This document is Amendment 0004 for a federal highway construction project at Mammoth Cave National Park in Edmonson County, Kentucky. The solicitation (693C73-25-B-000012) is specifically for reconstructing hotel parking areas and adjacent access roads, with a total project cost estimated between $10-$15 million. The amendment provides several key updates: revisions to special contract requirements regarding recycled asphalt pavement (RAP) percentages, responses to bidder questions about materials and specifications, and an attached hydraulics memo for project specifications.
The amendment maintains the original bid opening date of Tuesday, September 23, 2025, at 2:00 pm EDT and is restricted to Small Business Concerns. Notable technical details include allowances for up to 20% RAP in surface courses, acceptance of certain Kentucky Transportation Cabinet (KYTC) specifications, and specific requirements for asphalt binder performance grades. The project involves grading, aggregate base and surface course, asphalt concrete pavement, concrete work, drainage, stormwater retention, and miscellaneous infrastructure improvements. Bidders must complete representations and certifications online at www.sam.gov and comply with specific federal acquisition regulations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7325B000012 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1409/08/20250004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/06/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP MACA 12(1), 908(1)
The purpose of this Amendment is to:
1) Revise Special Contract Requirements (J-Pages) Section 401.03(a).
2) Provide responses and clarifications to bidders' questions.
3) Provide the attached Hydraulics Memo for project specifications.
The Bid Opening date of Tuesday, September 23, 2025, at 2:00 pm EDT remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0004
Info Page 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0004 Project NP MACA 12(1), 908(1)
Reconstruction of Hotel Parking Area and Adjacent Access Roads Solicitation: 693C73-25-B-000012
The purpose of this Amendment is to:
1) Revise Special Contract Requirements (J-Pages) Section 401.03(a).
2) Provide responses and clarifications to bidders' questions.
3) Provide the attached Hydraulics Memo for project specifications.
The Bid Opening date of Tuesday, September 23, 2025, at 2:00 pm EDT remains unchanged.
Changes to Special Contract Requirements (J-Pages)
1) Delete Subsection 401.03(a) and substitute the following:
(a) RAP. Limit the quantity of RAP by mass in the JMF for the top lift of surface course to 20 percent. Limit the quantity of RAP by mass in the JMF for intermediate and base courses to 30 percent. For intermediate and base courses containing 20 to 30 percent by mass RAP, reduce the asphalt binder performance grade by 6°C for both high temperature and low temperature performance grades.
Furnish Recycled Asphalt Pavement that passes one hundred percent of the maximum sieve size for the Nominal Maximum Size Aggregate of the submitted Job Mixture Formula.
Bidder Questions and Responses
1. Bidder question: Given the scarcity of non-polishing aggregates that are locally available and the ultimate low speed of traffic that will utilize the work, will non-polishing aggregates be required for the asphalt mixtures?
Response: Aggregates must meet FP-14 703.07 for surface course. “For the surface course, do not use aggregates known to polish or carbonate aggregates containing less than 25 percent by mass of insoluble residue when tested according to ASTM D3042.”
This is for the combined JMF aggregates.
Info Page 2 of 3
2. Bidder question: Will a Material Transfer Vehicle (MTV) be required for placing any asphalt mixture on this project?
Response: No.
3. Bidder question: A number of material suppliers and subcontractors are indicating that they are having difficulty receiving material quotes from various vendors for a multitude of reasons- BABA compliance chief among them. Would the Government consider extending the bid date?
Response: If this question relates to the “Build America, Buy America” clauses, it does not apply to this project. FAR 52.225-11 and FAR 52.225-12 of Buy American on pages F-1 through F-5 do apply to this project. The Bid Opening date was extended with Amendment 0003.
4. Bidder question: KYTC specifications allow up to 20% RAP in surface mixtures. If submitting a quality control plan for methods used to control RAP percentage, will an approved KYTC mixture with 20% be allowed for surface on this project?
Response: Yes. See Revised Special Contract Requirements above.
5. Bidder question: The specifications for this project appear to require a 75-gyration mixture based on ESAL class. KYTC utilizes 65 gyrations for all ESAL classes. Would a KYTC 65 gyration mixture be acceptable for this project?
Response: 65 gyrations will be acceptable and typical for state requirements relative to 75 gyrations.
6. Bidder question: KYTC requires Hamburg Rut Testing for similar ESAL class to meet
12.5 mm max rut at 10,000 passes contrary to 20,000 as listed in the specification. Will mixtures meeting KYTC specifications (10,000 passes) be accepted for this project?
Response: No. However, in consideration of the climate, the Hamburg may be performed at 45 Celsius for any binder great than PG 58 and less than PG 76. Table 401-1A tests temperatures greater than PG 58 and less than PG 76 with changes from 50°C to 45°C.
The passes will remain 20,000. The Hamburg is performed on the surface course only.
7. Bidder question: Is the intent of the Rut Testing Requirements in Table 401-1A that the mix incorporate PG76-22 binder? If so, will PG76-22 binder be required in each course of asphalt mixture or only the wearing course?
Response: No, see Section 401.03. The intent is to use an asphalt binder performance grade PG 64-22, or better, for the surface course. Contractor can use asphalt binder performance grade PG 58-22, or better, for non-surface course lifts. A PG 76-22 would be considered “better” for a surface (wearing) course and allowable but not required.
Info Page 3 of 3
8. Bidder question: What is the scope and estimated duration of the Utility Relocations that will be performed by Caveland Environmental Authority?
Response: CEA has completed their relocation prior to advertisement.
