Shroud; replace
505‐11‐001 Silicon Aluminum Bronze (SAB) Union Fittings; replace
541‐11‐001 Fuel Oil Stripping Piping; replace
551‐12‐001 Bleed Air Regulating Valve; replace
551‐80‐001 ShipAlt DDG51‐73738D, Installation of Additional Bulkhead Cutout Valves (partial); accomplish
631‐11‐001 Underwater Log Trunk; repair and preserve
633‐11‐001 Zinc Anode; replace
4. SAFETY:
4.1 SAFETY INSPECTOR / FIRE MARSHALL: In addition to the safety standards provided in the specifications, the contractor is responsible for providing an experienced Safety Inspector/Fire Marshall who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the Contracting Office’s Safety Representative. This Inspector or Fire Marshall shall not be one of the Contractor's supervisors or superintendents normally assigned to the ship and shall be identified in the contractor’s approved Safety Plan.
4.2 PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or dry docks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:
(a) Protective hard hats that meet the following specifications:
(1) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1‐1986, "American National Standard for Personnel Protection‐Protective Headwear for Industrial Workers‐Requirements," or shall be demonstrated to be equally effective.
(2) Protective helmets purchased before July 5, 1995 shall comply with ANSI Standard "American National Standard Safety requirements for Industrial Head Protection," Z89.1‐1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR
1910.135 Head Protection]
(b) Approved type Plano or prescription glasses meeting the following specifications:
(1) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard Z87.1‐1989, "American National Standard Practice for Occupational and Educational Eye and Face Protection", or shall be demonstrated by the employer to be equally effective.
(2) Protective eye and face devices purchased before July 5, 1994 shall comply with ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1‐ 1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF 1910.133 Protective eye and face devices.]
(c) Safety toe shoes, with built‐in protective toe box that meet the following specifications:
(1) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard Z41‐1991, "American National Standard for Personal Protection‐Protective Footwear", or shall be demonstrated by the employer to be equally effective.
(2) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]
4.3 BLACK OXIDE COATED THREADED FASTENERS (BOCTFs): Due to safety concerns, use of BOCTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.
5. OTHER REQUIREMENTS
5.1 USE/POSSESSION OF PERSONAL ELECTRONIC DEVICES (PED'S) ‐ The possession and use of portable electronic devices (PED's) within the confines of any naval vessel, or in the contractor's facility where equipment removed from the vessel is being worked, is strictly controlled. Cellular phones with digital imaging capabilities are strictly prohibited. PED's may not be connected to any Navy‐owned or controlled network. PED's may not be used to store or process any digital information associated with the conduct of the contract without written authorization from the Naval Supervising Activity (NSA). PED's include:
mobile computing devices such as personal digital assistants (PDA's);
hand‐held or laptop computers;
mobile telephone devices such as data‐enabled cellular telephones;
two‐way pagers, including those with e‐mail capability;
analog and digital sound recorders; and digital cameras, including cellular phones with digital imaging capabilities.
5.2 NON SMOKING POLICY ‐ For bidding purposes, contractors are advised that in light of the Navy's policy regarding smoke‐free facilities, the entire vessel, topside and below decks, is to be considered a "No Smoking Area" unless otherwise indicated by shipboard policy.
5.3. CITIZENSHIP REQUIREMENTS ‐ The contractor shall comply with the Department of Defense Industrial Security Manual (DoD 5220.22), and any revisions to that manual as of the Bid Opening Date prescribed, for verification of all U. S. Citizens. Prospective offerors shall refer all questions pertaining to the above to SWRMC, Security Manager.
