This document is an Amendment (Number 0008) to a federal highway construction contract for the Mammoth Cave National Park project, issued by the Eastern Federal Lands Highway Division of the Federal Highway Administration. The amendment, dated September 25, 2025, provides revised plan sheets (specifically C01-C04, C09-C11, C14, C16, C21-C22, C24-C25, C27, C29-C30, C32, and C35-C37) for the project. The bid opening date remains unchanged at Tuesday, October 7, 2025, at 2:00 PM EDT, and any questions submitted to EFLHD.CONTRACTS@DOT.GOV within 7 calendar days of the bid opening may not be answered in time for incorporation into bids. The amendment includes updates to various schedules and summaries, such as corrections to pay item descriptions, quantities, and schedule allocations across different project components including soil erosion control, drainage, lighting, and temporary traffic control.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325B000012 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1409/25/20250008
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/06/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP MACA 12(1), 908(1):
The purpose of this Amendment is to:
1)Provide the following revised Plan Sheets: C01-C04, C09-C11, C14, C16, C21-C22, C24-C25, C27, C29-C30, C32, and C35-C37.
The Bid Opening Date of Tuesday, October 7, 2025, at 2:00 PM EDT remains unchanged.
Any further questions sent to EFLHD.CONTRACTS@DOT.GOV within 7 calendar days of the bid opening date may not be answered in time for bidders to incorporate into their bids prior to the bid opening.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0008
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0008 Project NP MACA 12(1), 908(1) Mammoth Cave National Park
Solicitation: 693C73-25-B-000012
The purpose of this Amendment is to:
1) Provide the following revised Plan Sheets: C01-C04, C09-C11, C14, C16, C21- C22, C24-C25, C27, C29-C30, C32, and C35-C37.
The Bid Opening Date of Tuesday, October 7, 2025, at 2:00 PM EDT remains unchanged.
Any further questions sent to EFLHD.CONTRACTS@DOT.GOV within 7 calendar days of the bid opening date may not be answered in time for bidders to incorporate into their bids prior to the bid opening.
NO. DATE BY REVISIONS
9/25/25
OCP
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITIES
SCHEDULE A
MAMMOTH CAVE NATIONAL PARK
- Added pay item 61501-0800.AMD #88
:2
A
M
S e p te m b e r
Q u a n ti ty
T a b u la ti o n S h e e t
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C01
NPS Drwg No. 135/182690 NPS PMIS No. 178782
AMENDMENT NO. 8
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
8 8 - Added pay item 63610-1600.AMD #
8 - Adjusted quantity for pay item 63610-2800.AMD #8
:2
S e p te m b e r
Q u a n ti ty
T a b u la ti o n S h e
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C02
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE C
8 - Supplemental description changed for pay item 61501-0800.AMD #
:2
S e p te m b e r
Q u a n ti ty
T a b u la ti o n S h e
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C03
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE D
8 - Added pay item 63610-1600.AMD #
AMD #8 - Added pay item 63610-2800.
:2
S e p te m b e r
Q u a n ti ty
T a b u la ti o n S h e
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C04
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULES AND SUMMARIES
SCHEDULE D
8 to 2,1400.
8 - Corrected the Rounded Total for pay items 62401-0300 and 62502-0000 bothAMD #
:0
S e p te m b e r
E r o s io n C o n tr o l S h e
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C09
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE E
- Corrected the Rounded Total for pay items 62401-0300 and 62502-0000.AMD #8
:0
S e p te m b e r
E r o s io n C o n tr o l S h e
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C10
U.S. DEPARTMENT OF TRANSPORTATION
INTERCEPTOR."
8 - Revised supplemental description of 20301-2800 to "GREASEAMD #
:1
S e p te m b e r
R e m o v a ls
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C11
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULES D & E
8 - Corrected the listed Rounded Total for pay item 21101-2000 to 880.AMD #
:1
S e p te m b e r
R e m o v a ls
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C14
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE C, D, & E
8 in order of increasing number.
8 - Reordered the columns for pay items in Schedule E to keep pay items sorted AMD #
:2
S e p te m b e r
C le a r in g a n d
E a r th w o r k
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C16
U.S. DEPARTMENT OF TRANSPORTATION
8 - Corrected the items and the Rounded Total for pay item 20701-1000.AMD #
:0
S e p te m b e r
P a v e m e n
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C21
U.S. DEPARTMENT OF TRANSPORTATION
8 - Removed pay item 61201-0000.AMD #
:0
S e p te m b e r
D r a in a g
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C22
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULES A & B
8 - Corrected the Rounded Total listed for pay item 62011-0500.AMD #
:0
S e p te m b e r
D r a in a
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C24
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULES B, C, & E
Total for 62011-0200. Reorganized the columns for Schedule E to be in order.
route, station, and remarks for one of the associated items. Corrected the Rounded
8 - Corrected the supplemental description for pay item 60401-0000 and the AMD #
8 8
8 8
:5
S e p te m b e r
D r a in a
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C25
U.S. DEPARTMENT OF TRANSPORTATION
8 - Corrected the Schedule for pay item 63301-1000 from Schedule E to D.AMD #
:1
S e p te m b e r
P e r m a n e n t S ig s
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C27
U.S. DEPARTMENT OF TRANSPORTATION
63610-2800. Added pay item 63610-1600 and updated the quantities for 63610-2800.
8 - Added "(SCHEDULE 80)" to supplemental description for pay itemAMD #
:0
S e p te m b e r
L ig h ti
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C29
U.S. DEPARTMENT OF TRANSPORTATION MAMMOTH CAVE NATIONAL PARK
Added pay items 63610-1600 and 63610-2800 for Schedule D.
corrected the supplemental description for 63602-2000 in Schedule D to "30-INCH".
8 - Removed duplicate pay item 63602-6020 from the Lighting Summary andAMD #
8 - Removed pay item 63610-1000.AMD #
:0
S e p te m b e r
L ig h ti
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C30
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
CURB)" to "(TRANSITION)".
8 - Corrected the supplemental description for pay item 60902-1100 from "(2.92'AMD #
:0
S e p te m b e r
M is c
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C32
U.S. DEPARTMENT OF TRANSPORTATION
8 - Corrected pay item 61102-1700 from Schedule E to Schedule D.AMD #
:0
S e p te m b e r
M is c
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C35
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A & B
8 - Added pay item 61501-0800.AMD #
:2
S e p te m b e r
T
T C
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C36
U.S. DEPARTMENT OF TRANSPORTATION MAMMOTH CAVE NATIONAL PARK
SCHEDULE C & D
8 "(TEMPORARY)".
8 - Added the supplemental description for pay item 61501-0800 asAMD #
:2
S e p te m b e r
T
T C
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D C
-M
A C
A (1
)9 (1
T a b Q u a n t&
S c h .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) C37
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0008 |
| Project NP MACA 12(1), 908(1) |
| Mammoth Cave National Park |
| Solicitation: 693C73-25-B-000012 |
File details come from the government source that posted it. Updated .