RFP N00024-16-R-2321
Government Responses to Bidder's Questions
Question Number:
Question Source:
(RFP, attachment #, GFI title, etc.)
Page number and paragraph header from source: Question: Government Response Updated Government Response
1 Section B, Note C Page 6 of 164, Note C
Solicitation Instruction: The rates, by Government Fiscal Year (GFY), for each direct labor category and the indirect rates provided in Exhibits L0005 and L0006 of Attachment J-8 Cost Exhibits of the Contractor’s proposal shall be the maximum GFY rates allowed under any order placed under this contract.
Question: Based upon potential out-year workload fluctuations and the Navy's new "Contracting Strategy", proposing maximum GFY direct labor and indirect rates through GFY 2021 represents a significant financial risk to prospective bidders. Is this solicitation language focused on Delivery Order cost estimating/negotiations or incurred cost limitations? Request the Navy revise this maximum GFY rate guidance to eliminate the direct labor rates and out-year indirect rates from the Maximum GFY rate scenario. This GFY direct labor rate and indirect rate "MAXIMUM" language is considered unreasonable given the workload uncertainty and labor cost/expense issues associated with the out-years. Please advise soonest.
The inclusion of Note C, maximum rates, provides an appropriate means for the Government to competitively award to a single source now and facilitates reduced administrative effort to place orders under the IDIQ in the future. This maximum rate cap applies to cost estimating for negotiations, and does not limit incurred costs on cost reimbursable orders. On CPAF orders, all allowable and allocable costs are reimbursable. For FFP orders, the successful contractor will be limited to the total price agreed upon, including profit which will be appropriately negotiated commensurate to the scope and risk associated with each future order.
The inclusion of Note C, maximum rates, provides an appropriate means for the Government to competitively award to a single source now and facilitates reduced administrative effort to place orders under the IDIQ in the future.
This maximum rate cap applies to cost estimating for negotiations, and does not limit incurred costs on cost reimbursable orders. On CPAF orders, all allowable and allocable costs are reimbursable. For FFP orders, the successful contractor will be limited to the total rate agreed upon. Profit will be appropriately negotiated commensurate to the scope and risk associated with each future order.
2 Section C pg 30.Sec C. Item 0001.para h; pg 31.Item 0001 .Sec C.para q.sub para 2.iii; pg
32. Sec C.Item 0002 and 0003.para a
Request a copy of the DDG 1000 Class Design Build Process Specification (DBPS)
The DBPS is not being provided with the RFP; portions of the DBPS will be provided to the successful contractor as needed after award. All information required to evaluate the 4E specs for proposal purposes are contained within the 4E work specs themselves (J-201)
3 RFP, Section L Page 138, Paragraph A, Physical Format
In the table provided on the subject page, please verify that all items for which the page count is listed as N/A are excluded from the page count.
All items for which the page count is listed as N/A are excluded from the page count.
4 RFP, Section L Page 148, Section IV, Past Performance
The subject paragraph directs offerors to prepare and send out Past Performance Questionnaires (PPQs) provided as Attachment J-13. Due to push back from Government contracting officers/program managers concerning redundant effort, several recent solicitations have specified that PPQs need not be sent out if the availability/contract is already covered by a completed CPARS Report. Will the Government revise the solicitation to include this exception for submitting PPQs?
The RFP is not being amended to include exceptions for submitting PPQs. Please note, however, that as stated on page 148, "offerors will not be evaluated negatively for a lack of past performance questionnaires received in response to this RFP."
5 RFP, Section L Page 138, Paragraph A, Physical Format
The table provided on the subject page refers to a Craft/Trade Staffing Plan in the row for Non-Cost Section IV. The detailed instructions for Non-Cost Proposal Section IV on RFP pages 147 and 148 make no reference to a Craft/Trade Staffing Plan. Is the Craft/Trade Staffing Plan referred to in the table the same as the Manhour and Material Matrix (Attachment J-9) required by the instructions for Non-Cost Section II, Element 2, on RFP page 146? Please clarify.
The Craft/Trade Staffing Plan referred to in the table on page 138 is not the same as the Trade/Craft Hours and Material Exhibit (Attachment J-9) required by the instructions for Non-Cost Section II, Element 2, on RFP page 146. Attachment J-9 is specific to the hours proposed for CLIN 0002 Order 0001 (DDG 1000 Industrial Efforts).
Non-Cost; Section IV: Facilities/Production Capabilities requires Yard-Wide Facility Utilization Data. This data shall be presented in Yard-Wide Man- Power Loading Charts and Yard-Wide Craft/Trade Staffing Plans for the ordering period.
An amendment will be issued to clarify the requirement that yard-wide data shall be presented in man-power loading charts and craft/trade staff plans for the IDIQ ordering period.
The Craft/Trade Staffing Plan referred to in the table on page 138 is not the same as the Trade/Craft Hours and Material Exhibit (Attachment J-9) required by the instructions for Non-Cost Section II, Element 2, on RFP page 146.
Attachment J-9 is specific to the hours proposed for CLIN 0002 Order 0001 (DDG 1000 Industrial Efforts).
Non-Cost; Section IV: Facilities/Production Capabilities requires Yard-Wide Facility Utilization Data. This data shall be presented in Yard-Wide Man-Power Loading Charts and Yard-Wide Craft/Trade Staffing Plans for the ordering period.
Amendment 0001 was issued to clarify the requirement that yard-wide data shall be presented in man-power loading charts and craft/trade staff plans for the IDIQ ordering period.
6 RFP
Section L, Page 140, (B) General Content Requirements (7th paragraph)
The subject paragraph states, "Submission to the Government of the Offeror's proposal, including the entire RFP…… will constitute an offer…….." Question: Is it the intent of this paragraph that the Offeror submit the entire RFP with its proposal, or is the intent of this paragraph to just reiterate that the Offeror's proposal including the RFP will constitute an offer but only sections of the RFP requiring fill-ins and signatures are (as opposed to the entire RFP) are to be submitted with the proposal?
In accordance with page 140 (B) General Content Requirements, paragraph 7, "Submission to the Government of the Offeror's proposal, including the entire RFP [minus Sections L and M] and all of its attachments (completed as necessary) -- will constitute an offer and will indicate the Offeror's unconditional assent to the terms and conditions in this RFP and its attachments."
The intent of this paragraph is to instruct the offeror to submit the entire RFP, minus Sections L and M, with its proposal.
