MSBBT Justification for Other than Full and Open Competition 002_Redacted.pdf
PDF 175 KB Posted
- Solicitation number
- 6982AF23B000033
About this file
This document is a justification for other than full and open competition for a federal contract with the Department of Transportation Federal Highway Administration. The contract requires name brand tangent guardrail terminals, temporary crash cushions, and temporary concrete barriers for use on a project within the right-of-way owned by the California Department of Transportation. The total estimated value of the required products includes four tangent guardrail terminals ranging in price, three temporary crash cushions ranging in price, and 2,640 linear feet of temporary concrete barriers ranging in price per linear foot. The justification for limiting competition is that the California Department of Transportation specifies the listed products for work within its right-of-way. No market research was conducted as the products were requested during the encroachment permit process and match existing systems in the right-of-way. The justification will be posted with the solicitation and the agency will ensure all costs are fair and reasonable.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
1. Identification of the agency and the contracting activity
Department of Transportation, Federal Highway Administration, Central Federal Lands Highway Division (CFLHD), 12300 Dakota Avenue, Lakewood, Colorado.
2. Nature and/or description of the action being approved
Justification and approval to use other than full and open competition to award a contract for the following name brands:
Terminal Section, Type MGS Tangent (Tangent Guardrail Terminals):
MASH Sequentially Kinking Terminal TL-3 manufactured by Roads Systems, Inc., or MAX-Tension Tangent Guardrail Terminal TL-3 manufactured by Barrier Systems, Inc., or
MAX-Tension Tangent Guardrail Terminal TL-2 manufactured by Barrier Systems, Inc., or
Soft-Stop Guardrail Terminal TL-3 manufactured by Valtir, LCC, or SPIG Gating End Terminal TL-3 manufactured by SPIG Industry, LLC
Temporary Traffic Control, Crash Cushions (Temporary Crash Cushions):
Big Sandy Inertial Crash Cushion System (ICS) manufactured by TrafFix
Devices, Inc., or Crash Guard CC-48 Sand Barrels TL-3 manufactured by Plastic Safety Solutions, Inc., or ENERGITE 1 1 1 System TL-3 manufactured by Valtir, LCC
Temporary Traffic Control, Concrete Barrier (Temporary Concrete Barriers):
Cross Bolt Non Proprietary TL-3 manufactured by TTI
3. Description of the supplies or services required to meet the agency�s needs (including the estimated value)
The areas for these deliverables are tangent (inline) guardrail terminals, temporary crash cushions, and temporary concrete barriers. These items are required materials for California Department of Transportation (Caltrans) Highway Safety Features within the portion of the project within Caltrans right-of-way (ROW).
The total estimated amount of this product is as follows:
Tangent Guardrail Terminals: for 4 EA (Items range between each)
Temporary Crash Cushions: for 3 EA (Items range between each)
Temporary Concrete Barriers: for 2,640 LNFT (Items range between per LNFT)
4. Statutory authority permitting other than full and open competition
The authority to enter into a contract for this effort without full and open competition is 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements
5. Demonstration that the proposed contractor�s unique qualifications or the nature of the acquisition requires use of the authority cited
The name brand products are being prescribed for the project area within Caltrans ROW.
Caltrans requires the listed items for work within their ROW.
6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized
The Justification for Other than Full and Open Competition will be posted with the solicitation as required by FAR 5.102(a)(6).
7. Determination that the anticipated cost to the Government will be fair and reasonable
The FHWA will ensure that all costs associated with the proposed contract are fair and reasonable. The FHWA will perform a thorough analysis of the Offeror�s bid and/or proposal to substantiate this determination.
8. Description of the market research conducted and the results or a statement of the reason market research was not conducted
No market research was conducted. The decision to select these products is based on the Caltrans requirements as the maintaining partner and were requested during the encroachment permit process. The proposed products match the current existing systems located in the area along Caltrans right-of-way.
9. Other facts supporting the use of other than full and open competition
N/A