Exhibit_(A)_CDRL_Final.doc

DOC document 507 KB Posted

Attached to
Close Range Unmanned Aircraft Systems (UAS), Intelligence, Surveillance and Reconnaissance (ISR) Services
Solicitation number
N00019-16-R-0063
Issued by

About this file

Exhibit (A) CDRL

View the file

Other files

File Type Posted
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1&2_TO_2_12_Dec_16.pdf PDF
Amendment_0001.pdf PDF
Attachment_(L-15)_Vol_3_CE-2_ACE.xlsx XLSX spreadsheet
Attachment_(L-3)_Vol_1_NVTherm.xls XLS spreadsheet
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1.pdf PDF
Attachment_(L-9)_Vol_2_Staffing_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-14)_Vol_3_CE-1_Contract_Data.xlsx XLSX spreadsheet
Attachment_(L-11)_Vol_2_T-2.1 T-2.2.xlsx XLSX spreadsheet
Attachment_(L-10)_Vol_2_Staffing_-_Land_Based.xls XLS spreadsheet
Attachment_(L-6)_Vol_2_UAS_Maturity.docx DOCX document
Attachment_(3)_DD254_signed.pdf PDF
Attachment_(L-16)_Vol_4_Price_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-4)_Vol_1_Payload_Data.docx DOCX document
Attachment_(L-17)_Vol_4_Price_-_Land_Based.xls XLS spreadsheet
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3.pdf PDF
Attachment_(L-8)_Vol_2_Propulsion.docx DOCX document
Attachment_(L-5)_Vol_2_T-1_CRM.xlsx XLSX spreadsheet
Final_Solicitation_9_Nov_FINAL.pdf PDF
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1_Atth_(2).xlsx XLSX spreadsheet
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2_Atth_(2).xlsx XLSX spreadsheet
Attachment_(L-2)_Vol_1_SSCam_IP_EO.xls XLS spreadsheet
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2.pdf PDF
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3_Atth_(1).xls XLS spreadsheet
Attachment_(L-7)_Vol_2_AVP_Data.xlsx XLSX spreadsheet
Attachment_(L-1)_Vol_1_ES_Tables.xlsx XLSX spreadsheet
N00019-16-R-0063_Draft_RFP_Q A_27_Oct_2016.pdf PDF
Attachment_(L-15)_Vol_3_CE-2_ACE.xlsx XLSX spreadsheet
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1_(peer_review).pdf PDF
Attachment_(3)_DD254_signed.pdf PDF
Attachment_(L-3)_Vol_1_NVTherm.xls XLS spreadsheet
Attachment_(L-10)_Vol_2_Staffing_-_Land_Based.xls XLS spreadsheet
Attachment_(L-1)_Vol_1_ES_Tables.xlsx XLSX spreadsheet
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3_Atth_(1).xls XLS spreadsheet
Attachment_(L-11)_Vol_2_T-2.1 T-2.2.xlsx XLSX spreadsheet
Attachment_(L-2)_Vol_1_SSCam_IP_EO.xls XLS spreadsheet
Attachment_(L-9)_Vol_2_Staffing_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1_Atth_(2).xlsx XLSX spreadsheet
Attachment_(L-14)_Vol_3_CE-1_Contract_Data.xlsx XLSX spreadsheet
Attachment_(L-17)_Vol_4_Price_-_Land_Based.xls XLS spreadsheet
Draft_Solicitation_N00019-16-R-0063.pdf PDF
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3.pdf PDF
Attachment_(L-6)_Vol_2_UAS_Maturity.docx DOCX document
Attachment_(L-7)_Vol_2_AVP_Data.xlsx XLSX spreadsheet
Attachment_(L-5)_Vol_2_T-1_CRM.xlsx XLSX spreadsheet
Attachment_(L-16)_Vol_4_Price_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-8)_Vol_2_Propulsion.docx DOCX document
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2.pdf PDF
Attachment_(L-4)_Vol_1_Payload_Data.docx DOCX document
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2_Atth_(2).xlsx XLSX spreadsheet
Exhibit_(A)_CDRL.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit (A) Contract Data Requirements List

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

A

C. CATEGORY:

TDP _X TM OTHER_____________________

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Airworthiness-Related Substantiation Data FORMTEXT

3. SUBTITLE (See 16) Flight Clearance Engineering Data

4. AUTHORITY (Data Acquisition Document No. )

DI-SAFT-81905

5. CONTRACT REFERENCE

PBWS 4.1.1.1

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

See 16

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

SSUBSEQUENTSUBMISSION

b. COPIES

N/A

N/A
SUBMISSION

See 16

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block: 12: 30 days after Task Order award to flight clearance/ship suitability request.

Block 13: Updates to data as necessary to meet requirements and 30 days prior to a new flight clearance request.

Block 14: Provide notification and submittal via email to addressees in Block 14 at angel.m.perez@navy.mil and douglas.thorp@navy.mil.

AIR 4.1.1.5
0
1
0
PMA-263
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

XX XXX 2016

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

E3 Verification Report (E3VR)

FORMTEXT

3. SUBTITLE

E3 and EMI

4. AUTHORITY (Data Acquisition Document No. )

DI-EMCS-81542B

5. CONTRACT REFERENCE

PBWS 4.1.1.2

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

1 TIME

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

N/A

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 4: Information shall be provided as required in sub-paragraphs 3.2b, 3.2c, 3.2h, 3.2i, and 3.2o of DI-EMCS-81542B.

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block12. Certification required 30 days after contract award.

Block 14: Provide notification and submittal via email to addressees in Block 14 at angel.m.perez@navy.mil and douglas.thorp@navy.mil.

PMA-263
0
1
0
AIR-4.1.1.5
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Material Safety Data Sheet (MSDS) FORMTEXT

3. SUBTITLE

Hazardous Material (HM) Identification

4. AUTHORITY (Data Acquisition Document No. )

FED-STD-313E

5. CONTRACT REFERENCE

PBWS 4.1.1.3

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

AS REQ

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 4: Use Guidance of FED-STD-313E in document preparation.

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block 12 & 13. Due thirty days prior to arrival of HM at DOD installation.

Block 14. Submit original document(s) to the Facility/Installation Transportation Officer, with a copy to the receiving ship Supply Officer. Provide notification and submittal via email to addressees in Block 14 at

AIR 4.1.1.5
0
1
0
PMA-263
0
1
0
Transport Officer
0
1
0
Supply Officer
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Interface Control Document FORMTEXT

3. SUBTITLE

System Description Document / Interface Control Document

4. AUTHORITY (Data Acquisition Document No. )

DI-SESS-81248B

5. CONTRACT REFERENCE

Land Based PBWS 4.1.1.7 Sea Based PBWS 4.1.1.11

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

AS REQ

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

See 16

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block 13: 30 days after UAS System Upgrades (Block Change, ECPs, etc)

PMA-263
0
1
0
AIR 4.1.1.5
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Program Progress Report FORMTEXT

3. SUBTITLE

Daily/Monthly Report

4. AUTHORITY (Data Acquisition Document No. )

DI-MGMT-80555A

5. CONTRACT REFERENCE

PBWS 4.5.1.1

6. REQUIRING OFFICE

PMA-263

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

See 16
SUBMISSION

See 16

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block 10 and 13: Data is provided daily and then a consolidated monthly total is provided at the end of each month.

Block 11: End of each day’s operations and last day of each month Block 12: Upon completion of IOC

Denise.Lamb@navy.mil and douglas.thorp@navy.mil.

PMA-263
0
1
0
AIR 2.4
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Failure Analysis and Corrective Action Report FORMTEXT

3. SUBTITLE

Root-Cause Failure Analysis

4. AUTHORITY (Data Acquisition Document No. )

DI-SESS-81315B

5. CONTRACT REFERENCE

PBWS 4.5.2

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

N/A

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block 12. Within 120 days of the incident.

AIR 4.1.1.5
0
1
0
PMA-263
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Information Assurance (IA)/Cybersecurity Design Review information Package FORMTEXT

3. SUBTITLE (See 16) Information Assurance

4. AUTHORITY (Data Acquisition Document No. )

DoD 8500.2

5. CONTRACT REFERENCE

Appendix 3 Sec C. 7th paragraph

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

N/A

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block: 12: In accordance with DoD 8500.2 the following documentation must be provided after contract award (CA).

Program Schedule / POA&M (including milestones) , Mission Description, Concept of Operations Summary , System hardware list, System software list, System interfaces , Ports, Protocols, and Services, System Architecture Diagram – NLT 5 days after Contract Award.

Data Flow Diagram - NLT 5 days after Contract Award

Provide a diagram with an explanation of each external interface, including the classification of the data, the protocol used, the direction (in-bound, outbound, or both), the requirement for cross-domain solutions, and accreditation reference number (IATS # or accreditation tracking number) for external systems and hosting network/environment when applicable.

Contingency Plan and Disaster Plan (if not included with Contingency Plan), Incident Response Plan (if not included with Contingency Plan) , Configuration Management Plan , CCB Charter, System Design and/or Security Document, System User Manual, Description of the Operating and Computing Environment, Description of the Physical Security Measures/Facilities , User List (Description and Clearances) are to provided NLT 30 days after Contract Award Block 13: Updates to data as necessary to meet IA Certification requirements.

Block 14: Provide notification and submittal via email to addressees in Block 14 at debra.cusick@navy.mil , bradley.johnson@navy.mil and douglas.thorp@navy.mil.

AIR 4.11.3
0
1
0
AIR 4.1.1.5
0
1
0
PMA-263
0
1
0
15. TOTAL
0
3
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Technical Report FORMTEXT

3. SUBTITLE

Data Dissemination & Storage

4. AUTHORITY (Data Acquisition Document No. )

DI-MISC-81579

5. CONTRACT REFERENCE

Land PBWS 2.6.4 and 2.6.7.2

6. REQUIRING OFFICE

PMA-263

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASGEN

12. DATE OF FIRST SUBMISSION

ASGEN

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

N/A

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block 10 and 12: Provide sensor data, video and other technical information to appropriate government supported activities.

Block 14: Provide each submittal to supported agencies.

Supported Agency
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

N00019-16-R-0063

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Technical Report FORMTEXT

3. SUBTITLE (See 16) Pre-deployment Inventory List

4. AUTHORITY (Data Acquisition Document No. )

DI-MISC-81579

5. CONTRACT REFERENCE

Sea Based PBWS 4.1.2.5

6. REQUIRING OFFICE

AIR 4.1.1.5

7. DD 250 REQ

DD

9. DIST STATEMENT REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

SEE 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

N/A

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(12 September 2016). Other requests for this document shall be referred to PMA-263.

Block: 12: 10 days after completion of B Kit installation CLIN.

mike.chanda@navy.mil and douglas.thorp@navy.mil.

AIR 4.1.1.5
0
1
0
PMA-263
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

PR TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A00A

2. TITLE OF DATA ITEM

OPSEC Plan FORMTEXT

3. SUBTITLE (See 16) OPSEC Plan

4. AUTHORITY (Data Acquisition Document No. )

DI-MGMT-81999

5. CONTRACT REFERENCE

PBWS 4.7.2

6. REQUIRING OFFICE

AIR 7.4.3

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

See 16

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(31 October 2011). Other requests for this document shall be referred to PMA-263.

Block: 12: Draft within 90 days after Task Order award.

Block 13: Final 45 days from date Draft OPSEC Plan is approved. Updates as changes occur.

david.ince@navy.mil and douglas.thorp@navy.mil.

AIR 7.4.3
0
1
0
PMA-263
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT NO.

C. CATEGORY:

D. SYSTEM/ITEM

UAS ISR

E. CONTRACT/PR NO

PR TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A00B

2. TITLE OF DATA ITEM

COMSEC Key Management Plan FORMTEXT

3. SUBTITLE (See 16) COMSEC Key Management Plan

4. AUTHORITY (Data Acquisition Document No. )

DI-MGMT-81999

5. CONTRACT REFERENCE

PBWS 4.7.3

6. REQUIRING OFFICE

AIR 7.4.3

7. DD 250 REQ

LT

9. DIST STATEMENT REQUIRED

B

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

b. COPIES

N/A

N/A
SUBMISSION

See 16

a. ADDRESSEE

FINAL

DRAFT
Reg
Repro

16. REMARKS

Block 9: Distribution authorized to U.S. Government Agencies (To protect information not owned by the U.S. government and protected by a contractor’s “limited rights” statement, or received with the understanding that it not be routinely transmitted outside the U.S. Government)(31 October 2011). Other requests for this document shall be referred to PMA-263.

Block: 12: Draft within 90 days after Task Order award.

Block 13: Final 45 days from date Draft COMSEC Key Management Plan is approved. Updates as changes occur.

david.ince@navy.mil and douglas.thorp@navy.mil.

AIR 7.4.3
0
1
0
PMA-263
0
1
0
15. TOTAL
0
2
0

G. PREPARED BY

Angel Perez, AIR 4.1.1.5

H. DATE

XX XXX 2016

I. APPROVED BY

Douglas Thorp

J. DATE

File details come from the government source that posted it. Updated .