CODE
(Hour)
PAGE(S)
until 12:00 PM local time 10 Jul 2015
X
A
X B
X C X D
EX
X
G
F 144 - 161
162 - 203
X H 204 - 220 shanna.laging@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO A5 1 220
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 10 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L, Paragraph 1.2 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SHANNA M. LAGING 202-781-0917
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 43
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
44 - 93
94 - 97
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
98 - 105
106 - 108 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 109 - 112 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 113 - 117 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
118 - 141
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
142 - 143
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
09 Apr 2015
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00024-15-R-6400
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
7 Each
MK48 MOD 7 G&C Section POM/First Article
FPI
Base Year - MK48 MOD 7 G&C Section Proof of Manufacture (POM) Units /
First Article (Note A)
FOB: Origin
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
MK48 MOD 7 CBASS Upgrade Kits
POM
FFP
2 Each
Base Year - MK48 MOD 7 CBASS Upgrade Kits POM
NET AMT
MK48 MOD 7 G&C Section
Each
Base Year - MK48 MOD 7 G&C Section (Note F)
STEPLADDER PRICING
STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE
Base
0003 1.00 20.00
Base Year - MK48 MOD 7 CBASS Upgrade Kits (Note F)
MK48 MOD 7 CBASS
Upgrade Kits
0004 10.00 90.00
Factory Test Equipment
Lot
Base Year - Factory Test Equipment (Note F)
Factory Test Equipment 0005 1.00 6.00
OPTION Other Direct Costs
COST
Base Year - Other Direct Costs
ESTIMATED COST
MK48 MOD 7 Data
Base Year - MK48 MOD 7 Data - Not Separately Priced (NSP)
80,000 Hours
OPTION Engineering Services and Support
Base Year - Engineering Services and Support (Note B and E)
CPFF
FIXED FEE
TOTAL EST COST + FEE
8,000 Hours
OPTION Hardware Repair and Maintenance
Base Year - Hardware Repair and Maintenance (Note C and E)
Spare Components
1 Lot
OPTION Base Year - Spare Components
MK48 MOD 7 Production Support
Material
OPTION Base Year - MK48 MOD 7 Production Support Material (PSM)
Provisioned Items Orders (PIO)
OPTION Provisioned Items Orders (PIO) for Factory Test Equipment Component Spares (Note G)
MK48 MOD 7 CBASS Upgrade Kit Pre-
POM
4 Each
Base Year - MK48 MOD 7 CBASS Upgrade Kit Pre-POM
Small Business Subcontracting Incentive
Base Year - Small Business Subcontracting Incentive (Note D)
Reserved
OPTION Option Year 1 - MK48 MOD 7 G&C Section (Note F)
MK48 MOD 7 G&C Sections 0103 1.00 50.00
OPTION Option Year 1 - MK48 MOD 7 CBASS Upgrade Kits (Note F)
0104 10.00 90.00
OPTION Option Year 1 - Factory Test Equipment (Note F)
Factory Test Equipment 0105 1.00 6.00
Option Year 1 - Other Direct Costs
Option Year 1 - Engineering Services and Support (Note B and E)
Option Year 1 - Hardware Repair and Maintenance (Note C and E)
OPTION Option Year 1 - Spare Components
OPTION Option Year 1 - MK48 MOD 7 Production Support Material
OPTION Option Year 2 - MK48 MOD 7 G&C Section (Note F)
MK48 MOD 7 G&C Sections 0203 1.00 50.00
OPTION Option Year 2 - MK48 MOD 7 CBASS Upgrade Kits (Note F)
0204 10.00 90.00
OPTION Option Year 2 - Factory Test Equipment (Note F)
Factory Test Equipment 0205 1.00 6.00
Option Year 2 - Other Direct Costs
Option Year 2 - Engineering Services and Support (Note B and E)
Option Year 2 - Hardware Repair and Maintenance (Note C and E)
OPTION Option Year 2 - Spare Components
OPTION Option Year 2 - MK48 MOD 7 Production Support Material (PSM)
OPTION Option Year 3 - MK48 MOD 7 G&C Section (Note F)
MK48 MOD 7 G&C Section 0303 1.00 100.00
OPTION Option Year 3 - MK48 MOD 7 CBASS Upgrade Kits (Note F)
0304 10.00 90.00
OPTION Option Year 3 - Factory Test Equipment (Note F)
Factory Test Equipment 0305 1.00 6.00
Option Year 3 - Other Direct Costs
Option Year 3 - Engineering Services and Support (Note B and E)
Option Year 3 - Hardware Repair and Maintenance (Note C and E)
OPTION Option Year 3 - Spare Components
OPTION Option Year 3 - MK48 MOD 7 Production Support Material (PSM)
OPTION Option Year 4 - MK48 MOD 7 G&C Section (Note F)
MK48 MOD 7 G&C Section 0403 1.00 100.00
OPTION Option Year 4 - MK48 MOD 7 CBASS Upgrade Kits (Note F)
0404 10.00 90.00
OPTION Option Year 4 - Factory Test Equipment (Note F)
Factory Test Equipment 0405 1.00 6.00
Option Year 4 - Other Direct Costs
Option Year 4 - Engineering Services and Support (Note B and E)
Option Year 4 - Hardware Repair and Maintenance (Note C and E)
OPTION Option Year 4 - Spare Components
OPTION Option Year 4 - MK48 MOD 7 Production Support Material (PSM)
NOTE A
The Contractor shall propose a Fixed Price Incentive (FPI) structure for these item(s).
The Contractor shall propose within the following Government/Contractor shareline boundaries:
CLIN UNDERRUN OVERRUN
0001 50/50 50/50
Ceiling Price – 125% of Target Cost.
NOTE B
The Government may issue Technical Instructions in accordance with NAVSEA 5252.242-9115 TECHNICAL
INSTRUCTIONS (APR 1999) included in Section H of this contract. The Government estimate for Engineering
Services is approximately 80,000 man-hours during the base and all option years. These are estimated amounts of labor hours, and do not indicate that the Government will necessarily require this amount or any at all. These CLINs are Cost Plus Fixed Fee (CPFF). The Government anticipates funding efforts under this CLIN using WPN, OM&N, and RDT&E. Additional SLINs will be added as required. Any Other Direct Costs associated with the performance of Technical Instructions shall be reimbursed on CLINs 0006, (IF OPTIONS EXERCISED) 0106, 0206, 0306, and
0406. The fully burdened labor rates proposed in Table L-2 for CLINs 0008, 0108, 0208, 0308, and 0408 will be incorporated into the resultant Contract in Section B to be used on all work efforts performed under these CLINs.
NOTE C
The Government may issue Technical Instructions in accordance with NAVSEA 5252.242-9115 TECHNICAL
INSTRUCTIONS (APR 1999) included in Section H of this contract. The Government Estimate is approximately
8,000 man-hours per year for Hardware Repair and Maintenance as described in Section C. This is an estimated amount of labor hours, and does not indicate that the Government will necessarily require this amount or any at all.
These CLINs are Cost Plus Fixed Fee (CPFF). Any Other Direct Costs associated with the performance of
Technical Instructions shall be reimbursed on CLINs 0006(IF OPTIONS EXERCISED), 0106, 0206, 0306, and
0406. The fully burdened labor rates proposed in Table L-2 for CLINs 0009, 0109, 0209, 0309, and 0409 will be incorporated into the resultant Contract in Section B to be used on all work efforts performed under these CLINs.
NOTE D
SMALL BUSINESS SUBCONTRACTING INCENTIVE: CLIN0014
(a) Objective:
PEO Submarine is committed to increasing small business participation in submarine system and subsystem development, production and support efforts consistent with cost/benefit considerations and attainment of acquisition objectives. Therefore, the Contractor may earn a Small Business Subcontracting Incentive Fee (SBSIF) under this contract for exceeding the Subcontracting Goals identified in the table below. The specifics for evaluation of the
SBSIF are set forth in paragraphs that follow.
(b) Subcontracting Goals:
The following table identifies the percentages against which the
Contractor’s performance for the purposes of the SBSIF will be measured for the evaluation periods.
Goal*
Small Business (SB) 5.0%
HUBZone Small Business (HUBZone) 1.0%
Service-Disabled Veteran-Owned Small Business (SDVOSB) 3.0%
Small Disadvantaged Business (SDB) 5.0%
Women-Owned Small Business (WOSB) 5.0%
Historically Black Colleges & Universities and Minority Institutions
(HBCU)
3.0%
*Base for measurement is total subcontract dollars.
(c) Periods and SBSIF Available:
The SBSIF is available for each column in the table below. The evaluation will be based on the value of small business subcontracting under each column up through delivery of the last system. The SBSIF pools for each category in each year will be calculated by applying the percentages specified in the table below to the total amount obligated on the specified
Contract Line Item Number (CLIN).
*Percentages Apply to Each Separate Column as defined below.
Subcontract Category Base
CLIN 0001,
0002, 0003, *Option 1
CLIN 0103,
*Option 2
CLIN 0203,
*Option 3
CLIN 0303,
*Option 4
CLIN 0403,
SB 0.05 % 0.05 % 0.05 % 0.05 % 0.05 %
HUBZone 0.01 % 0.01 % 0.01 % 0.01 % 0.01 %
SDVOSB 0.01 % 0.01 % 0.01 % 0.01 % 0.01 %
SDB 0.01 % 0.01 % 0.01 % 0.01 % 0.01 %
WOSB 0.01 % 0.01 % 0.01 % 0.01 % 0.01 %
HBCU 0.01 % 0.01 % 0.01 % 0.01 % 0.01 %
*If and to the extent exercised in accordance with FAR 52.217-7 entitled “OPTION FOR INCREASED
QUANTITY—SEPARATELY PRICED LINE ITEM.”
(i) The Contractor may earn the amount available under each category if its subcontracting percentage meets or exceeds the goal for each category established in paragraph (b) above.
(ii) The Contractor will not earn any of the amounts available if its subcontracting percentage is below the goal for the applicable category established in paragraph (b) above.
(iii) The incentive categories under this clause will be earned or not earned on an individual basis. Failure to earn the amount available under one or more of the categories does not preclude the Contractor from earning the amount available under the remaining category/categories.
(d) SF294 Subcontracting Reports:
The Contractor, unless a small business itself, shall submit semi-annual SF294s Subcontracting Report for Individual
Contracts submitted by the Contractor even if under a Comprehensive Plan that does not normally require SF294s.
(e) Procedures:
1. Within one month of completion of effort and delivery of the last AUR Production Restart G&C Section or
CBASS Upgrade Kit (whichever is later) under each separate effort identified in paragraph (c), the
Contractor shall submit to the Contracting Officer in writing a self-evaluation of its performance under this clause. This self-evaluation will include, at a minimum, the SF 294s for the period and any other data used by the Contractor in determining its self-evaluation.
2. Within fifteen (15) working days of receipt of the Contractor’s self-evaluation, the Contracting Officer’s
Representative (COR) will review and evaluate the Contractor’s self-evaluation to determine if all required data was provided and if any SBSIF was earned. If the Contractor’s input is inadequate the COR shall ask the Contractor to correct the inadequacies of their self-evaluation and to resubmit a revised self-evaluation.
3. Within thirty (30) working days of receipt of the Contractor’s self-evaluation or revised self-evaluation, the
COR will meet with the PCO to make a final determination of whether any such SBSIF has been earned.
The PCO will issue a unilateral modification providing earned SBSIF. Determinations made under this paragraph are unilateral decisions made solely at the discretion of the Government.
4. No Small Business Subcontracting Incentive Fee will be earned unless the Contractor is making timely deliveries and is in compliance with the specifications for the hardware being acquired. The PCO will make the determination of whether the Contractor has met this prerequisite to be considered for the SBSIF. In the event that the PCO determines that the Contractor’s performance is not satisfactory, the Contractor will not be eligible for the SBSIF.
(f) Finality of PCO’s Determination:
The parties agree that determinations of the PCO with respect to the amount of SBSIF to be paid to the Contractor are unilateral decisions made solely at the discretion of the Government. Notwithstanding anything else in this incentive or contract, a payment under this incentive is not incurred or earned until the effective date of a written contract modification.
(g) Payment of SBSIF:
The Contractor will be paid the SBSIF amount(s) earned upon submittal of proper invoices to the cognizant Payment
Office. The Contractor’s invoice shall show the amount of SBSIF payable by contract line item. The Contractor’s invoice must cite the appropriate accounting data in order for payment to be effected.
(h) Single Point of Contact:
The Contractor shall establish a single point of contact to deal with the Government on its small business subcontracting activities relating to this contract. The Government encourages the Contractor to pursue activities that will support increasing the level of small business subcontracting participation under this contract including, but not limited to, internal education and training, participation in matchmaking conferences and other outreach efforts, and the use of SUB-Net to post subcontracting opportunities.
NOTE E
Level of effort Item in accordance with NAVSEA Provision 5252.216.9122 entitled “LEVEL OF EFFORT” ALT 1 to the Contract. The hours shown in the schedule are the maximum hours for each CLIN to be performed within the period established under Section F of the contract entitled “DELIVERIES OF PERFORMANCE” and include both prime and subcontracts hours.
NOTE F
These CLINs consist of stepladder quantities which may range from the stated minimum quantities through the stated maximum quantities for each respective CLIN. Maximum steps are provided for each respective CLIN and shall not be exceeded. Offerors shall provide stepladder pricing in the “Stepladder Pricing Table”. Stepladder pricing set forth in Note F supersedes pricing in all other locations in Section B.
STEPLADDER GUIDELINES
Stepladder guidelines for CLIN 0003:
Minimum Quantity: 1
Maximum Quantity: 20
Maximum Number of Steps: 4
Stepladder guidelines for CLINs 0103 and 0203:
Maximum Quantity: 50
Maximum Number of Steps: 6
Stepladder guidelines for CLINs 0303 and 0403:
Maximum Quantity: 100
Maximum Number of Steps: 8
Stepladder guidelines for CLINs 0004, 0104, 0204, 0304, and 0404:
Minimum Quantity: 10
Maximum Quantity: 90
Maximum Number of Steps: 8
Stepladder guidelines for CLINs 0005, 0105, 0205, 0305, and 0405:
Maximum Quantity: 6
Maximum Number of Steps: 3
STEPLADDER PRICING TABLE (TO BE FILLED IN BY OFFEROR)
STEPLADDER NAME
ITEM
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
MK48 MOD 7 G&C
Section Base 0003 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 1 - MK48
MOD 7 G&C Section 0103 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 2 - MK48
0203 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 3 - MK48
0303 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 4 - MK48
0403 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
MK48 MOD 7 CBASS
0004 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 1 - MK48
MOD 7 CBASS Upgrade
Kits
0104 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 2 - MK48
MOD 7 CBASS Upgrade
0204 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 3 - MK48
MOD 7 CBASS Upgrade
0304 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 4 - MK48
MOD 7 CBASS Upgrade
0404 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Factory Test Equipment 0005 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 1 - Factory
Test Equipment 0105 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 2 - Factory
0205 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 3 - Factory
0305 1
NO
Step
Number
FROM
QUANTITY
TO QUANTITY
UNIT
PRICE
Option Year 4 - Factory
0405 1
NOTE G
The Optional Provisioned Item Order (PIO) for Factory Test Equipment Component Spares CLIN 0012 will be implemented by separate contract modifications in accordance with Section C: PROVISIONED ITEMS ORDERS
(NAVSEA) (APR 1999). Pricing will be set forth on each order. Offerors shall propose a profit percentage in the table below. The proposed profit percentage will be utilized on all orders issued under CLIN 0012.
Proposed Profit Percentage
CLIN 0012 – PIO %
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(APPLICABLE TO ALL CLINS)
(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the
Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
HQ B-2-0007 LIMITATION OF COST/LIMITATION OF FUNDS (NAVSEA) (SEP 1990)
(APPLICABLE TO CLINs 0006, 0008, 0009, 0106, 0108, 0109, 0206, 0208, 0209, 0306, 0308, 0309, 0406, 0408, 0409)
The clause entitled "LIMITATION OF COST" (FAR 52.232-20) or "LIMITATION OF FUNDS" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
HQ B-2-0012 PAYMENT FOR ENGINEERING SERVICES AND SUPPORT (NAVSEA) (JAN 2008)
(APPLICABLE TO OPTION CLINs (IF EXERCISED) 0006, 0008, 0009, 0106, 0108, 0109, 0206, 0208, 0209, 0306, 0308, 0309, 0406, 0408, 0409)
(a) Invoices for engineering services and overtime shall contain the name(s) of engineer(s), date(s) and place(s) of performance, and a brief description of the services performed. This information may be included in the Comments tab of the applicable WAWF document. Each invoice shall be accompanied by a copy of the authorization for services and the original certification of performance. These documents may be attached to the invoice as described in the Invoice Instructions in Section G. A copy of each invoice shall be furnished to the applicable
NAVSEA/DRPM/PEO code identified in Section C under Engineering Services.
(b) Invoices for subsistence and transportation shall be supported by a statement of actual costs incurred by the
Contractor and claimed to be reimbursable and shall be in such form and reasonable detail as required by the cognizant
Defense Contract Audit Agency (DCAA). The Government shall make provisional payment after submission of each invoice and statement of costs. At any time prior to final payment, DCAA may audit the invoice(s) and statement(s) of costs, as appropriate.
(c) Each provisional payment for subsistence and transportation costs shall be subject to reduction to the extent any amount included in the related invoice and statement of costs is found not to be reimbursable under the support item(s) and shall also be subject to reduction for overpayment or to increase for underpayment on preceding invoices. Any disputes under this requirement shall be determined in accordance with the clause of this contract entitled "DISPUTES"
(FAR 52.233-1).
HQ B-2-0015 PAYMENT OF FEES(S) (LEVEL OF EFFORT – ALTERNATE I) (NAVSEA) (MAY 2010)
(APPLICABLE TO OPTION CLINs (IF EXERCISED) 0008, 0009, 0108, 0109, 0208, 0209, 0308, 0309, 0408, and 0409)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts for level of effort type contracts.
(b) The Government shall make payments to the Contractor, subject to and in accordance with the clause in this contract entitled "FIXED FEE" (FAR 52.216-8) or "INCENTIVE FEE", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "ALLOWABLE COST
AND PAYMENT" (FAR 52.216-7), subject to the withholding terms and conditions of the "FIXED FEE" or
"INCENTIVE FEE" clause, as applicable, and shall be paid at the hourly rate(s) specified above per man-hour performed and invoiced. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
HQ B-2-0017 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (SEP 1990)
(APPLICABLE TO OPTION CLINs (IF EXERCISED) 0010, 0011, 0110, 0111, 0210, 0211, 0310, 0311, 0410, and 0411)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will only be made for the difference between the intrinsic value of the item at the time an agreement on price was reached and the contract price. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (beyond economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the
Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a
Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "DISPUTES" clause (FAR 52.233-1).
(f) The Contractor will make refunds, as required under this requirement, in accordance with instructions from the
Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment with a unit price in excess of $100,000; or in excess of $25,000 if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
HQ B-2-0020 TRAVEL COSTS - ALTERNATE I (NAVSEA) (DEC 2005)
(APPLICABLE TO CLINs (IF EXERCISED) 0006, 0106, 0206, 0306, and 0406)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs accepted by the cognizant DCAA.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incident to relocation are allowable to the extent provided in FAR 31.205-35;
however, Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incident to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the
Contractor's or employee's convenience.
HQ B-2-0023 CONTRACT SUMMARY FOR PAYMENT OFFICE (COST/FIXED PRICE) (FEB 1997)
(APPLICABLE TO ALL CLINS)
This contract includes the following mixture of cost reimbursement and fixed price line items:
CLIN Type (FPI, FFP, CPFF, COST ONLY, NSP, RESERVERD CLINs)
0001 FPI
0002, 0003, 0004, 0005, 0010, 0011, 0012, 0013, 0014, 0103, 0104, 0105, 0110, 0111, 0203, 0204, 0205, 0210, 0211
0303, 0304, 0305, 0310, 0311
0403, 0404, 0405, 0410, 0411
FFP
0008, 0009
0108, 0109
0208, 0209
0308, 0309
0408, 0409
CPFF
0006, 0106, 0206, 0306, COST ONLY
0007 NSP
0101, 0102, 0107, 0112, 0113, 0114
0201, 0202, 0207, 0212, 0213, 0214
0301, 0302, 0307, 0312, 0313, 0314
0401, 0402, 0407, 0412, 0413, 0414
RESERVED
Section C - Descriptions and Specifications
PART 1: CLIN DESCRIPTIONS
CLIN 0001 – MK48 MOD 7 G&C Section Proof of Manufacture (POM)/First Article
The Contractor shall perform non-recurring engineering (NRE) design and redesign due to obsolescence, fabricate and/or procure, assemble, test and deliver MK48 Mod 7 Guidance and Control (G&C) Sections, part number
7054104 (Attachment 1). The G&C Sections shall consist of all parts in drawings 7054104, 7054105, and
7054106, provided in Attachment 1, except for the changed part numbers as listed below.
The Contractor shall fabricate and/or procure, assemble, test and deliver the Guidance and Control Box (GCB) to the requirements of the Mod 7 GCB Critical Item Performance Specification (CIPS) 8595311 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Broadband Sonar Analog Receiver
(BSAR) to the requirements of the Mod 7 BSAR CIPS 8595317 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Pre-Amplifier to the requirements of the
Mod 7 Pre-Amplifier CIPS 8595318 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Nose Array to the requirements of assembly drawing number 6879925 (Attachment 1) and test to the requirements of specification
8595315(Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Transmitter to the requirements of assembly drawing number 5728260 (Attachment 1) and test to the requirements of specifications 6238849
(Attachment 1), 6238850 (Attachment 1), 6238852 (Attachment 1), and 8595319 (Attachment 1).
The Contractor shall fabricate and/or procure, test and deliver the Inertia Measurement Unit (IMU) to the requirements of the IMU source control drawing 8475547 (Attachment 1). Source control drawing 8475547 replaces assembly number 6240279 listed in drawing 7054105.
The Contractor shall fabricate and/or procure, assemble, test and deliver the Tuning Box to the requirements of assembly drawing number 8619933 (Attachment 1). Assembly drawing number 8619933 replaces assembly number 5856624 listed in drawing 7054106.
The Contractor shall fabricate and/or procure, assemble, test and deliver the Depth Sensor Assembly (DSA) to the requirements of assembly drawing number 8475700 (Attachment 1). Assembly drawing number 8475700 replaces assembly drawing number 5856460 listed in drawing 7054105.
The Contractor shall fabricate and/or procure, assemble, test and deliver the Wirelink to the requirements of assembly drawing number 8619940. Assembly drawing number 8619940 (Attachment 1) replaces assembly drawing number 5728320 listed in drawing 7054105.
The Contractor shall fabricate and/or procure, assemble, test and deliver the Mod 7 Torpedo cable assemblies, identified in the Contract Baseline (Attachment 1) to the requirements of the Type 1 Cable Performance
Specification 6934929 (Attachment 1). With the exception of Type 1A cables, paragraphs 3.2.1.2.1 and 4.8.2 of the performance specification shall be 600 VRMS in lieu of 1000 VRMS.
The Contractor shall fabricate and/or procure, assemble, test and deliver all other material contained in parts lists
7054104, 7054105, and 7054106 (Attachment 1) required to build the G&C Section.
The Contractor shall perform NRE design and redesign due to obsolescence as necessary in order to make the deliverables detailed in CLINs 0002, 0005, and 0013 production ready.
CLIN 0002 – MK48 MOD 7 CBASS Upgrade Kits POM
The Contractor shall fabricate and/or procure, assemble, test and deliver MK48 Mod 7 CBASS Upgrade Kits. The
CBASS Upgrade Kit shall consist of a Guidance and Control Box (GCB), Broadband Sonar Analog Receiver
(BSAR), Pre-Amplifier, Cable assemblies, and CBASS Kit Materials.
The Contractor shall fabricate and/or procure, assemble, test and deliver the GCB to the requirements of the Mod 7
GCB CIPS 8595311 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the BSAR to the requirements of the Mod 7
BSAR CIPS 8595317 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Pre-Amplifier to the requirements of the
The Contractor shall fabricate and/or procure, assemble, test and deliver the Mod 7 CBASS Upgrade Kit Torpedo cable assemblies, identified as “CBASS Kit” cables in the Contract Baseline, to the requirements of the Type 1
Cable Performance Specification 6934929 (Attachment 1). With the exception of Type 1A cables, paragraphs
3.2.1.2.1 and 4.8.2 of the performance specification shall be 600 VRMS in lieu of 1000 VRMS.
The Contractor shall fabricate and/or procure, assemble, test and deliver the CBASS Kit Materials to the requirements of the drawings specified in Exhibit E.
The NRE associated for these deliverables shall be included in CLIN 0001.
CLIN 0003, and (IF OPTIONS ARE EXERCISED) CLINs 0103, 0203, 0303, and 0403 – MK48 MOD 7 G&C
Section
The Contractor shall fabricate and/or procure, assemble, test and deliver MK48 Mod 7 G&C Sections, part number
7054104 (Attachment 1). The G&C Sections shall consist of all parts in drawings 7054104, 7054105, and
7054106, provided in Attachment 1, except for the changed part numbers as listed below.
The Contractor shall fabricate and/or procure, assemble, test and deliver the Guidance and Control Box (GCB) to the requirements of the Mod 7 GCB Critical Item Performance Specification (CIPS) 8595311 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Broadband Sonar Analog Receiver
(BSAR) to the requirements of the Mod 7 BSAR CIPS 8595317 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Pre-Amplifier to the requirements of the
The Contractor shall fabricate and/or procure, assemble, test and deliver the Nose Array to the requirements of assembly drawing number 6879925 (Attachment 1) and test to the requirements of specification 8595315
(Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Transmitter to the requirements of assembly drawing number 5728260 (Attachment 1) and test to the requirements of specifications 6238849
(Attachment 1), 6238850 (Attachment 1), 6238852 (Attachment 1), and 8595319(Attachment 1).
The Contractor shall fabricate and/or procure, test and deliver the Inertia Measurement Unit (IMU) to the requirements of the IMU source control drawing 8475547 (Attachment 1). Source control drawing 8475547 replaces assembly number 6240279 (Attachment 1) listed in drawing 7054105 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Tuning Box to the requirements of assembly drawing number 8619933 (Attachment 1). Assembly drawing number 8619933 replaces assembly number 5856624 listed in drawing 7054106 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Depth Sensor Assembly (DSA) to the requirements of assembly drawing number 8475700 (Attachment 1). Assembly drawing number 8475700 replaces assembly drawing number 5856460 listed in drawing 7054105(Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Wirelink to the requirements of assembly drawing number 8619940 (Attachment 1). Assembly drawing number 8619940 replaces assembly drawing number 5728320 listed in drawing 7054105 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Mod 7 Torpedo cable assemblies, identified in the Contract Baseline (Attachment 1) to the requirements of the Type 1 Cable Performance
Specification 6934929 (Attachment 1). With the exception of Type 1A cables, paragraphs 3.2.1.2.1 and 4.8.2 of the performance specification shall be 600 VRMS in lieu of 1000 VRMS.
The Contractor shall fabricate and/or procure, assemble, test and deliver all other material contained in drawings
7054104, 7054105, and 7054106 (Attachment 1) required to build the G&C Section.
Applicable to FMS units: The Contractor may, per DFARS 225.7303-2, submit their negotiated offset agreement to the PCO at the time of Letter of Offer and Acceptance (LOA) approval prior to or after contract award. With concurrence from PMS404, the Contracting Officer will review and approve adjustments to CLIN/SLIN FMS pricing IAW DFARS 225.7303-2 for which the offset agreement has been negotiated between the Country and the
Contractor.
CLIN 0004, and (IF OPTIONS ARE EXERCISED) CLINs 0104, 0204, 0304, and 0404 – MK48 MOD 7
CBASS Upgrade Kits
The CBASS Upgrade Kit shall consist of a Guidance and Control Box (GCB), Broadband Sonar Analog Receiver
The Contractor shall fabricate and/or procure, assemble, test and deliver the GCB to the requirements of the Mod 7
GCB CIPS 8595311 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the BSAR to the requirements of the Mod 7
BSAR CIPS 8595317 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the Pre-Amplifier to the requirements of the
The Contractor shall fabricate and/or procure, assemble, test and deliver the cable assemblies, identified as “CBASS
Kit” cables in the Contract Baseline, to the requirements of the Type 1 Cable Performance Specification 6934929
(Attachment 1). With the exception of Type 1A cables, paragraphs 3.2.1.2.1 and 4.8.2 of the performance specification shall be 600 VRMS in lieu of 1000 VRMS.
The Contractor shall fabricate and/or procure, assemble, test and deliver the CBASS Kit Materials to the
Applicable to FMS units: The Contractor may, per DFARS 225.7303-2, submit their negotiated offset agreement to the PCO at the time of Letter of Offer and Acceptance (LOA) approval prior to or after contract award. With concurrence from PMS404, the Contracting Officer will review and approve adjustments to CLIN/SLIN FMS pricing IAW DFARS 225.7303-2 for which the offset agreement has been negotiated between the Country and the
Contractor.
CLINs 0005, and (IF OPTIONS ARE EXERCISED) 0105, 0205, 0305, and 0405 – Factory Test Equipment
The Contractor shall fabricate and/or procure, assemble, test and deliver Factory Test Equipment and associated cables that are capable of verifying the Factory Acceptance Test (FAT) requirements of the Transmitter, GCB, and
BSAR Functional Item Replacements (FIRs) set forth in Attachment 1, excluding the requirements that can be tested using the GFE test stations (see Attachment 4) and for further information see Section C - paragraph 3.3.7.1.
Cables shall be capable of performing testing during all ambient, environmental, and manufacturing screening conditions as required by the Statement of Work and associated specification documents.
The Contractor shall include as part of this CLIN any and all other Factory Test Equipment developed for the execution of this contract.
(IF OPTIONS ARE EXERCISED) CLIN 0006, 0106, 0206, 0306, and 0406 - Other Direct Costs
The Contractor shall invoice the costs of subsistence, transportation, overtime and material incurred, as authorized by Technical Instruction (TI) in accordance with (IAW) Section H clause 5252.242-9115 TECHNICAL
INSTRUCTIONS (APR 1999), for Engineering Services and Hardware Repair and Maintenance that are provided under Option CLINs 0008, 0108, 0208, 0308, and 0408 and 0009, 0109, 0209, 0309, and 0409 in accordance with
HQ C-1-0008 Support for Engineering Services (NAVSEA) (JUN 1992).
CLIN 0007 – MK48 MOD 7 Data
The data to be furnished hereunder shall be prepared in accordance with HQ C-1-0001 Data Requirements
(NAVSEA) (SEP 1992).
(IF OPTIONS ARE EXERCISED) CLINs 0008, 0108, 0208, 0308, and 0408 –Engineering Services and
Support
The Contractor shall, subject to Technical Instructions issued in accordance with (IAW) Section H clause 5252.242-
9115 TECHNICAL INSTRUCTIONS (APR 1999), furnish qualified engineers to conduct studies, provide services, testing, prototyping, and/or analyses of design and/or production related issues for the MK48 MOD 7 G&C Section, CBASS Upgrade Kit, and Factory Test Equipment as well as prototyping for future torpedo versions and obsolescence risk mitigation for MK48 Torpedo components.
The engineering services shall be performed within the limits, if any, as to place(s) and period(s) specified therefore, as authorized by Technical Instructions issued by the COR (see Section G).
The maximum liability of the Government for each engineering services item shall not exceed the amount set forth in the Schedule, or the amount obligated whichever is less. If, at any time, the Contractor has reason to believe that the amounts it expects to incur in the performance of each engineering services item in the next succeeding sixty (60) days, when added to all amounts previously incurred, will exceed seventy-five percent (75%) of the amount then set forth in the Schedule; or if, at any time, the Contractor has reason to believe that the man days and/or amount for the full performance of each engineering services item will be greater than or substantially less than that set forth in the
Schedule, the Contractor shall notify the Contracting Officer in writing, giving its revised estimate of the man days and/or amount for the performance of said item. The Contractor shall not exceed the obligated amount for each engineering services item, unless and until such amount has been increased in writing by the Contracting Officer.
(IF OPTIONS ARE EXERCISED) CLINs 0009, 0109, 0209, 0309, and 0409 – Hardware Repair and
Maintenance
The Contractor shall provide cost-reimbursable hardware repair services for Government Owned hardware delivered under this contract that are not covered under the manufacturer's or a third-party warranty. The Government will provide to the Contractor Government-Furnished Equipment (GFE) in need of rework or repair. The Contractor shall provide a cost estimate and schedule for rework or repair and retest to the Government within 10 working days of receipt of GFE needing rework or repair. The Government will assess that information and notify the Contractor in writing within 10 days as to whether or not the repair is authorized. The Contractor shall not proceed with the repair if it does not receive any written notification from the Government.
The Contractor shall provide cost-reimbursable hardware repair services for Contractor Owned hardware that has been damaged by the Government due to no fault of the Contractor. The Government will provide to the Contractor the damaged Equipment in need of rework or repair. The Contractor shall provide a cost estimate and schedule for rework or repair and retest to the Government within 10 working days of receipt of equipment needing rework or repair. The Government will assess that information and notify the Contractor as to whether or not the repair is authorized. The Contractor shall not proceed with the repair if it does not receive any written notification from the
Government.
The Contractor shall, subject to Technical Instructions issued in accordance with Section H clause NAVSEA
5252.242-9115 TECHNICAL INSTRUCTIONS (APR 1999), repair the Government hardware under this contract as hereby specified. Prior to the Contractor performing any hardware repair services the Contracting Officer’s designated Contracting Officer’s Representative (COR) (See Section G) will authorize all repairs.
The maximum liability of the Government for each engineering services item shall not exceed the amount set forth in the Schedule, or the amount obligated whichever is less. If, at any time, the Contractor has reason to believe that the amounts it expects to incur in the performance of each engineering services item in the next succeeding sixty (60) days, when added to all amounts previously incurred, will exceed seventy-five percent (75%) of the amount then set forth in the Schedule; or if, at any time, the Contractor has reason to believe that the man days and/or amount for the full performance of each engineering services item will be greater than or substantially less than that set forth in the
Schedule, the Contractor shall notify the Contracting Officer in writing, giving its revised estimate of the man days and/or amount for the performance of said item. The Contractor shall not exceed the obligated amount for each engineering services item, unless and until such amount has been increased in writing by the Contracting Officer.
(IF OPTIONS ARE EXERCISED) CLINs 0010, 0110, 0210, 0310, and 0410 – Spare Components
If the option(s) are exercised, the Contractor shall fabricate and/or procure, assemble, test, and deliver hardware and any associated software and firmware as specified in Exhibit C (MK48 MOD 7 G&C Sections and CBASS Upgrade
Kits Spares List). Varying quantities of spares may be ordered dependent upon need and quantities ordered in
CLINs 0003, and (IF OPTIONS EXERCISED) 0103, 0203, 0303, and 0403; 0004, and (IF OPTIONS
EXERCISED) 0104, 0204, 0304, and 0404, and based upon per unit pricing in Exhibit C.
(IF OPTIONS ARE EXERCISED) CLINs 0011, 0111, 0211, 0311, and 0411 – Production Support Material
If the option(s) are exercised, the Contractor shall fabricate and/or procure, assemble, test, and deliver MK48 MOD
7 G&C Sections and CBASS Upgrade Kits and/or Kit components as specified in Exhibit D (MK48 MOD 7 G&C
Sections and CBASS Upgrade Kit Production Support Material). Varying quantities of production support material may be ordered dependent upon need and based upon per unit pricing in Exhibit D.
(IF OPTION EXERCISED) CLIN 0012 – Provisioned Items Orders for Factory Test Equipment Component
Spares
If the option is exercised, the Contractor shall fabricate and/or procure, assemble, test, and deliver hardware and any associated software and firmware in support of the Factory Test Equipment Component Spares in accordance with
“HQ C-1-0003 Provisioned Items Orders (APR 1999)”. Varying quantities of spares may be ordered dependent upon need and results from the Factory Test Equipment Sparing Analysis (CDRL A027).
CLIN 0013 - MK48 MOD 7 CBASS Pre-POM Kit
The CBASS Pre-POM Kit shall consist of a Guidance and Control Box (GCB), Broadband Sonar Analog Receiver
The Contractor shall fabricate and/or procure, assemble, test and deliver the GCB to the requirements (excluding manufacturing, environmental, and HASS requirements) of the Mod 7 GCB CIPS 8595311 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the BSAR to the requirements (excluding manufacturing, environmental, and HASS requirements) of the Mod 7 BSAR CIPS 8595317 (Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver Pre-Amplifier to the requirements
(excluding manufacturing, environmental, and HASS requirements) of the Mod 7 Pre-Amplifier CIPS 8595318
(Attachment 1).
The Contractor shall fabricate and/or procure, assemble, test and deliver the cable assemblies, identified as “CBASS
Kit” cables in the Contract Baseline, to the requirements of the Type 1 Cable Performance Specification 6934929.
With the exception Type 1A cables, paragraphs 3.2.1.2.1 and 4.8.2 of the performance specification shall be 600
VRMS in lieu of 1000 VRMS.
The Contractor shall fabricate and/or procure, assemble, test and deliver the CBASS Kit Materials to the
CLIN 0014 – Small Business Subcontracting Incentive
Refer to Small Business Incentive clause in Note D in Section B.
PART 2: SPECIFICATE REQUIREMENTS
2.1 ACCESS TO GOVERNMENT FACILITIES
The Contractor will have access to the Government-owned facilities located at Naval Undersea Warfare Center
(NUWC) Division Newport, Rhode Island; NUWC Division Keyport, Washington; and NUWC Division Keyport facilities located at Naval Submarine Base Bangor, Washington as required in support of the life-cycle of this procurement including production, testing efforts, troubleshooting, failure analysis, meetings, etc. on a not to interfere basis. Attachment 5 (Government Furnished Facilities) provides a list of available Government test facilities for use in the execution of this contract.
For utilization of Government facilities, the Contractor shall establish a Test Availability Plan (TAP) with the appropriate Government activity 90 days prior to planned use.
The Government will not be responsible for conflicts, delays, or disruptions to any work performed by the
Contractor due to use of any or all of such property under this contract or any other contracts under which use of such property is authorized.
2.2 ACCESS TO CONTRACTOR'S FACILITIES
Without limiting the Government's rights or obligations set forth in this contract, the Contractor specifically agrees as follows:
a) In addition to the cognizant Government Inspector(s) at the Contractor's plant(s), the Contractor shall permit representatives of Government Contract Laboratories and any Government activities as designated by PMS404 to have badged access to the Contractor's plant(s) in order to observe and examine the
Contractor's performance of this contract on a non-interference basis.
b) The Contractor shall grant representatives of Advisory and Assistance Services Contractors access to the
Contractor's plant(s) with the cognizant Government Inspector for purposes of reviewing and otherwise examining all relevant systems and procedures.