This is a pavement engineering report providing design recommendations for roadway and parking infrastructure at Mammoth Cave National Park in Kentucky. The Federal Highway Administration's Eastern Federal Lands Highway Division prepared this October 2022 report for Project NP-MACA 12(1), 908(1), which involves reconstruction and new construction of multiple transportation facilities as part of renovating the Mammoth Cave Lodge.
The project encompasses several roadway and parking components including the Mammoth Cave Parkway left turn lane, Hotel Entrance Road realignment, Visitor Center Bus Loop modifications, a new Hotel Bus Loop with concrete drop-off lane, Hotel Services Parking reconstruction, a new Hotel Service Access Road, Mammoth Cave Parking area expansion, overflow parking construction, shared use pedestrian paths, plaza areas, and a gravel parking area. The report provides detailed pavement design specifications based on subsurface investigations, soil boring analysis, and pavement condition assessments conducted in December 2021. Design recommendations include varying asphalt concrete thicknesses (1.5 to 3.0 inches for different layers), aggregate base courses (5.0 to 6.0 inches), concrete pavement sections (6.0 to 8.0 inches), and geotextile separation materials. The analysis considered different traffic loading scenarios, with lighter passenger vehicle traffic for most areas and heavier bus/delivery truck traffic for service roads, resulting in structural numbers ranging from 3.03 to 3.41 inches and concrete thicknesses up to 8.0 inches for high-load areas.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAVEMENT REPORT NUMBER FY22-03
Project NP-MACA 12(1), 908(1)
Mammoth Cave National Park Edmonson County, Kentucky
Pavement Design Recommendations for
Mammoth Cave Entrance Road, Mammoth Cave Hotel Parking Area, and Hotel Service Road
October 2022
U.S. Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Division 22001 Loudoun County Parkway
Ashburn, VA 20147
NP MACA 12(1), 908(1) Pavement Report No. FY22-03
TABLE OF CONTENTS
1 INTRODUCTION
1.1 GENERAL
1.2 PROJECT DESCRIPTION
1.3 PROJECT PURPOSE-AND-NEED
2 PROCEDURES AND RESULTS
2.1 PAVEMENT CONDITION ASSESSMENT PROCEDURES
2.1.1 Existing Pavement Conditions
2.2 SUBSURFACE EVALUATION PROCEDURE
2.3 SUBSURFACE FINDINGS
2.3.2 Subsurface Conditions
3 ANALYSIS AND CONCLUSIONS
4 RECOMMENDATIONS
4.1 NEW CONSTRUCTION AND RECONSTRUCTION RECOMMENDATIONS
4.2 HOTEL BUS LOOP - BUS DROP-OFF LANE - CONCRETE PAVEMENT
4.3 SHARED USE PATH, HOTEL PLAZA, AND SIDE PATHS
4.4 GRAVEL PARKING AREA
APPENDICES
Appendix A - Project/Soil Boring Location Map Appendix B - Roadway Condition Summary Report Appendix C - Photographs Appendix D - Pavement Coring Log Appendix E - Soil Boring Logs Appendix F - Laboratory Testing Results Appendix G - Pavement Design Analysis
Note: Design changes, made subsequent to distribution of this report and prior to project advertisement, will be documented by a memo inserted after the title page
PAVEMENT REPORT NUMBER FY22-03
Project NP-MACA 12(1), 908(1)
Edmonson County, Kentucky
Pavement Design Recommendations for Mammoth Cave Entrance Road, Mammoth Cave
Hotel Parking Area, and Hotel Service Road
1 INTRODUCTION
1.1 General
This report discusses the findings and recommendations for Project NP MACA 12(1), 908(1) located in Mammoth Cave National Park in Edmonson County, Kentucky. A Project Location Map is presented in Appendix A.
1.2 Project Description
Mammoth Cave National Park encompasses portions of Mammoth Cave, the longest known cave system in the world. Project NP MACA 12(1) 908(1) focuses on the reconstruction and new construction of roadways and a shared use path as part of a series of projects to renovate the Mammoth Cave Lodge.
This project consists of the new construction and/or reconstruction of:
Mammoth Cave Parkway (MACA-0010) is an existing 5.74 mile long, 2-lane, 2-way asphalt concrete (AC) roadway. For this project a left turn lane will be constructed on this route to provide access to the new Hotel Service Access Road.
Hotel Entrance Road (MACA-0012) is an existing 633-foot long, 2-lane, 2-way, AC roadway. Approximately 1,000 feet of this road will be realigned for this project and will undergo new construction. To tie into the new alignment, the remaining portion of the road will undergo reconstruction.
Visitor Center Bus Loop (MACA-0224) is a 0.58-mile, 2-lane, 2-way, AC roadway that serves as a bus drop off for visitors to the Park and is accessed via the Hotel Entrance Road (MACA-0012). For this project, approximately 250 feet of the roadway will be demolished due to the realignment of the Entrance Road, and approximately 60 feet of the Bus Loop will be reconstructed to serve as a roadway apron to the new Hotel Services Access Road (MACA-0901C).
Hotel Bus Loop (MACA-0228) will be a 200-foot long, 2-lane, 1-way AC roadway.
The scope of work for this route also includes installation of a Jointed Reinforced Concrete Pavement (JRCP) drop off lane.
Hotel Services Parking (MACA-0901B) is a 5,763 square foot, AC parking area which serves as a loading bay for supplies to the Mammoth Cave Lodge.
Hotel Service Access Road (MACA-0901C) will be a 457-foot long, 2-lane, 2-way, Asphalt Concrete (AC) roadway that connects Mammoth Cave Parkway to the Hotel Services Parking Lot.
