Attachment 001 Contract Data Requirements Lists (CDRLs).docx
DOCX document 1019 KB Posted
- Attached to
- Mobile Tactical Cannon - Tracked (MTC-T) and Resupply Vehicle – Tracked (RSV-T) Capability Solutions
- Solicitation number
- MOSAIC-27-01
- Issued by
-
Department of the Army
About this file
This is a Contract Data Requirements Lists (CDRLs) document for a Mobile Tactical Cannon-Tracked (MTC-T) system development contract. The document specifies 20 data item requirements that contractors must deliver throughout the contract lifecycle, with deliverables controlled by Portfolio Management Executive Offensive Fires and PM Howitzer Systems at Detroit Arsenal.
Key deliverables include: (A001) Design Review Information Package due 60 days after contract award (DAC) as a one-time submission; (A002) Ammunition Ballistics Data due 60 DAC on a semi-annual basis; (A003) Indentured Bill of Material for DMSMS management due 60 DAC monthly; (A004) As-Built Configuration List due as required with every vehicle delivery; (A005) Product Level Technical Data Package due 60 DAC one-time by July 1, 2026; (A006) Software Bill of Materials due 60 DAC with revisions as required; (A007) Software Source Code due 180 DAC; (A008) Software Development Plan due 60 DAC with revisions as needed; (A009) Operation, Maintenance, Installation, Training Data due quarterly beginning 60 DAC; (A010) Lightweight CAD Model due 60 DAC; (A011) Weekly Field Service Representative Reports beginning one week after arrival at operational location; (A012) Critical Crew Drill Report due 60 DAC by June 1, 2026; (A013) Health Hazard Assessment Report due 60 DAC with revisions for each test event; (A014) Safety Assessment Report due 60 DAC with revisions for each test event; (A015) System Safety Hazard Analysis Report due 90 DAC one-time; (A016) Failure Analysis Corrective Action Reports with critical incidents due within 48 hours interim and 5 days final, major incidents within 30 days; (A017) Operator/Maintenance Manuals and Training Materials due 60 DAC; (A018) Production Capability Plan due 30 DAC initial with bi-weekly updates thereafter; (A019) Integrated Master Schedule in MS Project format due 14 DAC; and (A020) Power and Mobility Capabilities Report due 60 DAC. All technical data is classified as Controlled Unclassified Information (CUI) with Distribution Statement D, restricted to Department of Defense and U.S. DoD contractors only, controlled by the PM Howitzer Systems Security Manager at Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, Detroit Arsenal, Michigan.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
17. PRICE GROUP
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Design Review Information Package (DRIP)
3. SUBTITLE
System Design Review
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81757A (T)
5. CONTRACT REFERENCE
4.6.2.1
6. REQUIRING OFFICE
SFAE-PFO-H
7. DD 250 REQ
NO
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
60 DAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
60 DAC
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: Authority: DI-SESS-81757A is tailored (T) as follows:
1. Format: The information package shall be provided as a presentation in Microsoft PowerPoint or Adobe PDF (searchable), in English. The report and attachments shall not be password protected.
2. Contents: Sections 1-12 do not need to be addressed as formatted and are provided as reference. The contactor shall address directly the following contents:
System Design Review A. Introduction - System Summary B. Description of System Architecture
1. Overview of system specifications as they relate to Attachment 015 Key Characteristics Description
2. Trace Primary System Functions to Subsystems (i.e. cannon system, powerpack, fire control system)
3. Configuration Changes from legacy design for systems delivered on this contract
4. Modular Open System Approach – (Reference MOSA Implementation Guidebook – FEB 2025)
i. Identify system and subsystem designs which employ a modular and open approach
ii. Identify system and subsystem designs which may offer and opportunity for future implementation of a modular and open system approach
5. Digital Engineering/Model Based Systems Engineering
i. What Requirements Management tool is being used – if any
ii. What MBSE Tool is being used to support system design and maturation – if any
iii. Is a working system model available for review?
C. System Capabilities:
1. Mobility
2. Primary Armament System and Ammunition Handling
i. Ammunition Compatibility
ii. Ammunition Capacity (Projectiles/Propellant/Fuses)
iii. Fuse Setting Technology
iv. Ammunition Effective Range(s)
3. Secondary Weapon Systems
i. Systems already integrated
ii. Control Options (remote, direct, etc.)
iii. Inclusion with proposed howitzer system
iv. Designed integration provisions with proposed howitzer system
4. Communications
i. Internal
ii. External
5. System Sustainment
i. Petroleum, Oils, and Lubricants (POLs) for Operation and Maintenance (General Overview)
ii. Nuclear, Biological, Chemical (Operation and Decontamination)
iii. Environmental (Operation in Hot, Basic, and Cold Environments – Reference AR 70-38)
iv. Fault Detection and Management
v. Prognostic and Predictive Maintenance
6. Survivability and Force Protection
i. Crew Protection
ii. Ammunition Protection
iii. Compartmentalization (separation of crew and ammunition)
iv. Fire Suppression Systems D. Growth Characteristics – Size, Weight, Power, and Cost impacts to common system enhancements
1. Increased Primary Weapon System Range/Lethality
2. Increased Mobility/Range
3. Increased System Survivability/Force Protection
4. Growth Margins/Limitations with respect to Key Characteristics Description E. Integration Plan – Discussion Point (Preliminary Designs not Required)
1. US Army Fire Control
2. US Army Ammunition (Continued on next page)
PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
August J Ladensack III
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 1 of 66 Pages |
Distribution Statement A. Approved for public release: distribution is unlimited.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP ___ TM ___ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001 (cont’d)
2. TITLE OF DATA ITEM
Design Review Information Package (DRIP)
3. SUBTITLE
System Design Review
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81757A (T)
5. CONTRACT REFERENCE
4.6.2.1
6. REQUIRING OFFICE
SFAE-PFO-H18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
NO
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
60 DAC
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
(Continued from previous page)
F. Validation/Verification History
1. System Performance – Mobility/Reliability
2. Test Reports – Summary of Previous System Validation/Verification efforts G. Test Support
1. FSR Support Plan 2.Ammunition Provision Plan (Foreign Ammunition only) H. Safety
1. Hazard summary
2. Human Factors Assessments
i. 5th to 95th percentile soldier interaction with key Human – Machine Interfaces
ii. Primary system controls operable with gloved hands
iii. Handholds at climbing points and non-skid material on flat walking surfaces
iv. Emergency egress solutions I. Cyber
1. Anti-Tamper (physical and radio) Strategy
2. Supply chain risk management (traceability of microelectronic and precious material sources) J. Logistics Support Aspects
1. OEM output for delivering Logistics Product Data (LPD)
2. What life cycle logistics software is used to develop logistics product reports
Block 8: Contractor Shall Submit a draft read-ahead 7 business days ahead of the final submission. The Government will provide comments within 5 business days.
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02
| PEO GCS CDRL Application |
| 1 |
| 1 |
https://gcscdrl.army.mil/ext
| 15. TOTAL ---------à |
| 1 |
| 1 |
G. PREPARED BY
August J. Ladensack III
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 2 of 66 Pages
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Technical Report–Study/Services
3. SUBTITLE
Ammunition Ballistics Data
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B(T)
5. CONTRACT REFERENCE
4.6.3.8
6. REQUIRING OFFICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
SEMI A
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 tailored as follows:
Content shall be provided in contractor format.
The report must include, at a minimum, the information outline below:
- Provide a complete listing of each 155mm artillery shell, fuze, and propellant supported and tested for the platform.
- Provide a complete ammunition combination compatibility list (shell, fuze, propellant)
- Provide a complete list of expected muzzle velocities and Equivalent Full Charge (EFCs) for ammunition combinations and charges.
- Provide a complete listing of the ballistic fire control input data for the platform as agreed to in NATO STANAG 4144 and AOP-65.
- Provide ballistic tests report documenting measured ballistic. Reference DI-MISC-80246 for typical content.
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02 PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
John Baldwin
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 3 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) LIFE CYCLE MANAGEMENT DATA
3. SUBTITLE
Indentured Bill of Material (IBOM)
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82274(T)
5. CONTRACT REFERENCE
4.6.2.9.4; 4.6.2.9.5; 4.6.6.1
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-MGMT-82274, the following Data Element Numbers listed in Table 1 shall be excluded from the delivery:
Data Element Number 14 Data Element Number 16 Data Element Number 23 Data Element Number 31 Data Element Number 39 Data Element Number 47 Data Element Number 48 Data Element Number 49
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02 PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
Michael Rouleau
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 4 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
AS BUILT CONFIGURATION LIST– COMMON (ABCL-C)
3. SUBTITLE
ABCL-C Bill of Materials
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81830(T)
5. CONTRACT REFERENCE
4.9.1
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
D
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
ASREQ
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-SESS-81830, the following Column Numbers listed in Table 1 shall be excluded from the delivery:
Column Number 10 Column Number 11 Column Number 18
This CDRL shall be delivered to the United States Government with every vehicle delivered.
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02 PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 5 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS
3. SUBTITLE
Product Level Technical Data Package (TDP)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81000F(T)
5. CONTRACT REFERENCE
4.8.3
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
See Block 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
2026Jul01
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-SESS-81000F and Attachment 011 Titled “TDP OPTION WORKSHEET TDP PPA Par 11.1.2”.
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02 PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 6 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
CYBERSECURITY SUPPLY CHAIN RISK MANAGEMENT (C-SCRM) SOFTWARE
BILL OF MATERIAL (SBOM) REQUIREMENTS
3. SUBTITLE
Software Bill of Materials
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-82433
5. CONTRACT REFERENCE
4.6.4.1
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
See Block 16
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02
Block 10 Frequency: Provide initial delivery of CDRL and if any changes are made to the system a revised CDRL will be required post completion of changes.
PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
Aaron Arndt
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 7 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Software Product Specification
3. SUBTITLE
Software Source Code for Targeted Subsystems
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A
5. CONTRACT REFERENCE
4.8.4
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
D
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
180DAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02 PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 8 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
3. SUBTITLE
Software Development Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427B
5. CONTRACT REFERENCE
4.6.3.1
6. REQUIRING OFFICE
SFAE-PFO-H
7. DD 250 REQ
NO
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02h Block 10 Frequency: Provide initial delivery of CDRL and if any changes are made to the system a revised CDRL will be required post completion of changes.
PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
Aaron Arndt
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 9 of 66 Pages |
18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER X__
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Logistics Product Data
3. SUBTITLE
Operation, Maintenance, Installation, Training (OMIT) Data
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81758A
5. CONTRACT REFERENCE
4.7.2
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
Quarterly
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02 PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
John Kelty
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 10 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _X_ TM __ OTHER __
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Technical Data Package (TDP)
3. SUBTITLE
Lightweight Computer-aided Design (CAD) Model
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776B(T)
5. CONTRACT REFERENCE
4.8.2
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
2026Jul01
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: Contractor shall deliver Data Item Description (DID) In Accordance With (IAW) DI-SESS-80776B, the following sections shall be excluded from delivery:
3.a.
3.b.
3.c.(1) 3.c.(2) 3.c.(4) 3.c.(6) 3.c.(7) 3.c.(9)-(17) 3.d-j.
Attachment 010 Titled “TDP OPTION WORKSHEET CAD” shall be used to describe the type and format of data delivered
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02
Block 10 Frequency: One (1) delivery of this CDRL is required 30 calendar days after contract award.
PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 11 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER X__
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
CONTRACT FIELD SERVICE REPORT
3. SUBTITLE
FSR Weekly Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81238A(T)
5. CONTRACT REFERENCE
4.9.7, 4.10.5
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
Weekly
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
O
13. DATE OF SUBSEQUENT SUBMISSION
ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: The Contractor shall submit a report of all Field Service Representative (FSR) activity in their own format containing the information required in 3 through 3.15.6.5. The contractor may add but shall not change or delete data and information submitted by the FSR.
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02
Block 12: The Contractor shall submit the first weekly reports within 1 business day of the first full week after arrival at the CONUS or OCONUS location.
Block 13: The FSR shall submit subsequent a weekly summary of their activity within 1 business day of the last business day of the activity report week. The Contractor report shall include damaged or non-repairable equipment. The Contractor shall, for situations that may lead to or resulted in serious injury or loss of life, notify the Government by most expeditious means, and submit a follow-up report within 24 hours.
Block 14:
Electronic Submissions of data requirements shall be uploaded to the Contract Data Requirements List (CDRL) within the Governments PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
John Kelty
H. DATE
2026Feb18
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 12 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
CRITICAL TASK ANALYSIS REPORT
3. SUBTITLE
Critical Crew Drill Report
4. AUTHORITY (Data Acquisition Document No.)
DI-HFAC-81399B(T)
5. CONTRACT REFERENCE
4.9.10.2
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
ONE/R
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
2026JUN01
13. DATE OF SUBSEQUENT SUBMISSION
N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 authority: Tailor DID as follows:
Format: must be PDF Content:
1. Paragraph 3.b For this CDRL, the only tasks required are those associated with:
a. Emplacement
b. First Round Response
c. Displacement
d. Rate of Fire
e. Ammunition Rearm (Resupply of howitzer)
2. The contractor shall specify what the current U.S equivalent Military Occupational Specialty (MOS) is required for each crew member.
3. The Critical Crew Drill Report shall be developed using the notional U.S equivalent MOS for each crew member.
4. The Critical Crew Drill Report shall provide basic dimensions, locations, and human factors requirements (e.g. hand wheel torques) for each of the crew member interfaces. The contractor may use the Human Engineering Design Approach Document - Operator (HEDAD-O) (DI-HFAC-80746C) as guidance.
PEO GCS CDRL Application https://gcscdrl.army.mil/
15. TOTAL ---------à
G. PREPARED BY
MAJ Sauer, Craig
H. DATE
2026FEB24
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 13 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Health Hazard Assessment Report (HHAR)
3. SUBTITLE
Health Hazard Assessment Report (HHAR)
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80106C(T)
5. CONTRACT REFERENCE
4.6.2.13, 4.9.10.3
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: The contractor shall prepare the HHAR in accordance with the DI-SAF -80106C with the following tailored remarks:
• DI-SAFT-80106C Section 4.B shall include up-to-date Safety Data Sheets (SDSs) for all materials used by the system
• DI-SAFT-80106C Section 4.B shall include Noise and Blast Overpressure (BOP) measurements for each of the firing configurations under the following criteria:
- Steady-State Noise data/assessments in accordance with MIL-STD-1474D, Requirement 1.
- Blast Over Pressure and Impulse Noise data/assessments in accordance with MIL-STD-1474D, Requirement 4.
Block 9:
Controlled by: PME Offensive Fires Controlled by: PM Howitzer Systems CUI Category: CTI, EXPT Distribution Statement: D POC: {Insert name and email of person designating CUI}
Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only. Reason: CTI, EXPORT. Date of Determination: 20260306. Other requests for this document shall be referred to PM HS Security Manager at: Portfolio Management Executive Offensive Fires, ATTN: SFAE-PFO-H, MS 531, 6501 East 11 Mile Road, Detroit Arsenal, MI 48397-5000. Commercial (586) 282-0330 or DSN 786-0330.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02
Block 10 Frequency: The HHAR deliverable will be needed for each test/TiC event, and updated to reflect test/TiC specific operations.
PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
Christopher Hinkle
H. DATE
2026Feb19
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 14 of 66 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP __ TM __ OTHER _X_
D. SYSTEM/ITEM
MTC-Tracked
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Safety Assessment Report (SAR)
3. SUBTITLE
Safety Assessment Report (SAR)
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102D(T)
5. CONTRACT REFERENCE
4.9.10.4
6. REQUIRING OFFICE
SFAE-PFO-H
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLOCK 16
10. FREQUENCY
R/ASR
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4 Authority: The contractor shall prepare the SAR in accordance with the DI-SAFT-80102D with the following tailored remarks:
• DI-SAFT-80102D Section 5.b shall include up-to-date Safety Data Sheets (SDSs) for all materials used by the system
• DI-SAFT-80102D Section 5.b shall include the applicable Interim Hazard Classifications (IHCs) or Final Hazard Classifications (FHCs) for all Ammunition and Explosive (A&E) items/material used in the system.
o Note: an IHC is required at a minimum, for all A&E provided by the contractor
• DI-SAFT-80102D Section 4 shall include the following additional information:
- A discussion of analyses and tests performed to address software safety risks and Level of Rigor (LoR).
- A summary of Safety-Related (SR), Safety- Critical (SC), and Non-Safety-Significant (NSS) functions identified.
- A summary of Software Criticality Index (SwCI) functional allocations. (i.e. how many functions were SwCI 1, 2, 3, etc.)
- A statement of whether LoR tasks are complete, in progress, or unspecified at the time of the report.
• DI-SAFT-80102D Section 5.b shall include the following information on any system or subsystem that emitts radio frequency (RF) radiation
- RF emitter power output in Watts (W)
- RF emitter antenna gain in isentropic decibels (dBi)
- RF emitter frequencies
Additionally, the contractor shall outline in a safety summary the safety activities conducted on the cannon assembly to be utilized in the proposed howitzer. The safety summary shall include:
a. The safety tests conducted on the cannon (reference appropriate military standards, international test operating procedures [ITOPs], or North Atlantic Treaty Organization Standardization Agreement/Allied Ordnance Publications STANAG/AOP])
b. The ammunition utilized in the safety tests.
c. Provide an engineering report for Safe Service Life testing and/or analysis of the cannon to include the tube, breech, and muzzle brake.
d. Provide an engineering report for wear testing of the cannon tube.
e. Provide an engineering report for reliability of the armament system.
f. The permissible maximum pressure (PMP), the cannon design pressure (CDP), and the proof pressure (PP).
g. Evidence that the cannon has been proofed.
h. The design of the charge used to proof the cannon
i. Provide the maximum rate of fire to include charge and ammunition suite, include the number of rounds that can be fired at this rate.
j. Provide the sustained rate of fire to include charge and ammunition suite
k. Describe the thermal limits for propellant cookoff and for projectile exudation.
l. Describe any automated armament monitoring to include recoil, thermal temperature, and ammunition handling.
PEO GCS CDRL Application https://gcscdrl.army.mil/ext
15. TOTAL ---------à
G. PREPARED BY
H. DATE
2026Feb19
I. APPROVED BY
J.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .