Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3_Atth_(1).xls

XLS spreadsheet 252 KB Posted

Attached to
Close Range Unmanned Aircraft Systems (UAS), Intelligence, Surveillance and Reconnaissance (ISR) Services
Solicitation number
N00019-16-R-0063
Issued by

About this file

Attachment (L-18) Flight Clearance Task Order Attachment (1)

View the file

Other files

File Type Posted
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1&2_TO_2_12_Dec_16.pdf PDF
Amendment_0001.pdf PDF
Attachment_(L-15)_Vol_3_CE-2_ACE.xlsx XLSX spreadsheet
Attachment_(L-3)_Vol_1_NVTherm.xls XLS spreadsheet
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1.pdf PDF
Attachment_(L-9)_Vol_2_Staffing_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-14)_Vol_3_CE-1_Contract_Data.xlsx XLSX spreadsheet
Attachment_(L-11)_Vol_2_T-2.1 T-2.2.xlsx XLSX spreadsheet
Attachment_(L-10)_Vol_2_Staffing_-_Land_Based.xls XLS spreadsheet
Attachment_(L-6)_Vol_2_UAS_Maturity.docx DOCX document
Attachment_(3)_DD254_signed.pdf PDF
Exhibit_(A)_CDRL_Final.doc DOC document
Attachment_(L-16)_Vol_4_Price_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-4)_Vol_1_Payload_Data.docx DOCX document
Attachment_(L-17)_Vol_4_Price_-_Land_Based.xls XLS spreadsheet
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3.pdf PDF
Attachment_(L-8)_Vol_2_Propulsion.docx DOCX document
Attachment_(L-5)_Vol_2_T-1_CRM.xlsx XLSX spreadsheet
Final_Solicitation_9_Nov_FINAL.pdf PDF
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1_Atth_(2).xlsx XLSX spreadsheet
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2_Atth_(2).xlsx XLSX spreadsheet
Attachment_(L-2)_Vol_1_SSCam_IP_EO.xls XLS spreadsheet
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2.pdf PDF
Attachment_(L-7)_Vol_2_AVP_Data.xlsx XLSX spreadsheet
Attachment_(L-1)_Vol_1_ES_Tables.xlsx XLSX spreadsheet
N00019-16-R-0063_Draft_RFP_Q A_27_Oct_2016.pdf PDF
Attachment_(L-15)_Vol_3_CE-2_ACE.xlsx XLSX spreadsheet
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1_(peer_review).pdf PDF
Attachment_(3)_DD254_signed.pdf PDF
Attachment_(L-3)_Vol_1_NVTherm.xls XLS spreadsheet
Attachment_(L-10)_Vol_2_Staffing_-_Land_Based.xls XLS spreadsheet
Attachment_(L-1)_Vol_1_ES_Tables.xlsx XLSX spreadsheet
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3_Atth_(1).xls XLS spreadsheet
Attachment_(L-11)_Vol_2_T-2.1 T-2.2.xlsx XLSX spreadsheet
Attachment_(L-2)_Vol_1_SSCam_IP_EO.xls XLS spreadsheet
Attachment_(L-9)_Vol_2_Staffing_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-12)_NAVAIR_Sea_Based_USN_TO_1_Atth_(2).xlsx XLSX spreadsheet
Attachment_(L-14)_Vol_3_CE-1_Contract_Data.xlsx XLSX spreadsheet
Attachment_(L-17)_Vol_4_Price_-_Land_Based.xls XLS spreadsheet
Draft_Solicitation_N00019-16-R-0063.pdf PDF
Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3.pdf PDF
Attachment_(L-6)_Vol_2_UAS_Maturity.docx DOCX document
Attachment_(L-7)_Vol_2_AVP_Data.xlsx XLSX spreadsheet
Attachment_(L-5)_Vol_2_T-1_CRM.xlsx XLSX spreadsheet
Attachment_(L-16)_Vol_4_Price_-_Sea_Based.xls XLS spreadsheet
Attachment_(L-8)_Vol_2_Propulsion.docx DOCX document
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2.pdf PDF
Attachment_(L-4)_Vol_1_Payload_Data.docx DOCX document
Attachment_(L-13)_NAVAIR_Land_Based_OIR_Site_1 2_TO_2_Atth_(2).xlsx XLSX spreadsheet
Exhibit_(A)_CDRL.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISCLAIMER

DISCLAIMER
1This spreadsheet is only intended to serve as a reference and does not constitute a binding agreement between the facilitating Class Desk SE, a particular PM discipline, AIR 4.0P, or the person/parties requesting a NAVAIR SOF IFC.
2This reference is not complete as not all PM disciplines have been represented. Additionally, some of the PM's represented have not formally reviewed this document for accuracy of information. This document was created by the Close Range UAS Class Desk (AIR 4.1.15 - Gary McQuay). It's purpose is to help requestors of UAS SOF IFC's better understand what types of data may be required to support a NAVAIR SOF IFC early-on before the IFC process is started.
3The data requirements in this document were extracted/derived/compiled from past UAS SOF IFC's that AIR 4.1.1.5 has facilitated. It should be understood that a particular PM could require more or less data than what is listed for his/her particular discipline depending on the nature and circumstances of the IFC request.
4This reference guide could be updated at any time with new information.

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

IFC Process

The NAVAIR UAS IFC Process Explained…
1The requesting organization makes a request for a NAVAIR UAS IFC. This is typically done through the 4.0P Airworthiness office.
2The Class Desk Systems Engineer and the Airworthiness Office (4.0P) set up a Pre-Planning Meeting (PPM). The PPM serves as a means to allow the IFC requestor(s) and the NAVAIR IFC team to communicate directly with one another about the program in question.
3At the PPM, the requesting organization briefs the Class Desk, 4.0P, and the engineering performance monitors (PM's) of their program objectives. The Class Desk, 4.0P, and the PM's take the opportunity to communicate to the requesting organization general data requirements that will have to be met before an IFC can be drafted and issued. As a side note, PM's serve as the technical experts who ensure that the IFC is drafted in such a way that risk to personnel/property and/or the system itself is within acceptable limits (as pertains to their particular engineering discipline).
4If decided that a NAVAIR IFC is required, the Class Desk and 4.0P create a "chop list" of all PM's that must review/approve (i.e., "chop") the IFC.
5Once the chop list is created, the Class Desk generates an IFC request with the help of the requesting organization and submits the request through the 4.0P website (https://airworthiness.navair.navy.mil/index.cfm?fuseaction=PublicHome.Home). The IFC request will serve as a draft IFC. As such, the IFC request will contain details regarding the system configuration and operating envelope/limits required to meet the program objectives.
64.0P then generates a "draft" IFC from the IFC request and utilizes their web-site to notify all PM's of their new IFC work assignment.
7The requesting organization then provides the appropriate amount of funding to the IFC team (Class Desk, Flight Test, PM's) and immediately begins providing the PM's with data to answer their preliminary data requirements. This will often be an iterative and somewhat rigorous process wherein answers to PMs' questions will often generate additional data requirements. A NAVAIR IFC cannot be issued without funding!
8As data is exchanged between the requesting organization and the engineering PM's, the PM's will individually modifiy the IFC draft as appropriate until they are satisfied that, with respect to their particular discipline, the system poses minimal risk to personnel and property (Safety of Flight IFC) or additionally, if required, that it can safely attain, maintain, and terminate flight (Airworthiness IFC). The Class Desk and 4.0P will facilitate the data exchange process.
9If it happens that data requested by the PM's does not exist, then the following options can be taken to generate the requested data: (1) analysis/simulation, (2) lab/ground testing, and/or (3) flight testing. If, for some reason, it is still not possible to generate data that the Class Desk, 4.0P, and the PM's feel is necessary for IFC issuance, then the following options exist: (1) the IFC envelope/limits and/or configuration will have to be restricted/modified to bring risk to an acceptable level, and/or (2) appropriate "Warning", "Caution", and "Notes" statements will have to be added to the IFC that warn operators of identified risks and instruct them how to effectively mitigate them, and/or (3) the appropriate authority level will have to approve the risk level in the absence of a risk mitigation plan, or (4) NAVAIR will not issue an IFC.
10Once all PM's have signed off on the IFC, the Class Desk reviews and gives his/her final approval/signature.
11The 4.0P Senior UAS Engineer must then provide his/her final approval/signature.
124.0P then generates and distributes a final IFC to all appropriate organizations/personnel.

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.1.1.5 - Systems Eng

AIR CODE:4.1.1.5
ENGINEERING DISCIPLINE:Systems Engineering (PMA-263 Close Range UAS Class Desk)
NAMEWORK PHONEWORK EMAIL
Class Desk Engineer(S):
DATA REQUIREMENTS:
1UAS Type/Series/Model:
2Original Equipment Manufacturer (OEM):
3Program Funding Sponsor(s) (ONR, NRL, Congress, NAVAIR SBIR, etc..):
4All Essential Technical POC's (OEM, Contracting Agency, etc. - name, phone, email info):
NamePhoneEmail
1
2
3
4
5All Essential Program Management POC's (name, phone, email info):
NamePhoneEmail
1
2
3
4
6Max GTOW:Wingspan:Length:MAX Speed:Endurance:
7Take-off Method(s):
8Landing/Recovery Method(s):
9Payload Capability:
10Method of Propulsion:
11Intended CONOP's of UAS system:
12Who owns the assets that will be flown (USN, USMC, USA, Contractor, ONR, etc.):
13Does the owner consider the system to be expendable and probability of loss acceptable?
14Who will be operating the assets (USN, USMC, USA, Contractor, etc.):
15What type of airspace will assets be operated in?
a. Restricted Airspace(s):
b. National Airspace(s):
16What types of operations will the SOF IFC support (performance testing, operational testing, proof-of-concept testing, CONOP's development, deployment to end users, etc.):
Is over-flight of any personnel required during flight ops?
17What is the requestor's IFC need date:
18How long with the IFC need to be valid for:
19Past experience with configuration to be performed (total flight hours, number of in-flight failures, reliability data such as MTBR, MTBF, etc.):
20Does a Pilot Training Program exist? Have/will intended operators taken/take this program prior to operations?
21Does a Maintenance Program exist? Can an Operation/Maintenance Manual be provided for review?
22Does a Configuration Management Program exist?

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.4 - Propulsion

AIR CODE:4.4.1
ENGINEERING DISCIPLINE:Propulsion
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Description of entire propulsion system (fuel system, lubrication system, ignition system, propeller, alternator, etc.)
2If more than one configuration, provide details of how they differ
3Engine performance characteristics
4Engine test and/or operational history
5Engine reliability data (total flight hrs per configuration, mean time between failures, etc.)
6Maintenance/operating manuals
7Maintenance intervals (for all critical components: engine, spark plugs, magnetos, air filters, etc.)

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.4.4 - Electrical Power

AIR CODE:4.4.4.1
ENGINEERING DISCIPLINE:Electrical Power
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Electrical load analysis/survey (power budget) for all on-board avionics, payloads, etc.
2Specifications for all batteries and engine alternator
3Wiring diagrams and schematics

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.4.5 - Wiring

AIR CODE:4.4.4.3
ENGINEERING DISCIPLINE:Wiring
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1
2
3

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.4.5 - Fuels & Lubes

AIR CODE:4.4.5
ENGINEERING DISCIPLINE:Fuels and Lubricants
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Fuel type and spec
2Lube types and spec and how used
3Fuel system and lubrication system description (similar to above)