7 RFP Attachment J-101
Attachment J-101 provides 6 work items for various management and support functions to support CLIN 0001. For pricing purposes, please clarify that no individual price breakdown is required for these work items since it appears that the requirements are subsets of the CLIN 0001 SOW in Section C and because, as stated in Section L, Offerors shall propose costs for the Government provided hours for CLIN 0001 Order 0001."
No individual cost breakdown of the work items for CLIN 0001, Order 0001 is required. The requirements are subsets of the CLIN 0001 SOW in Section C and are provided for offerors to propose costs based on the Government-provided total labor hours expected for this order. The labor mix for CLIN 0001 should be determined based on the provided CLIN 0001 statement of work and requirements of CLIN 0001- Order 0001, as provided in Attachments J-100, J-101, and J-102.
An amendment will be issued to edit Attachment J-8, L0004 to remove the cost breakdown by Work Item for CLIN 0001, Order 0001 only.
No individual cost breakdown of the work items for CLIN 0001, Order 0001 is required. The requirements are subsets of the CLIN 0001 SOW in Section C and are provided for offerors to propose costs based on the Government-provided total labor hours expected for this order. The labor mix for CLIN 0001 should be determined based on the provided CLIN 0001 statement of work and requirements of CLIN 0001- Order 0001, as provided in Attachments J-100, J-101, and J-102.
Amendment 0001 issued to edit Attachment J-8, L0004 to remove the cost breakdown by Work Item for CLIN 0001, Order 0001 only.
8 RFP
Section L, , Table L-4, paragraph (d) - Attachment J- 8 Exhibit L-4
The description of Exhibit L-004 states that it is specifically for listing subcontractors utilized for CLINs 0002, Order 0001 and CLIN 0001, Order 0001. Please provide clarification of what data requirements may be needed for subcontractors for the CLINs other than 0001 and 0002, in order for all subcontracts to roll up to the total subcontracts on Exhibit L001
In accordance with "Instructions for Attachment J-8 - Exhibit L0003
– CLIN Cost Element Breakdowns," subcontractor costs must also be included in the Offeror’s (prime contractor) cost exhibit. All Subcontractor costs shall be included in the ‘Subcontractors’ section of L0003. The elements identified as Subcontractor costs must exactly equal the cumulative bottom line totals from Attachment J-8-Exhibit L0003 submitted by the Subcontractor(s).
Data requirements for Subcontracts are included on page 155 - Section III: - Subcontractor Cost Data
Section J-201, WI 171-11-002, Mast/Above Deck structure (ADS Update);
accomplish
Drawing 180- 8634704_Rev_A, MAST
UPDATE STRUCTURAL
FABRICATION DWG
Contractor notes upon review of Reference that Drawing 180- 8634704_Rev_A, MAST UPDATE STRUCTURAL FABRICATION DWG was provided but not invoked by the Specification.
• Sheet 6 and 7, state ATTENTION TCDL Foundation installation is alignment Critical
• Sheet 16, states ATTENTION Mast Collor installation is alignment Critical
Can Contractor be provided a drawing illustrating the Centerline/Elemental Benchmarks?
Drawing BD702004, Centerline/Elemental Benchmarks, will be provided via an amendment to the RFP attachments.
Drawing BD702004, Centerline/Elemental Benchmarks, was provided via Amendment 0002 to the RFP.
Section J-201, WI 171-11-002, Mast/Above Deck structure (ADS Update);
accomplish
Page 2 of 41, Paragraph 3.1, Reference 2.4, Contractor notes, Ref 2.4 drawing 528-8659810_Rev_A, identifies the following listed Items as being provided IAF the only Manufacture part numbers provided are for BIW.
• Item F0003, 2 each, penetration, composite deck drain assembly IAW
NGSS DWG., 4.512” THICK
P/N 13224-871
• Item F0012, 2 each, pad, mounting, steel, for composite decks and bulkheads, IAW DETAIL 124A & 15-4B NGSS STANDARD DWG, 82.9 – 89.2mm thick P/N 17071-637
• Item F0013, 2 each, penetration, for steel and can pipe deck or bulkhead, 1-1/2” NPS P/N 13225-770
• Item F0026, 2 each, penetration, for steel and can pipe deck or bulkhead, 2” NPS P/N 13225-869
Contractor requests clarification as to if this material is being provided as GFM and not IAF?
The following items identified within Ref 2.4 drawing 528- 8659810_Rev_A are IAF:
• Item F0003, 2 each, penetration, composite deck drain assembly
IAW NGSS DWG., 4.512” THICK, P/N 13224-871
• Item F0012, 2 each, pad, mounting, steel, for composite decks and bulkheads, IAW DETAIL 124A & 15-4B NGSS STANDARD DWG,
82.9 – 89.2mm thick, P/N 17071-637
• Item F0013, 2 each, penetration, for steel and can pipe deck or bulkhead, 1-1/2” NPS, P/N 13225-770
• Item F0026, 2 each, penetration, for steel and can pipe deck or bulkhead, 2” NPS, P/N 13225-869 The P/Ns addressed above are catalog numbers listed in column, "PY Use Only". These catalog numbers are inconsequential information within the drawing.
Section J-201, WI 441-11-010, Program of Record (POR) Antennas C4I Configuration Alternative;
accomplish
Page 4 of 7, Paragraph 3.1, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.7, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds, has not been received as of 04/18/2016,
• Ref 2.8, SP002006_Rev_F, Composite Structure Standard Procedures for Mounting Misc Foundations, has not been received as of 04/18/2016,
• Ref 2.10, drawing 304-8294041_Rev_F, Main Wireway Key Plan, has not been received as of 04/18/2016,
• Ref 2.14, 2A447C001_Rev_-, LOS/BLOS HF Systems Cable Integrity Verification, has not been received as of 04/18/2016,
• Ref 2.15, 2A447C002_Rev_A, LOS/BLOS UHF Systems Cable Integrity Verification, has not been received as of 04/18/2016,
• Ref 2.16, 2A448C001D_Rev_-, SATCOM Element Cable Integrity Verification, has not been received as of 04/18/2016, Contractor request the above listed missing references be made available.
