This document is a federal contract amendment (Amendment 0007) for the Reconstruction of Hotel Parking Area and Adjacent Access Roads project at Mammoth Cave National Park, solicitation number 693C73-25-B-000012. The project is being managed by the Eastern Federal Lands Highway Division of the Federal Highway Administration. The amendment modifies several contract requirements, including revisions to Special Contract Requirements sections 201, 203, 207, 301, 615, 624, 625, and 636, and provides responses to bidder questions about various project elements such as temporary sidewalks, lighting systems, EV charging spaces, and utility relocations.
The contract is structured with a base schedule (Schedule A) and four optional government schedules (Schedules B, C, D, and E) with different performance periods. If all schedules are awarded simultaneously, the total contract performance period will be 674 calendar days. The base Schedule A has a 240-day performance period, while the optional schedules range from 53 to 181 calendar days. The project involves extensive site work including roadway reconstruction, sidewalk installation, lighting systems, utility relocations, landscaping, and various traffic control and erosion control measures. The bid opening date is set for Tuesday, October 7, 2025, at 2:00 p.m. EDT.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325B000012 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1409/24/20250007
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/06/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP MACA 12(1), 908(1):
The purpose of this Amendment is to:
1) Revise the following Special Contract Requirements (J-Pages) sections:
a) Modify Sections 201, 203, 207, 301, 615, 624, 625, 636.
2) Provide responses and clarifications to questions received by potential bidders.
3) Provide revised Plan Sheets, H01-H02, N19, N26-N27, and S31.
4) Replace the Bid Schedule Pages B-1 - B-25 with a revised Bid Schedule.
5) The bid opening date of Tuesday, October 7, 2025, at 2:00 p.m. EDT remains unchanged.
Any further questions sent to EFLHD.CONTRACTS@DOT.GOV within 7 calendar days of the bid opening date may not be answered in time for bidders to incorporate into their bids prior to the bid opening.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0007
Info Page 1 of 8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0007 Project NP MACA 12(1), 908(1) Mammoth Cave National Park
Solicitation: 693C73-25-B-000012
The purpose of this Amendment is to:
1) Revise the following Special Contract Requirements (J-Pages) sections:
a) Modify Sections 201, 203, 207, 301, 615, 624, 625, 636.
2) Provide responses and clarifications to questions received by potential bidders.
3) Provide revised Plan Sheets, H01-H02, N19, N26-N27, and S31.
4) Replace the Bid Schedule Pages B-1 - B-25 with a revised Bid Schedule.
5) The bid opening date of Tuesday, October 7, 2025, at 2:00 p.m. EDT remains unchanged.
Any further questions sent to EFLHD.CONTRACTS@DOT.GOV within 7 calendar days of the bid opening date may not be answered in time for bidders to incorporate into their bids prior to the bid opening.
Changes to the Special Contract Requirements (J-Pages) Sections:
1) Special Contract Requirements Section 201.
201.08. Add the following:
Do not measure clearing and grubbing for constructing temporary sidewalks for payment.
2) Special Contract Requirements Section 203.
201.08. Add the following:
Do not measure removal of temporary sidewalks for payment.
3) Special Contract Requirements Section 207.
207.09. Add the following:
Do not measure geotextile used for constructing temporary sidewalks for payment.
Info Page 2 of 8
4) Special Contract Requirements Section 301.
301.09. Add the following:
Do not measure aggregate base used for constructing temporary sidewalks for payment.
5) Special Contract Requirements Section 615.
615.01. Delete the first two paragraphs and add the following:
This work consists of constructing sidewalks, pads, and paved medians. This work also includes the construction and removal of temporary sidewalks.
Sidewalks, pads, paved medians, and temporary sidewalks are designated as concrete, asphalt, concrete paving unit, paving brick, or aggregate.
615.02. Add the following:
Geotextile 714.01.
615.03. Add the following:
Construct temporary sidewalks for pedestrian detours as shown in the plans or as directed by the CO. Stake the locations for the temporary sidewalk according to Section 152 and obtain approval from the CO before beginning construction.
Add the following after Subsection 615.06:
615.06A Temporary Sidewalk, Aggregate
(a) Preparation. Stake the locations for temporary sidewalks according to Section 152 and obtain approval from the CO before beginning construction. Use the digital photos required by Subsection 107.02 to reestablish grading and vegetation to preconstruction conditions upon completion of the work.
Perform clearing and grubbing according to Section 201. Place separation geotextile over the existing ground according to Section 207 and extend to a minimum of 18 inches beyond the placement limits of the aggregate base material. Maintain a maximum 2 percent cross slope on the sidewalk to the maximum extent possible.
Do not exceed the limits of disturbance as shown in the plans.
Info Page 3 of 8
(b) Constructing Sidewalk. Remove obstructions according to Section 201.
Install and compact the aggregate base material according to Section 301 and maintain a 6-inch lift above the existing ground. Keep the temporary sidewalk maintained during construction and address any deficiencies to the sidewalk immediately and as directed by the CO.
(c) Removal. Upon completion of the work, remove the temporary sidewalk, including the geotextile and aggregate base material, according to Section 203.
Reestablish grading and vegetation to preconstruction levels if outside the construction limits or to that specified in the plans if within the construction limits according to Subsection 107.02 and as directed by the CO. Reestablish vegetation after the removal of temporary sidewalks by placing topsoil according to Section 624 and establishing turf according to Section 625, and as directed by the CO.
615.07. Add the following:
Aggregate base will be evaluated under sections 106.02, 106.03, and 106.04.
Temporary sidewalks will be evaluated under Subsection 106.02 and 106.04.
Clearing and grubbing will be evaluated under Section 201.
Removal of temporary sidewalk will be evaluated under Section 203.
Geotextile will be evaluated under Section 207.
Aggregate base will be evaluated under Section 301.
Topsoil will be evaluated under Section 624.
Turf establishment will be evaluated under Section 625.
615.08. Add the following:
Do not measure clearing and grubbing, geotextile, aggregate base, topsoil, and turf establishment used for constructing temporary sidewalks for payment.
6) Special Contract Requirements Section 624.
624.06. Add the following:
Do not measure topsoil used for constructing temporary sidewalks for payment.
Info Page 4 of 8
7) Special Contract Requirements Section 625.
625.11. Add the following:
Do not measure turf establishment used for constructing temporary sidewalks for payment.
8) Special Contract Requirements Section 636.
636.04B. Add the following:
(c) Sand cast, low copper content, marine-grade aluminum dome top with a ¼ thick spun aluminum shade painted white on the underside with bronze color finish, with a pole mounting adapter that fits over a standard 2-3/8” tenon with (4) ¼-20 set screws, stainless steel hardware and fasteners, and other fixtures.
Bidder’s Questions and Responses:
1) Bidder’s question: Sheet # P04 shows EV charging Parking Spaces. Are EV Charging stations included in this project.
Response: EV stations are not required for the job; only spaces for future stations.
2) Bidder’s question: Will there be a location on site for placement of Government Field Office. Or will Field office be required to be off site?
Response: See Special Contract Requirements Section 637 for field office information.
3) Bidder’s question: Will temporary sidewalks and (either concrete or asphalt) be paid by bid item?
Response: Temporary sidewalks will be aggregate and paid through pay item 61501-0800. See the Special Contract Requirements plan sheets revisions, including an added detail for further information.
4) Bidder’s question: Will removal of temporary sidewalks and ramps (either concrete or asphalt) be paid by bid item?
Response: Temporary sidewalk removal is included in the pay item 61501-0800.
For more information, see the Special Contract Requirements revisions.
Info Page 5 of 8
5) Bidder’s question: Will the regrading and revegetation of temporary sidewalks and ramps, if necessary and regardless of the material in which the temporary sidewalk or ramp is constructed, be paid by bid item?
Response: Regrading and revegetation of temporary sidewalks is included in the pay item 61501-0800. For more information, see the Special Contract Requirements revisions.
6) Bidder’s question: Referencing plan sheet C30, there are no bid items on Schedule D for either 20 LF- Conduit, 1-1/2 inch PVC (pay item 63610-1000) or 1 EA- Utility Box, Pullbox (pay item 63621-1000). Will items be added to Schedule D?
Response: Bid item discrepancies between the estimate and plans were assessed and revised for all plan sheets. See the revised plan sheets.
7) Bidder’s question: For intermediate and base courses containing 20-30% RAP, amendment 4 says to lower the binder performance grade by 6 degrees for the high and low temp. points. Does that mean to include mixes at 20% RAP or does it mean in excess of 20% RAP?
Response: Mixtures containing 20.00 percent RAP are included, mixtures containing 19.99 % RAP are excluded from performance grade reduction.
8) Bidder’s question: Would the Government consider allowing a KYTC type B polish-resistant compliant mixture to be used for the surface course per KYTC’s warrants for selecting asphalt mixtures? (KYTC’s warrants require type B polish-resistant aggregates for roads with ADT between 5,000 and 15,000). KYTC specifications provide for reference:
Response: The FP specification relating to aggregate polishing is found in FP-14
703.07 and requires 25 percent by mass of insoluble residue according to ASTM D 3042. This is for the combined JMF aggregates. Contract 401.03 limits natural sand to 10%. Material must meet FP specification.
9) Bidder’s question: Is this project considered a Design/Build? Does the contractor have any design responsibilities?
Response: Contractor design responsibilities are detailed in the FP-14, SCRs, and plans.
Info Page 6 of 8
10) Bidder’s question: Amendment 4 provided information concerning Oil/Grit separator. Is the contractor responsible or the design? If so, there is not enough site data to provide a design. Please Advise.
Response: Contractor design responsibilities are detailed in the FP-14, SCRs, and plans. Amendment 0004 also included the storm drain system memo with
11) Bidder’s question: It is still unclear of the depth of the structure for the oil/grit separator. The drawings just state varies. Please provide a height dimension for the Oil/Grit Separator Tanks.
Response: Contractor design responsibilities are detailed in the FP-14, SCRs, and plans. Amendment 0004 also included the storm drain system memo with
12) Bidder’s question: For the placement of colored concrete, what is the color that will be used?
Response: Special Contract Requirements Sections 601, 608, 609, and 615 discussed the color requirements for each application.
13) Bidder’s question: The Roof Pitch on the Plaza Shelter on drawing E646-B is a 3:12.
The other roof structures on site seem to steeper in pitch. Please Advise if this is correct?
Response: This item was addressed in Amendment 0002.
14) Bidder’s question: Is there any electrical power or lighting requirements for the Plaza Shelter?
Response: Requirements for the Plaza Shelters are described in SCR Section 646.
15) Bidder’s question: Is there any plumbing or electrical requirements for the White Nose Washing Station? None are shown on the drawings please advise.
16) Response: Requirements for the White Nose Station are described in SCR Section 646.
17) Bidder’s question: Is there a manufacturer for the White Nose Washing Station?
Response: This item was addressed in Amendment 0002.
Info Page 7 of 8
18) Bidder’s question: Please provide a detail, spec sheet or cut sheet on the “Aluminum tube” bollard light (reference sheet H01; assembly labeled LB)
Response: Design and submittal requirements are described in SCR 636.04C.
Contractor is responsible for submitting a lighting system package for approval.
19) Bidder’s question: Please provide a detail, spec sheet or cut sheet on the pole mount lights and light poles (reference sheet H01; assembly labeled LP).
Response: Design and submittal requirements are described in SCR 636. Contractor is responsible for submitting a lighting system package for approval.
20) Bidder’s question: Please provide a detail, spec sheet or cut sheet on the assemblies labeled PB (for Pull Box) referenced on sheet H01 & H02.
21) Bidder’s question: If there is a concrete base associated with either the bollard lights or light poles, please provide that detail.
22) Bidder’s question: Please provide a circuit layout & details on the home run for the lighting system shown on sheet H01 & H02.
23) Bidder’s question: Are the quantities by bid schedule correct for the entire “lighting system” scope of work? It seems there are bid items omitted.
Response: Bid items have been revised as needed.
24) Bidder’s question: Should there be a bid item for 2-inch SCH 80 conduit?
Response: Bid items have been revised as needed.
25) Bidder’s question: If possible, please ask the design team if they would consider alternate “or equal” frames & grates for the various storm sewer structures. We are receiving feedback from the castings suppliers that the frames & grates specified are no longer manufactured.
Response: Design and submittal requirements as in the various SCRs. Contractor design responsibilities are detailed in the FP-14, SCRs, and plans.
Info Page 8 of 8
26) Bidder’s question: Will typically used, commercially available frames & grates (i. e., cast iron) be acceptable for the various types of storm sewer inlets and manholes? Two major material suppliers that frequently provide frames & grates are J. R. Hoe and East Jordan Iron Works. Would you review their products shown on their websites to determine if either suppliers’ frames & grates would be considered “or equal”? (Referencing the attached detail sheets from the plans, some inlet types appear to permit the use of cast iron frames & grates based on the wording “Minor variations in design and dimensions for frames and grating are permitted to allow manufacturer’s standards.”)
Response: Contractors can submit their proposal during the construction. FP-14 Section 104 and SCR Section 604 describe the submittal requirements and contract requirements for the project.
27) Bidder’s question: Are the grates required to be galvanized?
Response: Refer to Detail 604-04 and FP-14 Section 725.10 for material specifications for this item.
28) Bidder’s question: Would a safety chain be considered “or equal” to secure the frame to the grate in lieu of a nut & bolt connection (Inlet, Type 5B) or a welded connection (Inlet, Type 7A and 7B)?
Response: Contractors can submit their proposal during the construction. FP-14 Section 104 and SCR Section 604 describe the submittal requirements and contract requirements for the project.