9. Bidder question: We kindly request the design information in reference to Reconstruction of Hotel Parking Area and Adjacent Access Roads, project NP MACA 12(1), 908(1) for the PRO-OilGrit separator (Detail E604-B – Contech Stormceptor) and PRO-FilterInlet (Detail E604-A – Contech StormFilter). For the PRO-OilGrit, please provide the treatment flowrate, and/or the site parameters used for the design (i.e.
drainage area, % impervious, Tc, required oil storage capacity, etc.). For the PRO- FilterInlet, please provide the treatment flowrate, and/or parameters used for the design (i.e. drainage area, % impervious, Tc, etc.). Please also provide any spec documents regarding the FilterInlet and OilGrit, if available. If there is a person of contact to coordinate the designs with, that would be preferred. My contact information is below should any discussion or coordination be needed.
Response: See SCR Section 604. The EFL Hydraulics memo is attached for informational purposes only. Contractor is responsible for submitting drawings and construction details for approval as stated in SCR Section 604.
10. Bidder question: The standard drawing for the Oil/Grit Separator and Filtration System on Detail E604-A doesn’t’ show a height for the cast in place structure. It just says “Varies”. Can you please provide a dimension for this?
Response: See SCR Section 604. EFL Hydraulics memo is attached for informational purposes only. Contractor is responsible for submitting drawings and construction details for approval as stated in SCR Section 604.
FHWA: I.Rosado-Vazquez:6257:JS: M\PROJECTS\maca\12(1) 908(1)\Techserv\Hydra\Reports\SD Preliminary Memo\Rev3 Feb 2024\NP MACA 12(1) 908(1) Preliminary Storm Drain System Memo_May 24.docx"Hydraulics, Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Form FHWA-201 U.S. DEPARTMENT OF TRANSPORTATION (Rev. 11-87) FEDERAL HIGHWAY ADMINISTRATION
MINUTE - MEMO
Use this form in lieu of transmittal slips within Dept. of Trans. when message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA-121 for informal correspondence.
SUBJECT: NP MACA 12(1) 908(1) Revised Preliminary Storm Drain System Memo
TO MESSAGE/COMMENT FROM/DATE
Sheila Foronda Project Manager
Rachel Wright Highway Design Manager
We have completed the preliminary storm drain system analysis for several locations within the Mammoth Cave National Park in the Edmonson County, Kentucky. The geometry of Route 908 Parking lot geometry has been updated to include designated parking spots for electrical vehicles (EVs). Consequently, the storm drain system design has been revised reflect this change as well as to correct the RIM elevation at several inlets.
The proposed storm drain system was analyzed and designed based Federal Highway Administration design standards and criteria for hydrology and hydraulics (Federal Lands Highway, Project Development and Design Manual, Chapter 7) to the maximum extent practicable. Based on the PDDM:
1. The design flow was analyzed for a 10-year design event for on-grade inlets, and 50-year design event for sag inlets.
2. Design storm drains should flow full for the design event whenever possible.
3. Design storm drains with slope sufficient to develop a self-cleaning velocity of 3 ft/s when flowing full. Slope less than 0.5% should be avoided for constructability reasons.
4. The limit of spread for a low standard road should be limit to half of one travel lane for gutter flow, both on grade and in roadway sags.
5. The minimum size for storm drain pipe is 15”.
6. The maximum flow depth at the curb should be equal or less to the curb height.
7. The minimum recommended capture efficiency for on-grade inlets is 70%.
8. Inlets located in a sag or sump point, should be designed for a 50% clogging factor.
9. Minimum cover should be equal or greater than 3ft. Under no case should the cover of the pipe be less than 1 ft. HEC 22 defines cover as the distance from the outside top of the pipe to the final grade of the ground surface.
10. In storm drain sections where the hydraulic gradeline for the design flood must exceed the pipe soffit (i.e., the pipe flows under pressure), the hydraulic gradeline for the design flood will remain below the ground elevation at all inlets and access structures, and watertight gaskets should be specified for the pipe joints.
The PDDM storm drain design criteria was met, with exceptions as presented below:
Velocity criterion:
o Pipe-12b’s velocity of 2.92 ft/s do not meet the criteria for 3 ft/s self-cleaning velocity. Providing an inlet type 6A (minimum) to increase pipe slope and subsequently velocity was not feasible at this location due to the effects of downstream backwater conditions. Therefore, we will provide the steepest slope feasible.
Isis Rosado- Vazquez Hydraulics Engineer
THROUGH
Wendy Hiciano Hydraulics Team Leader
05/30/24
ISIS Y
ROSADO-
VAZQUEZ
Digitally signed by
ISIS Y ROSADO-
VAZQUEZ
Date: 2024.05.30 09:59:49 -04'00'
WENDY MERCEDES
HICIANO
Digitally signed by WENDY
MERCEDES HICIANO
Date: 2024.05.30 10:55:03 -04'00'
FOR
ng fag mum covmum c he cover of thecover of the from the outsfrom the ou
10.10. In storm dIn storm d
must exmust ex hydrFelF
IN
FORMATIO
N ell el ased Federal ased Federal drology and rology and t and Design Mt and Design on the PDDM:on the PDDM:
sign event for ogn event for
s. .
he design evenhe design eve cient to develocient to develo
ll. Slope less tll. Slope less asons. sons.
w standard w standard roa w, both b on gradon gra r storm drain pr storm drain w depth at the cdepth at the c m recommenderecommende d in a sag or d in a sag or
r. r.
hh
PURPOSES d in rod in s 15”. 15”.
should be equahould be equ pture efficiencypture efficiency p point, shouldpoint, should be e equal or greequal or be less than 1 be less than 1 op of the pipe tp of the pipe sections wheresections wh d the pipe soffitthe pipe soffi gradeline for tradeline on at all inlets n at all inlets specified for thpecified for th
DM stormDM s
ONLY
ade enever ne self-cleaning elf-cleaning 0.5% should be0.5% should be d be limit tobe limit t dway sdway s
YY
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer o Pipe-Bypass01 and Pipe-Bypass02 do not meet the criteria for 3 ft/s self-cleaning velocity. Providing a 3ft/s self-cleaning velocity would require the installation of very deep drainage structures. This change will result in a significant economic impact, and based on the existing topography, we won’t be able to daylight the proposed Oil Grit System. Therefore, we provided the steepest slope feasible at these locations.
