Attachment_(L-18)_NAVAIR_Cat_3_Flight_Clr_TO_3.pdf
PDF 242 KB Posted
- Attached to
- Close Range Unmanned Aircraft Systems (UAS), Intelligence, Surveillance and Reconnaissance (ISR) Services
- Solicitation number
- N00019-16-R-0063
About this file
Attachment (L-18) NAVAIR Cat 3 Flight Clr TO 3
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00019-16-R-0063
Attachment (L-18)
Task Order Three Category 3 Interim Flight Clearance
Naval Air Systems Command
Category 3 Interim Flight Clearance
Task Order Three
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICE QUANTITY UNIT UNIT PRICE AMOUNT
0012 1 Lot $100,000.00 $100,000.00
Category 3 Interim Flight Clearance
Support
FFP
FOB: Destination
0013 1 Lot NSP
Data Material
FFP
Data for CLINs 0012
See Exhibit (A)
DD Form 1423, Contract Data Requirements List
Section C - Descriptions and Specifications
Item 0012 – The Contractor shall provide the engineering data, information and support necessary to obtain Interim NAVAIR Category 3 Interim Flight Clearance approvals to qualify system for use, in accordance with Attachment (1) Performance Based Statement of Work
(PBWS) for the Sea-Based Unmanned Aircraft System (UAS) Intelligence, Surveillance, and
Reconnaissance (ISR) Services and/or Attachment (2) PBWS for the Land-Based UAS ISR
Services of Contract Number N00019-17-D-XXXX as applicable, Reference Number 4.1.1.1.
Range Commander’s Council (RCC) 323-99 Range-Safety Criteria for Unmanned Air Vehicles dated Dec 1999 and RCC 323-99 Supplement dated Apr 2001 provide minimum generic criteria necessary to ensure that the UAS is capable of safe operation.
Attachment (1) to this Task Order, PMA-263 UAS Flight Clearance Data Requirements List is provided as a more comprehensive listing of the elements that may be required for issuance of an operational flight clearance. Note that Attachment (1) is provided for guidance only.
Item 0013 – The data to be furnished hereunder shall be in accordance with Exhibit (A), DD
Form 1423, Contract Data Requirements List (CDRL) of Contract Number N00019-17-D-
XXXX. The following CDRLs are required for this Task Order:
A001 Technical Report Flight Clearance Engineering Data
A002 E3 Verification Report (E3VR)
A004 Interface Control Document
Section D - Packaging and Marking
Item 0012 and 0013 – The data to be furnished hereunder shall be packaged, packed and marked in accordance with Exhibit (A), DD Form 1423, Contract Data Requirements List (CDRL).
Section E - Inspection and Acceptance
Item 0012 and 0013 – Inspection and acceptance is in accordance with Exhibit (A) DD Form
1423 CDRLs. Acceptance shall be performed by the first addressee listed in the distribution list under Block 14 and in accordance with Block 16 of DD Form 1423.
Section F - Deliveries or Performance
The period of performance is not to exceed 180 days after award of Task Order.
Item 0012 and 0013 – Delivery and/or performance shall be in accordance with Exhibit (A) DD
Form 1423 CDRLs.
Section J – List of Documents, Exhibits, and Other Attachments
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 PMA-263 UAS Flight Clearance
Contract Data Requirements List
File details come from the government source that posted it. Updated .