Mammoth Cave Parking (MACA-0908) is an existing 123,003 square foot AC parking area serving visitors to the Mammoth Cave Lodge. For this project the existing parking lot will undergo reconstruction and an extension to this parking area will be newly constructed.
Overflow Parking Area will be an approximately 14,000 square foot AC parking area meant for overflow traffic from the Mammoth Cave Hotel Parking that will be newly constructed.
Shared Use Paths will be a series of 10-foot wide, exposed aggregate concrete pedestrian trails for visitors to Mammoth Cave.
Mammoth Cave Plaza Area will be an exposed aggregate concrete gathering location for visitors to Mammoth Cave.
Side Paths will be a series of 8-foot wide, exposed aggregate concrete pedestrian trails for visitors to Mammoth Cave.
Gravel Parking Area will be a 2,125 square foot aggregate surfaced parking area.
1.3 Project Purpose-and-Need
The Purpose-and-Need for this project is to provide needed parking spaces, improve traffic circulation, construct new pavement, and reconstruct existing pavement, while improving the natural landscape within Mammoth Cave National Park.
2 PROCEDURES AND RESULTS
2.1 Pavement Condition Assessment Procedures
The existing pavement conditions of the roadways and parking areas included in the scope of work have been assessed based on information obtained from the following data sources:
In 2021, the Eastern Federal Lands Highway Division (EFLHD) Road Inventory Program (RIP) collected the road condition data for the Park using the automatic Data Collection Vehicle (DCV) as part of Cycle 6 (C6) collection. The RIP roadway condition information was used to determine the Pavement Condition Rating (PCR) which is the overall indicator of pavement performance and surface condition. Cracking, rutting and ride quality data are the surface characteristics that most contribute to PCR. Pavement conditions are categorized based on the PCR into “Good” (PCR ≥ 85), “Fair” (60 < PCR < 85), and “Poor” (PCR ≤ 60). A PCR below 30 is indicative of the end of pavement service life.
In December 2021, an EFLHD Pavement Engineer conducted a pavement condition survey as part to assess the existing pavement conditions based on visual observation of surface distresses.
In December 2021, the EFLHD Subsurface Exploration Team performed a subsurface investigation including collection of 6 pavement cores to determine the existing asphalt concrete pavement condition and layer thickness throughout the project.
2.1.1 Existing Pavement Conditions
A summary of PCRs and pavement conditions based on the condition survey conducted in 2021 are shown in Table 1. The Road Condition Summary Report for roadways within this project and photographs showing typical pavement conditions are included in Appendix B and C, respectively.
Table 1. Existing Pavement Conditions Route Name PCR Pavement Condition (December 2021)
Mammoth Cave Parkway (MACA-0010) 100 Pavement is in excellent condition overall.
Localized low severity transverse cracking was observed.
Hotel Entrance Road (MACA-0012) 98 Pavement is in excellent condition with no visible distresses
Visitor Center Bus Loop (MACA-0224) 99 Pavement is in excellent condition with no visible distresses
Hotel Services Parking (MACA-0901B) 73 High severity fatigue cracking, moderate to high severity edge cracking, and low severity longitudinal cracking.
Mammoth Cave Hotel Parking (MACA- 0908)
73 Low to moderate severity longitudinal cracking.
Raveling along cold joints.
In December 2021, EFLHD’s subsurface exploration team extracted a total of 6 pavement cores from the Hotel Entrance Road, Cave Hotel Parking, and Service Parking to determine the existing pavement condition and thickness. Table 2 summarizes the existing AC thickness and condition information from the cores. Pavement Coring Logs are included in Appendix D.
Table 2. Pavement Core Data Route Name Number of
Cores AC Thickness Range (Inches)
Average AC Thickness (Inches)
Pavement Cores Condition
Mammoth Cave Entrance Road
(MACA-0012)
1 6.0 6.0 Specimen intact
Hotel Services Parking
(MACA-0901B)
1 4.0 4.0 Loss of bond at 3.0”.
Stripping observed at loss of bond Mammoth Cave Hotel Parking (MACA-0908)
4 5.0-8.0 6.25 All cores collected experienced multiple occurrences of bond loss and stripping.
2.2 Subsurface Evaluation Procedure
EFLHD’s Subsurface Exploration Team drilled a total of 4 soil borings in December 2021.
The roadway borings were drilled to a depth of 5 feet below the existing grade along Mammoth Cave Entrance Road, Hotel Service Parking, and Hotel Parking Area.
Standard Penetration Tests (SPT) were performed using a 2 -inch (outer diameter) split-spoon sampler in accordance with AASHTO T-206. SPT soil samples were recovered by driving the split spoon sampler a distance of 24 inches, or until refusal, into the undisturbed soil under the action of a 140-pound automatic hammer free-falling 30 inches. The number of hammer blows required to advance the split-spoon sampler the middle 12 inches of the 24-inch sample interval is designated as the “Standard Penetration Resistance” or N-value. The N-values and the number of blows required to advance the sampler through each 6-inch interval was recorded on field boring logs. Representative portions of the SPT soil samples were placed in glass jars, labeled, and transported to the EFLHD Materials Testing Laboratory in Sevierville, TN for testing and storage.
Laboratory testing of selected soil samples included gradation analysis by sieve (AASHTO T-27 and AASHTO T-11), Liquid Limit, Plastic Limit, and moisture content of soils (AASHTO T-89, AASHTO T-90, and AASHTO T-265), California Bearing Ratio (AASHTO T-193), and standard proctor (AASHTO T-99).
2.3 Subsurface Findings
Table 3 summarizes the laboratory testing results for the subgrade soil. Soil boring logs and laboratory testing results are included in Appendix E and F, respectively.