The following references will be provided via an amendment to the RFP attachments:
• Ref 2.7, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds
• Ref 2.8, SP002006_Rev_F, Composite Structure Standard Procedures for Mounting Misc Foundations
• Ref 2.10, drawing 304-8294041_Rev_F, Main Wireway Key Plan
• Ref 2.14, 2A447C001_Rev_-, LOS/BLOS HF Systems Cable Integrity Verification
• Ref 2.15, 2A447C002_Rev_A, LOS/BLOS UHF Systems Cable Integrity Verification
• Ref 2.16, 2A448C001D_Rev_-, SATCOM Element Cable Integrity Verification
The following references were provided via Amendment 0002 to the RFP:
• Ref 2.7, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds
• Ref 2.8, SP002006_Rev_F, Composite Structure Standard Procedures for Mounting Misc Foundations
• Ref 2.10, drawing 304-8294041_Rev_F, Main Wireway Key Plan
• Ref 2.14, 2A447C001_Rev_-, LOS/BLOS HF Systems Cable Integrity Verification
• Ref 2.16, 2A448C001D_Rev_-, SATCOM Element Cable Integrity Verification
Ref 2.15, 2A447C002_Rev_A, LOS/BLOS UHF Systems Cable Integrity Verification is provided via Amendment 0003 to the RFP.
Section J-201, WI 448-11-008, Program of Record (POR) Antennas Sponsons and C4I Configuration Alternative;
accomplish
Pages 2 of 48, Paragraph 3.1, Reference 2.2, Contractor notes, Ref 2.2 drawing 100-8697528_rev_A, identifies the following listed 2nd tier drawings for Composite structure side shell & deck.
• Ref 3, Drawing 100-8294272. COMPOSITE STRUCTURE DECK 04 LVL
ZONE 4140
• Ref 7, Drawing 100-8694355, COMPOSITE STRUCTURE PORT
SIDESHELL ASSEMBLY SEQUENCE 03-07 LVL
• Ref 8, Drawing 100-8694356, COMPOSITE STRUCTURE PORT
SIDESHELL ASSEMBLY SEQUENCE 03-07 LVL
Ref 2.4 drawing 555-8697544_Rev_A, identifies the following listed 2nd tier drawing for Composite structure for mounting Piping.
• Ref 5, SP002008, COMPOSITE STRUCTURE STANDARD PROCEDURES
FOR MOUNTING PIPING
Contractor request the Planning yard provide copies of the above listed 2nd tier references.
The following reference will be provided via an amendment to the RFP attachments:
• Ref 5, SP002008, COMPOSITE STRUCTURE STANDARD
PROCEDURES FOR MOUNTING PIPING
• Ref 3, Drawing 100-8294272. COMPOSITE STRUCTURE DECK 04
LVL ZONE 4140
• Ref 7, Drawing 100-8694355, COMPOSITE STRUCTURE PORT
SIDESHELL ASSEMBLY SEQUENCE 03-07 LVL
• Ref 8, Drawing 100-8694356, COMPOSITE STRUCTURE STBD
SIDESHELL ASSEMBLY SEQUENCE 03-07 LVL
The following references were provided via Amendment 0002 to the RFP:
• Ref 5, SP002008, COMPOSITE STRUCTURE STANDARD PROCEDURES FOR
MOUNTING PIPING
• Ref 3, Drawing 100-8294272. COMPOSITE STRUCTURE DECK 04 LVL ZONE
• Ref 7, Drawing 100-8694355, COMPOSITE STRUCTURE PORT SIDESHELL
ASSEMBLY SEQUENCE 03-07 LVL
• Ref 8, Drawing 100-8694356, COMPOSITE STRUCTURE STBD SIDESHELL
ASSEMBLY SEQUENCE 03-07 LVL
Section J-201, WI 448-11-008, Program of Record (POR) Antennas Sponsons and C4I Configuration Alternative;
accomplish
Pages 2 & 3 of 48, Paragraph 3.1, References 2.8, 2.12, 2.13, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.8, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement, has not been received as of 04/18/2016,
• Ref 2.12, drawing 472-8298152_Rev_A, Special Treatments Installation Procedures Manual DDG 1000, has not been received as of 04/18/2016, Contractor request the above listed references and missing pages be made available.
• Ref 2.13, drawing 635-8299256_Rev_A2, Arrangement and Installation Details for Topside Insulation on Hangar and Deckhouse, has not been received as of 04/18/2016, Contractor request the above listed missing references be made available.
The following reference will be provided via an amendment to the RFP attachments the RFP:
• Ref 2.8, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement
• Ref 2.12, drawing 472-8298152_Rev_A, Special Treatments Installation Procedures Manual DDG 1000
• Ref 2.13, drawing 635-8299256_Rev_A2, Arrangement and Installation Details for Topside Insulation on Hangar and Deckhouse
The following references were provided via Amendment 0002 to the RFP:
• Ref 2.8, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement
• Ref 2.12, drawing 472-8298152_Rev_A, Special Treatments Installation Procedures Manual DDG 1000
• Ref 2.13, drawing 635-8299256_Rev_A2, Arrangement and Installation Details for Topside Insulation on Hangar and Deckhouse
Section J-201, WI 448-11-080, X/KA Antenna System Installation;
Accomplish
Pages 1 & 2 of 23, Paragraphs 3.1, 3.4, 3.5, 3.6.1, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.3, PL8243741-1, Antenna Installation X/KA, (PC0136, REV A, MARKUP) (PARTS LIST), has not been received as of 04/18/2016,
• Ref 2.4, PL8243741-2, Antenna Installation X/KA, (Shelf Life Items) (PARTS LIST), has not been received as of 04/18/2016,
• Ref 2.5, PL8247866-1, IKEE Kit, Electrical (PARTS LIST) has not been received as of 04/18/2016,
• Ref 2.6, 44800-8243741, Antenna Installation XKA, (PC01036, REV A, MARKUP 06/30/14), has not been received as of 04/18/2016,
• Ref 2.7, DDX_RCIA_02440, DDX Request for Clarification, Interpretation or Assistance, has not been received as of 04/18/2016,
• Ref 2.8, 44800-8270783, XKa Antenna assembly – Installation, (PC01036, REV A, MARKUP 06/30/14), has not been received as of 04/18/2016,
• Ref 2.9, SSG-M6001-053, Revision Date 07/05/2012, Carbon Vinyl Ester Composite Panel Boring, Cutting and Milling Requirements
• Ref 2.10, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement, has not been received as of 04/18/2016, Contractor request the above listed missing references be made available.
