S-2_Past_Performance_Questionnaire.docx

DOCX document 22 KB Posted

Attached to
USS RAMAGE (DDG 61) Extended Selected Restricted Availability (ESRA) Federal contract opportunity
Solicitation number
N00024-16-R-4402
Issued by
Department of the Navy Naval Sea Systems Command

About this file

S-2 Past Performance Questionnaire

View the file

Other files for this federal contract opportunity

Other files attached to USS RAMAGE (DDG 61) Extended Selected Restricted Availability (ESRA), newest first.
File Type Posted
J-4_Pricing_Workbook_(Ramage)_Amendment_0009.xlsx XLSX spreadsheet
N00024-16-R-4402_(USS_RAMAGE_DDG_61)_Amendment_0009.pdf PDF
N00024-16-R-4402_Conformed_Amendment_0009.docx DOCX document
Amendment_0005.pdf PDF
N00024-16-R-4402_Conformed_Amendment_0004.docx DOCX document
RAMAGE-4402_QA_3_Final_4.14.pdf PDF
Amendment_0004_(4.12).pdf PDF
1)_N00024-16-R-4402-0003.pdf PDF
2)_RAMAGE-4402_QA__2___4.4.16.pdf PDF
1)_Amendment_0002.pdf PDF
1)_J-4_Pricing_Workbook_(Ramage)_Amendment_0002.xlsx XLSX spreadsheet
4)_RAMAGE-4402_QA_1_28_March_Final.pdf PDF
2)_CDRLS_A.pdf PDF
1)_N00024 _8208 16 _8208 R _8208 4402_Amendment_0001_3.28.16.pdf PDF
3)_J A_41 218_Redacted.pdf PDF
2)_CDRLS_B C.pdf PDF
1)_J-4_Pricing_Workbook_(Ramage)_Amendment_0001.xlsx XLSX spreadsheet
J-4_Pricing_Workbook_(Ramage)_3.7.xlsx XLSX spreadsheet
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
S-3_PPI_Form.docx DOCX document
N00024-16-R-4402_Released_3.7.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
J-5_QASP_3.7.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-16-R-4402 USS RAMAGE (DDG 61) FY16 ESRA

PAST PERFORMANCE QUESTIONNAIRE

Instructions to Offeror

Completed questionnaires shall be forwarded directly to the Naval Sea Systems Command point of contact listed in this letter.

NOTE: ONCE COMPLETED BY THE POC, QUESTIONNAIRES MUST BE DIRECTLY TRANSMITTED TO THE GOVERNMENT AS DESCRIBED ON THE FOLLOWING PAGE. COMPLETED QUESTIONNAIRES RECEIVED FROM OFFERORS ARE NOT ACCEPTABLE.

Instructions to Evaluator

The Naval Sea Systems Command is requesting an evaluation of an Offeror’s past performance for source selection purposes. Accordingly, request your candid assessment of the Offeror’s past performance; please see Section A below for the identity of the Offeror and contract of interest.

Once completed, this questionnaire and any appended information becomes Source Selection Sensitive and must be protected from disclosure. Access to this information shall be limited to Government procurement officials.

Please forward the completed questionnaire no later than 08 April 2016 to elyssa.parana@navy.mil and to steven.galer@navy.mil.

Hand-written evaluations are acceptable. Please answer each question in SECTION B by circling one of the ratings: E V S M U N/A, where:

EExceptional; VVery Good; S-Satisfactory;

MMarginal; UUnsatisfactory; N/ANot Applicable

Exceptional - Contractor performance substantially exceeded expected levels of performance.

Very Good - Contractor performance exceeded expected levels.

Satisfactory – Performance met expected levels.

Marginal - Performance was less than expected.

Unsatisfactory - Performance was significantly less than expected.

In addition, please provide supporting comments for each rating. Please use your supporting comments to highlight the Offeror’s specific strengths and weaknesses. You may use additional sheets if required. Your ratings and comments should reflect only “contractor liable” performance. You may supplement your knowledge with the knowledge and judgment of others in your organization.

Please enter the requested information in SECTION C for the person primarily responsible for completing the questionnaire, then transmit the completed questionnaire to the point of contact identified above. Thank you for your assistance in this matter.

PLEASE DO NOT PROVIDE COMPLETED QUESTIONNAIRES TO THE OFFEROR

SECTION A (To Be Completed by the Offeror)

1. Name of Offeror/Contractor: __________________________________________________

Address of Offeror/Contractor: ________________________________________________

2A. Contract Number (between Prime and Sub):_______________________________________

Task or Order No., where applicable: ___________________________________________

2B. Contract Number (between Government and Prime):________________________________

Task or Order No., where applicable: ___________________________________________

3A. Period of Performance: ______________________________________________________

3B. Place of Performance: _______________________________________________________

4. Description of Work/Scope of Effort (max. 50 words): _____________________________

5.POCName:
Address:
Tel. No.:
Voice:
Facsimile:

6. Method and Date Questionnaire Sent to POC:

Date: ____________________
Method: _______________________________

SECTION B (To Be Completed by Evaluator)

E Exceptional; V-Very Good; S-Satisfactory;

M Marginal; U Unsatisfactory; N/A Not Applicable

1. Overall Contract Outcome: E V S M U N/A Ability to satisfactorily complete all tasks while conforming to customer requirements, standards of good workmanship and safe practices.

Comments: _____________________________________________________________________

2. Cost Performance: E V S M U N/A Ability to accurately forecast and control costs throughout all phases of the contract.

Comments: _____________________________________________________________________

3. Schedule Performance: E V S M U N/A Ability to develop accurate work schedules and adhere to those schedules, as well as the ability to adapt to changes in requirements and work schedules.

Comments: _____________________________________________________________________

4. Technical Performance (Quality of Product): E V S M U N/A Ability to overcome technical challenges by applying sound engineering principles, complete required engineering analyses and develop adequate technical reports and plans.

Comments: _____________________________________________________________________

4. Subcontracting Plan Adherence and Coordination: E V S M U N/A If a subcontracting plan was required please describe the offerors success in meeting planned goals and/or efforts made to overcome goal deficiencies and challenges as well as the offeror’s ability to successfully manage and integrate subcontractors.

Comments: _____________________________________________________________________

SECTION C (To Be Completed by Evaluator)

1. Name of Evaluator: _____________________________________________________________

2. Position Title: _________________________________________________________

3. Administrating Authority/Agency: _________________________________________________

4. Telephone Number:Voice __________________
Facsimile _______________

5. Signature: ______________________________Date: ____________

Please transmit completed questionnaire to elyssa.parana@navy.mil and to steven.galer@navy.mil.

Attachment S-2

File details come from the government source that posted it. Updated .