Table 3: Laboratory Testing Results Boring
ID
Sample
ID
Depth (Feet)
Moisture Content
Liquid Limit
Plastic Limit
Plasticity Index
AASHTO
Classification
Description CBR
PV21-01 J-1 1-3 8.3 19 NP NP A-2-4(0) Silty Gravel with Sand
PV21-01 Bulk 0-5 14.0 31 21 10 A-4(3) Sandy Lean Clay
PV21-02 J-1 1-3 8.9 NV NP NP A-1-a Poorly Graded Gravel with Silt and Sand
PV21-02 J-2 3-5 18.8 NV NP NP A-1-a Poorly Graded Gravel with Silt and Sand
PV21-02 Bulk 0-5 N/A 19 NP NP A-4(0) Silty Sand 3 PV21-04 J-2 3-5 23.6 27 17 10 A-4(2) Sandy Lean
Clay
PV21-04 Bulk 0-5 N/A NV NP NP A-3 Poorly Graded Sand with Silt and Gravel
PV21-06 J-1 1-3 20.0 18 38 20 A-6(5) Clayey Sand - NP – Non-Plastic NV – Non-Viscous
2.3.2 Subsurface Conditions
Based on the soil borings and laboratory testing results, the following conditions were encountered:
Mammoth Cave Entrance Road: silty gravel with sand and sandy lean clay were encountered at this site. The N-value recorded in the clay layer was 8 blows per foot (bpf) indicating firm consistency. The Plasticity Index (PI) and the Liquid Limit (LL) were 10 and 31. The soil strength tested from boring PV21-01 on this road resulted in a CBR of 3%, which corresponds to a resilient modulus (Mr) of 4,500 psi.
Mammoth Cave Hotel Parking: sandy lean clay, clayey sand and sand with gravel and silt soils were encountered at this site. The N-values recorded in the lean clay and clayey sand ranges from 4 to 19 bpf indicating soft to very stiff consistency. The LL and PI for the sandy lean clay sample were 27 and 10 and for the clayey sand sample were 38 and 20. The sand with gravel and silt sample was determined to be non-plastic (NP). The soil strength tested from boring PV21-04 on this parking area resulted in a CBR of 16%, which corresponds to a Mr of 15,067 psi.
Hotel Services Parking: gravel with silt and sand and silty sand with N-values recorded in the gravel and silty sand layers ranging from 8 to 11 bpf indicating loose to medium dense density. The LL and PI for the silty sand sample were tested to be 19 and NP. The soil strength tested from boring PV21-02 in this parking area resulted in a CBR of 3%, which corresponds to a Mr of 4,500 psi.
Borings were monitored for the presence of groundwater during drilling. No groundwater was encountered in any of the borings.
3 ANALYSIS AND CONCLUSIONS
The design for the pavement structure for routes in this project was performed in accordance with the 1993 AASHTO Guide for Design of Pavement Structures, AASHTOWare Darwin software (Version 3.1) and the Federal Lands Highway Project Development and Design Manual (PDDM). The recommendations included here reference the FP-14, “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” (FP-14 Specifications).
Structural Analysis was completed for two sets of routes; the first analysis was completed for the Hotel Entrance Road, AC Bus Drop Off Lane, and all AC parking areas. The second analysis was completed for New Left Turn Lane on Mammoth Cave Parkway, the Hotel Services Access Road, and the Visitor Center Bus Loop. A second analysis was needed as traffic to the three above mentioned routes is significantly different in classification and volume compared to the traffic going to the other routes. The majority of traffic for routes in the first analysis will be lighter passenger vehicles and occasional bus traffic for guests staying at the Mammoth Cave Lodge. Routes included in the second analysis will experience mostly bus traffic with occasional tractor trailer traffic for deliveries to the Mammoth Cave Lodge.
For the first analysis, an Annual Average Daily Traffic (AADT) of 682 vehicles per day was provided by the Park. The second analysis assumed an AADT of 100 vehicles per day as specific bus traffic data was not provided by the Park.
The effective roadbed soil resilient modulus was determined based on information obtained from the subsurface investigation via CBR correlation. MR of 4,500 PSI was used for both analyses. A terminal serviceability of 2.5 and 2.0 was used for the first and second analyses, respectively. Additional parameters specified in the analysis included a reliability of 75 percent, an overall standard deviation of 0.49, and an initial serviceability of 4.2. The results of the analyses are presented in Appendix G.
4 RECOMMENDATIONS
The following pavement recommendations are based on the existing pavement conditions at the time of the field investigation in December 2021. The recommendations included here reference the FP-14, “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” (FP-14 Specifications).
4.1 New Construction and Reconstruction Recommendations
It’s our understanding that the route construction for this project is to be conducted in phases.
As a result, the final lift of asphalt (AC surface course) is proposed to be placed during the last phase of construction. With this in mind, we recommend placement of a separation and stabilization geotextile, followed by a 6-inch aggregate base, a 3.0-inch AC base course, and a 2.0 AC intermediate course during the initial construction phase. Afterwards, a 1.5-inch (3/8” NMSA mix) surface course shall be placed as part of a separate phase.
The minimum requirements are listed in Table 4. These recommendations are applicable to the routes listed below. Please note that at the time of this report, the numbers for new routes has not been finalized and is subject to change.
Mammoth Cave Parkway Left Turn Lane (MACA-0010) Hotel Entrance Road (MACA-0012) Visitor Center Bus Loop (MACA-0224) Hotel Bus Loop (MACA-0228); Note this only applies to the AC lane of this route.
The pavement recommendations for the drop off lane (concrete pavement) are presented Section 4.2.
Hotel Services Parking (MACA-0901B) Hotel Service Access Road (MACA-0901C) Mammoth Cave Parking (MACA-0908) Overflow Parking Area
Table 4. New Construction and Full-Depth Reconstruction Recommendations
Layer Minimum Thickness
(in)
Comments
AC Surface Course(1)
1.5
Gyratory Asphalt Concrete Pavement (GACP), 0.3 to < 3 Million ESAL, 3/8”
Nominal Maximum Size Aggregate (NMSA), Type IV roughness, as per
Section 401 Asphalt Tack
Coat ---- AC Tack Coat as per Section 412
AC Intermediate Course
2.0 GACP, 0.3 to < 3 Million ESAL, 1/2”
NMSA, as per Section 401 Asphalt Tack
Coat --- AC Tack Coat as per Section 412
AC Base Course 3.0 GACP, 0.3 to < 3 Million ESAL, 3/4”
NMSA, as per Section 401
Aggregate Base 6.0 Aggregate Base Course, Grading C or
D, as per Section 301
Geotextile --- Separation and Stabilization Geotextile
Class 2 – Type E, per Section 207 (1)Surface course will be delayed and placed in separate phase.
4.2 Hotel Bus Loop - Bus Drop-Off Lane - Concrete Pavement
The Hotel Bus Loop will feature both an AC and a concrete lane that will serve as a Bus Drop-Off. For the construction of the concrete lane, we recommend placement of a separation and stabilization geotextile, followed by a 6.0-inch aggregate base, and 8.0 inches of reinforced concrete. Table 5 shows the minimum requirements.
Table 5. Bus Drop-Off Lanes New Construction
Layer Minimum Thickness
Concrete Pavement
8.0 Minor Concrete Pavement (Reinforced)
per Section 501
Aggregate Base Course
6.0 Aggregate Base Course, Grading C or
D, as per Section 301
Geotextile --- Separation and Stabilization Geotextile
4.3 Shared Use Path, Hotel Plaza, and Side Paths
For the new construction of the Shared Use Paths, Side Paths, and Hotel Plaza, we recommend placement of a stabilization and separation geotextile, followed by a 5.0-inch aggregate base, and 6.0 inches of reinforced exposed aggregate concrete. The exposed aggregate finish should match the existing-colored concrete exposed sidewalk that will provide the historic/aesthetic appearance per Park’s request. Table 6 shows the minimum requirements.
Table 6. Shared Use Paths, Side Paths, and Hotel Plaza
Minimum Thickness
Concrete
6.0 Sidewalk, Exposed Aggregate Colored Concrete, (Reinforced) per Section 615
Aggregate Base Course
5.0 Aggregate Base Course, Grading C or
D, as per Section 301
Geotextile ---
4.4 Gravel Parking Area
For the new construction of the Gravel Parking Area, we recommend placement of a separation and stabilization geotextile, followed by a 6.0-inch aggregate surface course.
Table 7 shows the minimum requirements.
Table 7. Gravel Parking Area
Minimum Thickness
Aggregate Surface Course
6.0 Aggregate Surface Course, as per
Section 301
Geotextile ---
DISCLAIMER/LIMITATIONS CLAUSE
The subsurface explorations and tests described in the section on Procedures and Results have been conducted in accordance with standard practices and procedures (except as specifically noted). The results of these explorations and tests represent conditions at the specific locations indicated. Subsurface and conditions between these locations may vary. The Analysis and Conclusions section and the Recommendations section in this report include interpretations and recommendations developed by the Government in the process of preparing the design.
These interpretations are not intended as a substitute for the personal investigation, independent interpretation, and judgment of the Contractor.
Prepared by:
Kenneth Nguyen Pavement Engineer
Reviewed by:
Mohammed Elias Pavement Team Leader
APPENDIX A – Project/Soil Boring Location Map
NP MACA 12(1) 908(1) Location/Soil Boring Map Appendix A
NP MACA 12(1) 908(1) Location/Soil Boring Map Appendix A
APPENDIX B – Cycle 6 RIP Report
APPENDIX C – Photographs
NP MACA 12(1) 908(1) Photographs Appendix C
Figure 1: Localized Low Severity Transverse Cracking in Mammoth Cave Parkway
NP MACA 12(1) 908(1) Photographs
Figure 2: Hotel Entrance Road in Excellent Condition
NP MACA 12(1) 908(1) Photographs
Figure 3: Visitor Center Bus Loop in Excellent Condition
NP MACA 12(1) 908(1) Photographs
Figure 4: Hotel Services Parking: High Severity Fatigue Cracking
NP MACA 12(1) 908(1) Photographs
Figure 5: Hotel Services Parking: High Severity Edge Cracking with Loss of
NP MACA 12(1) 908(1) Photographs
Figure 6: Hotel Services Parking: Moderate Severity Longitudinal Cracking and Raveling along Pavement Cold Joint
APPENDIX D – Pavement Coring Log
APPENDIX D
Pavement Coring Log
Project: MACA 12(1), 908(1)
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV21-01
12/14/21
Core Description Location / GPS 6.0” Asphalt Concrete Core is intact
Location: Mammoth Cave Entrance Road. Brownsville, KY.
GPS: 37.185134°, -86.098838°
Core No. Core Photograph / Side View Location Key
PV21-02
12/14/21
Core Description Location / GPS 3.0” Asphalt Concrete Separation occurs at 2.75”
Location: Hotel Services Parking. Brownsville, KY.
GPS: 37.186121°, -86.100578°
Project: MACA 12(1), 908(1)
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV21-03
12/14/21
Core Description Location / GPS 6.5” Asphalt Concrete Separation at 1.5”, 4.0”. Striping at 1.5”.
Location: Hotel Parking. Brownsville, KY
GPS: 37.185568°, -86.102132°
Core No. Core Photograph / Side View Location Key
PV21-04
12/14/21
Core Description Location / GPS 5.0” Asphalt Concrete Separation at 2.0”, 4”.
Location: Hotel Parking. Brownsville, KY.
GPS: 37.185242°, -86.102493°
Project: MACA 12(1), 908(1)
Notes:
1. Photographed cores show top of core on left-hand side, unless otherwise noted.
Core No. Core Photograph / Side View Location Key
PV21-05
12/14/21
Core Description Location / GPS 8.0” Asphalt Concrete Separation at 4.5”, 6.0”, and 7.0”. Striping at 4.5”
Location: Hotel Parking. Brownsville, KY.
GPS: 35.756982°, -83.208527°
Core No. Core Photograph / Side View Location Key
PV21-06
12/14/21
Core Description Location / GPS 5.5” Asphalt Concrete Loss of bonding between layers and stripping.
Location: Hotel Parking. Brownsville, KY.
GPS: 37.185596°, -86.103009°
APPENDIX E – Soil Boring Logs
1.4
1.8
Asphalt Pavement
Base course, gray sand and crushed stone
Silty GRAVEL with SAND (GM), medium dense, gray, moist, fill. A-2-4(0).
CLAY, firm, brown and tan, moist, fill.
Boring terminated at 5.0 ft.
1.5
2.0
13-5-6-8
2-3-5-9
J-1
J-2
0.6
1.0
3.0
5.0
Project Location:
Encountered at:
After
Caved at:
Hammer Drop:
Rock Core (RQD in %)
(Blows / ft)
Undisturbed (UD)
12/8/21
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
12/8/21 Doug Hutchins
Jason FarleyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
1) No groundwater was encountered during drilling operation.
Boring was backfilled with auger cuttings.
2) Bucket sample was collected hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
NP-MACA 12(1), 908(1)
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft)
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Edmonson County, Kentucky
E le va tio n (f ee t)
3" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
HSA
PV21-01
Hammer Wt. & Type:
Cloudy, 30° F
Mammoth Cave Entrance Road (Route 12)
Standard Penetration Test Data
Project Datum:
Inspector:
R ec ft/
P P
R
Q D
Northing: 4115790.41 Easting: 579987.93
B O
R
IN
G L
O G
/2
4/
:3
C
:\U S
E R
S \H
E S
H A
M .A
B D
U A
LL
A
\D O
C U
M E
N T
S \M
A C
A
2( 1)
(1
B O
R E
L O
G S
\M A
C A
2(
1)
(1
G
P J
Sheet: 1 of 1
0.6
1.7
Asphalt Pavement
Base course, gray sand and crushed stone
Gravel with SILT and SAND (GP-GM), medium dense, gray, moist, fill. A-1-a
Gravel with SILT and SAND (GP-GM), very loose, gray, moist, fill. A-1-a
Boring terminated at 5.0 ft.
1.0
5-10-8-6
1-1-3-2
J-1
J-2
0.4
1.0
3.0
5.0
Project Location:
Encountered at:
After
Caved at:
Hammer Drop:
Rock Core (RQD in %)
(Blows / ft)
Undisturbed (UD)
12/8/21
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
12/8/21 Doug Hutchins
Jason FarleyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
1) No groundwater was encountered during drilling operation.
Boring was backfilled with auger cuttings.
2) Bucket sample was collected hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
NP-MACA 12(1), 908(1)
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft)
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Edmonson County, Kentucky
E le va tio n (f ee t)
3" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
HSA
PV21-02
Hammer Wt. & Type:
Sunny, 38° F
Hotel Services Parking
Standard Penetration Test Data
Project Datum:
Inspector:
R ec ft/
P P
R
Q D
Northing: 4115898.44 Easting: 579832.44
B O
R
IN
G L
O G
/2
4/
:4
C
:\U S
E R
S \H
E S
H A
M .A
B D
U A
LL
A
\D O
C U
M E
N T
S \M
A C
A
2( 1)
(1
B O
R E
L O
G S
\M A
C A
2(
1)
(1
G
P J
0.0
1.9
Asphalt Pavement
Base course, gray sand and crushed stone
CLAY, firm, gray-brown, moist, fill.
Sandy lean CLAY (CL), firm, gray-brown, moist, fill.
(A-4(2))
Boring terminated at 5.0 ft.
1.5
10-6-3-4
1-2-3-4
J-1
J-2
0.7
1.0
3.0
5.0
Project Location:
Encountered at:
After
Caved at:
Hammer Drop:
Rock Core (RQD in %)
(Blows / ft)
Undisturbed (UD)
12/8/21
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
12/8/21 Doug Hutchins
Jason FarleyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
1) No groundwater was encountered during drilling operation.
Boring was backfilled with auger cuttings.
2) Bucket sample was collected hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
NP-MACA 12(1), 908(1)
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft)
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Edmonson County, Kentucky
E le va tio n (f ee t)
3" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
HSA
PV21-04
Hammer Wt. & Type:
Sunny, 42° F
Mammoth Cave Hotel Parking Area
Standard Penetration Test Data
Project Datum:
Inspector:
R ec ft/
P P
R
Q D
Northing: 4115799.31 Easting: 579663.39
B O
R
IN
G L
O G
/2
4/
:4
C
:\U S
E R
S \H
E S
H A
M .A
B D
U A
LL
A
\D O
C U
M E
N T
S \M
A C
A
2( 1)
(1
B O
R E
L O
G S
\M A
C A
2(
1)
(1
G
P J
1.4
1.8
Asphalt Pavement
Base course, Gray sand and crushed stone
Clayey SAND (SC), loose, brown-tan-gray, moist, fill.
A-6(5)
CLAY, very stiff, brown-tan-gray, moist, fill.
Boring terminated at 5.0 ft.
2.0
4.0
1-2-3-7
7-6-13-20
J-1
J-2
0.5
1.0
3.0
5.0
Project Location:
Encountered at:
After
Caved at:
Hammer Drop:
Rock Core (RQD in %)
(Blows / ft)
Undisturbed (UD)
12/8/21
Project Name:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
Sample Types:
BORING LOG
12/8/21 Doug Hutchins
Jason FarleyOperator:
T yp e
Weather:
SAMPLE
Plastic Limit
1) No groundwater was encountered during drilling operation.
Boring was backfilled with auger cuttings.
hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
NP-MACA 12(1), 908(1)
Density, Color, Plasticity, Size, Proportions, Moisture
Surface Elevation:
Boring Location:
La ye r
D ep th ft)
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
At Completion:
Completed:
S P
T B lo w s pe r in
D ep th S ca le ft)
N o.
Edmonson County, Kentucky
E le va tio n (f ee t)
3" Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/Automatic
Penetrometer (PP in tsf)
Water Content %
Hole Diameter:
NAD83
HSA
PV21-06
Hammer Wt. & Type:
Sunny, 40° F
Mammoth Cave Hotel Parking Area
Standard Penetration Test Data
Project Datum:
Inspector:
R ec ft/
P P
R
Q D
Northing: 4115835.26 Easting: 579662.96
B O
R
IN
G L
O G
/2
4/
:4
C
:\U S
E R
S \H
E S
H A
M .A
B D
U A
LL
A
\D O
C U
M E
N T
S \M
A C
A
2( 1)
(1
B O
R E
L O
G S
\M A
C A
2(
1)
(1
G
P J
APPENDIX F – Laboratory Testing Results
T he se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: CJ/CH Checked By:
Particle Size Distribution Report
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
+3" % GRAVEL % SAND % SILT % CLAY USCS AASHTO PL LL
SIEVE PERCENT FINER SIEVE PERCENT FINER Material Description
GRAIN SIZE REMARKS:
D60
D30
D10
COEFFICIENTS
Cc
Cu
Client:
Project:
Project No.: Figure
0.0 58.3 35.9 5.8 GP-GM A-1-a NP NV
0.0 64.0 29.8 6.2 GP-GM A-1-a NP NV
0.0 4.4 48.5 47.1 SM A-4(0) NP 19
3/4" 1/2" 3/8"
100.0 91.1 80.2
100.0 45.4 43.0
100.0 99.6
#4 #10 #40 #200
41.7 24.8 12.2
5.8
36.0 15.0 12.5
6.2
95.6 81.3 65.5 47.1
6.7123 14.8520 0.2518
2.9528 3.7177
0.2713 0.1831
4.79 5.08
24.74 81.11
Source of Sample: Hotel Parking Depth: 1-3 Sample Number: PV02/J-1 Source of Sample: Hotel Parking Depth: 3-5 Sample Number: PV02/J-2 Source of Sample: Hotel Parking Depth: 0-5 Sample Number: PV02/Bulk
FHWA/EFLHD
Mammoth Cave
MACA 12(1),908(1)
inches number size size poorly graded gravel with silt and sand poorly graded gravel with silt and sand silty sand
E-21-1156
E-21-1157
E-21-1158
FHWA
Sevierville, TN se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: CJ/CH Checked By:
Particle Size Distribution Report
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
+3" % GRAVEL % SAND % SILT % CLAY USCS AASHTO PL LL
SIEVE PERCENT FINER SIEVE PERCENT FINER Material Description
GRAIN SIZE REMARKS:
D60
D30
D10
COEFFICIENTS
Cc
Cu
Client:
Project:
Project No.: Figure
0.0 42.1 47.7 10.2 SP-SM A-3 NP NV
0.0 3.1 44.5 52.4 CL A-4(2) 17 27
0.0 10.1 43.6 46.3 SC A-6(5) 18 38
3/4" 1/2" 3/8"
100.0 97.1 74.7
100.0 99.8
100.0 99.3
#4 #10 #40 #200
57.9 59.0 50.6 10.2
96.9 77.3 74.2 52.4
89.9 71.9 68.0 46.3
5.6552 0.1268 0.1920
0.1630
Source of Sample: Hotel Parking Depth: 0-5 Sample Number: PV04/Bulk Source of Sample: Hotel Parking Depth: 3-5 Sample Number: PV04/J-2 Source of Sample: Hotel Parking Depth: 1-3 Sample Number: PV06/J-1
FHWA/EFLHD
Mammoth Cave
MACA 12(1),908(1)
inches number size size poorly graded sand with silt and gravel sandy lean clay clayey sand
E-21-1159
E-21-1160
E-21-1161
FHWA
Sevierville, TN se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: CJ/CH Checked By: CJ
C H
E C
K E
D B
Y A
P P
R O
V E
D B
Y D
R A
W N
B Y
D A
T E
FHWA
Sevierville, TN
Project:
Job No.: Figure
Hotel Entrance Road PV01/Bulk 0-5 14.0 21 31 10 CL
PV01/J-1 1-3 8.4 NP 19 NP GM
Mammoth Cave
MACA 12(1),908(1)
SYMBOL SOURCE
NATURAL
USCS
SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY
NO. CONTENT LIMIT LIMIT INDEX
SOIL DATA
P
LA
S T
IC
IT
Y I
N D
E X
LIQUID LIMIT
0 10 20 30 40 50 60 70 80 90 100 110
CL-ML
CL
or
O L
CH o r O
H
ML or OL MH or OH
Dashed line indicates the approximate upper limit boundary for natural soils
LIQUID AND PLASTIC LIMITS TEST REPORT
Hotel Entrance Road se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: CJ Checked By: CJ
C H
E C
K E
D B
Y A
P P
R O
V E
D B
Y D
R A
W N
B Y
D A
T E
FHWA
Sevierville, TN
Project:
Job No.: Figure
Hotel Parking PV02/Bulk 0-5 NP 19 NP SM
Hotel Parking PV02/J-1 1-3 8.9 NP NV NP GP-GM
Hotel Parking PV02/J-2 3-5 18.8 NP NV NP GP-GM
Hotel Parking PV04/Bulk 0-5 NP NV NP SP-SM
Hotel Parking PV04/J-2 3-5 23.6 17 27 10 CL
Mammoth Cave
MACA 12(1),908(1)
SYMBOL SOURCE
NATURAL
USCS
SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY
NO. CONTENT LIMIT LIMIT INDEX
SOIL DATA
P L
A S
T
IC
IT
Y
I N
D E
X
LIQUID LIMIT
0 10 20 30 40 50 60 70 80 90 100 110
CL-ML
CL
or
O L
CH o r O
H
ML or OL MH or OH
Dashed line indicates the approximate upper limit boundary for natural soils
LIQUID AND PLASTIC LIMITS TEST REPORT
se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: Checked By:
C H
E C
K E
D B
Y A
P P
R O
V E
D B
Y D
R A
W N
B Y
D A
T E
FHWA
Sevierville, TN
Project:
Job No.: Figure
Hotel Parking PV06/J-1 1-3 20.0 18 38 20 SC
Mammoth Cave
MACA 12(1),908(1)
SYMBOL SOURCE
NATURAL
USCS
SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY
NO. CONTENT LIMIT LIMIT INDEX
SOIL DATA
P L
A S
T
IC
IT
Y
I N
D E
X
LIQUID LIMIT
0 10 20 30 40 50 60 70 80 90 100 110
CL-ML
CL
or
O L
CH o r O
H
ML or OL MH or OH
Dashed line indicates the approximate upper limit boundary for natural soils
LIQUID AND PLASTIC LIMITS TEST REPORT
se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: CJ Checked By: CJ
COMPACTION TEST REPORT for Curve No. 1
D ry d en si ty pc f
Water content, %
7 9 11 13 15 17 19
12.5%, 119.6 pcf
Test specification: AASHTO T 99-15 Method D Standard
0-5 CL A-4(3) 14.0 31 10 0.0 55.8
sandy lean clay
MACA 12(1),908(1) FHWA/EFLHD
T-193 (CBR)= 3 @ 0.1 / Swell % = 0.0
01/12/21
Elev/ Classification Nat.
Sp.G. LL PI
Depth USCS AASHTO Moist. 3/4 in. No.200
TEST RESULTS MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Date:
Source: Hotel Entrance Road Sample No.: PV01/Bulk
FHWA
Sevierville, TN Figure
Maximum dry density = 119.6 pcf
Optimum moisture = 12.5 %
Mammoth Cave se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: Checked By:
COMPACTION TEST REPORT for Curve No. 1
D ry d en si ty pc f
Water content, %
2.5 5 7.5 10 12.5 15 17.5
12.1%, 119.0 pcf
Test specification: AASHTO T 99-15 Method D Standard
0-5 SM A-4(0) 19 NP 0.0 47.1
silty sand
MACA 12(1),908(1) FHWA/EFLHD
T-193 (CBR) = 3 @ 0.1 / Swell %= 0.0
Elev/ Classification Nat.
Sp.G. LL PI
Depth USCS AASHTO Moist. 3/4 in. No.200
TEST RESULTS MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Date:
Source of Sample: Hotel Parking Sample Number: PV02/Bulk
FHWA
Sevierville, TN Figure
Maximum dry density = 119.0 pcf
Optimum moisture = 12.1 % se r e su lts a re f or t he e xc lu si ve u se o f th e cl ie nt f or w h om t he y w er e o bt a in ed . T h ey a pp ly o n ly to th e sa m pl es te st e d an d a re n o t i n di ci tiv e o f ap pa re n tly id en tic al s a m pl e s.
Tested By: Checked By:
COMPACTION TEST REPORT for Curve No. 1
D ry d en si ty pc f
Water content, %
7 9 11 13 15 17 19
10.6%, 124.8 pcf
Test specification: AASHTO T 99-15 Method D Standard
0-5 SP-SM A-3 NV NP 0.0 10.2
poorly graded sand with silt and gravel
MACA 12(1),908(1) FHWA/EFLHD
T-193 (CBR)= 16 @ 0.1 / Swell= 0.0
Elev/ Classification Nat.
Sp.G. LL PI
Depth USCS AASHTO Moist. 3/4 in. No.200
TEST RESULTS MATERIAL DESCRIPTION
Project No. Client: Remarks:
Project:
Date:
Source of Sample: Hotel Parking Sample Number: PV04/Bulk
FHWA
Sevierville, TN Figure
Maximum dry density = 124.8 pcf
Optimum moisture = 10.6 %
APPENDIX G – Pavement Design Analysis
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWare Computer Software Product
Rigid Structural Design Module
Rigid Structural Design
Pavement Type JPCP 18-kip ESALs Over Initial Performance Period 359,735 Initial Serviceability 4.5 Terminal Serviceability 2 28-day Mean PCC Modulus of Rupture 531 psi 28-day Mean Elastic Modulus of Slab 3,600,000 psi Mean Effective k-value 31 psi/in Reliability Level 75 % Overall Standard Deviation 0.39 Load Transfer Coefficient, J 3.6 Overall Drainage Coefficient, Cd 1
Calculated Design Thickness 6.88 in
Effective Modulus of Subgrade Reaction
Period
Description
Roadbed Soil Resilient
Modulus (psi)
Base Elastic Modulus
(psi) 1 1 4,500 15,000
Base Type Aggregate Base Base Thickness 6 in Depth to Bedrock 30 ft Projected Slab Thickness 8 in Loss of Support Category 2
Effective Modulus of Subgrade Reaction 31 psi/in
Rigorous ESAL Calculation
Performance Period (years) 35 Two-Way Traffic (ADT) 35 Number of Lanes in Design Direction 1 Percent of All Trucks in Design Lane 100 % Percent Trucks in Design Direction 60 %
Vehicle Class
Percent of
ADT
Annual
Growth
Average Initial Truck Factor
(ESALs/ Truck)
Annual % Growth in
Truck Factor
Accumulated 18-kip ESALs over Performance Period
4 100 2 1 0 359,735 Total 100 - - - 359,735
Growth Simple
Total Calculated Cumulative ESALs 359,735
Layer Information
Material Description
Thickness
One Dir Width
(ft)
1 JPCP 8 12
2 Aggregate Base 6 12
Total - 14.00 -
Flexible Structural Design Module
Entrance Road, Bus Drop Off Lane, and Visitor Accessible Parking Areas
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 235,926 Initial Serviceability 4.2 Terminal Serviceability 2.5 Reliability Level 75 % Overall Standard Deviation 0.49 Roadbed Soil Resilient Modulus 4,500 psi Stage Construction 1
Calculated Design Structural Number 3.03 in
Performance Period (years) 25 Two-Way Traffic (ADT) 682 Number of Lanes in Design Direction 1
Growth
Average Initial Truck Factor
(ESALs/ Truck)
Annual % Growth in
Truck Factor
Accumulated 18-kip ESALs over Performance Period
2 90 2 0.0008 0 3,336 3 5 2 0.004 0 927 4 5 2 1 0 231,663
Total 100 - - - 235,926
Total Calculated Cumulative ESALs 235,926
Specified Layer Design
Struct Coef.
(Ai)
Drain Coef.
(Mi)
(Di)(in)
Width
(ft)
Calculated
SN (in) 1 AC Surface Course (3/8" NMSA) 0.44 1 1.5 12 0.66 2 AC Intermediate Course (1/2" NMS... 0.44 1 2 12 0.88 3 AC Base Course (3/4" NMSA) 0.44 1 3 12 1.32 4 Aggregate Base 0.12 1 6 12 0.72
Total - - - 12.50 - 3.58
Flexible Structural Design Module
Left Turn Lane, Hotel Services Access Road, Visitor Center Bus Loop, Hotel Services Parking Vehicle traffic is different in type and volume (mostly buses and occasional semi truck for supply drop-off), so a separate analysis was conducted to determine the required Structural Number
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 642,723 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 75 % Overall Standard Deviation 0.49 Roadbed Soil Resilient Modulus 4,500 psi Stage Construction 1
Calculated Design Structural Number 3.41 in
Performance Period (years) 25 Two-Way Traffic (ADT) 100 Number of Lanes in Design Direction 1
Growth
Average Initial Truck Factor
(ESALs/ Truck)
Annual % Growth in
Truck Factor
Accumulated 18-kip ESALs over Performance Period
2 8 2 0.0008 0 43 4 90 2 1 0 611,429 9 2 2 2.3 0 31,251
Total 100 - - - 642,723
Total Calculated Cumulative ESALs 642,723
Specified Layer Design
Coef.
(Ai)
Drain
1 AC Surface Course (3/8" NMSA) 0.44 1 1.5 12 0.66 2 AC Intermediate Course (1/2" NMS... 0.44 1 2 12 0.88 3 AC Base Course (3/4" NMSA) 0.44 1 3 12 1.32
Coef.
(Ai)
Drain
4 Aggregate Base 0.12 1 6 12 0.72
Total - - - 12.50 - 3.58
| Maa.pdf |
| MACA 12(1) 908(1) Appendix Compiled.pdf |
| MACA 12(1) 908(1) Appendix Compiled.pdf |
| MACA 12(1) 908(1) Appendix Compiled.pdf |
| MACA 12(1) 908(1) Appendix Compiled.pdf |
| dda.pdf |
| Binder3.pdf |
| MACA 12(1) 908(1) Appendix Compiled.pdf |
| Appendix A - Project and Soil Boring Location Map.pdf |
| Appendix B - C6 RIP Report.pdf |
| Appendix C - Photographs.pdf |
| Appendix D - Pavement Coring Log.pdf |
| Appendix F - Laboratory Testing Results.pdf |
| Appendix F - Laboratory Testing Results.pdf |
| MACA 12(1)-908(1)Grain2.pdf |
| MACA 12(1)-908(1)Grain3.pdf |
| MACA 12(1)-908(1)Proctor1.pdf |
| MACA 12(1)-908(1)Proctor2.pdf |
| MACA 12(1)-908(1)Proctor3.pdf |
| MACA12(1)-908(1)Limit1.pdf |
| MACA 12(1)-908(1)Limit2.pdf |
| MACA 12(1)-908(1)Limit3.pdf |
Appendix E - Soil Boring Logs.pdf
| Appendix G - Pavement Design Analysis.pdf |
| Darwin3.pdf |
| Binder1.pdf |
| MACA1.pdf |
| MACA2.pdf |
| 2022-11-22T12:50:59-0500 | |
| MOHAMMED B ELIAS |
| 2022-11-22T14:48:14-0500 | |
| KENNETH NGUYEN |
File details come from the government source that posted it. Updated .