D. Section F:
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 16‐JUN‐2017 1 N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 16‐JUN‐2017 1 N/A
0005 16‐JUN‐2017 1 N/A
0006 16‐JUN‐2017 1 N/A
0007 16‐JUN‐2017 1 N/A
0008 16‐JUN‐2017 1 N/A
0009 16‐JUN‐2017 1 N/A
0010 16‐JUN‐2017 1 N/A
0011 16‐JUN‐2017 1 N/A
0012 16‐JUN‐2017 1 N/A
0013 16‐JUN‐2017 1 N/A
0014 16‐JUN‐2017 1 N/A
0015 16‐JUN‐2017 1 N/A
0016 16‐JUN‐2017 1 N/A
0017 16‐JUN‐2017 1 N/A
E. Section J:
DOCUMENTS/EXHIBITS/ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:
No. Document
Attachment S‐1 Technical Capabilities Data Sheet Attachment S‐2 Past Performance Questionnaire Attachment S‐3 Pre‐Proposal Information (PPI) Form Attachment S‐4 Past Performance References Attachment S‐5 Eligibility Criteria Data Sheet
The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:
No. Document Attachment J‐1 Specification Package No. TPPC‐DDG60‐SSSD16‐CN01, Errata 1
Amendment 0001 Attachment J‐2 Work Item Plans, Drawings, and Other References, Errata 1 Amendment
Attachment J‐3 Execution Milestones and Key Event Dates
Attachment J‐4 Pricing Workbook, Amendment 0001 Attachment J‐5 Quality Assurance Surveillance Plan Attachment J‐6 Subcontracting Plan (to be incorporated upon award)
Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001‐A003; A005‐A009; A011; A012;
A014 (Does not include A004, A0010, or A0013) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001‐B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001‐C002
F. Section L:
SECTION L
1.0 INTRODUCTION
This solicitation is a Request for Proposals (RFP) that will result in the award of a single Fixed-Price contract for the FY16 Extended Selected Restricted Availability (ESRA) for USS RAMAGE (DDG 61). The Government anticipates awarding a single contract through a best value source selection process. The Government expects the best value to result from selection of the technically acceptable proposal with the lowest evaluated price and will thus use the Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2
ALL INQUIRIES shall be made in writing and directed to Elyssa Parana, Contracting Officer, and Steve Galer, Contract Specialist, at elyssa.parana@navy.mil mailto:elyssa.parana@navy.miland steven.galer@navy.mil. To ensure the Government is able to adequately address and respond to offeror requests for information (RFIs) via amendment, it is requested questions be submitted no later than 26 March 2016 at 3:00 pm, local time, Washington DC. The Navy reserves the right to not answer any requests received after this date and time.
Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of requests received after this date and time. RFIs should reference a solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.
Estimated Award Date: The Government anticipates making a single award on or around 14 July 2016. Offerors must provide a period of 120 calendar days from the proposal due date for Government acceptance of the offer (Complete block 12 of the Standard Form (SF) 33).
2.0 INSTRUCTIONS FOR THE SUBMISSION OF OFFERS
Proposal Due Date: All copies of proposals (Volumes I & II) shall be received by the Government at the address below no later than 20 April 2016 at 3:00 pm, local time, Washington DC. Electronic submittal of proposals will not be accepted. Late proposals WILL NOT be considered. Partial proposals or attachments submitted late WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.
Proposal Submission:
Proposals shall be sent to:
NAVAL SEA SYSTEMS COMMAND HQ
ATTN: SEA 02441G STEVEN GALER, CONTRACT SPECIALIST
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD, D.C. 20376-2030
Offerors shall mark all submittals “DO NOT OPEN PACKAGE IN MAIL ROOM—FORWARD UNOPENED DIRECTLY TO SEA 02444”. The outside of the package shall clearly indicate the Offeror’s name, the solicitation number and the contents of the package.
Offerors shall submit:
Volume Title Number of
Paper Originals Number of
Paper Copies Number of CDs
I Price Proposal 1 1 2 II Technical Proposal 1 4 4
Note 1: The CDs must be scanned to ensure that the files contained on them do not contain any computer viruses.
The CDs shall be labeled to indicate the Offeror’s name, the solicitation number and the associated volume numbers.
Note 2: The files on the CD shall be in a format that is compatible with and capable of being opened in Microsoft Office Suite 2007 or Adobe Acrobat. The material presented in electronic format shall be identical to the paper copy of the proposal. In cases where the hard copy and the electronic copy of the proposal conflict, the hard copy shall take precedence. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected. If files are compressed, the necessary decompression program must be included.
Note 3: Originals may be shipped in the same boxes as the copies to eliminate excess shipping costs. However, originals should be separately wrapped inside the container, and clearly labeled “ORIGINAL TECHNICAL PROPOSAL” or “ORIGINAL PRICE PROPOSAL.” The exterior of each box MUST clearly indicate its contents.
3.0 GENERAL INFORMATION
Ship Checks:
The USS RAMAGE (DDG 61) will be available for a ship check prior to the proposal submission due date.
Offerors, including significant subcontractors, may inspect the USS RAMAGE (DDG 61), between 11-17 March 2016 in Bahrain. Please note: These dates are subject to last minute change. To schedule a ship check, offerors shall email a request for shipcheck to Elyssa Parana and Steve Galer at elyssa.parana@navy.mil and steven.galer@navy.mil, respectively. Participants will be subject to security, safety, and other applicable regulations established by Mid-Atlantic Regional Maintenance Center (MARMC) and the Commanding Officer of the USS
RAMAGE (DDG 61).
Specifications and associated reference documentation: The Government will provide, upon request, CD/DVDs including Attachment J-1 Work Items and Work Item References not already in the possession of the offerors, commercially available, listed under 52.211-2, or available through the following websites:
https://jedmics.net/ https://webjed.nnsy.navy.mil/ https://psjed.psns.navy.mil/
Offerors may request a CD/DVD by contacting Steven Galer at steven.galer@navy.mil
Alteration of Solicitation: Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.
Proposal Information: Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, offerors are advised that statements such as: “the offeror understands”, “the offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors are encouraged to provide specific and concise information to validate all assertions.
Amendments: The Government may revise the solicitation at any time by means of an Amendment. It is an offeror’s responsibility to ensure it is accessing the Federal Business Opportunities (FBO) website to view potential amendments and procurement notifications for this solicitation.
Teaming Arrangements: Proposals must be submitted by one (1) prime contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a prime contractor with a unique Commercial and Government Entity code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.
4.0 PROPOSAL FORMAT
To facilitate efficiency and consistency in proposal evaluation the following is mandatory. Proposals which do not follow this direction may be rejected as non-responsive and thus ineligible for award.
Hard Copy Proposals: All pages shall be double-sided on 8.5 x 11 inch paper with a one-inch margin. The text used shall be Times New Roman with a minimum font size of 12-point. Each side of the page will count as one “page”.
Any type contained on graphics pages will not be smaller than 10-point font. Any pages that may be revised as a result of discussions (if required) shall contain revision numbers and date of the proposal revision submission.
Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section
5.0 where required.
Page Limits:
The cover letter is limited to three (3) pages Non-price proposals shall be limited to ten (10) pages for the Technical Capabilities Data Sheet
(Attachment S-1) for Factor 2 – Technical Capabilities There are no other page limitations
5.0 PROPOSAL CONTENT
VOLUME I
Price Proposal: The price proposal shall not contain non-price factor information. The price proposal shall be comprised of the following documentation:
a. Cover Letter,
b. Signed SF 33 with all amendments acknowledged,
c. Small Business Subcontracting plan per FAR Part 19 (large businesses only),
d. Any Joint Venture / teaming agreements (if applicable),
e. Completed Section B carrying forward information from Attachment J-4, and
f. Pricing Workbook Spreadsheet containing Work Item Pricing and Labor & Material Burden Rates ( Attachment J-4)
Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:
Identification of all enclosures included with the proposal, CAGE and Data Universal Numbering System (DUNS) numbers for the Prime contractor, Notice of any alterations to the solicitation, such as “fill-in” blocks and certifications, and Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).
Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more
Standard Form 33 (SF 33): As part of the price proposal package, the offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation.
Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.
Subcontracting Plan: A subcontracting plan is NOT REQUIRED from a small business concern.
Completed Section B and Attachment J-4 : Offerors must propose on all contract line items (CLINs), complete the clause entitled “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)” in Section B, complete the Pricing Workbook Spreadsheet containing Work Item Pricing and Labor & Material Burden Rates (Attachment J-4) to be considered responsive.
The contractor must submit prices for the Pricing Workbook Spreadsheet containing Work Item Pricing and Labor & Material Burden Rates (Attachment J-4) in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between the two, the CLIN price shall govern. The Labor & Material Burden Rates must match the rates provided in the Section B clause entitled “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)”. If there is a discrepancy between the two, the Section B clause rates shall govern.
For Attachment J-4, offerors are to insert pricing in all yellow shaded fields.
The RFP specified 83,188 labor hours and $1,305,253 included for material in the Labor & Material Burden Rate worksheet contained in Attachment J-4 are for evaluation purposes only. The proposed labor and material burden rates included in Attachment J-4 and inserted in Section B, Note A paragraph (7) shall be the fixed rates used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are negotiated and procured.
An Interport Differential shall be proposed for offerors that do not plan to perform the proposed work at the USS RAMAGE (DDG 61) homeport in Norfolk, VA. If applicable, include the value for the inter-port differential as follows:
Location* Differential Bath, ME $953,225
Charleston, SC $ 1,304,559
Mayport, FL $ 951,601
Pascagoula, MS $ 1,492,651
*Offeror’s whose location is not listed in the above inter-port differential table shall submit a bidder’s question requesting an inter-port differential be calculated for the location of the offeror’s proposed place of performance for the USS RAMAGE (DDG 61) FY16 ESRA.
009-72 Supporting Price Information: As part of the Price proposal package, the offeror shall submit other than cost and pricing information sufficient for the Contracting Office to validate the offerors price associated with completing the requirements of 009-72. This other than cost and pricing data shall include both a narrative description, including the basis of all labor and, material estimates and a quantitative and traceable price estimate by cost element to complete these requirements.
