Sheet1
| WORK ITEM / CHANGES | CLIN(s) | WORK SPECIFICATION | TITLE | SHORT DESCRIPTION | HULL 1 | HULL 2 | HULL 3 |
| AWI 0001 | 0003 - 0004 | 602-11-002 | DECKHOUSE AND HANGAR ELECTRICAL SYSTEM LABEL PLATES | Replaces all electrical system label plates in the HII deckhouse. | X | X | X |
| AWI 0002 | 0003 - 0004 | 593-21-401 | OILY WASTE REMOVAL AND DISPOSAL | Remove and dispose of Ship's oily waste. Accomplish off-loading and storage of the Ship's distillate fuel upon arrival at Contractors facility. Accomplish an analysis of fuel samples. Remove and dispose of contaminated seawater from the fuel oil compensating tanks. When directed by the SWRMC Safety and Environmental Representative or the PMS 500 Representative, on- load stored supply of distillate fuel oil that was off-loaded. | X | X | X |
| AWI 0003 | 0003 - 0004 | 997-11-001 | DRYDOCKING AND UNDOCKING | Provide a drydock facility which is certified by NAVSEA for docking DDG-1000 Class Ships. Certify to the PMS 500 PSA Representative at the time of each docking evolution that the material condition of the dock is safe and detail any restrictions to dock operations. 3.3. The Contractor shall provide a docking/undocking procedure to the PMS 500 PSA Representative one week prior to drydocking. | X | X | X |
| AWI 0004 | 0003 - 0004 | 863-71-402 | TEMPORARY BERTHING, MESSING AND BARGE SERVICES; PROVIDE | Provide movement of Personnel Barracks Barge to Contractor's facility and return to Government facility when directed to do so. Point of Contact for barge movements will be the PMS 500 Representative. | X | X | X |
| AWI 0005 | 0003 - 0004 | 863-51-401 | PROVIDE MARINE PILOT AND TUGBOAT SERVICES | Provide a licensed Marine Pilot, unlimited tonnage, for movement of Ship to and from the fairway of the Contractor's facility. Provide adequate Tug service for movement of Ship to and from pierside. | X | X | X |
| AWI 0016 | 0001 - 0002 | 863-71-401 | SUPPLY OFFICE AND CLASSROOM SPACE FOR SHIP'S FORCE AND PDA SUPPORT GROUPS | Provide 6,000 square feet of office space for use by the Ship's Force and Post Delivery support teams from start of availability through completion of availability. | X | X | X |
| AWI 0017 | 0001 - 0002 | 863-51-402 | PROVIDE TEMPORARY SERVICES | Provide two gangways, one forward and one aft. Install safety nets under gangways and platforms. Provide and maintain a watch hut, equipped with lights, adjacent to each gangway location used for normal access. Provide potable water. Provide fire main, flushing and cooling water. Provide electric power. | X | X | X |
| AWI 0022 | 0001 - 0002 | 813-11-401 | PROVIDE MILESTONE/KEY EVENTS/PRODUCTION SCHEDULES / STATUS REPORTS | Submit a schedule start date for each Work Item, Systems Activation Schedule, Compartment Completion, and acceptance of all spaces and areas in which Combat Systems testing will occur. | X | X | X |
| AWI 0023 | 0001 - 0002 | 813-11-402 | ATTEND/HOST DAILY COMBAT SYSTEMS/HM&E AND MATERIAL LOGISTICS PROGRAM MEETINGS | Daily progress meeting schedule. The Contractor shall attend three daily progress meetings commencing with arrival of the Ship at the Contractor's facility through the completion of availability. | X | X | X |
