Attachment 019 - As-built Production Unit Cost Volume.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Mobile Tactical Cannon - Tracked (MTC-T) and Resupply Vehicle – Tracked (RSV-T) Capability Solutions
Solicitation number
MOSAIC-27-01
Issued by

About this file

This is an Excel-based pricing template for submission of production unit costs in support of the Mobile Tactical Cannon-Tracked (MTC-T) and Resupply Vehicle-Tracked (RSV-T) Capability Solutions solicitation. Offerors are required to provide cost data in Base Year 2027 U.S. Dollars for two system types across three production quantity categories: units 1-24, units 25-36, and units 37-48. The template requires input of Direct Labor Cost, Direct Material Cost, Direct Subcontract Cost, Overhead Cost, General & Administrative (G&A) Cost, and Profit/Fee for each category and system type, with calculated total prices for each configuration.

The submission is part of Phase 3 of the proposal process under the Munitions Open Solicitation for Advanced and Innovative Capabilities (MOSAIC) program (Solicitation W50RAJ-26-S-0001, MOSAIC-27-01) issued by Army Contracting Command - Detroit Arsenal. The Government explicitly states that this attachment is required for planning, budgetary analysis, and production planning purposes only and will not be evaluated as an award factor or used to influence proposal selection. This is an Other Transaction (OT) for Prototype Project pursuant to 10 USC 4022, with the Government reserving the right to award to one or more contractors or to none.

View the file

Other files

File Type Posted
Attachment 001 Contract Data Requirements Lists (CDRLs).docx DOCX document
MTC-T OTA Prototype Project Agreement.docx DOCX document
Attachment 016 - MTC Sample Special License Agreement (SLA) 09232026.docx DOCX document
Appendix B - Project Other Terms and Conditions.docx DOCX document
Attachment 012 MTC Test Schedule Breakdown.xlsx XLSX spreadsheet
Attachment 009 - Proof Gun system Overview Distro A - Embedded video 1.pdf PDF
Attachment 005 - As-Built Configuration Template.xlsx XLSX spreadsheet
Appendix A - Project Articles.docx DOCX document
Appendix E Milestone Pricing Summary.xlsx XLSX spreadsheet
Attachment 007 - MATCE Input Datasheet Tracked Vehicle.xlsx XLSX spreadsheet
Appendix C - Representations and Certifications.docx DOCX document
Attachment 011 - TDP OPTION WORKSHEET TDP.pdf PDF
Attachment 010 - TDP OPTION WORKSHEET CAD.pdf PDF
MTC-T OTA Prototype Project Agreement.docx DOCX document
Attachment 013 - ATTLA_Universal_Data_Sheet_Tracked-2026.xlsx XLSX spreadsheet
Attachment 001 Contract Data Requirements Lists (CDRLs).docx DOCX document
Attachment 004 - Assertion of Restrictions.xlsx XLSX spreadsheet
MTC-Tracked Call for Solutions.docx DOCX document
Attachment 014 - Petroleum Oils and Lubricants (POL) Guide.pdf PDF
Attachment 006 - I-BOM Sample.xlsx XLSX spreadsheet
Attachment 003 - Supply Chain Market Checklistv2.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

UNCLASSIFIED

Item Description:As-built Production Unit Cost Volume
Cover Page
up
Distribution Statement A – Approved for Public Release; distribution unlimited

(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)

As part of the P-BL development, delete this sheet and submit only the "Title Page" and "P-BL" sheets.

DRAFT

1. Introduction

Tab 1. Instructions Nothing to input, informational only.

Tab 2. Production Unit Cost Insert the required information in the blue highlighted cells. As part of the Phase 3 proposal submission, the Offeror shall provide responses in Base Year (BY) 2027 U.S. Dollars (USD) for the requested production quantities and the as-built production configuration. This attachment is required for U.S. Government future planning, budgetary analysis, and production planning purposes only. The information submitted in this attachment is not an evaluated award factor and will not be used to influence proposal selection or award.

2. Production Unit Cost

Total Cost-Price Summary

Form Instructions: Insert the required information in the blue highlighted cells. As part of the Phase 3 proposal submission, the Offeror shall provide responses in Base Year (BY) 2027 U.S. Dollars (USD) for the requested production quantities and the as-built production configuration. This attachment is required for U.S. Government future planning, budgetary analysis, and production planning purposes only. The information submitted in this attachment is not an evaluated award factor and will not be used to influence proposal selection or award.

Category Description1-24
MTC-T systems25-36
MTC-T systems37-48
MTC-T systemsCategory Description1-24
RSV-T systems25-36
RSV-T systems37-48

RSV-T systems

Direct Labor CostDirect Labor Cost
Direct Material CostDirect Material Cost
Direct Subcontract CostDirect Subcontract Cost
Overhead CostOverhead Cost
G&A CostG&A Cost
Profit/FeeProfit/Fee
Total Price$ -$ -$ -Total Price$ -$ -$ -

File details come from the government source that posted it. Updated .