VOLUME II
Non-Price Proposal: The non-price proposal shall be comprised of four factors, Factor 1 – Eligibility Factor, Factor 2 – Technical Capabilities, Factor 3 - Past Performance, and Factor 4 – Resource Capacity as follows:
Factor 1 – Eligibility Factor: Offerors must provide the following to demonstrate eligibility:
Eligibility Criteria Data Sheet (Attachment S-5) with the top portion filled out A letter signed by the Principal identifying and confirming ownership or committed access (in the form of a letter signed by the subcontractor identifying and confirming committed access) to a pier capable of berthing the DDG-61
Co-signed Master Ship Repair Agreement or proof of MSRA Equivalency to demonstrate capability
MSRA Equivalency (Applicable to Non-MSRA holders only): Offerors that do not hold an MSRA must submit MSRA equivalency documentation to demonstrate sufficient organization and facilities capabilities. (Specific documentation requirements provided upon inspection request).
To be eligible for award, a prospective contractor must possess a MSRA as described in DFARS 217.71 Master Agreement for Repair and Alteration of Vessels (MARAV) or demonstrate organization and facilities equivalent to that reflected in a MSRA. Offerors meeting this eligibility requirement with documents and evidence outside of a MSRA must contact the PCO to schedule an on-site inspection. All requests for MSRA equivalency inspections must be received by 1300, local time, Washington DC on 26 March 2016. Requests shall be sent to Elyssa Parana and Steven Galer at elyssa.parana@navy.mil & steven.galer@navy.mil. Failure to request an inspection by the designated time may result in a negative determination of offeror eligibility. All inspections will be completed by a representative from Commander, Navy Regional Maintenance Center (CNRMC). All offerors requesting equivalency inspections will receive a copy of the final inspection report prior to the date of contract award. The on-site inspection will supplement documentation provided with the offeror’s proposal.
The Government reserves the right to conduct a pre-award survey or to require other evidence of technical, production, managerial, financial, and similar abilities to perform prior to the award of any proposed contracts;
regardless of whether the offeror has an existing MSRA. There is no page limit associated with this documentation.
Factor 2 - Technical Capabilities: Offerors shall complete the Technical Capabilities Data Sheet (Attachment S-1), provided with this solicitation for a previous availability or equivalent project. Offerors may not exceed a total of ten (10) pages between the data sheet and the narrative.
The Contractor shall provide this documentation for contracts/projects demonstrating relevant experience as a Prime contractor. The Government is looking for experience in executing projects of same or similar type and complexity of work as required by this solicitation. For purposes of this solicitation, the Government considers an offeror’s Technical Capability relating to the following types of projects/contracts to be relevant:
a. Performance as a prime contractor of a ship repair availability similar in complexity and magnitude as the proposed USS RAMAGE (DDG 61) availability, including approximately six (6) months production duration and 75,000 man-days in magnitude, using the same or similar personnel, processes and equipment the offeror is proposing to use to meet the solicitation requirements, to be relevant.
OR
b. Performance as a prime contractor of the construction of a ship of similar size and complexity and composition as a DDG 51 class ship or a comparable naval vessel of similar type and complexity using the same or similar personnel, processes, and equipment the offeror is proposing to use to meet the solicitation requirements.
The offeror’s proposed contract/project must demonstrate the following Technical Capabilities:
Demonstrate experience providing engineering and design support capabilities with sufficient capability to diagnose and evaluate technical problems and issues, and to make competent technical recommendations
Demonstrate experience providing an established management organization geared toward completing highly complex ship repair requirements, with clear lines of authority, delegation of responsibility, and mid-level managerial positions
Demonstrate experience in completing, controlling, integrating, scheduling, estimating and progressing complex ship repair requirements
Demonstrate experience purchasing, monitoring, receiving, inspecting, segregating, issuing, determining nonconformance, and disposing of material
Demonstrate experience managing subcontractors successfully, including successfully selecting, scheduling, managing, monitoring, and controlling of subcontractors
The project shall have been completed or be substantially complete within the past three (3) years. The project provided must be considered relevant based on its own features rather than demonstrating relevant experience as a combination of projects. Offerors are advised that the Technical Capability Factor is "prime contractor" specific.
Newly formed joint ventures may propose projects by the separate members of the joint venture as prime contractors. An offeror may not use the Technical Capabilities of an affiliated "prime contractor" to meet the Technical Capability Factor requirements.
Factor 3 – Past Performance: The Government requires relevant performance information on all Offerors based on the past and present efforts provided by the Offeror and data independently obtained from other government and commercial sources. The Government will evaluate the Offeror’s past performance as a prime contractor. In the investigation of an Offeror’s past performance, the Government reserves the right to contact former customers and Government agencies and other private and public sources of information.
Offerors with recent and relevant past performance shall submit information concerning contracts which offerors consider relevant in demonstrating their ability to perform…