The following references will be provided via an amendment to the RFP attachments:
• Ref 2.3, PL8243741-1, Antenna Installation X/KA, (PC0136, REV A, MARKUP) (PARTS LIST)
• Ref 2.4, PL8243741-2, Antenna Installation X/KA, (Shelf Life Items) (PARTS LIST)
• Ref 2.5, PL8247866-1, IKEE Kit, Electrical (PARTS LIST)
• Ref 2.6, 44800-8243741, Antenna Installation XKA, (PC01036, REV A, MARKUP 06/30/14)
• Ref 2.7, DDX_RCIA_02440, DDX Request for Clarification, Interpretation or Assistance
• Ref 2.8, 44800-8270783, XKa Antenna assembly – Installation, (PC01036, REV A, MARKUP 06/30/14)
• Ref 2.9, SSG-M6001-053, Revision Date 07/05/2012, Carbon Vinyl Ester Composite Panel Boring, Cutting and Milling Requirements
• Ref 2.10, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement
The following references were provided via Amendment 0002 to the RFP:
• Ref 2.3, PL8243741-1, Antenna Installation X/KA, (PC0136, REV A, MARKUP)
(PARTS LIST)
• Ref 2.4, PL8243741-2, Antenna Installation X/KA, (Shelf Life Items) (PARTS
LIST)
• Ref 2.5, PL8247866-1, IKEE Kit, Electrical (PARTS LIST)
• Ref 2.6, 44800-8243741, Antenna Installation XKA, (PC01036, REV A, MARKUP 06/30/14)
• Ref 2.7, DDX_RCIA_02440, DDX Request for Clarification, Interpretation or Assistance
• Ref 2.8, 44800-8270783, XKa Antenna assembly – Installation, (PC01036, REV A, MARKUP 06/30/14)
• Ref 2.9, SSG-M6001-053, Revision Date 07/05/2012, Carbon Vinyl Ester Composite Panel Boring, Cutting and Milling Requirements
• Ref 2.10, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement
Section J-201, WI 472-11-002, Passive Electronic Warfare System Upgrades;
accomplish
Page 2 of 14, Paragraph 3.1, References 2.8, 2.10, 2.11, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.8, drawing 472-8298152_Rev_A, Special Treatment Installation Procedures Manual DDG 1000, has not been received as of 04/18/2016,
• Ref 2.10, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds, has not been received as of 04/18/2016
• Ref 2.11, SP002006-BIW_Rev_F, Composite Structure Standard Procedures for Mounting Misc Foundations, has not been received as of 04/18/2016, Contractor request the above listed missing references be made available.
The following references will be provided via an amendment to the RFP attachments:
• Ref 2.10, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds
• Ref 2.11, SP002006-BIW_Rev_F, Composite Structure Standard Procedures for Mounting Misc Foundations
• Ref 2.8, drawing 472-8298152_Rev_A, Special Treatment Installation Procedures Manual DDG 1000
The following references were provided via Amendment 0002 to the RFP:
• Ref 2.10, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds
• Ref 2.11, SP002006-BIW_Rev_F, Composite Structure Standard Procedures for Mounting Misc Foundations
• Ref 2.8, drawing 472-8298152_Rev_A, Special Treatment Installation Procedures Manual DDG 1000
Section J-201, WI 492-11-002, Reinstate Advance Flight Deck Lights (AFDL) Installation:
Accomplish
Page 2 of 19, Paragraphs 3.7, 3.11.1, 3.12, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.5, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds, has not been received as of 04/18/2016
• Ref 2.6, BD406003_Rev_B, Grounding and Bounding Standard Methods for Composite Structures, has not been received as of 04/18/2016
• Ref 2.8, 3C588C001, AFDL Intensity and Operational Test
Contractor request the above listed missing references be made available.
The following references will be provided via an amendment to the RFP attachments:
• Ref 2.5, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds
• Ref 2.6, BD406003_Rev_B, Grounding and Bounding Standard Methods for Composite Structures
• Ref 2.8, 3C588C001, AFDL Intensity and Operational Test
The following references were provided via Amendment 0002 to the RFP:
• Ref 2.5, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds
• Ref 2.6, BD406003_Rev_B, Grounding and Bounding Standard Methods for Composite Structures
• Ref 2.8, 3C588C001, AFDL Intensity and Operational Test
Section J-201, WI 711-11-002, Advanced Gun System Inter-Ship Replenishment System (AIRS):
update
Page 2 of 5, Paragraph 3.2, Contractor notes, Para 3.2, states “Contractor to provide the services of a qualified Raytheon BAE Systems Original Equipment Manufacturer (OEM), field service technical representative to oversee, direct and verify the installation and testing of the AIRS system components, as directed by the PMS 500 Representative”.
• Contractor notes that Raytheon & BAE Systems are not the same company.
Contractor request clarification of correct OEM technical representative that is required to be provided?
The correct OEM technical representative is BAE Systems. 711-11- 002 Para 3.2 will be correct and updated via an amendment to the
RFP.
The correct OEM technical representative is BAE Systems. 711-11-002 Para
3.2 is provided via Amendment 0003 to the RFP.
Section J-201, WI 711-11-002, Advanced Gun System Inter-Ship Replenishment System (AIRS):
update
Page 2 of 5, Paragraph 3.4, Para 3.4, states “Accomplish the fabrication of new MT61 and MT62 AIRS Tip Stand and Tip Stand Assembly foundations, MT61 and MT62 Amplifier foundations, MT62 Pass Through Assembly foundation, MT61 Rotate Motor Table Control foundation, and AC Magnetic Controller foundation in accordance with sheets 14 through 22 of 2.2”.
• Para 5.1.1, states “As identified on sheets 24 through 26 of Ref 2.2” as (GFM) material.
• Contractor notes that all of the material is identified as (IAF) on sheets 24 through 26 of Ref 2.2.
• Contractor further notes that (MT61 and MT62 Amplifier foundations) that are shown on sheet 24 are identified as assemblies, A001 for MT62 Amplifier foundation and A002 for MT61 Amplifier foundation.
Contractor requests clarification regarding if all of the material identified on sheets 24 through 26 of Ref 2.2, will be provided as (GFM) material vice (IAF) and are the assemblies A001 (MT62 Amplifier foundation) and A002 (MT61 Amplifier foundation) be provided (GFM) as completed assemblies including all required machining and drilling?
All of the material identified on sheets 24 through 26 of Ref 2.2 are IAF with the Contractor procuring and fabricating the assemblies for A001 (MT62 Amplifier foundation) and A002 (MT61 Amplifier foundation), including all required machining and drilling.
Paragraph 5, GFM, shall be revised accordingly and updated via an amendment to the RFP.
19 RFP Page 1, Block 9
Request an extension of 3 weeks to the bid due date due to the new and unique complexities of this Solicitation. This extension will allow the necessary time to properly develop a thorough, responsive proposal.
An amendment will be issued extending the proposal due date by two weeks (10 June 2016).
Amendment 0002 extended the proposal due date to 10 June 2016.
20 RFP RFP Section J-10 Please provide 2nd tier reference 8 of Drawing 582-8293829, Number 321-8294070 titled, "HV Power System One-Line Diagram."