| AWI 0024 | 0001 - 0002 | 813-11-403 | ATTEND/HOST PROGRAM REVIEW CONFERENCE(S) AND PRT READINESS PANEL | Attend meetings and conferences as required to include but not limited to progress reviews, critical path meetings and pre-sea trial misssion readiness panels. | X | X | X |
| AWI 0025 | 0001 - 0002 | 993-21-401 | RIGGING, CRANE AND TRANSPORTATION SERVICES; PROVIDE | Provide crane services with crane operator, rigging, forklift and transportation services. | X | X | X |
| AWI 0026 | 0001 - 0002 | 864-31-401 | PROVIDE WAREHOUSE STORAGE, MATERIAL LOGISTICAL SUPPORT | Provide sevices for crating of Government Furnished Material to be shipped out to the contractor's facility. 3.2. Provide the services for transportation of freight. Provide a person to walk-through Government Material requisitions. | X | X | X |
| AWI 0027 | 0003 - 0004 | 863-51-403 | PROVIDE SUPPLEMENTAL REEFER AND DRY PROVISIONS STOWAGE | Provide climate controlled storage box for dry storage goods, refrigerated storage box for chilled goods and freezer box for frozen goods. | X | X | X |
| AWI 0028 | 0003 - 0004 | 868-41-401 | PROVIDE SUPPORT FOR DOCK TRIAL/FAST CRUISE/SEA TRIAL | Provide servies for acomplishing the correction of Dock Trial, Fast Cruise and Sea Trial Discrepancies. | X | X | X |
| AWI 0032 | 0003 - 0004 | 863-51-404 | PROVIDE CONEX BOX STOWAGE | Provide CONEX boxes or equivalent lockable warehouse space for Ship's Force general equipment and supplies stowage in the vicinity of the ship. | X | X | X |
| AWI 0033 | 0003 - 0004 | 863-51-405 | PROVIDE STOWAGE FACILITY FOR FLAMMABLE AND CORROSIVE MATERIAL | Provide storage facility for paint, flammable and corrosive materials to meet local codes. | X | X | X |
| AWI 0035 | 0003 - 0004 | 602-11-401 | LABEL PLATE MANUFACTURE | Provide services to manufacture and install label plates, signs, etc as directed. | X | X | X |
| AWI 0038 | 0003 - 0004 | 980-31-401 | AIT INDUSTRIAL SUPPORT; PROVIDE | Provide services for Alteration Installation Team (AIT) Industrial Support. | X | X | X |
| AWI 0051 | 0003 - 0004 | 865-51-401 | ACCOMPLISH VARIOUS LAGGING/INSULATION REPAIR | Provide services to repair or replace bulkhead insulation and pipe lagging. | X | X | X |
| AWI 0052 | 0003 - 0004 | 593-21-402 | PROVIDE REMOVAL/DISPOSAL OF HAZARDOUS WASTE MATERIAL | Provide services to remove, handle, store, transport and dispose of all hazardous waste. | X | X | X |
| AWI 0055 | 0003 - 0004 | 864-11-401 | ASSIST SHIP'S FORCE | Provide services to assist Ship's Force with Industrial Support. | X | X | X |
| AWI 0066 | 0003 - 0004 | 868-61-401 | PERFORM INCLINING EXPERIMENT | Provide a Ship Superintendent and industrial support to assist Government Representatives in accomplishing an inclining experiment. | X | X | X |
| AWI 0075 | 0003 - 0004 | 405-11-401 | PROVIDE A STANDARD SHIP ANTENNA CONFIGURATION PHOTOGRAPH SET | Photograph ship's antenna system. Photographs shall include clear views of all antennas and contain the following eight views. | X | X | X |
| AWI 0080 | 0001 - 0002 | 897-11-401 | ADMINISTRATION AND SUPPORT SERVICES | Provide program and production management to support accomplishment of authorized work. | X | X | X |
| AWI 0081 | 0003 - 0004 | 864-11-402 | 2-KILO CORRECTIONS | Provide services for accomplishing Stand Alone 2 Kilo Industrial Support. | X | X | X |
| AWI 0082 | 0003 - 0004 | 868-11-401 | FINAL CONTRACT TRIAL (FCT) CARD CORRECTIONS | Provide services for accomplishing the correction of Stand Alone Final Contract Trial (FCT) Cards. | X | X | X |
| AWI 0083 | 0003 - 0004 | 868-11-402 | ACCEPTANCE TRIAL CARD CORRECTIONS | Provide services for accomplishing the correction of Stand Alone Acceptance Trial (AT) Cards. | X | X | X |
| AWI 0084 | 0003 - 0004 | 868-11-403 | BUILDERS TRIAL CARD CORRECTIONS | Provide services for accomplishing the correction of Stand Alone Builder's Trial (BT) Cards. | X | X | X |
| AWI 0088 | 0003 - 0004 | 868-31-401 | SUPPORT TRIAL REHEARSALS | Provide services for accomplishing the correction of Trial Rehearsal Discrepancies. | X | X | X |
| AWI 1002 | 0003 - 0004 | TBD | TEMP RADAR REMOVAL | Provide services to remove temporary RADAR | X | X | X |
| AWI 1003 | 0003 - 0004 | TBD | RAISE AIR ESCAPE LINE TB-001 IN BERTHING AREA | The pipe is routed across the width of the bunk through the middle of the bunk’s length and has 16” of clearance. Need to re-route piping. | X | X | X |
| AWI 1006 | 0003 - 0004 | TBD | MTG1 LUBE OIL COOLER DRAIN PIPING | Add proper drain lines for both oil tanks. | X | X | X |
| PC 0725 | 0003 - 0004 | TBD | AGS ELECTRICAL POWER SHUTDOWN UPON SPRINKLER ACTIVATION | Implement functionality to remove Electrical power from Magazine within 10 seconds of sprinkler activation (excluding lights, and sprinkler system). | X | X | X |
| PC 0728 | 0003 - 0004 | TBD | AVIATION ORDNANCE STOWAGE | This change moves ordnance handling equipment and CAD stowage out of the Aviation Ordnance Magazine and into the Aviation Weapons Assembly Room. | X | X | X |
| PC 0895 | 0003 - 0004 | TBD | INCORPORATE NEW DESIGN REQUIREMENTS FROM JTD NVR 303-00016 (LVPD CKT BKR TRIP CHANGE) | Change to Circuit Breaker Trip Settings for Low Voltage Power Distribution System to limit trip to 150% of downstream cable rating. | X | X | X |
| PC 0944 | 0003 - 0004 | TBD | MODIFY 500 TON AC PLANT MOTOR TERMINAL BOX TO ELIMINATE 90-DEGREE BEND IN SHIP'S (2) 440 VAC POWER CABLES | Modify the sheet metal motor terminal box to bring the ship's cables into the motor on the same side as the control panel, perpendicular to motor shaft, and in-line with the motor terminal "spark-plugs". The motor terminal box is constructed of sheet metal that is installed with small fasteners and the nylon motor terminal box stuffing tubes are reusable. | X | X | X |
| PC 0974 | 0003 - 0004 | 522-20-001 | ADDITION OF OP-4 DELUGE SPRINKLING | Contractor shall install piping and sprinklers in AGS Hoist Rooms from the Magazine Sprinkling System | X | X | X |
| PC 0996 | 0003 - 0004 | 441-11-010 | POR ANTENNAS (C4I CONFIGURATION ALTERNATIVE - STRUCTURAL/MECHANICAL) | Contractor shall install equipment plus all antennas on the Mast, the two 07 Level TCDL Domes the 07 Level Pole Antenna VHF SINCGARS (AS-4366A/URC) and the 07 Level Pole Antenna UHF LOS QMCS (AS-2810C/SRC). | X | X | X |
| PC 0998 | 0003 - 0004 | 441-11-001 | POR ANTENNAS (C4I CONFIGURATION ALTERNATIVE - ELECTRICAL) | Contractor shall install electrical equipment and cable for equipment installed in PC 0996. | X | X | X |
