This document contains questions and answers regarding a solicitation for Administrative and Operational Contractor Support Services. The solicitation seeks to provide program management support for various directorates and teams within the F-35 Joint Program Office. Key details include that the requirement is set aside for Service-Disabled Veteran-Owned Small Businesses, responses are due by late November 2022, the contract will utilize both cost-plus-fixed-fee and cost reimbursement CLINs, and the incumbent contractor is the current provider. Offerors had various questions clarified around facility clearance requirements, labor categories and minimum qualifications, cost proposal instructions, and other solicitation elements.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation: Administrative and Operational Contractor Support Services (CSS) Support Knowledge Based Services (KBS), newest first.
File Type Posted
N0001922R0036 A003.docx.pdf PDF
Att_2_LCATs_and_Minimum_Quals A003.pdf PDF
Attachment_P1_Level_of_Effort 11102021.xlsx XLSX spreadsheet
N0001922R0036 A002 conformed.pdf PDF
Att P2_Past Performance Info (PPI) Form A002.pdf PDF
Attachment_P1_Level_of_Effort A002.xlsx XLSX spreadsheet
Admin KBS_Exhibit A002 - Transition In Plan 09132021.pdf PDF
Admin KBS_Exhibit A001 - In-Progress Review 09132021.pdf PDF
Admin KBS_Exhibit A001 - OPSEC Plan 09132021.pdf PDF
Admin KBS_Exhibit A004 - PNR 09132021.pdf PDF
Admin KBS_Exhibit A003 - Level of Effort 09132021.pdf PDF
Admin KBS_Exhibit A002 - Transition Out Plan 09132021.pdf PDF
Admin KBS_Exhibit C001 - Trip Report 09132021.pdf PDF
Admin KBS_Exhibit A003 - Hiring Status Report 09132021.pdf PDF
Admin KBS_Exhibit A002 - Quality Control Plan 09132021.pdf PDF
N0001922R0036 A002.pdf PDF
Admin KBS_Exhibit B001 - Monthly Expenditure Report 09132021.pdf PDF
Admin KBS_Exhibit_A001 - Program Management and Staffing Plan 09132021.pdf PDF
Admin KBS_Exhibit B001 - 45 Day Report 09132021.pdf PDF
Admin KBS_Exhibit A003 - Monthly Status Report 09132021.pdf PDF
Admin_Ops QAs Amendment 1.pdf PDF
N0001921R003600001.pdf PDF
Att_3_SAC.pdf PDF
Att_P2_Past_Performance_Matrix.doc.pdf PDF
Att_1_DoD_Security_Regulations.pdf PDF
Att_8_Contractor_Employee_NDA.pdf PDF
Att_P6_Question_Submittal_Form.xlsx XLSX spreadsheet
N0001922R0036_Admin_KBS_RFP 20211026.pdf PDF
Att_2_LCATS_and_Min_Quals.pdf PDF
Att_6_JPO_Visitor_Group_Security_Agreement.pdf PDF
Att_7_JPO_In-Processing Data Sheet.pdf PDF
Att_P1_Level_of_Effort 09092021.xlsx XLSX spreadsheet
Att_P5_Cost_Summary_Sheet_20211021.xls XLS spreadsheet
Att_P3_Subcontractor Teaming Partner Consent Form.pdf PDF
Att_4_DD254 Signed 2021 09 09.pdf PDF
Att_5_Travel Authorization Form.pdf PDF
Att_9_JPO_CUI_Information_Policy_May_2021.pdf PDF
Att_P4_Past Performance Questionnaire.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Source (RFP, attachment #, GFI title, etc.)

Page number and paragraph header from source Question Date of Response USG Response

1 RFP Section C. 3.2.2.2 Pg 21 Can the TS level Facility Clearance requirement be satisfied by use of a teammate/subcontractor’s FCL with a certified TS FCL in the same geographical area?

3 Nov, 2021 The prime must possess the required top secret facility clearance level.

2 RFP Pages 94-97, 4.0 VOLUME

4: PAST PERFORMANCE

and VOLUME 4:

PRICE/COST PROPOSAL

after reviewing the final RFP recognizes that numbering in Section L appears nonsequential. For example, section 4.0 VOLUME 4: PAST PERFORMANCE moves from 4.1.1 to 4.1.3, skipping over 4.1.2. Additionally, Section L labels the Price/Cost Proposal as Volume 4 and numbers the sections as 4.1 through 4.4 although Past Performance is also labeled as Volume 4 and uses sections 4.1 through 4.14. Should we use this numbering for our response or does the government anticipate releasing updated documents with revised section numbers for us to use? Any guidance is appreciated.

3 Nov, 2021 Paragraph numbering is revised. See Amendment 0001 to the Solicitation.

3 RFP Section A- Solicitation/Contract Form

The solicition identifies the requirement for a Top Secret Facility. The proposed prime currently has a secret facility. Would it be acceptable if the sub-contractor has an approved TS facility at the time of award and the prime then begins the upgrade process thereby allowing all TS requirements to be met upon award?

3 Nov, 2021 The prime must possess the required top secret facility clearance level.

4 Attachment P2 No past performacne matrix. Attachment is a copy of the Att_3 SAC. 10-Nov-21 Corrected Attachment P2 is provided under A002

5 RFP Section L Part B 3.2 RFP states "The number of resumes required for submission with an offeror's proposal is one (1) resume for each of the Key Labor Categories." Att P1 shows 4 key labor caetgories in Year One.

Years 2-5 show a "Facility Escort" bolded in the same fashion as key labor categories in Year One, but the "key" column (column I) for that labor category does not indicate a "1". Please confirm it is NOT key and that a resume is not required. Request correction of Attachment P1 to unbold it.

10-Nov-21 Resumes are required for only Key Personnel identified for Ordering Period Year 1. RFP updated via A003

6 RFP Section L Part A 3.3; Part B 4.1.1 Part A 3.3 indicates 3 PP (15 pages with 5 pages per PP). Part B 4.1.1 states: "The Offeror shall submit no more than three Past Performance Information Forms as the Prime Contractor, no morethan one form for each principal subcontractor, and/or no more than one form for each JV team member" Thsi would seem to indicate a possibility of 5 PP (3 for prime AND 1 for each of two principal subcontractors). Section M 2.2.3 indicates only the "first 3" PP will be evaluated.

Request section 4.1.1 wording revision to remove ambiguity.

10-Nov-21 Offeror shall submit no more than 3 past performance forms, regardless of the combination of submissions from the Prime, principals, or JV team members.

RFP revised via A003.

7 RFP SF 33 Block 5 Date is incorrect. Solicitation was posted 10/26/2021. 10-Nov-21 Concur, Solicitation issue date was 10/26/2021.

8 RFP SF 33 Block 9 No proposal due date provided. Only way to know proposal is due on November 26 is by text at SAM.GOV (not part of actual RFP package).

10-Nov-21 Proposal Due date was added to Block 9 via A002.

9 Section A Top Secret FCL is indicated at time of proposal submission. Would an Interim TS FCL be acceptable?

10-Nov-21 See USG Response to question #1

10 Attachment 2 - Labor Categories and Minimum Qualifications

Page 1 - paragraph A.2.3 In Attachment 2 - Labor Categories and Minimum Qualifications, there are education substitution guidelines for Master’s and Bachelor’s degrees but none for Associate’s degrees. Would the Government allow for a HS diploma and additional years of experience as a substitution for an Associate’s degree in mid-level labor categories? The degree restriction severely limits the number of highly qualified candidates available to industry specifically in labor categories such as Defense Travel Systems Analyst, DTS Reviewer and Travel SME, and Facility Management Support Administrator.

10-Nov-21 The Government will not revise the education substitution guideline for Associate's degrees in mid-level labor categories.

11 Attachment 2 - Labor Categories and Minimum Qualifications

Page 2 - IDIQ Program Manager - LC 01

The required experience for the IDIQ Program Manager specifically includes 4 years within the last 8 years managing a Major Defense Acquisition Program (MDAP). Given the fact that contractors can’t manage a MDAP, this requirement severely limits the candidate pool to Senior Military Officers (e.g. a former F-35 PEO) and/or SES Civilians who have retired from managing a MDAP within the past 4 years, and who don’t currently have a legal obligation to abstain from performing work in support of this effort. For the purposes of leading a contract effort under this NAICS, it seems much more applicable to require experience managing a contract effort. We request the Government consider modifying this requirement to include managing a contract effort as acceptable experience for the IDIQ Program Manager labor category.

10-Nov-21 Attachment 2 has been updated to revise via A003 the experience requirement for the IDIQ Program Manager.

12 Attachment 2 - Labor Categories and Minimum Qualifications

Page 2 - IDIQ Program Manager - LC 01

In Attachment 2 - Labor Categories and Minimum Qualifications, would the Government consider eliminating the requirement for the IDIQ Program Manager to have led a contract within the DoD environment that exceeds $75M in the last five years? The requirement does not seem applicable to an effort of this size and NAICS.

10-Nov-21 Refer to question # 11's answer.

13 Attachment P2 - Past Performance Information (PPI) Form entire document Attachment P2 Past Performance Information (PPI) Form has been inadvertently switched with the F-35 Surveillance Activity Checklist (SAC). Could you please provide the Past Performance Information (PPI) Form?

10-Nov-21 Corrected Attachment P2 was provided via A002.

14 Exhibits entire document Per Section J - List of Documents, Exhibits and Other Attachments - Exhibits - Contract Data Requirements List (CDRLs) have not been provided. Can the Government provide?

10-Nov-21 CDRLs are now provided

15 Attachment P1 - Level of Effort

Financial Analyst - SOC The SOC code provided for the Financial Analyst of 13-2051 is mapped to 13-2051 and 13-2054 in the 2010 to 2018 crosswalk, however neither of these codes are found in the either the Metropolitan or State OES table data for 2020. Please advise if there is another applicable SOC to utilize.

10-Nov-21 The provided SOC code 13-2051 is valid.

16 RFP - Section B, Attachment P1 - Level of Effort pg 3-7 of RFP Per Attachment P1, there are no hours associated with the CLINS 0008, 0009, and 0010. Please confirm that the Government just wants us to complete Section B for those CLINS with $0 for Cost/Fee and Cost+Fee.

10-Nov-21 At this time, there are no hours allocated to CLINs 0008, 0009, and 0010

17 RFP - Section B, Attachment P1 - Level of Effort pg 3-7 of RFP Per Attachment P1, Year 1 CLINS match Section B, however Year 2 - 4 CLINs are off from the CLINs in Section B, since Spain has been added to the CLIN #'s, but again with no associated hours. Please advise.

10-Nov-21 Attachment P1 has been updated to reflect the CLIN structure via A003.

18 RFP Page 2 Proposal Information Page 2, Proposal Information, states the proposal due date is stated in Block 9 of the Standard Form (SF) 33, but Block 9 is not filled in. Please confirm the closing date and time for the solicitation.

10-Nov-21 Proposal Due date was added to Block 9 via A002.

19 RFP Page 11, Section 3.1.1 Page 11, Section 3.1.1 Compatibility with the IT environment - Will the government be providing IT equipment to staff as GFE or is the contractor expected to provide all IT resources (e.g., laptops and peripherals)?

10-Nov-21 Yes, the Government will provide IT assets to staff for performance of this effort.

20 RFP Page 12, Section 3.1.2.1 Page 12, Section 3.1.2.1, Work Location - states that All contractor personnel will provide on-site support at the Government sites listed below for approximately 50% of the time, unless otherwise specified in a TO, IAW the telework requirements below. Is it the Government's intent to restrict contractor access to Government worksites to approximately 50% or will contractors have the opportunity to perform at the Government worksites 100%?

10-Nov-21 It is the intent to have personnel at government sites 50% of the time.

21 RFP Page 20, Section 3.2.2 Page 20, Section 3.2.2, Investigative Requirements, second full paragraph states "Contractor personnel shall require access to classified information in performance of this contract up to and including Top Secret, with a safeguarding level of Top Secret." The attached DD-254, section 1b states Safeguarding Requirements "None", and none of the Section 11 blocks authorizing storage of classified material are checked. Please clarify the safeguarding requirements.

10-Nov-21 Page 20, Section 3.2.2, Investigative Requirements, has been revised via A002 as no handling or safeguarding of classified material will be required at a contractor facility.

22 RFP Page 49, FAR Clause 5252.228-9501

Page 49, FAR Clause 5252.228-9501 Liability Insurance. The RFP has fill in blanks for required levels of Liability Insurance. Sub-section (d) lists requirements for Aircraft public and passenger liability. Will the Government consider waiving this requirement since the contract does not require the contractor to operate any aircraft?

10-Nov-21 No, the Government will not waive FAR Clause 5252.228-9501(d). Contractor shall comply with the requirements in the clause as stated.

23 RFP Page 53 Clauses Incorporated by Reference

Page 53 Clauses Incorporated by Reference includes FAR Clause 52.216-11 Cost Contract - No Fee. Would the Government consider removing this Clause based on earlier references to a cost plus fixed fee award?

10-Nov-21 Clause is applicable to cost only CLINs identified in Section B.

24 RFP Page 67 – Section J – List of Documents, Exhibits and Other Attachments

Will we be provided the Exhibits – Contract Data Requirements List (CDRLs)? 10-Nov-21 See response to Question #14

25 RFP Page 88 – Proposal Content and Volumes Table

The table states the page limit is 15 pages for the Past Performance (5 per Past Performance). If a prime has two principal sub-contractors and the prime submits 3 Past Performance Forms that totals 25 pages if we allow 5 pages for each. Can you please confirm the page count for this section?

10-Nov-21 See USG Response to question #6

26 RFP Page 93, Section 3.2 Page 93, Section 3.2 Element 2: Key Personnel. The final paragraph of this section states "All contingent hires shall have a signed Letter of Intent submitted as Annex 2 to this volume." Would the Government please clarify that the intent was for all contingent Key Personnel hires, and specifically does not require LoIs for non-Key Personnel?

10-Nov-21 Section 3.2 only pertains to Key Personnel; offerors should only submit Key Personnel in this volume and section of its proposal. Any contingent personnel submitted under Section 3.2 should comply with the requirements therein.

27 RFP Pg. 93 - 3.2 Element 2: Key Personnel

The third bullet of the 2nd paragraph states the resume shall contain a Letter of Intent (LOI) and then the last paragraph states the LOI is to be included in Annex 2 of the volume. Is the (LOI) required in both places, and if required in the resume, is the LOI included in the 3 page limit per resume?

10-Nov-21 The LOI is only required to be included in Annex 2.

28 RFP Page 95/96, Section 4.3 Page 95/96, Section 4.3 refers to NAVAIR labor tripwire rates identified in Section M. Section M does not include any labor tripwire rates. Will the government provide the tripwire rates or should reference to tripwires in Section 4.3 be disregarded?

10-Nov-21 Solicitation was revised in A002 to re-number Section M, Part B and add Part B paragraphs 4.0 through 4.6; and add Part C paragraphs 1.0 through 4.0.

29 RFP Page 96, Section 4.3e Page 96, Section 4.3e states that Cost of contract incurred for personnel includes direct labor cost, overhead that has only direct labor as its base, and the SDVOSBs’ General and Administrative rate multiplied by the labor cost. Is it the Government's intent to exclude fringe on direct labor?

10-Nov-21 Page 96, Section 4.3e pertains to the calculation for determining the SDVOSB eligibility only. Offerors should include fringe on direct labor in its pricing volume as applicable in accordance with their cost accounting practices.

30 Attachment Attachment P2 - Past Performance Matrix

The Attachment P2 on the PIEE website is the SAC not the Past Performance Matrix. Will the Government be providing the Matrix?

10-Nov-21 See response to question # 4

31 Attachment Attachment 2 - Labor Categories and Minimum Qualifications

The qualifications, as currently stated in the RFP, eliminate many qualified Program Managers who have applicable education and experience, but who have not necessarily managed a MDAP. Given the education and experience requirements for a Senior, and given the limited resources of a small business small enough to qualify under the cited NAICS, would the government consider eliminating the requirement for the IDIQ Program Manager to have a minimum of 12 years of Defense Acquisition Management experience, with four (4) years within the last eight (8) years managing a Major Defense Acquisition Program (MDAP)? This change will provide the government with increased competition.

10-Nov-21 Refer to question # 11's answer.

32 Attachment Attachment 2 - Labor Categories and Minimum Qualifications

The qualifications, as currently stated in the RFP, eliminate many qualified Program Managers who have applicable education and experience, but not necessarily a PMP, PgMP, or DAWIA Level III certification. This requirement limits the candidate pool extensively and will be very difficult for many SDVOSB companies of the required size to meet. Given the education and experience requirements for a Senior, and given the limited resources of a small business small enough to qualify under the cited NAICS, would the government consider eliminating the requirement for the IDIQ Program Manager to have a PMP, PgMP, or DAWIA Level III certification? This change will provide the government with increased competition.

10-Nov-21 No, the Government will not waive the requirement.

33 Attachment Attachment 2 - Labor Categories and Minimum Qualifications

The qualifications, as currently stated in the RFP, eliminate many qualified Program Managers who have applicable education and experience, but who have not necessarily managed a contract that exceeds $75M. Given the substantially reduced level of effort on this contract compared to the full and open contract, and given that this SDVOSB set-aside, would the government consider modifying the requirement for the IDIQ Program Manager to have "demonstrated experience successfully leading a contract within the DoD environment that exceeded $75M in the last five (5) years", to "demonstrated experience successfully managing a contract or subcontract within the DoD environment in the last five (5) years"? This change will provide the government with increased competition.

10-Nov-21 Refer to question # 11's answer.

34 Amendment of solicitation and Att 2 Past Performance Matrix

Att P2 Past Performance Matrix appears to be the Surveillance Activity Checklist (SAC), and not the Past Performance Information Form (PPIF) referenced in 4.1.1 on page 10 of the Amendment of Solicitation. Would the Government please provide the PPIF?

10-Nov-21 Refer to question # 4

35 Past Performance Information Form (PPIF)

N/A Are the 15 pages of the Past Performance Volume to include the PPIFs? Is any other narrative required?

10-Nov-21 Yes, the 15 page limit includes PPIFs.

No other narrative is required.

36 Attachment P4 page 2, part B, "Identification of Offeror's Representative"

For past performances from a principal subcontractor, please clarify if the name in "Identification of Offeror's Representative" should contain the name of a representative of the prime offeror, or the name of a representative of the significant subcontractor.

10-Nov-21 The name in Attachment P4 should reflect the name of the responsible prime or subcontractor that performed the work.

37 RFP Page 11, Scope Reference: SAMS and RFP reference to actual program name is inconsistent.

Question: Will the Government please confirm that the name of the solicitation is Administrative and Operational Contractor (ADMIN and OPS) Support Services (CSS)?

10-Nov-21 The name of the requirement is Administrative and Operational Contractor Support Services (CSS) Knowledge Based Services (KBS).

38 Attachment P1 All tabs, Column (F) Gov't Seating

Attachment P1 identified all staffing as "G" (meaning Gov't Space seating). This conflicts with Section 3.1.2.1 of the SOW which states, "All contractor personnel will provide on-site support at the Government sites listed below for approximately 50% of the time, unless otherwise specified in a TO, IAW the telework requirements below ". Please clarify whether the Government can accommodate 100 percent of the project staff on-site in Government offices.

10-Nov-21 While the "G" does refer to Government spaces, that does not negate the SOW staffing requirements and policies which will permit approximately 50% telework, unless otherwise specified. Attachment P1 is updated via A003 to reflect G/K.

39 Attachment P1 Year 2 - Year 5 LOE Tabs Column (Q) of the referenced tab identifies "% Spain 7006", but does not allocate any LOE. Please confirm this is accurate.

10-Nov-21 See USG Response to question #17

40 Attachment P1 Year 2 - Year 5 LOE Tabs Column (Q) of the referenced tab identifies "% Spain 7006". However, we could not find a corresponding CLIN in Section B for Spain. Please clarify.

10-Nov-21 See USG Response to question #17

41 Attachment P1 Year 2 - Year 5 LOE Tabs RFP Section B identified two CLINS: Country X Admin/Ops Support (CLIN 0008) and Country Y Admin/Ops Support (CLIN 0009). However, these CLINs do not appear to be represented in Attachment P1. Please confirm that offerors are not required to price Country X Admin/Ops Support and Country Y Admin/Ops Support CLINs.

10-Nov-21 See USG Response to question #16 and #17

42 Attachment P5 Fully Burdened Prime Labor Tab (row 12) and Composite Rates Tab (row 17)

The referenced rows identify a non-key FMS Human Resource Analyst - Senior. Should both of these rows be re-labeled as FMS Human Resource Analyst - Mid?

10-Nov-21 There is one key FMS Human Resource Analyst - Senior position. Additionally, there is only one non-key FMS Human Resource Analyst - Mid Position.

43 RFP Page 2, Contract Type "The Contract resulting from this solicitation will be a SA IDIQ contract utilizing CPFF CLINs for Labor. Cost Reimbursable CLINs will be used for Other Direct Costs (ODC) (Travel). Upon award, the Government intends on awarding one (1) initial task order (TO) ." The current pricing instructions and attachments appear to address IDIQ level pricing. We could find no statement of work or pricing instructions for the aforementioned task order. Please clarify.

10-Nov-21 The current pricing instructions and attachments address IDIQ level pricing for streamlined task order pricing.

44 RFP Page 9, Contract Labor Category Table

Reference: The following Labor Category References do not match Attachments P1 and P5:

Facility Escort (Junior) - LCAT missing from P1 and Att 2 Facility Management Support Analyst (Mid) - P1 and P5 reference "Administrator" not "Analyst" Program Manager (Senior) - LCAT missing from P1 Strategic Communications Analyst (Senior) - P1 and P5 states "(Mid)"

Question: Will the Govt reconcile P1, P5 and the RFP LCAT table to ensure all match?

10-Nov-21 LCAT table was revised in A002 to match attachments P1, P5, and Attachment 2. Reference Attachment P1 beginning in year 2 to locate Facility Escort (Junior) and Program Manager (Senior) LCATs.

45 RFP Page 95, Part B - Volume 4:

Cost/Price Proposal

The title of this RFP section references a Volume 4. Please confirm that the Cost/Price Volume should be Volume 5, not Volume 4.

10-Nov-21 This information has been updated in A001.

46 RFP page 95, Part B - Volume 4:

Section 4.3 Cost/Price Information

"Offerors shall submit their fully completed cost/price proposal utilizing the Cost Summary Spreadsheet, specifically the Detailed Cost Tab (Attachment P5)….

The Offeror shall use the CLIN Summary tab to breakout total proposed costs by CLIN ."

Attachment P5 does not contain a tab entitled "CLIN Summary". Is the tab entitled "Detailed Cost Summary" supposed to be used for breakout of total proposed cost by CLIN?

10-Nov-21 Page 95, Part B - Volume 5: Section 5.3 Cost/Price Information has been revised in A002 to match Attachment 5 tabs.

47 RFP page 95, Part B - Volume 4:

Section 4.3 Cost/Price Information

"Proposed fully burdened labor costs may be subject to the NAVAIR labor tripwire identified in Section M. Offerors that propose a fully burdened per employee labor cost exceeding the labor tripwire shall provide rationale in their cost proposal narrative section that justifies the reasonableness of the tripwire cost for the applicable employees ."

Section M appears to be missing the tripwire content. Would the Government please clarify.

10-Nov-21 See USG Response to question #28

48 RFP page 96, Part B - Volume 4:

Section 4.3 Cost/Price Information

"The fixed fee rate per hour shall be calculated as the total fee divided by the total number of hours for the ordering period. (Attachment P5 Composite Labor Rates tab required only from the Prime Offeror.) "

We recommend Section H-2 and Attachment P5 be modified to provide a schedule of fixed-fee per-hour for each labor category by contract period. We do not believe a single weighted average fixed fee hourly rate is in either the Government's or the Contractor's best interests.

10-Nov-21 There will be no modifications to Section H-2 and Attachment P5.

49 RFP page 96, Part B - Volume 4:

Section 4.3 Cost/Price Information

Complete Attachment P5 Composite Labor Rates tab, (Composite Labor Rate and Fee Worksheets), detailing the average fully (composite) burdened labor rates for all prime contractors and their subcontractor/consultant personnel per labor category, as well as the hourly fixed fee rate for the contract (Reference Section B, B-1 and B-2). The Composite Labor Rates are defined as the total labor costs (the sum of both prime and all subcontractor costs) for the labor category divided by the total number of labor hours for that category.

a. Since staff is estimated to be 50% Gov't Site, shouldn't the composite labor rate table also reflect the blending of contractor site rates?

b. Would the Government allow offerors the option of providing a separate composite table for the prime and each of their subcontractors? We believe this would produce a more accurate estimate of labor costs on future task orders where the mixture of subcontractor staff might fluctuate from one Task Order to the next.

10-Nov-21 a. Yes, the rates are regardless of stated location allowing site rates to be blended.

b. No change to the government requirement.

50 RFP page 96, Part B - Volume 4:

Section 4.3(c) Cost/Price Information

"The Offeror shall fully disclose the buildup of cost/price of each CLIN ."

The detail cost tab within Attachment P5 does not appear to organize costs by CLIN. Please confirm that offerors are allowed to replicate the rows within this tab so that the CLIN cost buildup can be clearly shown. If this is not permitted, please provide guidance on how offerors should show CLIN cost buildup. Please note the Attachment P5 instructions (#13) currently state only one detail tab per prime/subcontractor is permitted.

10-Nov-21 The detailed cost tab within Attachment P5 does not organize costs by CLIN, it organizes costs by ordering period and the rows shall not be replicated within this tab. The detailed cost summary organizes costs by CLIN. Offerors may add an additional tab to show the buildup of the cost by CLIN.

51 RFP page 96, Part B - Volume 4:

Section 4.3(e) Cost/Price Information

"This requirement is being set-aside for the Service-Disabled Veteran-Owned Small Business (SDVOSB) program. Provide a breakout to demonstrate how at least 50% of the cost of contract incurred for personnel for contract performance will be performed by the prime itself or other SDVOSBs for each period of performance in accordance with FAR clause 52.219-27. Cost of contract incurred for personnel includes direct labor cost, overhead that has only direct labor as its base, and the SDVOSBs’ General and Administrative rate multiplied by the labor cost. "

The solicitation instructions conflict with FAR clause 52.219-14 Limitations On Subcontracting (SEP 2021) (which is incorporated in Section I.1) because the clause does not define the percentage based on 'cost of contract'. Section (e) of the clause states, "By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for— (1)Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract"; We recommend the solicitation instructions be revised for offerors to provide the subcontract breakout that is consistent with FAR 52.219- 14(e).

10-Nov-21 Page 96, Part B - Volume 4: Section 4.3(e) Cost/Price Information pertains to the calculation for determining the SDVOSB eligibility only.

52 RFP Page 98, Part C, Section 1.0 "If the contractor chooses not to burden ODCs, then the contractor shall propose an H-clause to establish that burdens will be unallowable for ODCs."

If offerors propose an H-clause to establish that ODC burdens will be unallowable, which proposal volume should that information be placed into?

10-Nov-21 This H-Clause information shall be placed in the Price/Cost Volume.

53 RFP Page 97 Part B, Volume 4 Cost/Price, Section 4.4

The instructions state “The Offeror shall provide a Total Compensation Plan in accordance with FAR 52.222-46 for each proposed professional employee”. However, no incumbent pay information was provided in the solicitation. How are offerors supposed to ensure that their proposed compensation doesn’t fall below compensation levels of the predecessor JPO contract?

Specifically, FAR 52.222-46(b) states, "Additionally, proposals envisioning compensation levels lower than those of predecessor contractors for the same work will be evaluated on the basis of maintaining program continuity, uninterrupted high-quality work, and availability of required competent professional service employees. Offerors are cautioned that lowered compensation for essentially the same professional work may indicate lack of sound management judgment and lack of understanding of the requirement."

All offerors (except the incumbent contractor) lack visibility into existing incumbent pay and therefore cannot be certain whether their proposed pay will fall materially below existing incumbent pay rates. We think this gives an unfair competitive advantage to the incumbent. Therefore, we request the Government clarify in Section M how comparisons to incumbent pay will be accomplished and then either provide average incumbent salary information by labor category (broken out by tenure), locale, and security clearance level OR (if incumbent pay cannot be provided) we recommend the Government provide equivalent General Schedule (GS) Series/Grade/Step for each labor category to be used as a proxy for incumbent pay levels.

10-Nov-21 See USG Response to question #28

54 RFP Section M Section M does not define total evaluated price. What will the Government include/exclude from total evaluated price?

10-Nov-21 See USG Response to question #28

55 RFP Section M, Part B The RFP appears to be missing content in Section M. Section M part B provides evaluation details for Technical and Past Performance Factors, but does not contain evaluation details for Cost/Price Factor. Please clarify.

10-Nov-21 See USG Response to question #28

56 SF-33 Can the government reissue a complete SF-33 with Blocks 9, 10 and 12 completed and a corrected solicitation release date?

10-Nov-21 Solicitation was amended via A002 to reflect the correct information for blocks 9, 10, and 12.

57 RFP Amendment 2 RFP Amendment 2 Pg. 27, Section 3.3 and Pg. 33 Section 4.1.2

RFP Amendment 2, Page 27 states that Annex 1 for the proposal package is for Past Performanse Statement of Work and Annex 2 for the proposal package is for Letters of Intent. RFP Amendment 2, Page 33 states that Annex 2 is for Past Performance Statement of Work for the Past Performance Volume. Please confirm the that the Annex Number for Past Performance Statement of Work is Annex 1 to the proposal package (as stated on Page 27) and not Annex 2 to the Past Performance volume.

10-Nov-21 See USG Response to question #27

58 RFP Amendment 2, Attachment P1

RFP Amendment 2 Attachment P1 Level of Effort A002

The Year 1 LOE worksheet uses "000X" CLIN numbering, Year 2 LOE worksheet uses "100X" CLIN numbering, Year 3 LOE worksheet starts with "300X" numbering and changes to "200X" numbering, Year 4 LOE worksheet uses "400X" numbering, and Year 5 LOE worksheet used "500X" numbering. Please confirm the CLIN numbering format for all years.

10-Nov-21 See USG Response to question #17