The following reference will be provided via an amendment to the RFP attachments:
• 2nd tier reference 8 of Drawing 582-8293829, Number 321- 8294070 titled, "HV Power System One-Line Diagram."
The following reference was provided via Amendment 0002 to the RFP:
• 2nd tier reference 8 of Drawing 582-8293829, Number 321-8294070 titled, "HV Power System One-Line Diagram."
21 RFP
Section L, Page 138, Additional Information to Offerors
The RFP is silent regarding a shipcheck of the vessel. A shipcheck is essential to the development of accurate, responsive estimates for the 14 work items in CLIN 0002. Please provide a shipcheck opportunity and details and extend the bid due date an appropriate amount of time to allow incorporation of the shipcheck findings into the estimate/bid.
Shipcheck opportunities will not be provided until after award of the IDIQ, CLIN 0001 Order 0001, and CLIN 0002 Order 0001.
Shipchecks will occur during the DDG 1000 PDA planning period from the ship's arrival in homeport (San Diego, CA) until transit from the Naval Station to the Execution Yard. Prior to the start of PDA, the execution yard and the Navy will modify CLIN 0002 Order 0001 to incorporate the remaining level of effort (LOE) PDA work specifications into the availability. The offeror's proposal should be estimated based upon the available information provided within the RFP and attachments.
A shipcheck opportunity will be provided on 19 May 2016 in Bath, Maine.
Please contact Stacy Crisman (stacy.crisman@navy.mil) and Richard W. Rossi (richard.w.rossi) to schedule attendance for a maximum of four participants per offeror.
RFP Section J, Attachment J-6
Attachment J-6
The 54 drawings listed in Attachment 1 of this question are referenced in the specification to either accomplish or for reference purposes, however, they were not provided with the specification. In addition, for line 48 of the attachment, there appears to be a more current Rev 3 available. For line 54 of the attachment, it is unclear which revision of the drawing was provided and how it corresponds to the specification since the specification requires Rev (-), the title block of the drawing shows Rev (a) but the revision block and the follow pages of the drawing indicate that it is Rev (B). Please provide missing drawings and clarify the two drawing discrepancies as soon as possible. Thank you.
The drawings referenced in this question will be answered as individual bidders questions.
RFP Section J, Attachment J-6
Attachment J-6
For Work Item 448-11-008, the following drawings are missing pages:
Drawing 100-8697528 Rev A is missing page 2. Drawing 600-8697534 Rev A is missing page 1. Drawing 555-8697544 Rev A is missing page 2.
Drawing 512-8696744 Rev A is missing page 2. Please provide as soon as possible in order to be able to complete estimates.
On drawings: 100-8697528, Rev A; 555-8697544 Rev A; and 512- 8697444, sheet 2 is not used per the index on sheet 1 of each of those drawings.
For drawing 600-8697534 Rev A, sheet 1 was included with the final RFP attachments.
171-11-002, 448-11- 008, 461-11-001, 472-11-002
Drawing Drawing 472-8298152-A Not available in disc provided Drawing 472-8298152-A will be provided via an amendment to the RFP attachments.
Drawing 472-8298152-A was provided via Amendment 0002 to the RFP.
25 171-11-002 Drawing Drawing 447-8696705-A Not available in disc provided Drawing 447-8696705-A was provided with the RFP attachments.
See page 145 of filename: 171-11-002 Mast Install Navy Review.
26 171-11-002 Drawing Drawing 512-8659808-A Not available in disc provided Drawing 512-8659808-A was provided with the RFP as filename:
171-11-002-V-Bundle.
27 171-11-002 Test Procedure Test Procedure 2C612C001 Not available in disc provided Test Procedure 2C612C001 will be provided via an amendment to the RFP attachments.
Test Procedure 2C612C001 was provided via Amendment 0002 to the RFP.
171-11-002, 448-11- 008, 448-11-080
Procedure Procedure SP002005-B Not available in disc provided Procedure SP002005-B will be provided via an amendment to the RFP attachments.
Procedure SP002005-B was provided via Amendment 0002 to the RFP.
29 171-11-002 Drawing Drawing 304-8294041-F Not available in disc provided Drawing 304-8294041-F will be provided via an amendment to the RFP attachments.
Drawing 304-8294041-F was provided via Amendment 0002 to the RFP.
441-11-010, 448-11- 008, 472-11-002, 980-90-105
Manual Owners Manual For DDG1000 Composite Deckhouse and Hanger Not available in disc provided
Owners Manual for DDG 1000 Composite Deckhouse and Hangar was provided with the RFP in J-7 Attachment.
441-11-010, 461-11- 001, 472-11-002, 492-11-002, 711-11-
Drawing Drawing SP002001-BIW-C Not available in disc provided Drawing SP002001-BIW-D is the latest version and will be provided via an amendment to the RFP attachments.
Drawing SP002001-BIW-D is the latest version and was provided via Amendment 0002 to the RFP.
441-11-010, 472-11-
Drawing Drawing SP002006-F Not available in disc provided Drawing SP002006-F will be provided via an amendment to the RFP attachments.
Drawing SP002006-F was provided via Amendment 0002 to the RFP.
33 441-11-010 Drawing Drawing 304-8294041-F Not available in disc provided Drawing 304-8294041-F will be provided via an amendment to the RFP attachments.
Drawing 304-8294041-F was provided via Amendment 0002 to the RFP.
34 441-11-010 Drawing Drawing 406-8289952-B Not available in disc provided
Ref 2.11 of the Work Item 441-11-010 references Drawing 406- 8298952-B, Drawing 406-8289952-B appears to be a typographical error. Drawing 406-8298952-B will be provided via an amendment to the RFP attachments.
Ref 2.11 of the Work Item 441-11-010 references Drawing 406-8298952-B, Drawing 406-8289952-B appears to be a typographical error. Drawing 406- 8298952-B was provided via Amendment 0002 to the RFP.
35 441-11-010 Test Procedure Test Procedure 2A447C001 Not available in disc provided Test Procedure 2A447C001 will be provided via an amendment to the RFP attachments.
Test Procedure 2A447C001 was provided via Amendment 0002 to the RFP.
36 441-11-010 Test Procedure Test Procedure 2A447C002-A Not available in disc provided Test Procedure 2A447C002-A will be provided via an amendment to the RFP attachments.
Test Procedure 2A447C002-A is provided via Amendment 0003 to the RFP.
37 441-11-010 Test Procedure Test Procedure 2A448C001D Not available in disc provided Test Procedure 2A448C001D will be provided via an amendment to the RFP attachments.