ELEC
WATER
SANSAN
TEL
SANSAN
SANSAN
ELEC
TEL
SANSAN
SANSAN
ELEC
WATER
WATER
WATERWATER
TVTV
WATER
TV
WATER
TV
WATER
WATER
TV
TV
WATER
WATER
WATER
WATER
WATER
W
TEL
WATER
SANSAN
SANSAN
SANSAN
ELEC
SANSAN
WATER
WATER
WATER
WATER
JB
WATER
TEL
ELEC
TEL
TEL
WATER
WATER
TVTV
SANSAN
WATER
SANSAN
WATER
SS
ELEC
WATER
WATER
WATER
WATER
ELEC
WATER
WATER
WATER
WATER
WATERWATER
WATER
WATER
TEL
WATER
WATER
WATER
ELEC
ELEC
ELEC
ELEC
WATER
WATER
ELEC
WATER
WATER
ELEC
WATER
WATER
WATER
WATER
WATER
WATER
TP
WATER
WATER
TEL
ELEC
WATER
WATER
ELEC
ELEC
ELEC
WATER
WATER
WATER
ELEC
WATER
WATER
WATER
WATER
WATER
TV
WATER
ELEC
WATER
WATER
WATER
WV
TV
TV
WATER
WATER
WATER
WATER
TV
WATER
TV
TV
TV
TV
TV
ELEC
ELEC
ELEC
ELEC
ELEC
TVTV
TV
ELEC
TV
WATER
TV
TV
WATER
TVTV
TV
ELEC
SANSAN
SD
WATER
ELEC
TV
ELEC
TV
TV
WATER
WATER
ELEC
TV
WATER
ELEC
ELEC
WATER
TV
ELEC
TV
TV
TVTV
ELEC
20003
RBAR
20003
RBAR
TV
ELEC
TV
TV
RBAR
20002
RBAR
ELEC
SANSAN
TRANS
SS
TRANS
ELEC
DI
DI
ELEC
ELEC
SDDI
DI
SS
ELEC
TRANS
SD
ELEC
ELEC
ELEC
ELEC
TV
ELEC
ELEC
ELEC
ELEC
ELEC
TV
ELEC
WV
ELEC
ELEC
ELEC
ELEC
ELEC
ELEC
SD
ELEC
ELEC
WV
ELEC
JBTV
ELEC
TV
ELEC
WV
TBM1
PC
WATER
PP
WV
WV
WV
WV
WV
SS
N
1. Existing tree to remain. Do not disturb existing tree.
2. Hand excavation is required for work within the tree critical root zone area.
3. Adjust locations of light bollards and light poles based on field conditions as approved by the CO.
4. See Section 636 for the proposed lighting requirements.
NOTES:
PATH #1
ROUTE 908AZ
PATH #2
PATH #3
ROUTE 9
08BZ
ROUTE 1
See Note 1
LB-02
LB-01
LB-03
LB-04
LB-05
LB-06
LB-07
LB-08
LB-09
LB-10
LB-11
LB-12
LB-13
LB-14
PB-01
PB-02
PB-03
PB-04
PB-05
PB-06
PB-07
PB-08
PB-09
PB-10
PB-11
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline (typ.)
LP-01
LP-02
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION MAMMOTH CAVE NATIONAL PARK
LIGHTING SYSTEM LAYOUT
Schedules A to E
SCALE IN FEET
0 25 50
LEGEND
Light Bollard (LB)
Light Pole Mount (LP)
Sheet 1 of 2
80808
D D e s ig n S u r v F t
M P
R O J E
C T S m a c a
H
W Y
D E S C
A D
D
M A
C A d e s L in e s .d g n
:1
A
S e p te m b e r
L ig h ti n g P la n
H
P la n
S h e e t]
P R
O J E
C T
S \m a c a \1
(1
(1
H
W Y
D
E S
\C A
D D
\A M
E N
D H
H
-M
A C
A (1
)9 (1 li g h ti n g .d g n
STATE PROJECT
NUMBER
SHEET
KY NP-MACA 12(1), 908(1) H01
NPS Drwg No. 135/182690 NPS PMIS No. 178782Amendment 0007
I s
- ....,�� - �,,� -:�,,�. 1� - �,,� - �,,� - �,,� -l -::-!so s mo, f lSD
---=iw ;::::---==- ---1"!
I-=- , ". - -----,w� -1� ,-..... . cl,____
I �- · r ------, cl
PB-13
0 -� 'b � :11
I II
___.;p\- 'l,-/ _---\Pl-- � o··-
N
N
':E. \ . . . . . . . . . \ · · · · · · sa \· . . . ure 90 .•.
\�· . . RO __ .. •. l --···:
-:·l:
NO. DATE BY REVISIONS
6 9/19/25
LEGEND
e Light Bollard
J f:}
NPS PMIS No. 178782 NPS Drw No. 135/182690
AMENDMENT NO. 7 � STATE PROJECT
KY NP-MACA 12(1), 908(1)
NOTES:
1. Hand excavation is required for work within the tree critical root zone area.
2. Adjust locations of light bollards based on field conditions as approved by the CO.
3. See Section 636 for the proposed lighting requirements.
CONDUIT
Location to No. of 63610-1600 Conduit, 2- 63610-2800 Conduit, 4-
Location Size (Dia.) (in.) Conduits inch PVC (Schedule 80) inch PVC (Schedule 80)
Lnft Lnft
PB-01 - LB-10 4 1 45
LB-10 - LB-11 4 1 80
LB-11 - PB-02 4 1 120
PB-02 - LP-01 2 1 10
PB-02 - PB-03 2 1 140
PB-03 - LP-02 2 1 10
PB-01 - PB-09 2 1 100
PB-09 - PB-10 2 1 55
PB-10 - PB-11 2 1 235
PB-11 - LB-14 2 1 84
PB-04 - PB-05 4 1 160
PB-05 - LB-02 2 1 14
LB-02 - LB-01 2 1 85
Source - PB-04 4 1 21
PB-04 - PB-06 4 1 200
PB-06 - PB-07 2 1 137
PB-07 - PB-08 2 1 163
PB-08 - LB-09 2 1 14
Source - PB-12 4 1 60
PB-12 - PB-13 4 1 120
PB-13 - LB-16 2 1 21
LB-16 - LB-17 2 1 54
PB-13 - LB-18 2 1 62
PB-13 - PB-14 4 1 80
PB-14 - PB-15 4 1 54
PB-14 - LB-19 2 1 41
PB-14 - WNS 4 1 10
LB-19 - DF 2 1 7
PB-15 - LB-20 2 1 35
PB-15 - LB-21 2 1 73
DF= Drinking fountain; WNS= White Nose Station
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
0 20 40 L....-a-1
MAMMOTH CAVE NATIONAL PARK
LIGHTING SYSTEM LAYOUT
Schedules A to E
SHEET
NUMBER
H02
SCALE IN FEET Sheet 2 of 2
DATE BY
ROUTE 961
REVISIONS
"'1--------x---+-- -+----+-- - - - - - - - -� -- -----j
� 6 9/17 /25 QCP AMD #6 - Revised callout for temporary sidewalk from asphalt to aggregate.
"l:1---+-- -+---+-- - - - - - - -- - - - ----J J!I
Jil---+-- -+---+-- - - - - - - - - - - - ----J
NPS PMIS No. 178782 NPS Drw No. 135/182690
AMENDMENT NO. 7 <B> STATE PROJECT
KY NP-MACA 12(1), 908(1)
SHEET
NUMBER
N19
STAGE 3 TEMPORAR.Y PARKING
NOTES:
······1·· ..
- 1 • - i..: .... :. . .- ·r - • • • - r: · · - · ·
PARKING SPACES
Regular
Accessible
Van Accessible
Total
PROPOSED
L-:-
1. See Temporary Traffic Control Plans, Stage 2, for the temporary pavement marking and signs. =--= = __;_ =
2. See Temporary Pedestrian Detour Plans for more information.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
0 25 50
�c-
POINT
A
B
NORTHING EASTING
1,950,833.712 1,538,127.640
1,950,833.714 1,538,277.640
RESERVED
PARKING
··r
R7-8 (mod.)
MAMMOTH CAVE NATIONAL PARK
TEMPORARY TRAFFIC CONTROL
PLAN
SCALE IN FE ET
:C:L_..J.... __ .J......J.. _____________ .,L _________________________________ ...__ __________ ...,_ _____________________ _ STAGE 3 Sheet 3 of 4
� NO. DATE BY
NOTES:
1.
3.
Provide pedestrian detour route in full compliance with
Construct additional temporary sidewalk as directed by the CO.
he area to match original contours as directed by the CO.
REVISIONS
"'l------.----1-- --1-----1-- - - - - - - - - - - -----l � 6 9/17/25 QCP AMD#6-InsertedanewNote2, "Construct additionaltemporary ..• •
"l:1---+-- -l---+-- - - - - - - - - - - -----1 J!I Jil---+-- -l---+-- - - - - - - - - - - -----1
N
SP-4
Caver's
Camp Store
NPS PMIS No. 178782 NPS Drw No. 135/182690
II
Cavefs
Camp Store SP-4
DETOUR M4-9b
AMENDMENT NO. 7 <B> STATE PROJECT
KY NP-MACA 12(1), 908(1)
U.S. DEPARTMENTOF TRANSPORTATION MAMMOTH CAVE NATIONAL PARK
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
SHEET
NUMBER
N26
1---------TEMPORARY PEDESTRIAN DETOUR
STAGE 1
NO SCALE
�L.L __ L__L ____________ ....J. ________________________________ ...L,. __________ .i.... ____________________ _
NPS PMIS No. 178782 NPS Drw No. 135/182690
NOTES:
1.
2.
3.
N
AMENDMENT NO. 7 � STATE
KY
Work area (typ.)
PROJECT
NP-MACA 12(1), 908(1)
SHEET
NUMBER
N27
�:1----r-----.---,---------------r------------------------------------.-----------.-------------------------------------, � NO. DATE BY REVISIONS U.S. DEPARTMENT OF TRANSPORTATION MAMMOTH CAVE NATIONAL PARK
"' FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
1------------1 TEMPORARY PEDESTRIAN DETOUR
il----l------l-----t-----------------1
E STAGE 3
�l----l------l-----+-----------------1 NO 9CALE g:L...L--.L.....l ______________ .J.... __________________________________ ...,_ ___________ i.... _____________________ __.
NO. DATE BY
Existing pavement structure
REVISIONS
6 9/17 /25 QCP
AMD #6 -Added new Standard Detail sheet 53lA to plans, Gap, varies.
See Note 1.
Existing curb e(var.) �
Width as shown in the plans 2' (min.)
6" aggregate base course
8%_
Separation geotextile
SIDEWALK WITH CURB
6" aggregate base course
Separation geotextile
SIDEWALK WITHOUT CURB
NO SCALE
NPS PMIS No. 178782 NPS Drw No. 135/182690
AMENDMENT NO. 7 <B> PROJECT
SHEET
NUMBER
NP-MACA 12(1), 908(1) S31A
NOTES:
1. There may be a gap between the temporary aggregate sidewalk and existing edge of pavement.
2. Place temporary aggregate sidewalk as directed by the CO.
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
TEMPORARY SIDEWALK,
AGGREGATE
EFLHD DETAIL
E615-01B
SPECIFICATION
FP-14
APPROVED FOR USE
05/2024
Project No : Schedule : Schedule Type : Base Project Name :
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Price Amount
A0010 15101-0000 MOBILIZATION ALL
A0020 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL
A0030 15401-0000 CONTRACTOR
TESTING ALL
A0040 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
2,490.000
A0050 15705-1400
SOIL EROSION
CONTROL, FIBER
ROLL
20.000
A0060 15706-1300
SOIL EROSION
CONTROL, INLET
PROTECTION TYPE
C
8.000
A0070 15706-1400
SOIL EROSION
CONTROL, INLET
PROTECTION TYPE
D
15.000
A0080 15706-1600
SOIL EROSION
CONTROL,
STABILIZED
CONSTRUCTION
EXIT
1.000
A0090 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL
A0100 20101-0000 CLEARING AND
GRUBBING 1.160
EACH
EACH
LPSM
ACRE
LPSM
LPSM
LNFT
LNFT
EACH
Unit
LPSM
B-1
BID SCHEDULE
NP-MACA 12(1), 908(1) A
RECONSTRUCTION OF HOTEL PARKING AREA AND ADJACENT
ACCESS ROADS
Revised by Amendment 0007
A0110 20301-1100 REMOVAL OF GATE 1.000
A0120 20301-1200 REMOVAL OF
HEADWALL 2.000
A0130 20301-1400 REMOVAL OF INLET 9.000
A0140 20301-2400 REMOVAL OF SIGN 5.000
A0150 20301-2400 REMOVAL OF SIGN (SALVAGE) 1.000
A0160 20301-2800
REMOVAL OF
STRUCTURES AND
OBSTRUCTIONS
(GREASE
INTERCEPTOR) 1.000
A0170 20301-3100 REMOVAL OF
UTILITY POLE 2.000
A0180 20302-0200 REMOVAL OF
CURB 116.000
A0190 20302-0300
REMOVAL OF
CURB AND
GUTTER,
CONCRETE
380.000
A0200 20302-0900 REMOVAL OF
FENCE, CHAIN LINK 256.000
A0210 20302-1900
REMOVAL OF
PAVED
WATERWAY,
CONCRETE
330.000
A0220 20302-2100 REMOVAL OF PIPE
CULVERT 440.000
A0230 20302-2100 REMOVAL OF PIPE
CULVERT
(SLOTTED DRAIN
PIPE) 28.000
A0240 20303-0300 REMOVAL OF
CONCRETE 170.000
A0250 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
1,090.000
A0260 20303-2300
REMOVAL OF
PAVEMENT,
CONCRETE
(PAVER)
36.000
A0270 20303-3200
REMOVAL OF
SIDEWALK,
CONCRETE
145.000
A0280 20303-3600 REMOVAL OF WALL 12.000
A0290 20305-1000 REMOVAL OF
CONCRETE 65.000
A0300 20305-2000 REMOVAL OF
STONE MASONRY 28.000
A0310 20401-0000 ROADWAY
EXCAVATION 2,200.000
A0320 20402-0000 SUBEXCAVATION 13.000 CUYD
SQYD
SQYD
CUYD
CUYD
CUYD
LNFT
LNFT
SQYD
SQYD
SQYD
EACH
LNFT
LNFT
LNFT
LNFT
EACH
EACH
EACH
EACH
EACH
EACH
Revised by Amendment 0007 B-2
A0330 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
5,510.000
A0340 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
180.000
A0350 30101-4000 AGGREGATE BASE
GRADING C OR D 1,570.000
A0360 31302-0500
AGGREGATE-
TOPSOIL COURSE,
5-INCH DEPTH
640.000
A0370 40101-0600
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
1/2-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
620.000
A0380 40101-1000
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
760.000
A0390 41202-0000 TACK COAT 580.000
A0400 60201-0300 8-INCH PIPE
CULVERT 120.000
A0410 60201-0400
12-INCH PIPE
CULVERT
(CORRUGATED
POLYETHYLENE
PIPE)
55.000
A0420 60201-0500
15-INCH PIPE
CULVERT
(CORRUGATED
POLYETHYLENE
PIPE)
40.000
A0430 60201-0500 15-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 600.000
A0440 60201-0600
18-INCH PIPE
CULVERT
(CORRUGATED
POLYETHYLENE
PIPE)
18.000
A0450 60201-0600 18-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 410.000
A0460 60201-0800
24-INCH PIPE
CULVERT
(CORRUGATED
POLYETHYLENE
PIPE)
150.000
LNFT
LNFT
LNFT
LNFT
LNFT
TON
TON
GAL
LNFT
LNFT
SQYD
SQYD
TON
SQYD
B-3
A0470 60201-0800 24-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 170.000
A0480 60401-0000 MANHOLE 1.000
A0490 60401-0000 MANHOLE (BYPASS) 1.000
A0500 60401-0000 MANHOLE (DEPTH GREATER
THAN 5 FEET) 4.000
A0510 60401-0000 MANHOLE (DEPTH LESS
THAN 5 FEET) 4.000
A0520 60401-0000 MANHOLE (PRO OIL GRIT) 1.000
A0530 60403-1400 INLET, FLH TYPE 5B 1.000
A0540 60403-1700 INLET, FLH TYPE 6A (HEADROOM) 2.000
A0550 60403-1700 INLET, FLH TYPE 6A (LIMITED) 9.000
A0560 60403-1700 INLET, FLH TYPE 6A (MINIMUM) 2.000
A0570 60403-1700 INLET, FLH TYPE 6A (MODIFIED) 2.000
A0580 60403-2200 INLET, FLH TYPE 7A 4.000
A0590 60404-0000 CATCH BASIN , GREASE
INTERCEPTOR 1.000
A0600 60406-0000 INLET
ADJUSTMENT 1.000
A0610 60421-0000 OIL/GRIT
SEPARATOR
AND
INFILTRATION 1.000
A0620 60802-0400
PAVED
WATERWAY, TYPE
205.000
A0630 60902-0800
CURB AND
GUTTER,
CONCRETE, 10-
INCH DEPTH
550.000
A0640 60902-1100
CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
1,890.000
A0650 61203-0000 MANHOLE,
SANITARY SEWER 1.000
A0660 61401-0000 LEAN CONCRETE
BACKFILL 1.500
A0670 61501-0500
SIDEWALK,
EXPOSED
AGGREGATE
CONCRETE
110.000
0007 A0675 61501-0800 SIDEWALK,
AGGREGATE
(TEMPORARY) 180.000
SQYD
SQYD
LNFT
LNFT
LNFT
EACH
CUYD
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LNFT
EACH
EACH
EACH
EACH
B-4
A0680 61503-1000 MEDIAN,
CONCRETE 60.000
A0690 61504-2000
ACCESSIBILITY
RAMP, EXPOSED
AGGREGATE
CONCRETE
11.000
A0700 61902-0100 GATE, WOOD 1.000
A0710 62011-0500
STONE MASONRY
HEADWALL FOR 24-
INCH PIPE
CULVERT
3.000
A0720 62013-2000 STONE MASONRY
WALL
(VENEER) 39.000
A0730 62401-0300
FURNISHING AND
PLACING TOPSOIL,
4-INCH DEPTH
1,640.000
A0740 62502-0000 TURF
ESTABLISHMENT 1,640.000
A0750 63304-0900
SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
70.000
A0760 63502-0100
TEMPORARY
TRAFFIC
CONTROL, ARROW
BOARD, TYPE A
1.000
A0770 63502-0900
TEMPORARY
TRAFFIC
CONTROL, CONE,
TYPE 28-INCH
25.000
A0780 63502-1300
TEMPORARY
TRAFFIC
CONTROL, DRUM
17.000
A0790 63502-1600
TEMPORARY
TRAFFIC
CONTROL,
WARNING LIGHT
TYPE B
20.000
A0800 63503-0300
TEMPORARY
TRAFFIC
CONTROL,
BARRICADE TYPE 3
360.000
A0810 63503-0700
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS
3,840.000 LNFT
EACH
EACH
EACH
EACH
LNFT
EACH
SQYD
SQYD
SQYD
SQFT
SQYD
SQYD
EACH
B-5
A0820 63503-1000
TEMPORARY
TRAFFIC
CONTROL,
PLASTIC FENCE
2,200.000
A0830 63504-1000
TEMPORARY
TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
260.000
A0840 63602-2000
SYSTEM
INSTALLATION,
LIGHTING
(36-INCH LIGHT
BOLLARD HEIGHT) 2.000
A0850 63610-2800 CONDUIT, 4-INCH,
PVC
(SCHEDULE 80) 450.000
A0860 63621-3000 UTILITY BOX,
JUNCTION BOX 2.000
A0870 63641-0400 RELOCATE POLE (ELECTRICAL) 1.000
A0880 63701-0000 FIELD OFFICE 1.000
A0890 64501-0000 LOCATE UTILITIES ALL
EACH
EACH
EACH
LPSM
Submitted By: Schedule Total:
LNFT
SQFT
EACH
LNFT
Revised by Amendment 0007 B-6
Project No : Schedule : Schedule Type : Option
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Price Amount
B0010 15101-0000 MOBILIZATION ALL
B0020 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL
B0030 15401-0000 CONTRACTOR
TESTING ALL
B0040 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
1,560.000
B0050 15705-1400
SOIL EROSION
CONTROL, FIBER
ROLL
100.000
B0060 15706-1300
SOIL EROSION
CONTROL, INLET
PROTECTION TYPE
C
2.000
B0070 15706-1400
SOIL EROSION
CONTROL, INLET
PROTECTION TYPE
D
12.000
B0080 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL
B0090 20101-0000 CLEARING AND
GRUBBING 1.520
B0100 20217-0000 TREE ROOT
PRUNING 160.000
B0110 20301-1200 REMOVAL OF
HEADWALL 1.000
B0120 20301-1500 REMOVAL OF
LIGHT POLE 3.000
B0130 20301-2400 REMOVAL OF SIGN 8.000
B0140 20301-2400 REMOVAL OF SIGN (SALVAGE) 1.000
EACH
EACH
EACH
EACH
LPSM
ACRE
LNFT
EACH
LPSM
LPSM
LNFT
LNFT
EACH
Unit
LPSM
B-7
BID SCHEDULE
NP-MACA 12(1), 908(1) B
RECONSTRUCTION OF HOTEL PARKING AREA AND ADJACENT
B0150 20302-0200 REMOVAL OF
CURB 140.000
B0160 20302-0300
REMOVAL OF
CURB AND
GUTTER,
CONCRETE
2,430.000
B0170 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
9,960.000
B0180 20303-3200
REMOVAL OF
SIDEWALK,
CONCRETE
195.000
B0190 20401-0000 ROADWAY
EXCAVATION 8,700.000
B0200 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
16,635.000
B0210 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
160.000
B0230 30101-4000
AGGREGATE BASE
GRADING C OR D 4,650.000
B0240 30112-0000 AGGREGATE
SURFACE COURSE 100.000
B0250 31302-0500
AGGREGATE-
TOPSOIL COURSE,
5-INCH DEPTH 1,590.000
B0260 40101-0600
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
1/2-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
1,520.000
B0280 40101-1000
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
2,260.000
B0290 41202-0000 TACK COAT 1,720.000 GAL
TON
CUYD
SQYD
TON
TON
SQYD
SQYD
CUYD
SQYD
SQYD
LNFT
LNFT
B-8
B0300 60201-0500 15-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 420.000
B0310 60201-0600
18-INCH PIPE
CULVERT
(CORRUGATED
POLYETHYLENE
PIPE)
60.000
B0320 60201-0600 18-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 390.000
B0330 60201-0800 24-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 170.000
B0340 60201-0800
24-INCH PIPE
CULVERT
(SMOOTH WALL
POLYETHYLENE
PIPE)
200.000
B0350 60401-0000 MANHOLE (DEPTH LESS
THAN 5 FEET) 6.000
B0360 60403-1400 INLET, FLH TYPE 5B 3.000
B0370 60403-1700 INLET, FLH TYPE 6A (HEADROOM) 2.000
B0380 60403-1700 INLET, FLH TYPE 6A (LIMITED) 6.000
B0390 60403-1700 INLET, FLH TYPE 6A (MINIMUM) 3.000
B0400 60403-1900 INLET, FLH TYPE 6B 1.000
B0410 60403-2200 INLET, FLH TYPE 7A 1.000
B0420 60901-1700 CURB, CONCRETE,
18-INCH DEPTH 3,490.000
B0430 60901-1700 CURB, CONCRETE,
18-INCH DEPTH
(VARIABLE CURB
HEIGHT) 35.000
B0440 60902-1100
CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
1,360.000
B0450 60902-1100
CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
(DEPRESSED)
420.000
B0460 60902-1100
CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
(TRANSITION)
75.000
B0470 60915-3000
WHEELSTOP,
RECYCLED
PLASTIC
3.000
B0480 60920-0000 RESET
WHEELSTOP
(TEMPORARY) 8.000
B0490 61108-2000 ADJUST FIRE
HYDRANT 1.000 EACH
LNFT
LNFT
LNFT
EACH
EACH
EACH
EACH
EACH
LNFT
LNFT
LNFT
EACH
EACH
EACH
EACH
LNFT
LNFT
LNFT
LNFT
B-9
B0500 61109-4000 RELOCATE FIRE
HYDRANT 1.000
B0510 61501-0500
SIDEWALK,
EXPOSED
AGGREGATE
CONCRETE
800.000
B0520 61503-1000 MEDIAN,
CONCRETE 330.000
B0530 61504-2000
ACCESSIBILITY
RAMP, EXPOSED
AGGREGATE
CONCRETE
500.000
B0540 62011-0500
STONE MASONRY
HEADWALL FOR 24-
INCH PIPE
CULVERT
1.000
B0550 62401-0300
FURNISHING AND
PLACING TOPSOIL,
4-INCH DEPTH 3,090.000
B0560 62502-0000 TURF
ESTABLISHMENT 3,090.000
B0570 62642-0000 ROOT BARRIER 162.000
B0580 63304-0900
SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
45.000
B0590 63502-1300
TEMPORARY
TRAFFIC
CONTROL, DRUM
18.000
B0600 63502-1600
TEMPORARY
TRAFFIC
CONTROL,
WARNING LIGHT
TYPE B
24.000
B0610 63502-2900
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS,
SYMBOLS, AND
LETTERS
(ACCESSIBILITY
SYMBOL)
3.000
B0620 63503-0300
TEMPORARY
TRAFFIC
CONTROL,
BARRICADE TYPE 3
180.000
EACH
EACH
EACH
LNFT
EACH
SQYD
SQYD
LNFT
SQFT
EACH
SQYD
SQYD
SQYD
B-10
B0630 63503-0700
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS
4,550.000
B0640 63504-1000
TEMPORARY
TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
30.000
B0650 63602-2000
SYSTEM
INSTALLATION,
LIGHTING
(36-INCH LIGHT
BOLLARD HEIGHT) 12.000
B0660 63602-2000
SYSTEM
INSTALLATION,
LIGHTING
(POLE MOUNT)
3.000
0007 B0665 63610-1600 CONDUIT, 2-INCH,
PVC
(SCHEDULE 80) 1,150.000
0007 B0670 63610-2800 CONDUIT, 4-INCH,
PVC
(SCHEDULE 80) 4,500.000
B0680 63621-1000 UTILITY BOX,
PULLBOX 11.000
B0690 63621-3000 UTILITY BOX,
JUNCTION BOX 9.000
B0700 63640-0600
RELOCATE
COMMUNICATION
LINE
(ONE FIBER OPTIC
LINE AND THREE
COAXED CABLES) ALL
EACH
EACH
LPSM
Submitted By: Schedule Total:
SQFT
EACH
EACH
LNFT
LNFT
LNFT
B-11
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Price Amount
C0010 15101-0000 MOBILIZATION ALL
C0020 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL
C0030 15401-0000 CONTRACTOR
TESTING ALL
C0040 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
2,900.000
C0050 15705-1400
SOIL EROSION
CONTROL, FIBER
ROLL
6.000
C0060 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL
C0070 20101-0000 CLEARING AND
GRUBBING 1.010
C0080 20301-0100 REMOVAL OF
BOLLARD
(LIGHT) 2.000
C0090 20301-2400 REMOVAL OF SIGN 3.000
C0100 20301-2400 REMOVAL OF SIGN (SALVAGE) 15.000
C0110 20301-3000
REMOVAL OF
TRASH
RECEPTACLE
3.000
C0120 20302-0300
REMOVAL OF
CURB AND
GUTTER,
CONCRETE
840.000
C0130 20302-1000 REMOVAL OF
FENCE, RAIL 35.000
LNFT
LNFT
ACRE
EACH
EACH
EACH
EACH
LPSM
LPSM
LNFT
LNFT
LPSM
Unit
LPSM
B-12
BID SCHEDULE
NP-MACA 12(1), 908(1) C
RECONSTRUCTION OF HOTEL PARKING AREA AND ADJACENT
C0140 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
980.000
C0150 20303-3200
REMOVAL OF
SIDEWALK,
CONCRETE
1,020.000
C0160 20401-0000 ROADWAY
EXCAVATION 1,760.000
C0170 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
3,800.000
C0180 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
800.000
C0190 30101-4000
AGGREGATE BASE
GRADING C OR D 1,160.000
C0200 31302-0500
AGGREGATE-
TOPSOIL COURSE,
5-INCH DEPTH 785.000
C0210 40101-0600
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
1/2-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
315.000
C0220 40101-1000
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
470.000
C0230 41202-0000 TACK COAT 360.000
C0240 60201-0500 15-INCH PIPE
CULVERT
(REINFORCED
CONCRETE PIPE) 35.000
C0250 60703-0000
CLEANING
CULVERTS IN
PLACE
150.000
TON
GAL
LNFT
LNFT
SQYD
SQYD
TON
SQYD
TON
SQYD
SQYD
CUYD
B-13
C0260 60902-1100
CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
1,980.000
C0270 60915-1000 WHEELSTOP,
CONCRETE 42.000
C0280 61501-0500
SIDEWALK,
EXPOSED
AGGREGATE
CONCRETE
910.000
0007 C0290 61501-0800 SIDEWALK,
AGGREGATE
(TEMPORARY) 100.000
C0300 61504-2000
ACCESSIBILITY
RAMP, EXPOSED
AGGREGATE
CONCRETE
110.000
C0310 62011-0200
STONE MASONRY
HEADWALL FOR 15-
INCH PIPE
CULVERT
2.000
C0320 62401-0300
FURNISHING AND
PLACING TOPSOIL,
4-INCH DEPTH 2,420.000
C0330 62502-0000 TURF
ESTABLISHMENT 2,420.000
C0340 63304-0900
SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
25.000
C0350 63502-0900
TEMPORARY
TRAFFIC
CONTROL, CONE,
TYPE 28-INCH
20.000
C0360 63502-1300
TEMPORARY
TRAFFIC
CONTROL, DRUM
80.000
C0370 63502-1600
TEMPORARY
TRAFFIC
CONTROL,
WARNING LIGHT
TYPE B
20.000
C0380 63502-2900
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS,
SYMBOLS, AND
LETTERS
(ACCESSIBILITY
SYMBOL)
8.000
EACH
EACH
SQYD
SQYD
SQFT
EACH
EACH
EACH
SQYD
SQYD
SQYD
EACH
LNFT
B-14
C0390 63503-0300
TRAFFIC
CONTROL,
BARRICADE TYPE 3
490.000
C0400 63503-0700
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS
9,620.000
C0410 63504-1000
TEMPORARY
TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
100.000
C0420 63602-2000
SYSTEM
INSTALLATION,
LIGHTING
(36-INCH LIGHT
BOLLARD HEIGHT) 1.000 EACH
Submitted By: Schedule Total:
LNFT
LNFT
SQFT
B-15
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Price Amount
D0010 15101-0000 MOBILIZATION ALL
D0020 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL
D0030 15401-0000 CONTRACTOR
TESTING ALL
D0040 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
850.000
D0050 15705-1400
SOIL EROSION
CONTROL, FIBER
ROLL
190.000
D0060 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL
D0070 20101-0000 CLEARING AND
GRUBBING 0.260
D0080 20301-0080 REMOVAL OF
BENCH 2.000
D0090 20301-0080 REMOVAL OF
BENCH
(BIKE RACK,
SALVAGE) 2.000
D0100 20301-1100 REMOVAL OF GATE 1.000
D0110 20301-1500 REMOVAL OF
LIGHT POLE 2.000
D0120 20301-3000
REMOVAL OF
TRASH
RECEPTACLE
1.000
D0130 20302-0300
REMOVAL OF
CURB AND
GUTTER,
CONCRETE
180.000
D0140 20302-1000 REMOVAL OF
FENCE, RAIL 260.000
EACH
LNFT
LNFT
ACRE
EACH
EACH
EACH
EACH
LPSM
LPSM
LNFT
LNFT
LPSM
Unit
LPSM
B-16
BID SCHEDULE
NP-MACA 12(1), 908(1) D
RECONSTRUCTION OF HOTEL PARKING AREA AND ADJACENT
D0150 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
1,160.000
D0160 20303-3200
REMOVAL OF
SIDEWALK,
CONCRETE
145.000
D0170 20401-0000 ROADWAY
EXCAVATION 425.000
D0180 20402-0000 SUBEXCAVATION 28.000
D0190 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
2,740.000
D0200 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
880.000
D0210 30101-4000
AGGREGATE BASE
GRADING C OR D 520.000
D0220 31302-0500
AGGREGATE-
TOPSOIL COURSE,
5-INCH DEPTH 860.000
D0230 40101-0200
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/8-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
2,035.000
D0240 40101-0600
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
1/2-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
100.000
SQYD
TON
TON
CUYD
CUYD
SQYD
SQYD
TON
SQYD
SQYD
B-17
D0250 40101-1000
ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
150.000
D0260 41202-0000 TACK COAT 3,150.000
D0270 41301-0400
ASPHALT
PAVEMENT
MILLING, 1 1/2-
INCH DEPTH
2,680.000
D0280 50101-0800
MINOR CONCRETE
PAVEMENT,
REINFORCED, 8-
INCH DEPTH
170.000
D0290 60902-1100
CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
690.000
D0300 61102-1700
2-INCH
WATERLINE,
POLYVINYL
CHLORIDE (PVC)
165.000
D0310 61112-0000
WATER FOUNTAIN (WITH UPPER
BOTTLE FILLING
STATION)
1.000
D0320 61114-0000 WATER SYSTEM
ACCESSORY
, 2-INCH SHUT-OFF
VALVE 1.000
D0330 61114-0000 WATER SYSTEM
ACCESSORY
, BACK FLOW
PREVENTER 1.000
D0340 61114-0500
WATER SYSTEM
ACCESSORY,
BRANCH
(1/2-INCH TEE
CONNECTION) 1.000
D0350 61114-0500
WATER SYSTEM
ACCESSORY,
BRANCH
(2-INCH WYE
CONNECTION) 1.000
D0360 61501-0500
SIDEWALK,
EXPOSED
AGGREGATE
CONCRETE
950.000
D0370 61504-2000
ACCESSIBILITY
RAMP, EXPOSED
AGGREGATE
CONCRETE
8.000 SQYD
EACH
EACH
EACH
EACH
SQYD
SQYD
SQYD
LNFT
LNFT
EACH
TON
GAL
B-18
D0380 62401-0300
FURNISHING AND
PLACING TOPSOIL,
4-INCH DEPTH 2,140.000
D0390 62502-0000 TURF
ESTABLISHMENT 2,140.000
D0400 62601-0100
ACER RUBRUM,
RED MAPLE, 1 1/2-
INCH TO 2-INCH
CALIPER, BALLED
AND BURLAPPED
9.000
D0410 62601-0700
ACER
SACCHARUM,
SUGAR MAPLE, 1
1/2-INCH TO 2-INCH
CALIPER, BALLED
AND BURLAPPED
4.000
D0420 62603-0150
CERCIS
CANADENSIS,
EASTERN
REDBUD, 1 1/2-
INCH TO 2-INCH
CALIPER, BALLED
AND BURLAPPED
5.000
D0430 62603-0750
CORNUS FLORIDA,
WHITE
FLOWERING
DOGWOOD, 6
FEET TO 8 FEET
HEIGHT, BALLED
AND BURLAPPED
8.000
D0440 62603-1700
CASTENEA
DENTATA,
AMERICAN
CHESTNUT, 8
FEET TO 10 FEET
HEIGHT, BALLED
AND BURLAPPED
5.000
D0450 62603-1800
CLADRASTIS
KENTUCKEA,
KENTUCKY
YELLOWWOOD, 8
FEET TO 10 FEET
HEIGHT, BALLED
AND BURLAPPED
3.000
EACH
EACH
EACH
EACH
SQYD
SQYD
EACH
EACH
B-19
D0460 62606-0150
FAGUS
GRANDIFLORIA,
AMERICAN BEECH,
1 1/2-INCH TO 2-
INCH CALIPER,
BALLED AND
BURLAPPED
3.000
D0470 62610-0150
JUNIPERUS
VIRGINIANA,
EASTERN RED
CEDAR, 6 FEET TO
8 FEET HEIGHT,
BALLED AND
BURLAPPED
10.000
D0480 62610-0400
JUGLANS NIGRA,
BLACK WALNUT, 8
FEET TO 10 FEET
HEIGHT, BALLED
AND BURLAPPED
2.000
D0490 62612-0300
LIROIDENDREN
TULIPFERA, TULIP
TREE, 1 1/2-INCH
TO 2-INCH
CALIPER, BALLED
AND BURLAPPED
8.000
D0500 62616-0550
PLATANUS
OCCIDENTALIS,
SYCAMORE, 6
FEET TO 8 FEET
HEIGHT, BALLED
AND BURLAPPED
5.000
D0510 62617-0150
QUERCUS ALBA,
WHITE OAK, 1 1/2-
INCH TO 2-INCH
CALIPER, BALLED
AND BURLAPPED
7.000
D0520 62621-0050
ULMUS
AMERICANA
(VALLEY FORGE),
AMERICAN ELM, 2-
INCH TO 2 1/2-INCH
CALIPER, BALLED
AND BURLAPPED
3.000 EACH
EACH
EACH
EACH
EACH
EACH
EACH
B-20
D0530 62622-0300
VIBURNUM
PRUNIFOLIUM,
BLACKHAW
VIBURNUM, 30-
INCH TO 36-INCH
HEIGHT, BALLED
AND BURLAPPED
3.000
D0540 63301-1000
SIGN SYSTEM,
GOVERNMENT
FURNISHED SIGN
12.000
D0550 63304-0900
SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
45.000
D0560 63401-1500
PAVEMENT
MARKINGS, TYPE
H, SOLID
12,200.000
D0570 63401-1650
PAVEMENT
MARKINGS, TYPE
H, DOTTED
75.000
D0580 63405-2900
PAVEMENT
MARKINGS, TYPE
H, TURN ARROW
2.000
D0590 63405-3250
PAVEMENT
MARKINGS, TYPE
H, ACCESSIBILITY
SYMBOL
11.000
D0600 63502-0900
TEMPORARY
TRAFFIC
CONTROL, CONE,
TYPE 28-INCH
10.000
D0610 63502-1300
TEMPORARY
TRAFFIC
CONTROL, DRUM
13.000
D0620 63502-1600
TEMPORARY
TRAFFIC
CONTROL,
WARNING LIGHT
TYPE B
37.000
D0630 63502-2900
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS,
SYMBOLS, AND
LETTERS
(YIELD TRIANGLES)
4.000
EACH
EACH
LNFT
EACH
EACH
EACH
EACH
EACH
EACH
SQFT
LNFT
B-21
D0640 63503-0300
TRAFFIC
CONTROL,
BARRICADE TYPE 3
180.000
D0650 63503-0700
TEMPORARY
TRAFFIC
CONTROL,
PAVEMENT
MARKINGS
1,700.000
D0660 63504-1000
TEMPORARY
TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
30.000
D0670 63506-0500
TEMPORARY
TRAFFIC
CONTROL,
FLAGGER
175.000
D0680 63601-6000
SYSTEM
INSTALLATION,
TRAFFIC
DETECTOR
SYSTEM
ALL
D0690 63602-2000
SYSTEM
INSTALLATION,
LIGHTING
(36-INCH LIGHT
BOLLARD HEIGHT) 6.000
D0700 63602-6020
SYSTEM
INSTALLATION,
TRAFFIC
DETECTOR WIRE
LOOP
2.000
0007 D0704 63610-1600 CONDUIT, 2-INCH,
PVC
(SCHEDULE 80) 320.000
0007 D0705 63610-2800 CONDUIT, 4-INCH,
PVC
(SCHEDULE 80) 360.000
D0710 63621-1000 UTILITY BOX,
PULLBOX 4.000
D0720 64602-2000
BUILDING,
SUPPORT
BUILDING
, PLAZA SHELTER
ALL
D0730 64603-0000
FIXTURE , WHITE NOSE
WASHING STATION 2.000
D0740 64603-0300 FIXTURE, BENCH 2.000
D0750 64603-0500 FIXTURE, BICYCLE
STORAGE RACK 2.000 EACH
Submitted By: Schedule Total:
LNFT
EACH
LPSM
EACH
EACH
HOUR
LPSM
EACH
EACH
LNFT
LNFT
LNFT
SQFT
B-22
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Price Amount
E0010 15101-0000 MOBILIZATION ALL
E0020 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL
E0030 15401-0000 CONTRACTOR
TESTING
ALL
E0040 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
1,600.000
E0050 15706-1300
SOIL EROSION
CONTROL, INLET
PROTECTION
TYPE C
1.000
E0060 15706-1400
SOIL EROSION
CONTROL, INLET
PROTECTION
TYPE D
2.000
E0070 15720-0000
STORM WATER
POLLUTION
PREVENTION PLAN
ALL
E0080 20101-0000 CLEARING AND
GRUBBING
0.250
E0090 20301-1500 REMOVAL OF
LIGHT POLE
1.000
E0100 20301-2400 REMOVAL OF SIGN 8.000
E0110 20302-0300
REMOVAL OF
CURB AND
GUTTER,
CONCRETE
960.000
E0120 20303-1600
REMOVAL OF
PAVEMENT,
ASPHALT
1,140.000
E0130 20401-0000 ROADWAY
EXCAVATION
670.000
SQYD
CUYD
LPSM
ACRE
EACH
EACH
LNFT
LPSM
LPSM
LNFT
EACH
EACH
Unit
LPSM
B-23
BID SCHEDULE
NP-MACA 12(1), 908(1) E
RECONSTRUCTION OF HOTEL PARKING AREA AND ADJACENT
E0140 20701-1000
SEPARATION-
STABILIZATION
GEOTEXTILE,
CLASS 2, TYPE E
1,650.000
E0150 21101-2000
ROADWAY
OBLITERATION,
METHOD 2
3,330.000
E0160 30101-4000
AGGREGATE
BASE GRADING C
OR D
330.000
E0170 31302-0500
AGGREGATE-
TOPSOIL
COURSE, 5-INCH
DEPTH
570.000
E0180 60201-0200
6-INCH PIPE
CULVERT
(SMOOTH WALL
POLYETHYLENE
PIPE)
40.000
E0190 60407-0000 CAPPING INLETS
AND MANHOLES
2.000
E0200 61501-0500
SIDEWALK,
EXPOSED
AGGREGATE
CONCRETE
1,410.000
E0210 61504-2000
ACCESSIBILITY
RAMP, EXPOSED
AGGREGATE
CONCRETE
9.000
E0220 62401-0300
FURNISHING AND
PLACING
TOPSOIL, 4-INCH
DEPTH
6,710.000
E0230 62502-0000 TURF
ESTABLISHMENT
6,710.000
SQYD
SQYD
Submitted By: Schedule Total:
SQYD
LNFT
EACH
SQYD
SQYD
SQYD
SQYD
TON
Revised by Amendment 0007 B-24
B - 25
BID SUMMARY
Project NP MACA 12(1), 908(1)
(1) Schedule A (Base Contract) BID Total (from Page B-6) = (1) $
(2) Schedule B (Government Option 1) BID Total (from Page B-11) = (2) $
(3) Schedule C (Government Option 2) BID Total (from Page B-15) = (3) $
(4) Schedule D (Government Option 3) BID Total (from Page B-22) = (4) $
(5) Schedule E (Government Option 4) BID Total (from Page B-24) = (5) $_____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) + (4) + (5) $
Maximum Time Allowed for the Contract if Schedules A, B, C, D, and E are Awarded at the Same Time:
If the Government awards the contract as Schedules A + B + C + D + E, the performance period to complete all contract work will be 674 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 240 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 108 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 181 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 92 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period to complete all Schedule E work will be 53 calendar days and will start on the effective date of Schedule E’s Notice to Proceed.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0007 |
| Project NP MACA 12(1), 908(1) |
| Mammoth Cave National Park |
| Solicitation: 693C73-25-B-000012 |
| Bid Summary Page.pdf |
| BID SCHEDULE INSTRUCTIONS |
| COMPLETING THE BID SCHEDULE |
| SCHEDULES OF WORK |
| The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, D, and E (Government Options 1, 2, 3, and 4); see FAR Clauses 52.217-4 and 52.217-5. |
| Schedule A (Base Contract). |
| Schedule B (Government Option 1). |
| Schedule D (Government Option 3): No later than the contract completion date for |
| Schedule C (Government Option 2). |
| Schedule E (Government Option 4): No later than the contract completion date for |
| Schedule D (Government Option 3). |
| COMPLETION OF WORK |
| Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228- 15) may result in the start of construction activities to be no earlier than Novem... |
| BASIS FOR AWARD |
| Schedule A (Base Contract) Bid Total + |
| Schedule B (Government Option 1) Bid Total + |
| Schedule C (Government Option 2) Bid Total + |
| Schedule D (Government Option 3) Bid Total + |
| Schedule E (Government Option 4) Bid Total. |