MTC-T OTA Prototype Project Agreement.docx
DOCX document 191 KB Posted
- Attached to
- Mobile Tactical Cannon - Tracked (MTC-T) and Resupply Vehicle – Tracked (RSV-T) Capability Solutions
- Solicitation number
- MOSAIC-27-01
- Issued by
-
Department of the Army
About this file
This is a Draft Prototype Project Agreement for an Other Transaction (OT) under 10 U.S.C. 4022 between the U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) and a contractor for the Mobile Tactical Cannon-Tracked (MTC-T) system development. The agreement establishes a fixed-price prototype project with up to 48 months of performance following award. The contractor must deliver six prototype MTC-T Self-Propelled Howitzer (SPH) systems—three within 12 months and three within 18 months of award—along with accompanying Resupply Vehicle-Tracked (RSV-T) systems. Additional deliverables include up to 12 additional prototype systems as options, up to four system trainers, five complete cannon assemblies for testing, ammunition storage cells, and training systems. The contractor must also provide ammunition compatibility testing support using a Government Proof Gun Stand, including delivery of conventional and inert projectiles (up to 5,000 rounds total across three increments), primers (up to 5,550 total), and propelling charges (up to 22,608 charge increments). Pricing is structured as milestone-based fixed-price payments tied to hardware deliveries and service milestones; specific dollar amounts are to be filled in by the vendor.
The agreement requires extensive technical and integration support, including systems engineering deliverables (System Overview, SEMP, MBSE Development Plan), cyber resilience demonstrations achieving Authority to Operate (ATO) under Army Risk Management Framework with medium or lower risk rating, supply chain management and supportability planning, and comprehensive testing and soldier evaluation support. Critical success metrics include soldier evaluation demonstrating mission viability, cyber resilience validation, viable long-term sustainment and material release paths, and demonstration that the system meets full material release requirements without safety, suitability, or supportability deficiencies. The contractor must complete onshoring of production and assembly to U.S. facilities within two years of award and provide technical data and software with sufficient license rights to support Army operations. Program management requirements include weekly programmatic and technical meetings, twice-yearly Program Management Reviews, Cost and Software Data Reporting (CSDR) compliance, and extensive configuration management and variance documentation. The agreement explicitly preserves the Government's unilateral right to terminate for cause or convenience and allows the Government to award follow-on production contracts to successful prototype participants without competitive procedures, contingent on Army Senior Leader decisions and available funding.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
DRAFT
PROTOTYPE PROJECT AGREEMENT
Concerning
Mobile Tactical Cannon – Tracked (MTC-T) set: Mobile Tactical Cannon Self Propelled Howitzer (MTC-T SPH) and Resupply Vehicle – Tracked (RSV-T)
Other Transaction Prototype Project under 10 U.S.C. §4022
BETWEEN
{Vendor Name} {Vendor Address} {Vendor CAGE Code}
AND
The Government:
United States Army Contracting Command – Detroit Arsenal (ACC-DTA)
Controlled by: ACC-DTA POC: Mrs. Betty Bundoc, (571) 588-1541
DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.
SECTION 1: GENERAL INFORMATION
1.0. This Fixed Price Prototype Project Agreement (PPA) results from a competitive solicitation, evaluation, and selection process. Under this PPA, the identified contractor shall serve as a collaborative partner with the Government.
1.1. This bi-laterally executed PPA is between the Contractor and the Government. This PPA, to include all attachments and appendices, describes the rights, duties, obligations, and privity of contract between the parties. The Contractor shall be responsible for performance of the work set forth in the PPA and associated attachments and appendices, as agreed upon by the Government and the Contractor. The Government’s designated Agreements Officer Representative (AOR) for the specific project will serve as the Government technical point of contact.
1.2. By executing this PPA, the Contractor, and the Government (referred to collectively as “Parties”) hereby agree that the Parties shall adhere to all terms and conditions described herein and in the associated attachments and appendices to the PPA, to include the non-negotiable general terms and conditions listed in Appendix A – Project Articles (entirety), and Appendix B – Project Other Terms and Conditions.
1.3. Order of Precedence and Remedies. This Agreement consists of the main body of this Prototype Project Agreement (PPA) and its incorporated attachments and appendices, including the Project Articles. In the event of any conflict, inconsistency, or ambiguity between the main body of this PPA and any attachment or appendix, the terms shall be interpreted to preserve the Government's maximum legal remedies. Notwithstanding any other clause in this Agreement, the Government's unilateral right to terminate this transaction for cause or convenience, as detailed in the Project Articles, shall take precedence over any other remedy or provision.
SECTION 2: PRODUCTION FOLLOW-ON ACTIVITIES
2.0. Pursuant to 10 USC §4022(f), “a follow-on production contract or transaction may be awarded to the participants of the transaction without the use of competitive procedures…..if A) competitive procedures were used for selection of the parties for participation in the transactions; and B) the participants in the transaction successfully completed the prototype project provided for in the transaction.”
2.1. Prototype Success Metrics:
The prototype will be deemed successful by the Government if it meets the metrics below. The prototype will be evaluated by the Government using information collected throughout performance of the PPA.
2.1.1. Soldier Evaluation.
The prototype will be deemed successful if the Mobile Tactical Cannon – Tracked (MTC-T SPH) and Resupply Vehicle – Tracked (RSV-T) demonstrates mission viability with US Army Soldiers through Evaluation events and execution of operationally relevant fire missions, inclusive of performance, reliability, and operational value.
2.1.2. Demonstration of Cyber Resilience.
The prototype effort will be deemed successful if the Contractor can provide evidence that, with minimal modifications, the prototype MTC-T SPH and RSV-T could achieve Authority to Operate (ATO) under the US Army Risk Management Framework (RMF) with a medium or lower risk rating.
2.1.3. Demonstration of a viable path to US Army supportability The prototyping effort will be deemed successful if the Contractor can provide a plan that shows how the US Army will be able to support the prototype MTC-T SPH and RSV-T during long-term production and sustainment, with special emphasis on crucial software, technical data, and manufacturing and supply of critical components. The plan must also address configuration management, obsolescence management, supply chain risk management and how the US Army will be able to oversee these activities CONUS.
2.1.4. Demonstrate a viable path to US Army Material Release
The prototyping effort will be deemed successful if the MTC-T SPH and RSV-T does not demonstrate deficiencies in safety, suitability, or supportability that would preclude the system from achieving Full Material Release (FMR).
2.1.5. In accordance with the statutory discretion regarding the use of competitive procedures to award a follow-on production effort, if multiple prototype solutions are determined to be successful, the Government reserves the right to either pursue a production effort with only one successful contractor, or to solicit proposals from successful contractors for the purpose of selecting an awardee(s) for a follow-on production contract or transaction.
2.2. The Government shall be solely responsible for documenting whether competitive procedures were utilized and whether prototype projects were successfully completed. Any follow-on production effort will be pursued outside of this agreement and will be entered into by the Government and the follow-on production Contractor(s). The potential follow-on production effort is primarily intended to procure systems to replace M109 Family of Vehicles within the U.S. Army. The potential follow-on production effort may include ancillary services and ancillary items such as spare parts, technical manuals, etc. Note that the information provided within this section is for planning purposes only and is an estimate that is subject to change based on the progression of the prototype project, funding, schedule and other considerations.
SECTION 3: DELIVERY AND PRICING/INVOICING
3.0. Invoice Instructions / Payments
The Contractor shall be paid a fixed amount for each milestone accomplished in accordance with the tables below. The Contractor shall invoice against the following Milestone Payment Schedules. The Milestone Payment Schedules are effective from the day of agreement execution. The Contractor shall submit invoices for payment in accordance with the Milestone Payment Schedules and the terms of Appendix B, Project Terms and Conditions. The Contractor shall submit all invoices through the Wide Area Work Flow (WAWF) system. Inspection and acceptance of invoices within WAWF is the responsibility of the Agreements Officer Representative (AOR). The tables are broken out into major hardware deliveries and service milestones. For table A, delivery after award (days) for Contract Base Milestones are set as calendar days from initial award of the OTA. Delivery afterwards (days) for Unfunded Milestones (UM) are set as calendar days after the milestone is funded.
3.1. The Contractor shall deliver the prototype hardware identified in section 4.4 in accordance with the tables below. The Contractor shall deliver CDRLs A004 and A035 with each vehicle delivery to receive payment.
Table A1: Prototype MTC-T SPH delivery
| Vehicle Qty |
| Delivery after award (days) |
| Delivery Location |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded Amount |
| 1-3 |
| 360 |
| CONUS |
| Base |
| Vendor Fill In |
| 4-6 |
| 540 |
| CONUS |
| Base |
| Vendor Fill In |
| 7-9 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
| 10-12 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
| 13-15 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
| 16-18 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
Table A2: Prototype RSV-T delivery
| Vehicle Qty |
| Delivery after award (days) |
| Delivery Location |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded Amount |
| 1-3 |
| 360 |
| CONUS |
| Base |
| Vendor Fill In |
| 4-6 |
| 540 |
| CONUS |
| Base |
| Vendor Fill In |
| 7-9 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
| 10-12 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
| 13-15 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
| 16-18 |
| TBD |
| CONUS |
| UM |
| Vendor Fill In |
Table B: Cannon/Breech Assemblies for Proof Gun Stand (USG PGS)
| Assemblies |
| Delivery after award (days) |
| Delivery Location |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded Amount |
| 1 |
| 120 |
| CONUS |
| Base |
| Vendor Fill In |
| 1 |
| 150 |
| CONUS |
| Base |
| Vendor Fill In |
| 3 |
| 300 |
| CONUS |
| UM |
| Vendor Fill In |
Table C: Ammunition storage cells for Sequential Environmental Testing
| Type |
| Delivery after award (days) |
| Delivery Location |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded Amount |
| Howitzer Projectile |
| 300 |
| CONUS |
| Base |
| Vendor Fill In |
| Howitzer Propellant |
| 300 |
| CONUS |
| Base |
| Vendor Fill In |
Table D: Training System
| Training System |
| Delivery after award (days) |
| Delivery Location |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded Amount |
| 2 |
| 270 |
| CONUS U.S. Army Installation |
| Base |
| Vendor Fill In |
| 2 |
| 420 |
| CONUS U.S. Army Installation |
| UM |
| Vendor Fill In |
Table E: Test Ammunition – OPTION
| Ammunition |
| Delivery after award (days) |
| Delivery Location |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded Amount |
| Increment 1 HE Projectiles |
| Vendor Fill In |
| CONUS |
| UM |
| Vendor Fill In |
| Increment 2 HE Projectiles |
| Vendor Fill In |
| CONUS |
| UM |
| Vendor Fill In |
| Increment 3 HE Projectiles |
| Vendor Fill In |
| CONUS |
| UM |
| Vendor Fill In |
| Increment 1 Training Projectiles |
| Vendor Fill In |
| CONUS |
| UM |
| Vendor Fill In |
| Increment 1 Primers |
| Vendor Fill In |
| TBD, CONUS U.S. Army Location |
| UM |
| Vendor Fill In |
| Increment 2 Primers |
| Vendor Fill In |
| TBD, CONUS U.S. Army Location |
| UM |
| Vendor Fill In |
| Increment 3 Primers |
| Vendor Fill In |
| TBD, CONUS U.S. Army Location |
| UM |
| Vendor Fill In |
| Increment 1 Propelling Charges |
| Vendor Fill In |
| TBD, CONUS U.S. Army Location |
| UM |
| Vendor Fill In |
| Increment 2 Propelling Charges |
| Vendor Fill In |
| TBD, CONUS U.S. Army Location |
| UM |
| Vendor Fill In |
| Increment 3 Propelling Charges |
| Vendor Fill In |
| TBD, CONUS U.S. Army Location |
| UM |
| Vendor Fill In |
Table F: Service Payment Schedule
| Milestone Name |
| Delivery after award (days) |
| Scope Reference |
| Contract Base / Unfunded Milestone (UM) |
| Fixed Price |
| Funded |
| Completion of Start of Work Meeting, Deliver Program Integrated Master Schedule (CDRL A019) |
| 14 |
| 4.5.3 |
| Base |
| Vendor Fill In |
| Ammunition Ballistics Data (CDRL A002) |
| 60 |
| 4.6.3.8 |
| Base |
| Vendor Fill In |
| Complete PMR 1 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 2 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 3 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 4 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 5 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 6 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 7 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Complete PMR 8 |
| TBD |
| 4.5.6 |
| Base |
| Vendor Fill In |
| Integration & Technical Support (monthly) |
| Monthly |
| 4.6 |
| Base |
| Vendor Fill In |
System Engineering
| Delivery of Cyber Risk Management Framework Artifacts (CDRL A031) |
| 60 |
| 4.6.4.5 |
| Base |
| Vendor Fill In |
| Delivery of System Overview (A001), Final Inspection Record - Template (A035), Indentured Bill of Materials (CDRL A003), |
| 60 |
| 4.6.2.1, 4.12.5, 4.6.6.1, |
| Base |
| Vendor Fill In |
| Deliver Systems Engineering Management Plan (SEMP) and Model Based Systems Engineering (MBSE) Development Plan (MDP) |
| 60 |
| 4.6.2.2 |
| Base |
| Vendor Fill In |
| Armor Suitability Report (CDRL A026) |
| 120 |
| 4.6.2.7 |
| Base |
| Vendor Fill In |
Fire Control and Network Integration
| (a) Completion of Tactical Radio Integration |
| Prior to delivery of system 1 |
| 4.6.3.2 |
| Base |
| Vendor Fill In |
| (b) Completion of Position/Navigation/Timing Device |
| Prior to delivery of system 1 |
| 4.6.3.3 |
| Base |
| Vendor Fill In |
| (c) Fire Mission Data Processing integration |
| Prior to delivery of system 1 |
| 4.6.3.4 |
| Base |
| Vendor Fill In |
| (d) Completion of Command-and-Control Applications Integration |
| Prior to delivery of system 1 |
| 4.6.3.5 |
| Base |
| Vendor Fill In |
| (e) Development of Vehicle Fire Control Emulator |
| Prior to delivery of system 1 |
| 4.6.3.6 |
| Base |
| Vendor Fill In |
Supply Chain
| Delivery of EDFP (CDRL A029) & OMIT Data (CDRL A009) |
| 60 |
| 4.7.1, 4.7.2 |
| Base |
| Vendor Fill In |
| Delivery of Availability Assessment (CDRL A032) & Supply Chain Market Checklist (CDRL A034) |
| 90 |
| 4.6.6.3, 4.6.6.4 |
| Base |
| Vendor Fill In |
Test & Soldier Evaluation
| Deliver Critical Crew Drill Report (CDRL A012), Health Hazard Assessment Report (CDRL A013), Safety Assessment Report (CDRL A014) |
| 60 |
| 4.9.10.2, 4.9.10.3, 4.9.10.4 |
| Base |
| Vendor Fill In |
| US Ammunition Interfaces Report (CDRL A028) |
| 60 |
| 4.6.5.4 |
| Base |
| Vendor Fill In |
| Deliver System Safety Hazard Analysis Report (CDRL A015), Failure Mode Effects and Critical Analysis (CDRL A023), Transportability Report (CDRL A024), Petroleum, Oils and Lubricant List (CDRL A025) |
| 90 |
| 4.9.10.5; 4.6.2.10; 4.6.2.4; 4.6.2.5 |
| Base |
| Vendor Fill In |
| Test Support Services (est. 18 Months) |
| Monthly |
| 4.9.1-4.9.10.6 |
| Base |
| Vendor Fill In |
| Soldier Evaluation Support (est. 12 Months) |
| Monthly |
| 4.10-4.10.7 |
| Base |
| Vendor Fill In |
Training
| Complete 1st Operation and Crew Level training |
| TBD |
| 4.11.1 |
| Base |
| Vendor Fill In |
| Complete 2nd Operation and Crew Level training |
| TBD |
| 4.11.1 |
| Base |
| Vendor Fill In |
| Complete 3rd Operation and Crew Level training |
| TBD |
| 4.11.1 |
| Base |
| Vendor Fill In |
| Complete 4th Operation and Crew Level Training |
| TBD |
| 4.11.1 |
| Base |
| Vendor Fill In |
| Completion of 1st Cannon/Breech/Muzzle Brake Assembly training |
| TBD |
| 4.11.2 |
| Base |
| Vendor Fill In |
| Completion of 2nd Cannon/Breech/Muzzle Brake Assembly training |
| TBD |
| 4.11.2 |
| Base |
| Vendor Fill In |
| Completion of 1st Operator and Field Maintainer training |
| TBD |
| 4.11.3 |
| Base |
| Vendor Fill In |
| Completion of 2nd Operator and Field Maintainer training |
| TBD |
| 4.11.3 |
| Base |
| Vendor Fill In |
| Completion of 3rd Operator and Field Maintainer training |
| TBD |
| 4.11.3 |
| Base |
| Vendor Fill In |
| Complete 1st vehicle familiarization training event |
| TBD |
| 4.11.4 |
| Base |
| Vendor Fill In |
| Complete 2nd vehicle familiarization training event |
| TBD |
| 4.11.4 |
| Base |
| Vendor Fill In |
Prototype Production
| Deliver Production Capability Plan (CDRL A018) |
| 60 |
| 4.12.1 |
| Base |
| Vendor Fill In |
CSDR
| Deliver Quantity Date Report (A049) and Resource Distribution Table (RDT) (A050) |
| TBD |
| 4.5.9, 4.5.10 |
| Base |
| Vendor Fill In |
Options (Unfunded Milestones)
| Option 1: Technical Data- Modular System Interfaces |
| TBD |
| 4.8.1 |
| UM |
| Vendor Fill In |
| Option 2: Technical Data - Lightweight CAD Model |
| TBD |
| 4.8.2 |
| UM |
| Vendor Fill In |
| Option 3: Technical Data - Targeted Subsystems |
| TBD |
| 4.8.3 |
| UM |
| Vendor Fill In |
| (a) Fire Control System |
| TBD |
| 4.8.3.1 |
| UM |
| Vendor Fill In |
| (b) Cannon Assembly |
| TBD |
| 4.8.3.2 |
| UM |
| Vendor Fill In |
| (c) Human-Machine Interfaces |
| TBD |
| 4.8.3.3 |
| UM |
| Vendor Fill In |
| (d) Electrical Power Generation Storage and Distribution System |
| TBD |
| 4.8.3.4 |
| UM |
| Vendor Fill In |
| (e) Ammunition Handling System |
| TBD |
| 4.8.3.5 |
| UM |
| Vendor Fill In |
| (f) Cannon Mount and Reoil System |
| TBD |
| 4.8.3.6 |
| UM |
| Vendor Fill In |
| (g) Cannon Pointing System |
| TBD |
| 4.8.3.7 |
| UM |
| Vendor Fill In |
| (h) Wheel and Tire Assembly |
| TBD |
| 4.8.3.8 |
| UM |
| Vendor Fill In |
| (i) Armor |
| TBD |
| 4.8.3.9 |
| UM |
| Vendor Fill In |
| (j) Integrated Fire Suppression System |
| TBD |
| 4.8.3.10 |
| UM |
| Vendor Fill In |
| (k) Climate Control Systems |
| TBD |
| 4.8.3.11 |
| UM |
| Vendor Fill In |
| Option 4: Computer Software Package - Targeted Subsystems |
| TBD |
| 4.8.4 |
| UM |
| Vendor Fill In |
| (a) Fire Control System |
| TBD |
| 4.8.4.1 |
| UM |
| Vendor Fill In |
| (b) Human-Machine Interfaces |
| TBD |
| 4.8.4.2 |
| UM |
| Vendor Fill In |
| (c) Electrical Power Generation, Storage, and Distribution System |
| TBD |
| 4.8.4.3 |
| UM |
| Vendor Fill In |
| (d) Ammunition Handling System |
| TBD |
| 4.8.4.4 |
| UM |
| Vendor Fill In |
| (e) Cannon Pointing System |
| TBD |
| 4.8.4.5 |
| UM |
| Vendor Fill In |
| (f) Climate Control Systems |
| TBD |
| 4.8.4.6 |
| UM |
| Vendor Fill In |
3.2. Place of Performance
The list below includes all places of performance. Any changes to the place of performance must be approved in writing by the Agreements Officer (AO).
3.2.1. Contractor CONUS Location(s) – Vendor Fill In
3.2.2. Contractor OCONUS Location(s) – Vendor Fill In
3.2.3. USG Primary Test Location – See Attachment 021 MFR - Planned Locations for Performance
3.2.4. USG Alternate Test Location – See Attachment 021 MFR - Planned Locations for Performance
3.2.5. USG Soldier Evaluation – See Attachment 021 MFR - Planned Locations for Performance
3.3. Period of Performance
Up to 48 months after date of award.
SECTION 4: STATEMENT OF WORK (SOW)
4.0. Background
4.0.1. Army formations require enhanced mobility, survivability, sustainability, maintainability, reliability and long-range lethal cannon artillery fires during Large Scale Combat Operations (LSCO).
4.0.2. To achieve this, the Army is seeking Mobile Tactical Cannon – Tracked (MTC-T) systems, to replace select artillery systems currently in use by the United States Army (U.S. Army). The MTC-T system consists of a tracked MTC-T Self-Propelled Howitzer (MTC-T SPH) and an accompanying Resupply Vehicle – Tracked (RSV-T). The initial focus is to replace the M109 Family of Vehicles.
4.1. Near-Term Objectives (Within period of performance)
The following represents the U.S. Army’s objectives that are expected to be achieved while executing this PPA with the Contractor. They do not reflect discrete scope for the Contractor.
4.1.1. Acquire systems and cannon assemblies to support the objectives below.
4.1.2. Execute preliminary U.S. Army familiarization and safety assessment at the Contractor facility and/or country of origin prior to the delivery of the MTC-T systems.
4.1.3. Ensure all material delivered is fully supported, such that each system is fully mission capable, throughout the characterization, test, and soldier evaluation efforts through use of Contractor Logistics Support (CLS) and technical support from the manufacturer.
4.1.4. Train all required U.S. Army personnel and support Contractors for safe and effective use of the systems procured.
4.1.5. Assess the MTC-Ts interoperability within the current and future U.S. fires network.
4.1.6. Conduct U.S. ammunition integration.
4.1.7. Execute characterization, formal testing, and Soldier Evaluation events within the United States (U.S.).
4.1.8. Achieve Interim Authority to Test (IATT).
4.1.9. Issue the MTC-T to U.S. Army artillery units for evaluation.
4.1.10. Identify recommended modifications (hardware/software) in support of long-term U.S. Army operations.
4.1.11. Obtain delivery of technical data and software to the U.S. Army, with sufficient license rights, to support the purposes stated herein.
4.1.12. Begin the transition of the MTC-T system’s supply chain, production and assembly to a facility or facilities located in the United States (“onshoring”) with onshoring complete within two (2) years of initial award of this agreement to support domestic production in the Follow-On.
4.1.13. Establish Options for the Government to acquire technical data and computer software and license rights to enable future Government objectives, such as sustainment of an MTC-T system selected for follow-on production.
4.2. Long-Term Objectives
4.2.1. The following represents the U.S. Army’s objectives that will follow the execution of this effort and which some PPA tasks support. They do not reflect discrete scope for the Contractor.
4.2.1.1. If success criteria are achieved, award a long-term production contract. *Note: Decision is predicated on Army Senior Leader (ASL) decisions, available funding, and Army requirements.
4.2.1.2. Make any modifications identified in the initial characterization, testing, and evaluations.
4.2.1.3. Production Verification Testing of the domestically produced MTC-T.
4.2.1.4. Achieve Authorization to Operate (ATO) as defined by DoD Instruction 8510.01, which requires the residual cybersecurity risk to be at or reduced to an acceptable level (no unmitigated high-risk items remain).
4.2.1.5. Obtain U.S. Army Material Release and field the systems to U.S. Army units.
4.3. Applicable Documents
| Attachment # |
| Document Title |
| Attachment 001 |
| Contract Data Requirements Lists (CDRLs) |
| Attachment 002 |
| Cyber Control Compliance Description |
| Attachment 003 |
| Supply Chain Market Checklist |
| Attachment 004 |
| Assertion of Restrictions |
| Attachment 005 |
| As Built Configuration Template |
| Attachment 006 |
| Indentured Bill of Materials (I-BOM) Sample |
| Attachment 007 |
| Mobility Analysis Tool-Computer Edition (MATCE) Input Datasheet Tracked Vehicles |
| Attachment 008 |
| Memorandum For Record – MIL-STD-6017 Initial Integration for MTC-T (CUI) |
| Attachment 009 |
| Proof Gun System Overview Distro A |
| Attachment 010 |
| TDP Option Worksheet CAD |
| Attachment 011 |
| TDP Option Worksheet |
| Attachment 012 |
| MTC-T Test Schedule Breakdown |
| Attachment 013 |
| ATTLA Universal Data Sheet |
| Attachment 014 |
| Petroleum Oils and Lubricants (POL) Guide |
| Attachment 015 |
| Key Characteristics Description |
| Attachment 016 |
| MTC-T Sample Special License Agreement (SLA) |
| Attachment 017 |
| US Army 155mm Artillery Ammunition Interfaces for Compatibility Evaluation |
| Attachment 018 |
| SPH FOV Security Classification Guide 07 April 2023 |
| Attachment 019 |
| As-Built Production Unit Cost Volume |
| Attachment 020 |
| Government Furnished Material |
| Attachment 021 |
| MFR – Planned Locations for Performance (CUI) |
| Attachment 022 |
| MIL-STD-6017 (CUI) |
| Attachment 023 |
| MTC-T CSDR Plan (CUI) |
| Attachment 024 |
| Resource Distribution Table (RDT) (CUI) |
| Attachment TBD |
| Contract Security Classification Specification (DD Form 254) |
| Attachment TBD |
| DD254 Attachment A Additional Guidelines for CUI |
| AR 530-1 |
| Operations Security (OPSEC) |
| AR 750-1 |
| Army Materiel Maintenance Policy |
| MIL-STD-6017 |
| Variable Message Format (VMF) |
| MIL-DTL-53072 |
| Chemical Agent Resistant Coating (CARC) System Application Procedures and Quality Control Inspection |
Department of Defense Cyber Table Top Guide Version 2.0, 16 Sept 2021
4.4. Hardware Requirements
4.4.1. The Contractor shall deliver six (6) prototype MTC-T systems: Three (3) prototype systems will be delivered within twelve (12) months of award with three (3) subsequent systems delivered within eighteen (18) months of award. Capabilities of delivered systems will match those capabilities bid in response to Request for Commercial Solution Proposal.
4.4.2. Deliver up to 12 additional prototype MTC-T systems as option.
4.4.3. The Contractor shall deliver up to four (4) system trainers. This requirement is dependent on whether the production vehicle includes an integral or embedded training system. If the system does not include an integral or embedded training system, then system trainers are required. If there are integral or embedded training systems resident in production vehicles, then system trainers are unnecessary. For this effort, a system trainer is defined as a training device that replicates the system’s core operational functions, enabling a crew to achieve and sustain at least preliminary gunnery and crew drill qualification.
4.4.4. Deliver five (5) complete cannon assemblies (including tube/barrel, breech mechanism assembly, bore evacuator, and muzzle brake), modified for testing with up to 5 pressure measurement locations and up to 2 temperature measurement locations based on proposed cannon assembly design to be clarified at the Start of Work Meeting, and any associated equipment to conduct ammunition compatibility testing utilizing a United States Government (USG) Proof Gun Stand (PGS).
4.4.5. The USG intends to maximize the use of US Ammunition that is compatible with the Contractor’s system. If foreign optimized ammunition is necessary to meet USG objectives, the USG reserves the right to procure the quantities of optimized foreign ammunition identified in sections 4.4.6-4.4.9. In the event foreign ammunition is required, the contractor is solely responsible for importing that foreign ammunition into the U.S., including full compliance with all foreign and U.S. import and export control laws. All US Ammunition will be provided by the U.S. Army.
4.4.6. Deliver conventional projectiles that are qualified for the MTC-T system. The projectile shall be of an unassisted, high explosive type. The U.S. Army’s equivalent would be the M795.
4.4.6.1. Increment 1: 1,000 projectiles
4.4.6.2. Increment 2: 2,000 projectiles
4.4.6.3. Increment 3: 2,000 projectiles
4.4.7. Deliver inert projectiles that are qualified for the MTC-T system. The projectile performance shall be sufficient to allow for payload, demonstration, experimentation, and training in non-combat environments. The U.S. Army’s equivalent would be the inert wax filled M795.
4.4.7.1. Increment 1: 500 projectiles
4.4.8. Deliver primers qualified for the MTC-T system that are compatible with the propelling charges.
4.4.8.1. Increment 1: 1,150 primers
4.4.8.2. Increment 2: 2,200 primers
4.4.8.3. Increment 3: 2,200 primers
4.4.9. Deliver propelling charges qualified for the MTC-T system. The propelling charges’ performance shall allow for the full range capability of the MTC-T armament.
4.4.9.1. Increment 1: 5,004 charge increments
4.4.9.2. Increment 2: 6,600 charge increments
4.4.9.3. Increment 3: 11,004 charge increments
4.4.10. The Contractor shall deliver hardware representing the vehicle's ammunition stowage interface (as defined in Table C: Ammunition storage cells), in a quantity sufficient for at least twenty (20) projectiles and twenty (20) full propelling charges, along with associated mounting equipment. The USG intends to use the provided hardware for system level simulation of the shock and vibration environment that the ammunition will experience while the MTC-T is performing its missions. This does not require any automation and/or robotics but does require the cells to transfer the laboratory induced shock and vibration to the ammunition.
4.5. Program Management
4.5.1. Start of Work Meeting: The Contractor shall host a contract Start of Work Meeting (SOWM) with the government no later than 14 days after contract award. The start of work meeting should include topics provided by USG upon contract award. The Contractor shall provide readaheads (RAH) IAW CDRL (A054) and meeting minutes IAW CDRL A055.
4.5.2. The Contractor shall maintain a program management team with technical SME support for the duration of the agreement. The Contractor shall provide presentation materials, meeting minutes, and action items as requested by the USG.
4.5.3. The Contractor shall develop, maintain, and submit an Integrated Master Schedule (IMS) IAW CDRL A019.
4.5.4. The Contractor shall hold weekly programmatic meetings that will focus on cost, schedule, onshoring status, and risks and issues, with Read Ahead (RAHs) IAW (CDRL A054) and meeting minutes IAW (CDRL A055). Examples topics for programmatic meetings are build/parts status, schedule, risk, onshoring progress, and test results.
4.5.5. The contactor shall hold weekly technical meetings that will focus on the technical aspects of the program, with RAH IAW (CDRL A054) and meeting minutes IAW (CDRL A055). Example topics for technical meetings are technical briefings on the system, technical issues, technical risks/issues, variances, software and/or cyber.
4.5.6. The Contractor shall conduct a Program Management Review (PMR) twice yearly. The Contractor shall provide RAH’s IAW (CDRL A054) identifying at a minimum: current program schedules, onshoring status, integration and/or modification status, software/cyber status, financial status, action items, risks, issues, and problem resolutions. Meeting Minutes IAW (CDRL A055) are required.
4.5.7. The contractor shall deliver a Data Accessions List (DAL) IAW CDRL A033
4.5.8. The contractor shall support USG development of a Total Cost of Ownership assessment.
4.5.9. Cost and Software Data Reporting (CSDR) Requirements: The Contractor shall comply with the Cost and Software Data Reporting (CSDR) requirements set forth in the Government-approved CSDR Plan [DD Form 2794 / Attachment 023] attached to this Agreement. The Contractor shall submit required cost and software technical data directly to the Defense Cost and Resource Center (DCARC) via the Cost Assessment Data Enterprise (CADE) system in accordance with the timelines, Work Breakdown Structure (WBS), and Data Item Descriptions (DIDs) established in the approved CSDR Plan. The Contractor shall flow down these CSDR requirements to any subcontractor performing work valued at $50 million or more (or software development subcontracts valued at $20 million or more), unless a formal waiver is approved by the Director of Cost Assessment and Program Evaluation (CAPE).
4.5.10. CSDR Readiness Review: Within 90 days of the start of work, the Contractor shall host a one-day CSDR Readiness Review with the Government’s Cost Working Group Integrated Product Team (CWIPT). This review will occur at a mutually agreed-upon location or virtually. The purpose of this review is to align the Contractor’s accounting practices with the CSDR requirements outlined in the approved CSDR Plan (Attachment 023) and DoD Manual 5000.04. During the review, the Contractor and the CWIPT shall also evaluate the initial Resource Distribution Table (RDT), Attachment 024 to identify which subcontractors meet the statutory thresholds for direct CSDR reporting and which subcontractors may qualify for government-approved waivers.
4.6. Integration and Technical Support
4.6.1. Technical Support
The Contractor shall provide access to subject matter experts and documentation as required for the purposes of addressing items related to safety, general vehicle operation, correction of vehicle deficiencies arising during test or evaluation, and planning of future US modifications. The contractor shall provide the requisite access to subject matter experts and documentation no later than five days following notification.
4.6.2. Systems Engineering
4.6.2.1. System Design Review: The Contractor shall prepare and deliver a System Overview IAW CDRL A001 and present the overview at a one-time design review. The purpose of this design review is to achieve the following for the system in its design state at the time of the event: familiarize the US Army with the system, verify both Contractor and US Army assumptions about performance/integration, provide the US Army with insight to enable future modifications for US Army needs, and provide the US Army with understanding of previously completed verification and validation activities. This overview is intended to be analogous to a tailored Critical Design Review. Execution of the System Overview must be completed no later than 90 days after contract award. The System Overview must be completed CONUS with options for both in-person and virtual attendance. It is expected to be a multiple-day event, with RAHs IAW (CDRL A054) and meeting minutes IAW (A055).
4.6.2.2. Systems Engineering Model Development: The contractor shall provide an overview of the contractor’s existing systems engineering plan and digital engineering capabilities IAW CDRLs A052 and A053 with focus on how these capabilities are implemented on the system offered and the artifacts that currently exist for the system. The contractor shall also collaborate with the USG on incorporation of existing content/methodologies and deliverables within this contract into the USG’s emerging digital acquisition strategy.
4.6.2.3. Key Interfaces: The Contractor shall support discussion and review of the information provided in Section 4.7.5 as requested by the USG.
4.6.2.4. System Transportability: The Contractor shall prepare and deliver a Transportability Report for the proposed system IAW CDRL A024 – Transportability Report. This report shall include Attachment 013 ATTLA Universal Data Sheet as described in CDRL A024.
4.6.2.5. Petroleum, Oils, and Lubricants: The Contractor shall prepare and deliver a report defining any Petroleum, Oils, and Lubricants (POLs) used in the operation and maintenance of the proposed system, IAW CDRL A025 - Petroleum, Oils, and Lubricants List.
4.6.2.6. System Performance Data: The Contractor shall prepare and deliver a report defining the system mobility and power capabilities IAW CDRL A020 – Power and Mobility Capabilities Report. This report shall include Attachment 007 Mobility Analysis Tool-Computer Edition (MATCE) as described in CDRL A020.
4.6.2.7. System and Force Protection: The Contractor shall prepare and deliver a report defining system and force protection capabilities of the system IAW CDRL A026 – Armor Suitability Report.
4.6.2.8. Configuration Management and Standardization: The Contractor shall provide a briefing and support a discussion detailing their current Configuration Management processes, for both hardware and software, explaining how the system produced for this contract will be managed. The Contractor shall also provide a detailed summary of the Technical Data Package’s ability to meet International or Industry standards. The Contractor shall provide RAHs IAW (CDRL A054) 24 hours in advance, and meeting minutes IAW(CDRL A055) provided within 2 business days following.
4.6.2.9. Notification of System Variances: From the time of contract award, if the Contractor finds it necessary to deviate from the proposed MTC-T configuration, the Contractor shall submit written documentation detailing the variance and discuss these variances during the weekly Technical Review meetings, see 4.5.
4.6.2.9.1. Variance Definitions
4.6.2.9.1.1. Critical. Critical variances are not allowed. A critical variance is a departure from proposed MTC-T configuration affecting one or more of the following: (1) Safety, (2) Human health, (3) Environment, (4) Security (local program or national).
4.6.2.9.1.2. Major. A major variance is a departure from proposed MTC-T configuration affecting one or more of the following: (1) Performance or operational limits, (2) Interchangeability, reliability, survivability, maintainability, or durability of the item or its repair parts, (3) Structural strength, (4) Effective use or operation, (5) Weight, moment, center of gravity, (6) Appearance, (7) Limits on product use or operation, (8) Temporary use of alternate items
4.6.2.9.1.3. Minor. A minor variance is a departure which does not involve any of the factors listed for critical or major.
4.6.2.9.2. Variances are for the benefit of the Contractor. Under no circumstances shall submission of a Variance be the basis for a contract price increase.
4.6.2.9.3. Supporting Data: Variances shall contain marked up copies of affected drawings and 3D models as well as impact statements and any other supporting data necessary to fully understand the Variance. All Requests for Variance shall be submitted in accordance with CDRL A042 – Request for Variance Supporting Data.
4.6.2.9.4. Effectivity Certification: Variances incorporated into the proposed MTC-T configuration shall be annotated by the Contractor to reflect the anticipated effectivity point by product serial/registration number and date. The Contractor shall maintain the original effectivity point certification on file. The Contractor shall assume financial responsibility for all retrofit activities in their entirety. Configuration updates resulting from Variances shall be incorporated as an update to the MTC-T IBOM in accordance with CDRL A003 - IBOM.
4.6.2.9.5. Configuration Change Notification: The Contractor will notify the USG of any changes to the technical baseline as provided by CDRL A003 - IBOM, delivered in section 4.6.6.1. The notification shall be provided as part of the Weekly Technical Review meeting presentation, and must include the driving requirements, impacts to the system, the technical solution, and an updated IBOM.
4.6.2.10. Technical Reviews for Modifications: The contractor shall prepare a technical review for all modifications made to the system to accommodate changes requested by the USG or resulting from USG needs in accordance with CDRL A043 – Configuration Change Design Review. The format and cadence of the review or reviews shall be at the discretion of the Contractor, so long as it addresses the purposes stated here. The purpose of the review is to capture the essential systems engineering activities to review the design requirements, interfaces, preliminary design, and final design prior to fabrication or prototype integration. The technical review must be completed prior to implementation of modifications into the prototype vehicles. Entry requirements for the technical reviews shall include a description of which requirements and/or vehicle capabilities are affected, impacts on producibility, impact on cyber security, impact on system safety, and changes to form, fit, or function of modified configuration item. The only exit criteria is that the USG must agree that the technical solution is adequate to address the USG needs.
4.6.2.11. Failure Modes, Effects, Critical Analysis (FMECA): The Contractor shall prepare and deliver the system level FMECAs (functional and design level) IAW CDRL A023. The purpose of this delivery is to allow for USG familiarization, test support, and preparation for future modification planning.
4.6.2.12. System thermal management data: The Contractor shall provide access to information regarding the architecture, physical behavior, and performance of all thermal management (“Cooling”) systems on the vehicle to allow USG modeling and simulation as requested by the USG. These include but are not limited to engine, transmission, electronics, climate control, and armament temperature monitoring and cooling systems.
4.6.2.13. Armament Performance Data: The Contractor shall provide access to information regarding the architecture, physical behavior, and performance of the 155mm armament and associated systems on the vehicle to allow modeling and simulation as requested by the USG. These include, but are not limited to, interior ballistics, muzzle brake efficiency, gun mount stress capabilities, and recoil system performance, including recoiling mass, fluids, pressures, fluid-throttling profiles, thermal limits (fluid, seals, ability to compensate for fluid expansion), and embedded sensors.
4.6.2.14. Hazardous Materials Report: The Contractor shall prepare and deliver a report outlining use of the following materials at any point through the system lifecycle and identify any ongoing or proposed efforts to remove those materials from the system in accordance with CDRL A013 Hazardous materials: The following are prohibited materials: asbestos, beryllium, Class I and Class II Ozone Depleting Substances (ODS), hexavalent chromium, cadmium, mercury, lead, radioactive materials, and other Group 1 Agents classified as "carcinogenic to humans" by the International Agency for Research on Cancer (IARC) Monographs. The following exceptions are allowed without prior approval from the Government:
4.6.2.14.1. Cadmium and hexavalent chromium on electrical connectors and back shells used to mate with cadmium electrical connectors on Government Furnished Equipment (GFE)
4.6.2.14.2. Products listed under "Priming" and "Topcoating" in MIL-DTL-53072, Table I
4.6.2.14.3. Lead-acid batteries
4.6.2.14.4. Lead in engine bearings
4.6.2.14.5. Leaded battery terminal adaptors/clamps
4.6.2.14.6. Steel containing up to 0.35 % lead by weight
4.6.2.14.7. Aluminum containing up to 0.4 % lead by weight
4.6.2.14.8. Copper and Brass alloys containing up to 4 % lead by weight
4.6.2.14.9. Beryllium and Beryllium alloys used in electrical components
4.6.2.14.10. Mercury containing components compliant with European Union (EU) Directive 2011/65/EC (RoHS2)
4.6.2.14.11. Trace amounts of identified restricted materials contained in base materials and/or alloys. For the purposes of this contract trace amounts are defined as <0.1% by weight for carcinogens and <1% by weight for all other materials.
4.6.3. US Fire Control and Network Integration
4.6.3.1. The Contractor shall participate in a Network Interoperability working group meeting to convey status and collaborate with the USG throughout the period of performance. For any software that needs to be developed in order to facilitate the scope herein, the Contractor shall deliver a Software Development Plan IAW CDRL A008 – Software Development Plan.
4.6.3.2. Tactical Radios: The Contractor shall integrate Government Furnished Equipment (GFE) tactical radios systems, to be determined 15 days after contract award. The Contractor shall install/integrate all radios and demonstrate performance in accordance with USG defined test procedures. The integration shall not negatively impact the performance of the USG GFE or the base system. This task shall be completed prior to delivery of the first prototype.
4.6.3.3. Position/Navigation/Timing Device: The Contractor shall integrate the US Army’s Mounted Assured Positioning, Navigation and Timing System (MAPS) Gen II system and modify their system such that it only uses this device and it’s y-code output for position and navigation data, exclusive of any Inertial Navigation Unit (INU) integrated into the system as a baseline. The Contractor shall prepare a plan for integration of the m-code implementation of the MAPS Gen II. The unit and antenna will be provided as GFE. This task shall be completed prior to delivery of the first prototype.
4.6.3.4. Fire Mission Data Processing: The Contractor shall modify their system to receive and transmit fire mission data as defined in Attachment 008 MFR - MIL-STD-6017. This task shall be completed prior to delivery of the first prototype.
4.6.3.5. Command and Control Applications: The Contractor shall integrate a Command and Control system, comprised of Government furnished software and hardware, to be clarified at the time of award. This task shall be completed prior to delivery of the first prototype.
4.6.3.6. Vehicle Fire Control Emulator: The Contractor shall prepare and provide access to the USG a combination of hardware and software to allow the USG to conduct fire mission processing simulation. The emulator shall receive VMF 6017 messages, emulate the performance of the vehicle, and then transmit appropriate end-of-mission VMF messages, as integrated on the vehicle in task 4.6.3.4. The emulator will provide an accurate representation of user displays and system behaviors of the tactical fire control software for integration and verification testing. The Contractor shall provide access to and present evidence in the form of verification test results showing the emulator matches vehicle behavior and performance. This task shall be completed prior to delivery of the first prototype.
4.6.3.7. Graphical Human Machine Interface (HMI) Adjustments: The MTC-T shall have a graphical HMI in English. This task shall be completed prior to initial delivery.
4.6.3.8. Ammunition Ballistics: The Contractor shall provide the data necessary to produce a ballistic kernel for US Army Fire Direction Center (FDC) computations IAW CDRL A002.
4.6.4. Cybersecurity Assessments
The purpose of the cybersecurity assessments is to allow the USG to validate the cyber survivability of the system and to achieve an Interim Authority to Test.
4.6.4.1. Software Bill of Materials: The Contractor shall prepare and deliver a Software Bill of Materials (SBOM) IAW CDRL A006 – Software Bill of Materials.
4.6.4.2. The Contractor shall deliver the system software source code with access rights for the purpose of the USG conducting a vulnerability assessment of the vehicle software and electronics using the Software Assurance Tool (SWAT). The Contractor shall support two separate Government led cyber penetration test events. As part of each of those events, the Contractor shall provide special connectors and subject matter expert support to answer questions and provide connectivity to electronic components and networks within the vehicle.
4.6.4.3. The Contractor shall support cyber tabletop exercises as described by The Department of Defense Cyber Tabel Top Guide Version 2.0, 16 Sept 2021 (https://ac.cto.mil/wp-content/uploads/2021/09/DoD-Cyber-Table-Top-Guide-v2.pdf)
4.6.4.4. The Contractor shall develop solutions that mitigate cybersecurity vulnerabilities through the period of performance.
4.6.4.5. The Contractor shall provide Cyber RMF Artifacts IAW CDRL A031. This shall include Contractor executed scans of vehicle software and electronics using the Assured Compliance Assessment Solution (ACAS) scanner.
4.6.5. U.S. Ammunition Integration
4.6.5.1. Assessment of Compatibility: The Contractor will evaluate compatibility of U.S. fielded and developmental ammunition, as requested, and provide feedback as to the compatibility of that ammunition in the Contractor system. Compatibility assessments should include, but are not limited to, assessments on the interior ballistics of the cannon-ammunition combination, considerations for the ammunition handling system, safety, and ammunition storage environment. The assessment shall also include potential platform and/or ammunition solutions to any ammunition incompatibilities, to include scope and estimated cost and schedule. The Contractor shall participate in working group meeting focused on ammunition compatibility to convey findings and collaborate with the USG.
4.6.5.2. Cannons for Ammunition Assessments: The Contractor shall collaborate with the USG on the USG led integration of the delivered cannon/breech/muzzle brake assemblies into a USG Proof Gun Stand (PGS) and shall be responsible for modification of the cannon for USG required instrumentation. An overview of the PGS is provided in Attachment 009. Instrumentation will be defined at the Start of Work meeting.
4.6.5.3. The Contractor shall assess integration of US Army fuze setter systems with the intent of enabling maximum system and US ammunition capability.
4.6.5.4. The Contractor shall prepare and deliver to the Government an Ammunition Interfaces Report IAW CDRL A028 – US Ammunition Interfaces Report. The purpose of these deliverables is to enable U.S. Government (USG) led shock, vibration, and live-fire testing at Government test facilities to validate system integration and performance. To facilitate this testing and future integration efforts, the Government seeks a Special Negotiated License for the delivered technical data package. The specific deliverables shall be of the same design as the delivered system and the resupply system, if applicable.
4.6.5.5. If non-US ammunition is purchased as an option, then the Contractor shall prepare and deliver to the Government a Foreign Ammunition Safety and Reliability Report IAW CDRL A027 - Foreign Ammunition Safety and Reliability Report.
4.6.6. Supply Chain
For all subsections, the supply chain referenced is the current supply chain for the as-built system, before onshoring.
4.6.6.1. Indentured Bill of Materials (IBOM): The Contractor shall provide an IBOM IAW CDRL A003. The data will be used by the Government to perform a Diminishing Manufacturing Sources and Material Shortages (DMSMS) assessment and examination for items common to other US Army systems. The IBOM shall also identify components that contain “specialty metals” as defined by DFARS 225.7003. If no materials fitting this category exist in any of the platform components the Contractor shall furnish to the Government a declaration stating that no such materials exist within the configuration of the platforms being provided.
4.6.6.2. The Contractor shall provide SME support for discussions to characterize how the Contractor conducts supply chain risk management.
4.6.6.3. Supply Availability Assessments: The Contractor shall provide support for Government SME discussions to characterize how the Contractor supports their system with respect to spare repairable and consumable parts. The intent of this scope is to demonstrate to the Government how system sustainment can be accomplished. Any report provided by the contractor shall be IAW CDRL A032 - Availability Assessment.
4.6.6.4. The Contractor shall provide a completed Supply Chain Market Checklist (Attachment 003) to assess commonality with US Military, NATO supply systems, and Commercial off The Shelf (COTS) parts. The completed checklist shall be delivered IAW CDRL A034 - Supply Chain Market Checklist.
4.7. Technical Data and Computer Software Base Requirements
The Contractor shall prepare and deliver the following system technical data and software as requested within the below sections. All documentation shall be provided in the English language.
4.7.1. Engineering Data for Provisioning (EDFP): The contractor shall prepare and deliver EDFP for the comprehensive weapon system IAW CDRL A029. The EDFP must be adequate to allow the Government to identify, catalogue, and procure each individual part of the end item and to fully understand the relationship and assembly of all parts within the system. This requirement shall include all items, for which the Contractor shall furnish sufficient form, fit, and function data (such as Vendor Item Control Drawings per ASME Y14.24), to support the identification of alternative sources. EDFP containing only form, fit, and function data shall be delivered to the Government with Unlimited or Unrestricted Rights.
4.7.2. Data Necessary for Operation, Maintenance, Installation, and Training (OMIT): The Contractor shall provide comprehensive Operations, Maintenance, Installation, and Training (OMIT) data to allow the US Army to organically conduct field and depot level maintenance, and to use the submitted technical data for any other Government programs. The Contractor shall provide all OMIT data with no less information or detail than industry standards, nor less than the Contractor typically requires, to perform such maintenance activities, and shall include any additional information necessary for the stated US Government purposes. Examples of OMIT data include, but are not limited to, Operator's and Maintenance Manuals, Repair Parts and Special Tools Lists (RPSTLs), Maintenance Allocation Charts (MACs), troubleshooting guides, software installation guides, and all training materials. The Government shall be granted Unlimited and Unrestricted Rights for all OMIT data. This data shall be delivered IAW CDRL A009.
4.8. Technical Data and Computer Software Options
The USG will have the option to procure system technical data and software, in whole or in part, as requested within the below sections. All documentation shall be provided in the English language. Upon determination of exercise of an option, the AO will notify the Contractor of the Government’s desire to exercise the option. Thereafter, the Government and the Contractor shall determine a mutually agreeable time and duration to examine the technical data and/or computer software to be delivered under the proposed exercised option. The Government shall have sole discretion on exercising the option.
4.8.1. Modular System Interfaces: To establish a Modular, Open System Approach (MOSA) foundation that enables rapid modernization and allows for competitive or Government-led modification for experimentation, the Government requires detailed architectural and interface data. The Contractor shall deliver comprehensive systems engineering information that defines the system's functional and physical architecture. This includes detailed descriptions of interfaces between all major system components.