Test Procedure 2A448C001D was provided via Amendment 0002 to the RFP.
38 448-11-008 Drawing Drawing 635-8299256-A2 Not available in disc provided Drawing 635-8299256-A2 will be provided via an amendment to the RFP attachments.
Drawing 635-8299256-A2 was provided via Amendment 0002 to the RFP.
39 448-11-080 Drawing Drawing PL8273741-1 Not available in disc provided Drawing PL8273741-1 will be provided via an amendment to the RFP attachments.
Drawing PL8273741-1 was provided via Amendment 0002 to the RFP.
40 448-11-080 Drawing Drawing PL8243741-2 Not available in disc provided Drawing PL8243741-2 will be provided via an amendment to the RFP attachments.
Drawing PL8243741-2 was provided via Amendment 0002 to the RFP.
41 448-11-080 Drawing Drawing PL8247866-1 Not available in disc provided Drawing PL8247866-1 will be provided via an amendment to the RFP attachments.
Drawing PL8247866-1 was provided via Amendment 0002 to the RFP.
42 448-11-080 Drawing Drawing 44800-8243741 Not available in disc provided Drawing 44800-8243741 will be provided via an amendment to the RFP attachments.
Drawing 44800-8243741 was provided via Amendment 0002 to the RFP.
43 448-11-080 Unknown DDX RCIA 02440 Not available in disc provided DDX RCIA 02440 will be provided via an amendment to the RFP attachments.
DDX RCIA 02440 was provided via Amendment 0002 to the RFP.
44 448-11-080 Drawing Drawing 44800-8270783 Not available in disc provided Drawing 44800-8270783 will be provided via an amendment to the RFP attachments.
Drawing 44800-8270783 was provided via Amendment 0002 to the RFP.
45 448-11-080 Unknown SSG-M6001-053 Not available in disc provided SSG-M6001-053 will be provided via an amendment to the RFP attachments.
SSG-M6001-053 was provided via Amendment 0002 to the RFP.
46 457-11-001 Mfg Drawing Mfg Drawing 46100-8244776 Not available in disc provided Mfg Drawing 46100-8244776 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244776 was provided via Amendment 0002 to the RFP.
47 457-11-001 Mfg Drawing Mfg Drawing 46100-8244767 Not available in disc provided Mfg Drawing 46100-8244767 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244767 was provided via Amendment 0002 to the RFP.
48 457-11-001 Mfg Drawing Mfg Drawing 46100-8244792 Not available in disc provided Mfg Drawing 46100-8244792 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244792 was provided via Amendment 0002 to the RFP.
49 457-11-001 Mfg Drawing Mfg Drawing 46100-8244769 Not available in disc provided Mfg Drawing 46100-8244769 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244769 was provided via Amendment 0002 to the RFP.
50 457-11-001 Mfg Drawing Mfg Drawing 46100-8244771 Not available in disc provided Mfg Drawing 46100-8244771 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244771 was provided via Amendment 0002 to the RFP.
51 457-11-001 Mfg Drawing Mfg Drawing 46100-8244774 Not available in disc provided Mfg Drawing 46100-8244774 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244774 was provided via Amendment 0002 to the RFP.
52 457-11-001 Mfg Drawing Mfg Drawing 46100-8244772 Not available in disc provided Mfg Drawing 46100-8244772 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244772 was provided via Amendment 0002 to the RFP.
53 457-11-001 Mfg Drawing Mfg Drawing 46100-8244773 Not available in disc provided Mfg Drawing 46100-8244773 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244773 was provided via Amendment 0002 to the RFP.
54 457-11-001 Mfg Drawing Mfg Drawing 46100-8244585 Not available in disc provided Mfg Drawing 46100-8244585 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244585 was provided via Amendment 0002 to the RFP.
55 457-11-001 Mfg Drawing Mfg Drawing 46100-8244775 Not available in disc provided Mfg Drawing 46100-8244775 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244775 was provided via Amendment 0002 to the RFP.
56 457-11-001 Mfg Drawing Mfg Drawing 46100-8244796 Not available in disc provided Mfg Drawing 46100-8244796 will be provided via an amendment to the RFP attachments.
Mfg Drawing 46100-8244796 was provided via Amendment 0002 to the RFP.
57 457-11-001 Drawing Drawing 807-5037407-A Not available in disc provided Mfg Drawing 807-5037407-A will be provided via an amendment to the RFP attachments.
Mfg Drawing 807-5037407-A was provided via Amendment 0002 to the RFP.
58 457-11-001 Test Procedure Test Procedure 2A461C007 Not available in disc provided Test Procedure 2A461C007 will be provided via an amendment to the RFP attachments.
Test Procedure 2A461C007was provided via Amendment 0002 to the RFP.
59 457-11-001 Drawing Drawing 583-8294002-B Not available in disc provided Drawing 583-8294002-B will be provided via an amendment to the RFP attachments.
Drawing 583-8294002-B was provided via Amendment 0002 to the RFP.
60 461-11-001 Drawing Drawing 470-8306541-B Not available in disc provided Drawing 470-8306541-B will be provided via an amendment to the RFP attachments.
Drawing 470-8306541-B was provided via Amendment 0002 to the RFP.
61 461-11-001 Drawing Drawing 470-8306542-B Not available in disc provided Drawing 470-8306542-B will be provided via an amendment to the RFP attachments.
Drawing 470-8306542-B was provided via Amendment 0002 to the RFP.
62 461-11-001 Test Procedure Test Procedure 2A461C006 Not available in disc provided Test Procedure 2A461C006 will be provided via an amendment to the RFP attachments.
Test Procedure 2A461C006 was provided via Amendment 0002 to the RFP.
63 492-11-002 Test Procedure Test Procedure 3C588C001 Not available in disc provided Test Procedure 3C588C001 will be provided via an amendment to the RFP attachments.
Test Procedure 3C588C001 was provided via Amendment 0002 to the RFP.
64 522-20-001 Drawing Drawing 8100-2400-0062-BH Not available in disc provided Drawing 8100-2400-0062-BH will be provided via an amendment to the RFP attachments.
Drawing 8100-2400-0062-BH was provided via Amendment 0002 to the RFP.
65 711-11-002 Drawing Drawing B117009-B Not available in disc provided Drawing B117009-B will be provided via an amendment to the RFP attachments.
Drawing B117009-B was provided via Amendment 0002 to the RFP.
66 711-11-002 Mfg Drawing Mfg Drawing BFD370005-B Not available in disc provided Drawing BFD370005-B will be provided via an amendment to the RFP attachments.
Drawing BFD370005-B was provided via Amendment 0002 to the RFP.
Section J-201, WI 171-11-002, Mast/Above Deck structure (ADS Update);
accomplish
Page 2 of 41, References 2.8, 2.12, 2.13, 2.17, 2.18, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.8, drawing 472-8298152_Rev_A, Special Treatment Installation Procedures Manual DDG 1000, has not been received as of 04/18/2016,
• Ref 2.12, 2C612C001, Test Procedures, Lifeline, Liferail and Helo Safety Barrier Strength and Load Test, has not been received as of 04/18/2016,
• Ref 2.13, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement, has not been received as of 04/18/2016,
• Ref 2.17, drawing 304-8294041_Rev_F, Main Wireway Key Plan, has not been received as of 04/18/2016,
• Ref 2.18, Test Procedure Volumetric Testing/Balancing DDG 1000 (TBD), has not been received as of 04/18/2016, Contractor request the above listed missing references be made available.
The following references were provided via Amendment 0002 to the RFP attachments:
• Ref 2.8, drawing 472-8298152_Rev_A, Special Treatment Installation Procedures Manual DDG 1000
• Ref 2.13, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement
• Ref 2.12, 2C612C001, Test Procedures, Lifeline, Liferail and Helo Safety Barrier Strength and Load Test
• Ref 2.17, drawing 304-8294041_Rev_F, Main Wireway Key Plan
• Ref 2.18, Test Procedure Volumetric Testing/Balancing DDG 1000 is revised within the WI 171-11-002 to reflect the correct Test Procedure 4C512C004, DDG 1000 Class Test Procedure for Zone, System, Compartment, and Terminal Volumetric Airflow Test and identify the applicable HVAC system to include terminal airflow rates. The revised Spec 171-11-002 will be provided via a forthcoming amendment to the RFP attachments.
The following references were provided via Amendment 0002 to the RFP attachments:
• Ref 2.8, drawing 472-8298152_Rev_A, Special Treatment Installation Procedures Manual DDG 1000
• Ref 2.13, SP002005_Rev_B, Composite Structure Standard Procedures for Composite Reinforcement
• Ref 2.12, 2C612C001, Test Procedures, Lifeline, Liferail and Helo Safety Barrier Strength and Load Test
• Ref 2.17, drawing 304-8294041_Rev_F, Main Wireway Key Plan
• Ref 2.18, Test Procedure Volumetric Testing/Balancing DDG 1000 is revised within the WI 171-11-002 to reflect the correct Test Procedure 4C512C004, DDG 1000 Class Test Procedure for Zone, System, Compartment, and Terminal Volumetric Airflow Test and identify the applicable HVAC system to include terminal airflow rates. The revised Spec 171-11-002 is provided via Amendment 0003 to the RFP.
Section J-201, WI 171-11-002, Mast/Above Deck structure (ADS Update);
accomplish
Page 2 of 41, Paragraph 3.1, Reference 2.5, Contractor notes,
• Ref 2.5 drawing 304-8659807, sheet 5 implies the mast is being fabricated however sheet 5 has notes that show to tubes being installed on the fabrication drawing 180-8634704.
• Ref 2.5 drawing 304-8659807, sheet 6 has the T-bars locations local note sheet 5 states holes for swage tubes are lofted and cut per Ref 6, drawing 180-8634704 not supplied with package.
Contractor requests clarification as to if the mast is being fabricated are the studs for the T-bars being installed at that time?
The mast will be provided as GFM. The swage stuffing tubes and studs for the T-bars referenced in Ref 2.5 drawing 304-8659807, shall be installed by the Contractor during erection of the mast.
The holes for the swage tubes will be provided pre-cut for installation.
Section J-201, WI 171-11-002, Mast/Above Deck structure (ADS Update);
accomplish
Page 4 of 41, Paragraph 3.17, Contractor notes, Para 3.17 states “Accomplish removals, modifications and installations to piping drain, water mist, and PAO cooling systems in accordance with 2.5”.
• However Ref 2.5, drawing 304-8659807_Rev_A, Mast Update Main Cableway Installation Drawing & ML, has no pipe requirements
• Contractor believes that Para 3.17, is actually intended to accomplish the requirements of Ref 2.4, drawing 555-8659810_Rev_A, Mast Update Piping Water Mist Installation Drawing and ML.
Please, review and advise.
The revised spec 171-11-002 will be provided via a forthcoming amendment to the RFP attachments, which reflects the correct reference from Ref 2.5, drawing 304-8659807_Rev_A, Mast Update Main Cableway Installation Drawing & ML to the Ref 2.4, drawing 555-8659810_Rev_A, Mast Update Piping Water Mist Installation Drawing & ML.
The revised spec 171-11-002 is provided via Amendment 0003 to the RFP, which reflects the correct reference from Ref 2.5, drawing 304- 8659807_Rev_A, Mast Update Main Cableway Installation Drawing & ML to the Ref 2.4, drawing 555-8659810_Rev_A, Mast Update Piping Water Mist Installation Drawing & ML.
Section J-201, WI 457-11-001, Multi-Function Towed Array System (MFTA);
install
Pages 2 & 3 of 10, Paragraphs 3.3.2, 3.4.1, 3.4.2, 3.4.3, 3.4.4, 3.4.5, 3.4.6, 3.4.7, 3.4.8, 3.4.9, 3.5, 3.24, 3.25, References 2.6 through 2.17 and 2.20, 2.22, 2.23, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.6, 46100-8244776, ODIM Spectrum Mfg Dwg, MTAH General Arrangement, has not been received as of 04/18/2016,
• Ref 2.7, 46100-8244767, ODIM Spectrum Mfg Dwg, MTAH Transom Seal Assembly, has not been received as of 04/18/2016,
• Ref 2.8, 46100-8244792, ODIM Spectrum Mfg Dwg, MTAH Maintenance Kit, MSE ID:
461-028-0101, has not been received as of 04/18/2016,
• Ref 2.9, 46100-8244769, ODIM Spectrum Mfg Dwg, MTAH Array Handling Tray, has not been received as of 04/18/2016,
• Ref 2.10, 46100-8244771, ODIM Spectrum Mfg Dwg, MTAH Drogue Handling Unit, has not been received as of 04/18/2016,
• Ref 2.11, 46100-8244774, ODIM Spectrum Mfg Dwg, MTAH Operator Control Station, has not been received as of 04/18/2016,
• Ref 2.12, 46100-8244772, ODIM Spectrum Mfg Dwg, MTAH Levelwind Assembly, has not been received as of 04/18/2016,
• Ref 2.13, 46100-8244773, ODIM Spectrum Mfg Dwg, MTAH Towing Winch, has not been received as of 04/18/2016,
• Ref 2.14, 46100-8244585, ODIM Spectrum Mfg Dwg, MTAH 440VAC Isolation Transformer, has not been received as of 04/18/2016,
• Ref 2.15, 46100-8244775, ODIM Spectrum Mfg Dwg, MTAH Power Control Cabinet, has not been received as of 04/18/2016,
• Ref 2.16, 46100-8244796, Rev – MFTA Tow Cable, MSE ID 461-029-0201, has not been received as of 04/18/2016,
• Ref 2.17, drawing 807-5037407_Rev_A, AN/SQQ-89A(V) 15 MFTA Towed Body, MSE ID 461-024-0101, has not been received as of 04/18/2016,
• Ref 2.20, BD406003_Rev_B, Grounding and Bonding Standard Methods for Composite Structure, has not been received as of 04/18/2016,
• Ref 2.22, 2A461C007_Rev-, Multi-Function Towed Array Load Test, has not been received as of 04/18/2016,
• Ref 2.23, drawing 583-8294002_Rev_B, Major Equipment Removal Routes, has not been received as of 04/18/2016, Contractor request the above listed missing references be made available.
The following references were provided via Amendment 0002 to the RFP attachments:
• Ref 2.23, drawing 583-8294002_Rev_B, Major Equipment Removal Routes
• Ref 2.6, 46100-8244776, ODIM Spectrum Mfg Dwg, MTAH General Arrangement
• Ref 2.7, 46100-8244767, ODIM Spectrum Mfg Dwg, MTAH Transom Seal Assembly
• Ref 2.8, 46100-8244792, ODIM Spectrum Mfg Dwg, MTAH Maintenance Kit, MSE
ID: 461-028-0101
• Ref 2.9, 46100-8244769, ODIM Spectrum Mfg Dwg, MTAH Array Handling Tray
• Ref 2.10, 46100-8244771, ODIM Spectrum Mfg Dwg, MTAH Drogue Handling Unit
• Ref 2.11, 46100-8244774, ODIM Spectrum Mfg Dwg, MTAH Operator Control Station
• Ref 2.12, 46100-8244772, ODIM Spectrum Mfg Dwg, MTAH Levelwind Assembly
• Ref 2.13, 46100-8244773, ODIM Spectrum Mfg Dwg, MTAH Towing Winch
• Ref 2.14, 46100-8244585, ODIM Spectrum Mfg Dwg, MTAH 440VAC Isolation Transformer
• Ref 2.15, 46100-8244775, ODIM Spectrum Mfg Dwg, MTAH Power Control Cabinet
• Ref 2.16, 46100-8244796, Rev – MFTA Tow Cable, MSE ID 461-029-0201
• Ref 2.17, drawing 807-5037407_Rev_A, AN/SQQ-89A(V) 15 MFTA Towed Body, MSE ID 461-024-0101
• Ref 2.20, BD406003_Rev_B, Grounding and Bonding Standard Methods for Composite Structure will be deleted from Spec 457-11-001, due to no composite work, and replaced with MIL-STD-1310. Spec 457-11-001 will be revised to reflect this change and will be provided via a forthcoming amendment to the RFP attachments.
• Ref 2.22, 2A461C007_Rev-, Multi-Function Towed Array Load Test+H20
The following references were provided via Amendment 0002 to the RFP attachments:
• Ref 2.23, drawing 583-8294002_Rev_B, Major Equipment Removal Routes
• Ref 2.6, 46100-8244776, ODIM Spectrum Mfg Dwg, MTAH General Arrangement
• Ref 2.7, 46100-8244767, ODIM Spectrum Mfg Dwg, MTAH Transom Seal Assembly
• Ref 2.8, 46100-8244792, ODIM Spectrum Mfg Dwg, MTAH Maintenance Kit, MSE ID: 461-028-
• Ref 2.9, 46100-8244769, ODIM Spectrum Mfg Dwg, MTAH Array Handling Tray
• Ref 2.10, 46100-8244771, ODIM Spectrum Mfg Dwg, MTAH Drogue Handling Unit
• Ref 2.11, 46100-8244774, ODIM Spectrum Mfg Dwg, MTAH Operator Control Station
• Ref 2.12, 46100-8244772, ODIM Spectrum Mfg Dwg, MTAH Levelwind Assembly
• Ref 2.13, 46100-8244773, ODIM Spectrum Mfg Dwg, MTAH Towing Winch
• Ref 2.14, 46100-8244585, ODIM Spectrum Mfg Dwg, MTAH 440VAC Isolation Transformer
• Ref 2.15, 46100-8244775, ODIM Spectrum Mfg Dwg, MTAH Power Control Cabinet
• Ref 2.16, 46100-8244796, Rev – MFTA Tow Cable, MSE ID 461-029-0201
• Ref 2.17, drawing 807-5037407_Rev_A, AN/SQQ-89A(V) 15 MFTA Towed Body, MSE ID 461-024-
• Ref 2.20, BD406003_Rev_B, Grounding and Bonding Standard Methods for Composite Structure is deleted from Spec 457-11-001, due to no composite work, and replaced with MIL- STD-1310. Spec 457-11-001 is revised to reflect this change and is provided via Amendment 0003 to the RFP.
• Ref 2.22, 2A461C007_Rev-, Multi-Function Towed Array Load Test+H20
Section J-201, WI 461-11-001, Nixie SLQ Variant and Winch System:
accomplish
Pages 1 & 2 of 6, Paragraphs 3.4.2, 3.7, 3.8, 3.9, 3.16, 3.20.1, 3.21, 3.22, References 2.4, 2.5, 2.6, 2.7, 2.13, 2.15, 2.16, Contractor notes upon review of the Specification that the following list of references have not been made available.
• Ref 2.4, K939000065_Rev_E, Foundation “C” Winch 25A, has not been received as of 04/14/2016,
• Ref 2.5, K939000050_Rev_G, Transmitter Foundation 25A, has not been received as of 04/14/2016,
• Ref 2.6, drawing 470-8306541_Rev_B, Fleet Angle Compensator (Unit 10, 11,) AN/SLQ-25C, has not been received as of 04/14/2016,
• Ref 2.7, drawing 470-8306542_Rev_B, Deck Sheave (Unit 12, 13,) AN/SLQ-25C, has not been received as of 04/14/2016,
• Ref 2.13, SP002001-BIW_Rev_C, Standard Methods for Mounting Electrical Equipment under 100 pounds, has not been received as of 04/18/2016,
•…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .