QnA 2.7.24 Monterey.pdf

PDF 123 KB Posted

Attached to
CA FLAP SCRT5(1) Monterey Bay Sanctuary Scenic Trail
Solicitation number
6982AF23B000033
Issued by

About this file

This document contains questions and answers regarding a solicitation for the development of a 7.5-mile multi-use bicycle and pedestrian trail extending from Wilder Ranch State Park to Davenport in Santa Cruz County, California. Key details include that the Federal Highway Administration and Santa Cruz County Regional Transportation Commission are seeking to develop an asphalt paved path with gravel shoulders and improve two parking lots along Highway 1 to provide visitor amenities and ADA access. Questions from potential offerors covered clarification on removal and technical services line items, railroad panel specifications including length, rail size and tie details, and whether railroad flaggers would be required during construction. A two-week extension to the bid submission deadline was also requested and approved.

View the file

Other files

File Type Posted
Bid Tabulation Monterey Bay.pdf PDF
Bid Opening Summary- CA FLAP SCR T5(1) Monterey Bay Sanctuary Scenic Trail.pdf PDF
QnA 3.19.24 Monterey.pdf PDF
A005.pdf PDF
Amendment A004.pdf PDF
QnA 3.15.24 Monterey.pdf PDF
Amendment A003.pdf PDF
QnA 2.28.24 Monterey.pdf PDF
6982AF23B000033 Interested Vendors 2.29.24.pdf PDF
CA FLAP SCR T5(1) MBSST SV Presentation.pdf PDF
QnA 2.23.24 Monterey.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QnA 1.30.24 Monterey.pdf PDF
CA FLAP SCR T5(1) MBSST Schedule A - Cross Sections.pdf PDF
CA FLAP SCR T5(1) MBSST_Sealed Plan Set options X and Y.pdf PDF
FP-14_Eng.pdf PDF
CA FLAP SCR T5(1) and T5(2) MBSST - Final Pavement Tech Memo.pdf PDF
6982AF23B000033-CA FLAP SCRT5(1) Monterey.IFB Final.pdf PDF
CA FLAP SCR T5(1) MBSST Schedule A -Plans.pdf PDF
MSBBT Justification for Other than Full and Open Competition 001.redacted.pdf PDF
MSBBT Justification for Other than Full and Open Competition 002_Redacted.pdf PDF
CA.FLAP.SCR T5(1) (2).Monterey Bay Sanctuary Scenic Trail. Geotech Rpt FINAL.June 2023 with Appendic.pdf PDF
6982AF23B000033-CA FLAP SCRT5(1) Monterey IFB Appendicies.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CA FLAP SCR T5(1) Monterey Bay Sanctuary Scenic Trail

January 26, 2024

Questions Answers 1 Please provide Autocad file for the project showing finished surface, subgrade and existing surface. This will help in earthwork calculations.

No, xml files will not be provided

February 5, 2024

1 A017 and A018 are lump sum items, I did not see much on the plans, it would be nice to have clarification on what those items consist of

Presume this question is in regard to Line Item #A0170, 20304-1000, REMOVAL OF STRUCTURES AND OBSTRUCTIONS (RAILROAD

REMOVAL), LPSM:

For information, refer to SCR203.04(d) Removal of Railroad Components.

An amendment will be issued showing the station range of railroad to be removed.

Presume this question is in regard to Line Item #A0180, 20304-1000, REMOVAL OF STRUCTURES AND OBSTRUCTIONS (UTILITY

REMOVAL), LPSM:

For information, refer to SCR203.04(e) Removal of Private and Public Utilities.

2 Some of the Technical Services are lump sum also, it would be nice to get those clarified a bit more.

For items 62301-0000, General Labor, 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES and 62302-1100 HIRED SURVEY SERVICES, refer to Section 623 of the FP-14 and the SCR’s.

For the 62303-1000, SPECIAL LABOR, HIRED TECHNICAL SERVICES (_______ MONITORING) Items, (line items A0780, A0790, A0800, A0810) refer to Sections 107, 623 of the FP-14 and the SCR’s.

3 Our Rail Road Panel supplier says he needs this information to quote the job:

• Specified panel length (Typ panel length is 8.125’ per BNSF / UP, SCRRA standards).

• Total track footage (combined length of all crossings etc)

• Rail size (90ARAA, 112RE, 115RE, 133RE, 136RE etc)

• Tie type (timber, concrete, composite, steel etc)

• Tie length (8’06”, 9’, 10’ etc)

• Tie spacing (center of tie to center of tie). Standard panels are built for 19.5” tie spacing

• Whether crossing is in tangent or curved track with radius less than 1910’

4 We are writing to request a two-week extension for the bid submission deadline for the above project. The complexity of the project and the involvement of various sub-specialties necessitate additional time for thorough preparation. We believe that the additional time will contribute significantly to the overall quality of our bid

See Amendment A001.

February 7, 2024

1 Can you please clarify if we need any railroad flagger during the construction of this project Refer to Appendix C, Santa Cruz Branch Rail Line Rail Right-of-Way Specifications