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.9.7 - Materials

AIR CODE:4.9.7
ENGINEERING DISCIPLINE:Materials
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Materials used on the system (and were they purchased to a specification?)
2Protective finish scheme employed
3Dissimilar material contact areas
4Hazardous materials used
5Inspection procedures followed
6For water landings, procedures for readying the UAV for the next flight (is system cleaned, rinsed, inspected for corrosion, etc.)
7Materials manufacturing scheme(s)

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.3.2.6 - Flight Controls

AIR CODE:4.3.2.6
ENGINEERING DISCIPLINE:Flight Controls
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Air vehicle system description
2Flight Control System (FCS) design description
a. Functional block diagram
b. FCS performance summary/description
c. FCS components layout and analysis
3Risk assessment and mitigation
4Lessons-learned including all FCS related trouble reports
5FCS component drawings and specifications
6Aircraft envelope and limitations
7Flight Controls Software Design
a. Block Diagrams of Inner and Outer Loops of Controller
b. Description of Controller Design Process to ensure controller stability
c. Description of any Aerodynamic, Sensor, Actuator, and Gear Models used in design
d. S/W configuration control and management
e. Regression analysis and testing procedures
8FTS system design as it interfaces with Flight Controls
9Flight test instrumentation description

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.3.2.4 - Flying Qualities

DATA REQUEST FORPOCs:
4.3.2.4 FLIGHT DYNAMICS
Purpose: To list the data requested to secure a recommended airworthiness flight clearance for UAVs. This list is intended as a starting point to communicate data requests. Specific requests may be tailored based upon the purpose of the requested flight clearance. This is not intended to be the final data requirements list, but captures major areas to define the UAV flight dynamics.
Data Available?
1. Basic Questions:YESNON/ARemarks
a. What is the name of the UAV?
b. What types of flight clearances are requested?Test FC____Restricted Airspace FC_(SOF) Deployment____
c. How many configurations of the vehicle will be operational?
d. What configurations are applicable for the flight clearance?
e. How many flight hours planned on each configuration?
f. What is the flight test development program plan?
g. How many incidents/accidents have occurred?
1. What have been the causal factors of the incidents/accidents?
h. What is the desired flight envelope: Altitude range, Airspeed range, Crosswinds, GW range, CG range.
i. What is the desired wind envelope and shipboard launch/recovery envelope?
j. Mass properties data?
k. What are the methods used to record quantitative data? (autopilot, GCS recorder, etc.)
l. What are the parameters that are available as recorded quantitative data?
m. What is the recording rate for quantitative data?
n. How many software configurations will be authorized?
o. Are software gains adjustable by the user?
p. What autonomous modes are available?
q. Total flight hours on this UAV?
r. How many vehicles are in flight status?
Data Available?
2. Design Data:YESNON/ARemarks (or Documents identified)
a. What aircraft design/configuration data exists (detailed three-view drawings with dimensions, 2-D airfoil data, wing area, designed stability parameters, etc.)Must haves: Moments of Inertia [Ixx, Iyy, Izz, Ixz]

- X, Z Location of Aero Moment Center

- Airfoil(s) (wing & tail)

- X,Y, & Z CG location

- Cruise Altitude

b. What empirical aerodynamic data exists (e.g., CFD, panel code, wind tunnel, flight PID data)?
1. How many configurations (e.g. landing, take-off, conversion, cruise)?
2. Ground effects data?
c. What propulsion data exists?
d. What performance/S+C analyses have been performed?
1. Stall speed?
2. Max ceiling?
3. Endurance?
4. Basic static stability?
5. Dynamic stability (short period, phugoid, Dutch roll)?
6. Basic time constants (roll mode, spiral mode, etc.)?
7. Attitude quickness?
8. Frequency response?
e. What controls information/analyses exists?
1. Phase/gain margins?
2. Air data calibrations?
3. FMEAs?
4. Control System Description?
5. Control law diagrams?
f. Is there a simulation?
1. What models exist?
2. What is the process for model validation?
3. Flight Test Data (Manual and Autonomous Modes, as required):
3.1 QuantitativeRemarks (or Documents identified)
please be more specific regarding following test requirements
a. Static Longitudinal Stability
b. Dynamic Long Stab
1. Short Term (e.g., pitch doublets)
2. Long Term
c. Static Lateral-Directional Stability
1. Steady Heading Sideslips
2. Turns on One Control
3. Bank-to-bank rolls
d. Dynamic Lat-Dir
1. Release from SHSS
2. Roll doublets
3. Yaw doublets
e. Maneuvering Stability
f. Control Response (all axes)
g. Trimmed Flight Control Positions (TFCPs) in Level Flight
h. TFCPs in Climbs/Descents
i. Stall Characteristics
j. Low Speed Flying Qualities
1. Critical Azimuth (rotary wing aircraft)
2. Approach Characteristics
k. Launch/Recovery Characteristics
1. Manual
2. Autonomous
3. Degraded modes (i.e., flight control system failure characteristics)
l. Autonomous characteristics
1. Waypoint capture accuracy
2. Ride qualities in autopilot
Data Available?
3.2 QualitativeYESNON/ARemarks
a. Pitch Attitude Captures (Quantitative/Qualitative)
b. Roll Attitude Captures (Quantitative/Qualitative)
c. Trimmability
d. Pilot feedback
NOTES

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.3.2.5 - Performance

AIR CODE:4.3.2.2
ENGINEERING DISCIPLINE:Aero Performance
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Existing Flight Clearance
a. Configuration Description
b. Performance
Flight Envelope
Mission Performance
c. Limitations
Wt & CG envelope
2Requesting Flight Clearance
a. Configuration Description
OML Changes
Propulsion Changes
Payload power and cooling requirements
Effects on Air Data System
b. Weight & CG
c. Performance
Flight Envelope
Operating Procedures changes
Mission Performance
3Launch Envelope:
a. Max Head Winds
b. Max Cross Winds
c. Pre-launch Check to determine if satisfactory engine motor performance for launch.
d. Hazard area
e. Max Climb rate to determine launch climb out clearance requirements
f. Stall speed
g. Launcher performance (end speed)
h. Max Density Altitude
4Recovery:
a. Recovery area definition (hazard area)
c. Wave-off Performance
d. Night recovery
e. Stall speed
f. Approach Profile (airspeed)
g. Max Headwinds
h. Max Cross winds
i. Max Density Altitude
5Up&Away Performance:
a. Flight Envelope
b. Max Speed
c. Stall Speed
d. Ceilings
e. Cruise & Loiter Performance
Fuel Flow
Airspeed
Engine Power
f. Rate of Climb
g. Max Bank Angle
6Additional:
a. Basic Aerodynamic Data Report
b. Substantiating Performance Report
c. Flight manual (NATOPS equivalent)
d. Test plan (if one exists)

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.3.3 - Strength & Loads

AIR CODE:4.3.3
ENGINEERING DISCIPLINE:Strength, Flight Loads, Landing Loads, & Dynamic Loads
NAMEAREAWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Assist the AIR 4.3.3.3 team in arriving at realistic Flight, Landing, and Dynamic Load Factors for the UAS in question.
2Work with AIR 4.3.3, Class Desk SE, and AIR 4.0P to determine what types of analyses and/or testing will be required to satisfy constraints of the requested IFC.
3Maximum Data Requirements for STRUCTURAL ANALYSIS:
a. Provide a standalone Stress and Loads Analysis report containing calculations and conclusions.
b. The structural analysis shall clearly show all calculations, references, critical structure Margins of Safety (MS), free-body diagrams, assumptions, and methodologies.
c. Any preparatory reference must be submitted as part of the analysis for review.
d. No Plastic Bending analysis shall be used.
e. Stresses used shall be Principal (Ultimate Load) not Von Mises (Limit Load).
f. Load cases to be used for the structural analysis are defined by AIR-4.3.3.3.
g. Material Strengths to be Taken From MIL-HDBK-5 / MMPDS, Column “A” Values where available.
h. Static Elastic Analyses with Positive Structural Margins:
i. 0.15 Additional Margin for Lugs and Fittings
ii. 0.33 Additional Margin for Castings
iii. 2.00 Additional Margin for Bearing Factor
iv. Applicable Margin For Fiber Reinforced Composite Structure (wet/dry Strength Allowable)
v. Applicable Summation of Margins do Apply
i. For Metal, Composite, and Wood Structure, Flight and Ground Load Margins to Account for 1.5 x Limit Loads (Ultimate)
j. No Yielding allowed at 1.15 x Limit Load
k. Crash Loads (ground) are Considered Ultimate
4Maximum Data Requirements for STATIC AIRFRAME TESTING:
a. All critical areas must be addressed by analysis and/or static testing. If a Loads and Strength analysis is not an option, static testing to 1.15 x limit (no yielding allowed) and ultimate (1.50 x limit with no failure allowed) loading will be required.
b. The following critical areas must be included (if applicable): landing gear, wing panels (wing root, spar), empennage/tail boom, tail boom-to-fuselage attachment, engine-to-fuselage attachment, and catapult/arresting aircraft structure. Include all other Safety of Flight critical areas or of structural interest in the report.
c. If amphibian, wet/dry conditions must be taken into account. Option 1, add applicable margin (factor) for fiber reinforced composite structure to flight and ground loads. Option 2, test under wet conditions. Representative coupon testing may be used.
d. All loads used for testing must have AIR-4.3.3.3 (Loads & Dynamics) concurrence. Structural test plan must have AIR-4.3.3.2 concurrence.
e. Static testing, procedures, findings, and conclusion will be documented in a report.
f. Report will be stand-alone with details allowing test to be recreated.
5Preferred Airframe STRUCTURAL DESIGN REQUIREMENTS:
a. Welding is not preferred. Contact AIR-4.3.3.2 for specific applications.
b. Castings are not preferred. Contact AIR-4.3.3.2 for specific applications.
c. Hardware (fasteners, nut plates, nuts, Hi-Loc, collars, rivets, etc.) strengths to be taken from specific hardware specification.
d. NA 01-1A-8, Structural Hardware Manual strengths can be used if strengths are not provided in specific specification.
e. NA 01-1A-1, General Manual for Structural Repair can be used as guidance for structural design and repairs.
f. MIL-HDBK-5 / MMPDS hardware strengths can be used if strengths are not provided in specific specification.
g. Fasteners (bolts, screws) that are below 125 KSI Ftu or above 220 KSI Ftu are not to be used.
h. Rivets tension loads shall not exceed 10% of the specified rivet shear strength and shall not be the primary applied load.
i. Fastening systems with known and proven positive locking mechanisms are to be used.
6Preferred STRUCTURAL FEA REQUIREMENTS (if FEA is used):
a. Loads (Px, Py, Pz, Mx, My, Mz) to be taken from model for use with classic analyses techniques.
b. Include Free Body Diagram.
c. Validity of Model; Verify, document, and report verification that the sum of the respective boundary reaction loads and moments “zero out”.
d. Validity of Model; Verify, document, and report comparison of model results to known and accepted closed form solution methods. The two should equal.
e. Provide written description of model. (number of elements and types, how elements were used, number of nodes, did the model run, error value, FO 6 file data for NASTRAN).
f. Provide node schematic showing numbered node locations.
g. Provide node results table relating back to schematic.
7Preferred IFC Date Package Requirments:
a. Stress, loads, and/or static test report(s) showing the installation and/or modification to be structurally adequate for flight.
b. Drawing package. Submitted with the structural report as a reference. Drawings must show details, sub assemblies, and installation. Drawings to provide enough information for fabrication, assembly, procurement, installation, and quality control.
c. Any and all references used in the report that are not common; i.e., preparatory information.
d. Reporting in an Electronic Format is Preferred.
8Loads Checklist:
a. Mass properties - weight, Center of Gravity (CG), Ixx, Iyy, Izz.
b. Flight loads analysis - include load trends and design load cases.
c. Ground loads analysis - include load trends and design load cases.
d. Strength Summary and Operating Restrictions report.
e. Structural Design Criteria Report - includes maneuver weights, load factors, design speeds.

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.9.3 - Weight & Bal

AIR CODE:4.9.3
ENGINEERING DISCIPLINE:Weight And Balance
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1C.G. envelope data and how it was arrived at
2Vehicle weight information and distribution data (for all possible payload configs)

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.6 - Human Systems

AIR CODE:4.6
ENGINEERING DISCIPLINE:Human Systems
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Operating Manual
2Description of Launch/Recovery Procedures
3Description of flight modes
4Emergency Procedures
5A description of the functional and physical flows of the ground station data/information (this includes flight information displays, control mode annunciation, failure detection and annunciation, and control logic)
6Handling procedures
7Interface documents
8Need to know if NVGs will be used during operation
9Anything that relates to the position of the operators

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.1.10.2 - SW Safety

AIR CODE:4.1.6.2
ENGINEERING DISCIPLINE:Software Safety
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
MAXIMUM DATA REQUIREMENTS:
1Compliance with a Systems Safety Program Plan that includes software safety issues, or a stand-alone Software Safety Program Plan
2Having a System Safety Working Group within which the members assess and collect evidence/documentation that no system components (harware, software, or human system integration) can contribute to the loss of life, property, or environment. The System Safety Working Group is to be chaired by Government and Contractor System Safety Leads.
3Having performed an initial severity assessment of system functionality via the NAVAIR Hazard Risk Index (HRI)
4Having executed a Hazard Analysis (PHL & PHA) for functional hazards:
PHL – Development of a Preliminary (System) Hazards List that can be contributed to by any system-level component (hardware, software, or human system integration)
PHA – Development of a categorized and prioritized Preliminary Hazards List (functional) specific to the system, that can be contributed to by the hardware, human, or the software (including software environment in which the system is built)
7Identification of all the (functional) casual factors for each prioritized hazard
8Identification of the derived (functional) mitigating safety-critical requirements for each causal factor
9Having updated the severity assessment using the HRI approach
10Having tailored the Generic (i.e. Common Global) Software Safety-Critical Requirements Lists, usually in an appendix, as they apply to the system
11Identification of the mitigating Generic (i.e. Common Global safety-critical requirements
a. Having executed Hazard Analysis (SSHA and SHA) for functional hazards
1a. Refinement of the SSHA analysis by linking the causal factors to their mitigating requirements (especially with respect to COTS/GOTS interfacing)
2a. Refinement of the SHA analysis by performing an interface hazard analysis between subsystems within the system with regard to hardware, software, and human systems integration causal factors
12Having executed Process analysis/testing by tracing the Generic (i.e. Common Global) Software Execute Product analysis/testing by tracing the functional Software Safety-Critical Requirements to test
13Having executed “Safety” Tests on Software Safety-Critical Requirements at the appropriate level of rigor (ex. Level I, II, or III Software as identified in the NAVAIR Flight Clearance Instruction)
14Having identified mitigating evidence and any residual risk for inclusion within the overarching System Safety Assessment Report (SAR).
15Having executed regression analysis/testing of the system when there is a change. (i.e., a mod to the baseline, or a mod for a particular flight test)
16An audit trail for all of the above items, and substantiating data for safety decisions

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.1.6 - System Safety

AIR CODE:4.1.7
ENGINEERING DISCIPLINE:System Safety
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
1Overall system description
2How UAV will be used
3Where UAV will be used (i.e, what type of environment)
4Operator’s manual(s)
5Types of hazardous materials employed (batteries, fuels, etc.)
6Hazard and/or flight contingency analysis (if ones exist)
7Reports of all previous incidents/mishaps
8Range safety analysis report (if one exists)

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

4.1.7 - E3

AIR CODE:4.1.7
ENGINEERING DISCIPLINE:Electromagnetic Environmental Effects (E3)
NAMEWORK PHONEWORK EMAIL
PERFORMANCE MONITOR(S):
DATA REQUIREMENTS:
The following would provide electromagnetic environmental effects (E3) support for a proposed flight clearance. Most flight clearances will require only an applicable subset of this data. See the latest version of MIL-STD-464 for details of aircraft- and system-level E3 requirements.
1Describe the system or modification for which the flight clearance has been requested. Do not neglect ancillary equipment, if this equipment is used when aircraft engines are on. (An obvious example of such ancillary equipment would be a land- or ship-based “command and control” console for unmanned aerial vehicles.)
a. Include an overall description of constituent electronic/electrical components and wiring, whether new, modified, or deleted.
b. Include the frequencies, powers, modulations and bandwidths of any radio-frequency (RF) transmitters or receivers. Also include antenna types and gains. Cite any submittals of DD Form 1494, “Application for Equipment Frequency Allocation”.
c. Include changes to software which might affect the action of a component in response to electrical noise or disruption.
d. Include changes to mechanical components---those which might adversely affect lightning safety, accumulation of electrostatic charge, or other E3-related concerns.
e. Include additions, deletions, or changes with respect to electrically-initiated explosive devices (including munitions).
2Describe any manner in which the requested flight clearance involves---or might affect---flight-critical equipment. (Flight-critical equipment is usually listed in the NATOPS---for military systems---or in an operating/servicing manual). Describe the manner is which flight safety might be degraded by disruption or malfunction of the system/modification described in the requested flight clearance.
3Describe the intended operational environments.
a. Describe where the system will be used (For example, will flight be limited to restricted airspace above sparsely-populated military ranges, or could flight occur anywhere in the world? Will the system be used aboard one or more classes of air-capable Navy ships?)
b. State whether or not operations might be conducted when lightning is a possibility.
4Describe the measures taken to ensure proper E3 performance of the system or modification covered by the requested flight clearance.
a. Summarize specific design steps taken to ensure adequate E3 performance, such as those relating to electrical cable design, electrical/electronic circuit design, electrical shielding, continuity of electrical shielding, electrical bonding of mating surfaces, etc.
b. Summarize steps taken to preclude radiation hazards: hazards of electromagnetic radiation to personnel (HERP), to ordnance (HERO), and to fuel (HERF). Summarize the details and results of any tests (or analyses), and describe any necessary precautions (such as “keep away” distances).
c. Summarize the details and results of electromagnetic interference (EMI) tests of constituent equipment. (Ideally, tests would be in accordance with the latest version of MIL-STD-461.)
d. Describe the operating modes and results of electromagnetic compatibility (EMC) tests, including any EMC safety-of-flight tests (SOFTs).
e. Summarize the details and results of immunity testing (or analyses) against disruption by external RF emitters.
f. Summarize the details and results of susceptibility tests against electrostatic discharge (ESD), such as ESD caused by handling of electronic equipment, ordnance, or the constituents of either.
g. Summarize the details and results of testing against the adverse effects of precipitation static on RF receivers.
h. Describe the testing and measures taken to assure that neither direct nor indirect effects of lightning will impair flight safety.
I. Summarize the details and results of testing to assure that spurious RF emissions will not reveal aircraft presence to hostile forces. (MIL-STD-464 refers to this as emissions control, or EMCON.)
5If the system processes classified information, cite the required TEMPEST test or TEMPEST vulnerability assessment.

&R&"Arial,Bold"N00019-16-R-0063 Attachment (1) to Task Order Three PMA 263 UAS Flight Clearance Data Requirements List Page &P of &N &A

File details come from the government source that posted it. Updated .