| PC 0999 | 0003 - 0004 | TBD | REVISE HVSG AFD (ARC FLASH DETECTION) SOLUTION | This PC deletes the requirement for the obsolete John Hopkins University Arc Fault Detection (AFD) system from the HVSG Switchboards. HVSG Arc Fault Detection will be provided by spare capacity in the IFTP Load Center Controllers. This PC will also lift SWO 19 which stopped procurement, design and installation of the replacement Arc. Fault Detection System that was to be installed into the 4 High Voltage SG Switchboards. | X | X | X |
| PC 1002 | 0003 - 0004 | TBD | REINSTATE DARK SHIP REQUIREMENTS | This PC will provide a manual dark ship capability by adding curtains as follows: |
Add to the following doors:
- Strl Dr 02-84-2, Pressure Lock 02-84-2-L going to Bridge
- Strl Dr 02-84-3, Pressure Lock 02-84-3-L going to Bridge
- Strl Dr 1-33-2, Passage 1-34-0-L going to Mooring 1-20-0-Q (Mooring Sta. 3 through 6)
- Strl Dr 2-155-2, Air Lock 2-153-2-L going to Boat Bay
- Hatch 1-79-1, Replenishment Passage going to Mooring Sta #7
- Strl Dr 2-81-6, Pressure Lock 2-82-2-L going to Mooring Sta #8
| - Strl Dr 1-109-1, Replenishment Passage going to Mooring Sta #9 & FAS. | X | X | X | |||||
| PC 1006 | 0003 - 0004 | TBD | MK 46 CIGS REPLACEMENT | Accomplish the installation of the MK 46 Mod 2 Gun Weapon System and including equipments. | X | X | X | |
| PC 1007 | 0003 - 0004 | TBD | NIXIE - AN/SLQ-25D TO AN/SLQ-25C | Install the Nixie System from AN/SLQ-25C variant. | X | X | X | |
| PC 1013 | 0003 - 0004 | 513-11-001 | AIM (PM) BEARING FALLING PRESSURE CIRCUIT IS NOT FAIL SAFE | This change will issue an ICN to the HVSSS vendor (GE) to revise the PM Bearing Falling Pressure alarm circuit logic, wire connections to PM Bearing Falling Pressure switches and ACP internal wiring to Falling Pressure relay contacts to provide an alarm indication in the event of a component failure in the falling pressure alarm circuit. | X | X | X | |
| PC 1023 | 0003 - 0004 | 457-11-001 | MFTA - REINSTATE THE MULTIFUNCTION TOWED ARRAY SYSTEM | Reinstate the Multifunction Towed Array System (MFTA) in compartment 2-169-1-Q for DDG1000AF. | X | X | X | |
| PC 1026 | 0003 - 0004 | TBD | BIW- PASSIVE ELECTRONIC WARFARE SYSTEM UPDATES (SEWIP) | Install Electronic Warfare System components providing DDG-1000 with passive Electronic Warfare capability. | X | X | X | |
| PC 1027 | 0003 - 0004 | 403-11-001 | BIW- MAN OVERBOARD INDICATOR (MOBI) INSTALLATION | This PC will provide the mounting attachments necessary to support the load out of Handheld Direction Finder and mounting bracket. Locations for mounting brackets are in the port and starboard Bridge Alcoves, in the vicinity of the port and starboard Hangar personnel doors to the Flight Deck, and to the port and starboard walkways in the Boat Bay. Note that the actual BriarTek Handheld Direction Finder and BriarTek Mounting Bracket are AEL items and will subject to load out. | X | X | X | |
| PC 1028 | 0003 - 0004 | 441-64-006 | CPES BREAKOUT BOX VFI RELEASE | This PC implements a solution to CPES DCWS Consoles currently in MMR1, MMR3, DCTL STA 1, 2 and the AFT STEERING CONSOLE in the SSMC, five locations total, which require this new CPES Breakout Box to accomplish telephony voice communications by providing PTT headset/microphone capability. The Breakout Box shall be provided as GFE. A single cable assembly between the Box and J15 on the local CPES Mini ODM and a Ground Strap shall be provided as CFE. The Breakout Box is designed to be bulkhead mounted or Desk Frame mounted within a 10 foot maximum cable run length from the Mini ODM. The PTT Switch on the Breakout Box must be within arm's reach of the 95% Male to 5% Female console operator. | X | X | X | |
| PC 1029 | 0003 - 0004 | 593-11-001 | SOLID WASTE PROCESSING EQUIPMENT | Installs Solid Waste Processing System components : |
- Small Pulper
- Metal Glass Shredder
- Plastic Shredder
- CMU (Plastic Waste Processor)
- Auxiliary Unit
| - Heat Sealer | X | X | X | |||||
| PC 1030 | 0003 - 0004 | 491-11-001 | INSTALLATION OF CBR DETECTORS | Installs Chemical, Biological, Radiological (CBR) System. | X | X | X | |
| PC 1033 | 0003 - 0004 | 711-11-001 | INSTALL OF ADVANCED GUN SYSTEM (AGS) INTRASHIP REARMAMENT | This PC reconstitutes the installation of the AIRS equipment. | X | X | X | |
| PC 1034 | 0003 - 0004 | 141-11-001 | REMOVABLE PLATFORM TO PERFORM FORWARD CEWE MAINTENANCE | Installs a removable platform across the ladder opening in order to perform installation and maintenance of the electronics within the CEWE. | X | X | X | |
| PC 1035 | 0003 - 0004 | 633-11-001 | TACTICAL TOMAHAWK WEAPONS CONTROL SYSTEM (TTWCS) | This PC implements the TTWCS functionality on DDG-1000 class. | X | X | X | |
| PC 1036 | 0003 - 0004 | 448-11-080 | INSTALLATION OF X/KA ANTENNA | This proposed change provides the authority to re-constitute the X/KA System; including the antenna all associated services (VENT/Electrical). | X | X | X | |
| PC 1042 | 0003 - 0004 | 492-11-001 | REINSTATE MULTI-FUNCTION DISPLAY (MFD) INSTALLATION | This change will installs the Multi Function Display System consisting of; Main Display Panel Schedule A 588-013, Reference Data Panel 588-031, Maintenance Control Panel 588-032, and Wave-off Status Panel 588-033. | X | X | X | |
| PC 1043 | 0003 - 0004 | 492-11-002 | REINSTATE ADVANCED FLIGHT DECK LIGHTS (AFDL) INSTALLATION | This change will installs the the Advanced Flight Deck Lighting System. | X | X | X | |
| PC 1044 | 0003 - 0004 | 634-11-002 | REINSTATE FINAL INTERIOR AND EXTERIOR DECK COVERINGS | This PC will installs the intended final deck coverings. | X | X | X | |
| PC 1048 | 0003 - 0004 | 172-11-002 | DDG 1000 CLASS MAST UPDATE | The 07 level mast design that resulted from PC00996 did not include the ability to raise and fly the ensign and commissioning pennant from the mast. This PC is to add an aft-sloping upper section to the PC00996 mast, raise the TACAN antenna and lightning rod to the top of the new section, re-locate other 07 level antennas as required, and add the ability to raise and lower the ensign from inside the deckhouse. The new mast must be assessed and re-designed if necessary in order to insure it meets all requirements. | X | X | X | |
| PC 1049 | 0003 - 0004 | 439-21-001 | FLIGHT DECK CAMERA AND POWER SUPPLY VFI UPDATE | This PC implements the new Flight Deck Camera & Power Supply | X | X | X | |
| PC 1051 | 0003 - 0004 | TBD | ADD TWO AGS POWER DISCONNECT SWITCHES | This PC modifies that direction to add the below two disconnect switch into class design and production. |
- MT-61 - Reconnect load to power panel 4-51-2 located in Forward Gyro Room and install disconnect switch adjacent to the power panel 2-60-2 in Crew Training Room to secure the 115 VAC for MT-61 REC.
| - MT 62 - Install disconnect switch in the MT-62 Fan Room, 2-62-0-Q to secure the 650 VDC for MT-62 REC. | X | X | X | |||||
| PC 1054 | 0003 - 0004 | TBD | HELO CONTROL STATION (HCS) REMOTE COMMON ELECTRONICS MODULE (CEM) | This PC identifies a solution for places where the Common Electronics Module (CEM) is located too far away from the Common Display System (CDS) console such that normal copper cabling fails to be a viable solution. | X | X | X | |
| PC 1074 | 0003 - 0004 | TBD | TRIALS DATA ACQUISITION & ANALYSIS SYSTEM (TDAAS) | A Trials Data Acquisition and Analysis System (TDAAS) will be installed to acquire data for Post Delivery Test and Trials (PDT&T). The system will consist of a standard rack with computers and network equipment in DATA EME 2B, connected to six Node boxes distributed around the ship. The nodes serve to consolidate signals from various smaller enclosures serving sensors and ship systems. The work will include fabrication and mounting of foundations, cableways and any MCTs required for the GFE nodes and signal enclosures, acquisition and routing of required cabling, limited piping modifications and cable termination as defined in the technical data package (TDP). | X | X | X | |
| PC 1080 | 0003 - 0004 | TBD | PSW-TO-ASW CROSS CONNECT FOR ASW PUMP BACKFLUSH | Modifies the ASW pump discharge pulsation dampener connections and adding permanent cross-connections from PSW to ASW. | X | X | X | |
| PC 1082 | 0003 - 0004 | TBD | ANTI-TERRORISM FORCE PROTECTION (AFTP) SMALL ARMS STOWAGE AND NON-LETHAL RESPONSE | This PC adds the below small arms and associated equipment to satisfy the Small Arms Allowance per CNSL/CNSP message: Small Arms Allowance Guidance for CNSP_CNSL Ship 182130ZNOV14. |
Qty (8) M240B Machine Guns w/spare barrels Qty (2) Mk 99 Gun Mounts Qty (6) Mk 97 Gun Mounts
| In addition, this PC adds Qty (2) Long Range Acoustic Devices (LRAD) and configures the CIGS magazine to be used as.50 cal ammo stowage Ready Service Locker for the Aft Topside Gun Mounts. | X | X | X | |||||
| RCIA 2073 | 0003 - 0004 | TBD | PCM4 SOFT START LOCKOUT/TAG-OUT | Adds two NQB-A50 disconnect switches downstream of each HV SWBD and within visual sight of each PCM4 to allow for lockout/tag-out of the 450VAC soft start voltage and the 120VAC control power feed and to minimize hardware retrofit/rework. These two disconnect switches would be enclosed in a single power panel. The power panel will be appropriately marked to indicate that it is fed from two different sources of power. The 120VAC vital power feed will be isolated by removing a 10A fuse on the front of the HV SWBD. | X | X | X | |
| RCIA 2408 | 0003 - 0004 | 320-11-001 | EMI PPROTECTION FOR COPPER CABLES SERVICING THE MK-57 VLS LAUNCHERS | Accoomplishes the installation of EMP conduit on existing cables. Accomplishes the installation of EMP conduit, modification of existing cable trays, additional T-Bar hangers and studs. | X | X | X | |
| RCIA 2450 | 0003 - 0004 | TBD | MAIN ROTOR BLADE STOWAGE IN HANGAR | Installs stowage for spare helo main rotor blades in the hangar. | X | X | X | |
| RCIA 2457 | 0003 - 0004 | 624-11-001 | REPLENISHMENT PATH HINGED DOORS MANUAL OPERATION | Accomplishes the replacement of quantity (3) Replenishment Path Hinged Door Panel assemblies. | X | X | X | |
| RCIA 2471 | 0003 - 0004 | TBD | MAFO DOOR FIRE RATING | Modifies MAFO door necessary to comply with the N-0 division rating. | X | X | X | |
| RCIA 2673 | 0003 - 0004 | 304-11-003 | HV CABLE ENHANCED PHYSICAL PROTECTION LOCATIONS | Accomplishes the enhanced physical protection of high voltage cables, with EMI shielding. Accomplishes the installation of enhanced physical protection on impacted cables and cable bundles. | X | X | X | |
| RCIA 2759 | 0003 - 0004 | TBD | FAN ROOM 05-92-0-Q LIGHTING | Add compartment lighting to the space. Originally this was an intake space rather than a fan room and therefore did not require lighting. | X | X | X | |
| RCIA 2766 | 0003 - 0004 | 555-21-001 | BOAT BAY, FLT DECK & HANGAR AFFF ACTIVATION STATION LOCATIONS | Accomplishes the relocation of existing AFFF actuation station. | X | X | X |