Existing Oil Grit Invert Elevation Constrains:
o CB-03, CB-04, CB-05, CB-06b, and C-14b will not meet our standard Type 6A inlet depth. If we install a deeper inlet than what is currently shown in the memo, the invert elevations of INLT-08 will be lower than the existing oil grit bypass chamber invert elevation of 733.28’ and we won’t be able to connect to the existing Oil Grit System. As a result, we recommend removing the 8-in depth top of the inlet Type A and installing only 15-in or 18-in pipes to mitigate the new inlet maximum width restriction of 1’-11 1/8”.
o Refer to Attachment 06 and 08. In order to connect to the existing oil grit bypass chamber invert elevation of 733.28’, the new storm drain pipe slopes will need to range from 0.005 to 0.02. Flatter pipe slope tends to result in higher flow depths inside the pipe, and therefore greater pipe diameters. Based on our StormCadd analysis results, Pipe Ex-Bypass 01 (currently shown in the asbuilts as 18-in diameter) will need to be replaced with a 24-in pipe in order to convey the flow leaving INLT-08B.
o In storm drain design, it is a good practice to transition from a smaller to larger diameter pipes, and not viceversa; Given that we are replacing the Ex-Bypass 01b with a 24-in pipe to convey the flow leaving INLT-08B; we may also need to replace several of the18-in existing oil grit bypass pipes to reduce the potential of significant water pressure due the reduction in diameter size. However, the StormCadd analysis results shows that given the existing 18-in pipes have steep slopes, Ex Bypass 02 and Ex Bypass 03 will be able to convey INLT08b flow.
Therefore, increasing Ex Bypass 02 and Ex Bypass 03 pipe size to 24-in to provide uniform transition in pipe sizes will be a good practice but not required.
Proposed Oil Grit Terrain Constrains:
o CB-26b and CB-27b will not meet our standard Type 6A inlet depth. If we install a deeper inlet that what is currently shown in the memo, we will require the installation of very deep drainage structures and given the existing topography, we won’t be able to daylight the proposed Oil Grit System. This change will result in a significant economic impact. Therefore, we recommend removing the 8-in depth top of the inlet Type A and installing only 15-in or 18-in pipes to mitigate the new inlet maximum width restriction of 1’-11 1/8”.
CB-06b, CB-19, CB-20, and CB-26b will require a grate length equal or greater than 4 ft to meet our PDDM criteria, which is greater than the 3 ft grate length shown in our detail 604-05. However, a 4ft grate length is a typical grate length used and available in the market.
FOR opes, Epes, Therefore, Therefore provide uniprovide uni roposed Oil Groposed Oil G oo CB-2B-a da d
IN
FORMATIO
N ur standartand ntly shown in y shown in e existing oil ge existing o e able to connable to conn mend removingmend removing or 18-in pipes tr 18-in pipe /8”. ” r to connect to to connect to the nehe new storm w storm pipe slope tendsipe slope ten reater ater pipe diampipe diam pass 01 (currenpass 01 (curren replaced with aplaced with gn, it is a good n, it is a good nd not vicevernd not vicever ipe to convey tipe to con eral of the18-inof the18 ant water pressunt water pressu add analysisadd analy
BypasBypas
PURPOSES
ice ice to trto
Given that we iven that w ow leaving INLow leaving IN sting oil ng oil grit bygrit ue the reductioue the reductio lts shows that gshows that and Ex Bypassand Ex Bypass ng Ex Bypass 0Ex Bypa transition in ptransition in p errain Constrainrrain Con d CB-27bd CB-27b willw r inlet that whar inlet that wha allation of very on of ve e won’t be able won’t be abl result in a sigresult in a sig 8-in depth 8-in d mitigatemitig
ONLY
igatega existing oil gristing oil n pipe slopes wpipe slopes w esult in higher ult in higher
rs. Ba. Based on oused on ou hown in the asbhown in the asb n pipe in orderpipe in orde sitioniti
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Hydraulic Grade Line (HGL):
o Most of the pipes were designed to contain the 10-year HGL below their pipe crown, with the exception of the existing and the proposed oil grit storm drain system (See Attachment 08, Attachment 16 and Attachment 17). These locations connect to existing outfalls or existing structures that could not be replaced due to potential disturbance impacts and potential utilities conflicts.
o Pipe 17b, Pipe 18b and Pipe-Oil Grit 01 have 10-year HGL above their respective pipe crowns. Their pipe diameters can’t be increased to 24-in because of the Inlet Type 6A (minimum) width constrain of 1’-11 1/8” discussed earlier in this memo.
However, the hydraulic gradeline for the design flood will remain below the ground elevation. Therefore, as a mitigation we recommend using watertight gaskets for these pipe joints.
Additional observations and considerations during the design and analysis of the storm drain systems includes:
1. Based on the proposed contours, most of the Route 012, Route 228 and Overflow Parking area will flow to the existing oil grit system.
2. The location of the proposed oil grit system differs from the previously discussed partner’s preferred location. Adding a new curb and gutter to the proposed overflow parking to catch and treat all surface runoff has created a new low point for the new storm drain system. Using the Partner’s preferred location would require us to raise the parking lot elevation +/- 5ft and install deep drainage structures. Based on proposed contours, we are recommending to install the proposed oil grit system south of the proposed overflow parking lot, and connect it to an existing grate inlet (INLT-6). Please refer to Attachment 02. Please note the proposed oil grit system location is very close to the parking lot. Moving it south will require deeper drainage structures and the risk of not being able to connect to the existing grate inlet invert elevation (INLT-6). Asbuilts for the existing sewer system has been verified and no conflict is anticipated.
3. Based on our hydrology analysis, the flow conveyed by the proposed oil grit system will be less than the existing oil grit system. Therefore, we are recommending the proposed oil grit system matches the design of the existing oil grit system (Model No.7200). This approach will also address any future flow that might be connected to the new system.
See Attachment 22 for Existing oil grit asbuilts.
a. The MHSW-Filter Inlet depth will be greater than what it is shown in Attachment 22 in order to meet invert requirements and the top of manhole match the existing ground. See Attachment 17.
b. The diameter of Pipe Loop 01 (15 inches) is greater than the diameter shown in the Route 908 existing oil grit as-built plans. According to the StormCadd results, using a 12-inch diameter would result in a HGL above the pipe crown and subject to water pressure.
4. INLT-04 and INLT-05b efficiency is less than 70%. However, the recommended efficiency of 70% doesn’t apply to these locations because they are not on-grade inlets.
Instead, a clogging factor of 50% was applied to these inlets. Based on the 30% field visit, the area consist of an open grass area and no debris were observed. As a result, clogging and spread concerns are not a concern at these locations. In addition, all proposed improvements equal or exceed spread requirements and in no location do they increase spread beyond existing conditions.
FOR n our hn our s than the exs than the grit system magrit system ma approach will approach will See Attachmee Attach a.a TT
IN
FORMATIO
N eca d earlier arlie ll remain beloremain bel mend using wamend using n and n and analysis onalys
Route 012, Rouute 012, Rou it system. t system.
tem differs fromdiffers fr a new ew curb and curb and ce runofce runoff has crf has cff artner’s preferrtner’s prefer and install dand install deep ending to instalnding to instal king lot, and coking lot, and co
02. Please note02. Pleas
Moving it south ng it sou to connect to tto connect to t sewer systsewer s rologyrology
PURPOSES
na proposepropo ct it tot it to an exis an ex proposed proposed oil groil g require deeper quire deep xisting grate inlisting grate inl as been vebeen verifierifie lysis, the flow ysis, the flow oil grit system. grit system s the design of s the design of address any futdress an
22 for Existing22 for Existi MHSW-Filter InHSW-Filter In achment 22 in ment 22 match the existatch the exist The diameteThe diamete the Routethe R resultsresu dd
ONLY
e storst
8 and Overfloand Over previously disreviously di er to the proposto the propos d a new low pod a new low po ocation wation would rould e structuresstructure oil gil
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
5. Please note the proposed Route 010 alternative shown in this memo will reduce the grading at the entrance of the storm drain system, reduce flow velocities and provide additional cover.
6. Please note the proposed Route 910C alternative shown in this memo will reduce the grading at the exit of the storm drain system and reduce flow velocities.
7. Although the scope of work for the Trail #4 existing storm drain system is to cap the top of the existing inlet. If during the design or construction phase the determination is made to replace the system, the design alternative shown in this memo is available.
8. White Nose Washing station to be designed by others and connected to INLT-10b. A manhole or junction box is recommended to be installed to avoid any potential conflict with the proposed trees in the area. Refer to Attachment 2b and Attachment 18.
Hydrology and Hydraulic Results
All storm drainage systems hydrology and hydraulics were designed and analyzed using the Bentley Open Flow StormCad software. The drainage areas (DR) were delineated using Bentley StormCad Automatic Catchment Delineation. The peak flow rates were automatically computed by the rational method. Please refer to summary tables for analysis results.
Route 908 Hydrology Summary
Label Area (ac)
Time of Concentration
(hours)
Runoff Coefficient
( C )
Q10 (cfs)
Q50 (cfs)
DR-3 0.119 0.083 0.95 0.74 0.89
DR-4 0.179 0.083 0.95 1.11 1.33
DR-5 0.17 0.083 0.95 1.05 1.26
DR-6 0.28 0.083 0.91 1.67 2.00
DR-7b 0.349 0.096 0.89 1.96 2.36 DR-8b 0.429 0.103 0.85 2.26 2.71 DR-9b 0.292 0.083 0.95 1.81 2.17 DR-10a 0.184 0.083 0.95 1.14 1.37 DR-11a 0.137 0.083 0.52 0.46 0.56 DR-12a 0.011 0.083 0.95 0.07 0.08
DR-13 0.13 0.083 0.68 0.58 0.7
DR-14 0.044 0.083 0.95 0.27 0.33
DR-INLT-2 0.09 0.083 0.95 0.56 0.67
DR-INTL-3 0.425 0.083 0.95 2.64 3.17
FORRRRRDR-7bRORORDR-8RO
ORORDR-9bOROFOFODROFOFOFOFOFOFFFF
IN
FORMATIO
N vai ed to INto IN d any potenany potentit nd Attachmentnd Attachm e deside gned andgned and areas (DR) wereas (DR) we eak flow rates eak flow rates ables for analyes for ana
ORMRMRoute 908
ORMdrology SummRM FOFFORORTime of
FORConcentr
FO(houOR
FO
NFO
NF0.119 FOFOFOFO
NNFNF0.179 FFNFNF
INIININ0NININININ0.2ININIII
PPPPPPP
RPOSESESEESSSCoeff
ES ( C )
ESESEESES0.95ESES
SES
SE083 ESE0ESES
OSE
OSE.083 EESEE
OSOS0.083
OS
POPPOS
POS09OS
POPOP29 POPO0.10POPO
RPO
RP292 POPOPOPO
RRRPRP18 PPRPRP
URURURUR0.137 RURURUR-12 URUR0.0URUR
PUPUDR-13 UUUUPUPUDR-1 UPUU
R-INPP
ONLY
yzed usinyzed u ineated using eated usi automatically automatically esults. ults.
ONONONNOOf OOQOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Overflow Parking Lot Hydrology Summary
Label Area (ac)
Time of Concentration
(hours)
Runoff Coefficient
( C )
Q10 (cfs)
Q50 (cfs)
DR-15 0.075 0.087 0.95 0.46 0.55
DR-16 0.014 0.083 0.95 0.08 0.10
DR-17 0.15 0.083 0.95 0.93 1.11
DR-19 0.311 0.083 0.95 1.93 2.32
DR-20 0.236 0.083 0.95 1.46 1.75
DR-22 0.232 0.083 0.95 1.44 1.73
DR-23 0.069 0.083 0.95 0.43 0.51
DR-24 0.048 0.083 0.95 0.30 0.36
DR-25 0.25 0.083 0.46 0.74 0.89
DR-26 0.271 0.083 0.95 1.68 2.02
DR-27 0.172 0.083 0.95 1.07 1.28
DR-INLT-1 0.457 0.168 0.15 0.24 0.28
DR-INLT-6 0.54 0.083 0.35 1.23 1.48
DR-INLT-7 0.019 0.083 0.95 0.12 0.15
Route 010 Hydrology Summary
Label Area (ac)
Time of Concentration (hours)
Runoff Coefficient
( C )
Q10 (cfs)
Q50 (cfs)
DR-INLT4 1.104 0.083 0.35 2.52 3.03
DR-21 0.121 0.083 0.95 0.75 0.9
Trail #4 Hydrology Summary
Label Area (ac)
Time of Concentration (hours)
Runoff Coefficient
( C )
Catchment CA (ac)
Q10 (cfs)
Q50 (cfs)
DR-INTL 5 0.809 0.083 0.35 0.283 1.85 2.22
Route 901C (Service Road) Hydrology Summary
Label Area (ac)
Time of Concentration (hours)
Runoff Coefficient
( C )
Q10 (cfs)
Q50 (cfs)
DR-901C-HW 0.577 0.083 0.512 1.93 2.32
DR--1 1.467 0.083 0.44 4.21 5.06
DR--2 0.099 0.083 0.95 0.61 0.74
FOFOLab OOOR RRRRR R-21
RRRRRR
FOROR
FOROR
FOOFFF
IN
FORMRMRM0.08 RMMRMATIO
NNN
NNNN1.11NNONONON
ON2 32NONONON1.4 ONON1.7ONON
TTIOIO1.4 OOOTIOTTTIOTIO0.43 OTIOTIO
ATAT5
ATITI30TI
ATI
ATAT0.46 ATTATAT
MMMAT
MAT
0.95 ATAT
MAT
MMMAMA0.95MAMRMRM8
RMMMRMRMRM
OROR0.083 RRORR
FORo
NFOdFO INNIN(ac) NFNFTime oNFNFNININ.104 NNINNII1I
PPPPUPUUUPURP
URTime of Con
URPOSESES
ESSummaryS
OSES
SESration
SEurs) ESESRECoEESES
OS0.083
OSOSOS83 OS
PO
RPO
RPO
RPPO
RP
PUPPUPU0.809
PUUPUPPUPUPUUPUP
ONOOONON1.23 NONLYYY
YY6 YYLLLYLY
0 89YLYNLNLNLYNLYLYNLYNLNL7
NLNL1.28
NLNL
OONL
ONL0.24 NLNLNL
ONL
ONONOOOO0.ONOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Mammoth Cave Hotel Parking (Route 908) Storm Drain System
Route 908 Link Summary
Q10 Q50
Label Q10 Flow (cfs)
Vel.
(ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Q50 Flow (cfs)
Vel (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Pipe-01 0.71 3.33 736.49 736.25 0.33 0.63 0.84 3.49 736.52 736.43 0.36 0.81 Pipe-02 1.79 4.16 736.15 736.12 0.53 0.82 2.14 4.37 736.37 736.37 0.75 1.07 Pipe-03 2.82 4.19 736.04 736.04 0.74 1.14 3.37 4.4 736.32 736.29 1.02 1.39 Pipe-04b 4.95 4.48 735.92 735.81 1.02 1.29 5.94 4.65 736.18 736 1.28 1.48 Pipe-05b 6.67 5.06 735.72 735.7 1.2 1.58 7.99 5.3 735.91 735.87 1.39 1.75 Pipe-06b 2.81 5.02 735.58 735.7 0.58 1.58 3.36 5.29 735.82 735.87 0.82 1.75 Pipe-07b 1.31 3.18 735.87 735.69 0.43 0.69 1.58 3.35 735.91 735.88 0.47 0.88 Pipe-08b 1.32 3.39 736.24 735.95 0.45 0.51 1.59 3.57 736.29 736 0.5 0.56 Pipe-09a 0.46 4.96 737.34 736.33 0.26 0.54 0.56 5.25 737.37 736.38 0.29 0.59 Pipe-10b 0.82 3.08 736.41 736.33 0.36 0.54 0.99 3.24 736.44 736.38 0.39 0.59 Pipe-11b 0.27 3.03 738.54 736.47 0.2 0.42 0.33 3.2 738.56 736.51 0.22 0.46 Pipe-22 0.56 3.01 736.04 736.04 0.74 1.3 0.67 3.18 736.29 736.29 1 1.56 Pipe-24a 1.88 5.05 736.14 735.7 0.52 0.95 2.17 5.26 736.18 735.87 0.56 1.12 Pipe-Ex
Bypass 01b 13.05 9.53 735.42 734.73 1.3 1.45 15.58 9.97 735.54 734.9 1.42 1.62
Pipe-Ex Bypass 02 12.98 17.57 734.45 730.96 1.3 1.32 15.5 18.48 734.57 731.13 1.42 1.49
Pipe-Ex Bypass 03 12.95 17.12 730.67 727.07 1.29 0.67 15.46 18.01 730.8 727.14 1.42 0.74
Route 908 Node Summary
Q10 Q50
Label
Q10 Flow (Total
In) (cfs)
Q10 Flow (Total Out) (cfs)
Elevation (Ground)
(ft)
Elevation (Invert)
(ft)
EGL
In (ft)
EGL
Out (ft)
Q50 Flow (Total
In) (cfs)
Q50 Flow (Total Out) (cfs)
EGL
In (ft
EGL
Out (ft)
CB-03 0.71 0.71 738.95 736.16** 736.66 736.61 0.84 0.84 736.71 736.65
CB-04 1.82 1.79 738.58 735.62** 736.27 736.35 2.17 2.14 736.44 736.49
CB-05 2.85 2.82 738.84 735.30** 736.14 736.18 3.41 3.37 736.43 736.42
CB-06b 5.04 4.95 738.61 734.90** 735.91 736.01 6.05 5.94 736.29 736.39 CB-10b 1.32 1.31 740.23 735.44 736.07 736.02 1.59 1.58 736.14 736.08 CB-11a 0.46 0.46 741.04 737.08 737.48 737.44 0.56 0.56 737.52 737.47 CB-12a 1.35 1.32 741 735.79 736.37 736.41 1.63 1.59 736.43 736.48
OR RRRRRR
FOROR
FOOR
FOFO FOOFOFOFOFOOFOFO
IININN
FORMATIO
NNNNONN736.52 N N NNOO
ONON736.3NN7
ONONOO.4 ONON36.32 ONOTTTIOTIO4.65 OO736OT OTT99 TIOTIO.3 OOTIOT O
AATATATITI5TI
AAT
MAAMATAT1.58 ATTAT
MAAT
MAMA51
MAMA1.AMAMAA
RRMA
RMA0.54 MAMA0.5MA
RMA
RR
RMRM0.54 MMRMRM
OROR0.2 RMRM0.42 RMROO
OROR0.74 RROROR
FOFO5.7
FOROR52 RROR
FOR
NNFOFO734.73FOO1FO
NFO
INN
4.45 NFNF730.96FNFNF
0.67 NNININ
PPPPPURPOSESSSSSSSSSSSESES1.4
ESS
5.5SES
SS
SES
SE1.3ESES
SEES
OOOSOS1.29 SES0SE
OOOSSES
RPO
RPO
RPPO
URP
URPRP
PUUPUPU (Total PUIn) Pcfs) PURURQ10
PURw
PU(Total PUPURREUR
PUUR
PP
ONLYYYYYYLYY
5.82
LYYYLYLYLYLYY73LYLYNNNLYNLY736LYYLYNLYNN5.25 NLNL737.37 NLNOOONON3.24 NN736NONOO3 ONON3.2 NNONONOO7 OO.18OOOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
CB-13b 0.85 0.82 740.92 736.05 736.48 736.53 1.02 0.99 736.52 736.58 CB-14b 0.27 0.27 741.13 738.34** 738.65 738.61 0.33 0.33 738.68 738.64
INLT-02 0.56 0.56 738.95 735.29 735.92 735.92 0.67 0.67 736.3 736.29
INLT-03a 1.88 1.88 740.37 735.62 736.42 736.33 2.17 2.17 736.49 736.38 INLT-07b 6.75 6.67 739.27 734.52 735.89 735.9 8.07 7.99 736.18 736.09 INLT-08b 13.62 13.05 739.62 734.12 735.74 735.99 16.23 15.58 735.91 736.2 INLT-09b 2.95 2.81 740 735 735.73 735.79 3.53 3.36 735.91 735.94
Ex Bypass* 13.05 12.98 737.13 733.15 735.17 735.01 15.58 15.5 735.41 735.23 Ex MH
Constant* 12.98 12.95 733.49 729.38 731.5 731.24 15.5 15.46 731.72 731.45
HW-Ex OilGrit Outfall*
(N/A) 12.92 730.4 (N/A) 727.07 727.07 (N/A) 15.43 727.14 727.14
Notes: * Potential replacement.
**Cash Basin invert elevation should match the pipe invert elevation.
Route 908 Catch Basin and Inlet Summary
Q10 Q50
Label Flow
(Captured) (cfs)
Flow (Total
Bypassed) (cfs)
Capture Efficiency
(Calculated)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
Flow (Captured)
(cfs)
Flow (Total
Bypassed) (cfs)
Capture Efficiency
(Calculated)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
CB-03 0.71 0.03 95.7 2.61 4.54 0.84 0.05 94 2.76 5.17
CB-04 1.11 0 100 3.62 8.76 1.33 0 100 3.91 9.95
CB-05 1.05 0 100 3.55 8.45 1.26 0 100 3.82 9.60
CB-06b 1.67 0 100 4.03 10.45 2 0 100 4.36 11.82 CB-10b 1.14 0 100 0.99 0.99 1.37 0 100 1.06 1.06 CB-11a 0.46 0 100 2.65 4.73 0.56 0 100 2.81 5.40 CB-12a 0.07 0 100 1.27 1.27 0.08 0 100 1.43 1.43 CB-13b 0.58 0 100 2.85 5.55 0.7 0 100 3.04 6.33 CB-14b 0.27 0 100 2.28 3.15 0.33 0 100 2.40 3.65
INLT-02 0.56 0 100 2.68 4.85 0.67 0 100 2.88 5.65
INLT-03a 1.88 0.75 71.4 3.77 9.37 2.17 1 70 3.97 10.20 INLT-07b 1.8 0.16 91.6 3.77 9.37 2.13 0.22 90.5 3.97 10.20 INLT-08b 2.26 0 100 4.38 11.92 2.71 0 100 4.78 13.57 INLT-09b 1.64 0.16 91 3.50 8.24 1.95 0.22 89.7 3.68 9.02
FFFFORRRRR
RRROROR0 RR RROOOROR0 RROROR
FOFO7
FOR
FOR0 OR
FOFOFO0.58 FOFO0FOFOFOFO.27 FOFOFOFOFF
ININ00 NFORMATIO
NNNN
15.5
NNONONONON15.46 N NONN
TIOTI7
TIO
N
TIO(N/AONOON
TIOTIOTIOO
N
RMAMAe 9 Mand Inlet SummMA
RMRMMMRMM
NFOF
d)
FFORORDepth
FOR(G
FO(in) ORORSp
OR/ TOR
FOOR
NFNF.7 FFNFF
IN
F
IN
F100 FFNFF
INII10I
PPP0.16PUR
PUPUURPOSE
OSOS.55
OSE
OSSESESE
t)
ESSS(Captur
ES (cfs)
ES
SSES
SE4.54 ESES0ES
SES
SSSESE8.76 EESESE
ESE
OSE
OOSOS4 OSOS10OSOOS
POPPOPO0 OOOPOO
RPO
RP0 POPO65POPO
RPRP100 PPRPP
UURP
URP100 PPRP
U
P
UUURUR100URUPURUR1UR
PUPUPU0.75 PUUPUPUPPUPPPP
ONLYYY
ONLYNL
ONLNLY
ONONONOOONOFlO(OONO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Route 908 Catch Basin and Inlet Summary
Label Grate width (+/- ft)
Grate length (+/- ft)
Type of inlet On-grade vs Sag
Clogging
CB-03 2 3 6A (minimum) On-grade 50% CB-04 2 3 6A (minimum) Sag 50% CB-05 2 3 6A (minimum) Sag 50% CB-06b 2 4 6A(limited) Sag 50% CB-10b 2 3 6A(limited) On-grade 0% CB-11a 2 3 6A(limited) Sag 50% CB-12a 2 3 6A(headroom) Sag 50% CB-13b 2 3 6A(headroom) Sag 50% CB-14b 2 3 6A (minimum) Sag 50% INLT-02 3 3 604-08 Sag 50% INLT-03a 2.38 2.38 E604-07 On-grade 0% INLT-07b 2.33 4.33 5B- E604-04 On-grade 0% INLT-08b 2.33 4.33 5B- E604-04 On-grade 0% INLT-09b 2.33 4.33 5B- E604-04 On-grade 0%
Route 908 Pipe Summary
Label Diameter (in)
Length (ft)
Invert Start (ft)
Invert Stop (ft)
Material
Pipe-01 15 60 736.16 735.62 RCP Pipe-02 15 40 735.62 735.30 RCP Pipe-03 18 66 735.30 734.90 RCP Pipe-04b 18 77 734.90 734.52 RCP Pipe-05b 24 72 734.52 734.12 RCP Pipe-06b 24 82 735.00 734.12 RCP Pipe-07b 18 87 735.44 735.00 RCP Pipe-08b 15 61 735.79 735.44 RCP Pipe-09a 15 32 737.08 735.79 RCP Pipe-10b 15 41 736.05 735.79 RCP Pipe-11b 15 150 738.34 736.05 RCP Pipe-22 18 64 735.29 734.73 RCP Pipe-24a 18 63 735.62 734.75 RCP
Pipe-Ex Bypass 01b 24* 74 734.12 733.28 PVC Pipe-Ex Bypass 02 24* 57 733.15 729.64 PVC Pipe-Ex Bypass 03 24* 52 729.38 726.40 PVC
Note: * Potential replacement.
FORORPipRR Pip
ORRPipe-03RORORPi
OROR
FOFOFOFOFOFOFOFOFOFFFF
ININ
FOORMATIO
NNN
NNNN50%NNONONrade
ON
ON0%N
ONONONSag ONON5ONON
TIOTIOSag OOOT OTTm) TIOTIOSag TIOTATATATI
ATITI
ATATAT08 ATATATAT
MAMA604-07 AAAAMAMA5B- E604-04 MA
RMRM5B- E604
RMR3
ORMRM5B- E6RM
OROROR
FOORRoute
FOPipeOR
NFFOFOFFOFO
ININ-01 ININININ
RPO
RPO
RPPOPPOSESES SSry S
SES
SESESLength
SES
(ft) SSInSES
SES
OSE
OS5 SESE60SESE
OOSOS15 SSOSOS
POPOPOS
POSOS
POPOPOPOPO18POPOPOPO
RPRP06b PRPP URURe-07b R
PUR
PURPipe-08b UR PUPUPipe-09a PUPUPUPPUPPPP
ONLYYY
0%
YY%YYLLLYLY0%YLYNLNLrade
NLYNLY%LYNLNLNLn-grade NLNL0NLNL ONONOn-grade NNNLNOOONONn-gradeONOOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Overflow Parking Lot Storm Drain System
Overflow Parking Lot Link Summary
Q10 Q50
Label Q10 Flow (cfs)
Vel.
(ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Q50 Flow (cfs)
Vel (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Pipe-12b 0.19 2.92 737.71 737.39 0.17 0.58 0.23 3.09 737.73 737.46 0.19 0.65 Pipe-13b 1.05 3.54 737.35 737.36 0.54 0.75 1.25 3.72 737.43 737.43 0.62 0.82 Pipe-14 2.79 5.47 737.24 736.21 0.63 0.94 3.29 5.72 737.3 736.31 0.69 1.04 Pipe-15 0.46 3.34 736.37 736.21 0.26 0.94 0.55 3.52 736.39 736.31 0.29 1.04 Pipe-16b 4.18 6.17 736.05 735.45 0.78 1.01 4.99 6.46 736.13 735.68 0.86 1.24 Pipe-17b 4.75 7.84 735.28 735.4 0.84 1.48 5.66 8.22 735.55 735.58 1.11 1.66 Pipe-18b 2.98 3.83 735.51 735.4 0.78 1.48 3.53 4 735.73 735.58 1 1.66 Pipe-19b 1.97 5.36 735.95 735.59 0.56 0.86 2.32 5.61 736 735.79 0.61 1.06 Pipe-20b 1.72 4.33 736.57 736.06 0.52 0.67 2.02 4.52 736.62 736.12 0.57 0.73 Pipe-21b 0.43 3.05 737.85 736.67 0.25 0.62 0.51 3.22 737.88 736.72 0.28 0.67 Pipe-23 0.24 4 736.92 736.21 0.19 0.94 0.28 4.23 736.94 736.31 0.21 1.04 Pipe-31 0.12 1.67 738.4 738.16 0.14 0.16 0.15 1.76 738.41 738.17 0.15 0.17 Pipe-32 0.12 1.7 738.13 737.74 0.13 0.2 0.14 1.79 738.15 737.76 0.15 0.22
Pipe- Bypass01 6.9 11.89 734.79 732.87 0.93 0.53 8.21 12.51 734.88 732.93 1.02 0.59
Pipe- Bypass02 8.41 6.37 731.27 731.08 1.03 1.31 10.01 6.66 731.37 731.21 1.13 1.44
Pipe-Loop01 1.62 4.32 734.36 734.39 0.5 0.67 1.92 4.51 734.45 734.47 0.59 0.75 Pipe-Loop02 1.62 4.33 734.17 733.92 0.54 0.48 1.92 4.52 734.22 733.97 0.59 0.53 Pipe-Loop03 1.61 5.27 731.58 731.48 0.54 0.58 1.92 5.52 731.63 731.61 0.59 0.71 Pipe-Loop04 1.61 4.79 731.44 731.48 0.64 1.14 1.91 5.04 731.58 731.6 0.78 1.26
Pipe-Pro OilGrit 01 8.53 4.83 735.18 735.01 1.26 1.13 10.15 5.74 735.3 735.11 1.38 1.23 Existing
Pipe_Do not disturb
9.3 11.26 730.86 727.87 1.09 0.63 11.08 11.83 730.96 727.94 1.19 0.7 FOROO61 ORORRRRRRR4.33RRRROOOROR5.27 RR
73ROROR4.79 RROROR
FFFOFO8.53 OO4.8OFOFFFOF9 OFOFO
NFORMATIO
NNNN
(ft)
NNOO
ONON737.73 NNN
ONOO.7 ONON737.43ONOTITTIOTIO5.72 OO73OTIOTIT55 TIOTIO3.52 OOTIOTIO
AATI
AT4
ATITITI
AATI
AAATAT5.66 ATT8ATAAT
MAMA48
MAMA3.AAMAA
RRMAMA0.86 MAMA2MA
RMMA
RR
RMRM0.67 MMRMRMM
OROR0.2 RMRM0.62RMRM
OO
OROR0.19 RROROR
FOFO16
FOROR14 ROR
FOR
FOFO737.74 FOO0.13FOFO
NN
NFO
NFO
732FOOFO
NFO
ININ731.27 NFN731NFNININ4.36NNINNIII
PURPOS
SSSSS
SSSSESES0.2
ESS 0.1SES
SESESES.53ESS8ES
SEES
OSES1.03 SESE1.31 SESEE
OO
OSOS0 SS0
OSOS
POPO92
POSOS54 SOS
POS
POPO731.48
POO0.5
POPO
RPRRPO
RPO731.4POOPO
RPPO
URPR35.1 RPRP5.0RPRP
PUU26
PURUR30.86 RRUR
PUPUPUR
ONLYYY
YYYYY6. YYYYLLYLYYY7YLYNLNNLYNLY735.73 YYLYNLYNLN5 NLNL736 NLNL
OOONON4.52 NN73NONOO51 ONON3.22 NNONONOO28 OO4.2OOOOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Overflow Parking Lot Node Summary
Q10 Q50
Label
Q10 Flow (Total
In) (cfs)
Q10 Flow (Total Out) (cfs)
Elevation (Ground)
(ft)
Elevation (Invert)
(ft)
EGL In (ft)
EGL
Out (ft)
Q50 Flow (Total
In) (cfs)
Q50 Flow (Total Out) (cfs)
EGL In (ft
EGL
Out (ft)
CB-15 0.46 0.46 739.98 736.10 736.51 736.46 0.55 0.55 736.55 736.5
CB-16b 0.2 0.19 741.33 737.33 737.75 737.77 0.24 0.23 737.77 737.79 CB-17b 1.11 1.05 741.77 736.81 737.39 737.42 1.31 1.25 737.46 737.49
CB-19 2.91 2.79 740.57 736.61 737.39 737.48 3.43 3.29 737.47 737.57
CB-20 5.02 4.18 739.23 735.27 736.21 736.37 6.02 4.99 736.31 736.48
CB-22b 1.77 1.72 740.34 736.05 736.68 736.77 2.08 2.02 736.73 736.83 CB-23b 0.43 0.43 741.06 737.60** 737.99 737.94 0.51 0.51 738.03 737.98
CB-24 2 1.97 739.43 735.39 736.16 736.16 2.36 2.32 736.23 736.24
CB-25b 4.93 4.75 737.98 734.44** 735.62 735.62 5.88 5.66 735.83 735.8 CB-26b 9.4 8.53 737.71 733.92** 735.51 735.63 11.21 10.15 735.74 735.85 CB-27b 3.04 2.98 738.61 734.73 735.66 735.67 3.6 3.53 735.86 735.86
INLT-01 0.24 0.24 739.75 736.73** 737.02 736.98 0.28 0.28 737.04 737.01
INLT-06 9.65 9.3 733.42 729.77 731.31 731.3 11.5 11.08 731.48 731.46
INLT-10b 0.12 0.12 741.92 738.26 738.46 738.44 0.15 0.15 738.48 738.46
PRO-
BYPASS1 8.53 6.9 738.22 733.86 735.52 735.15 10.15 8.21 735.75 735.28
PRO-Deep MH 01_Not
Constant
1.61 1.61 738.25 730.8 731.66 731.52 1.92 1.91 731.77 731.65
PRO-Drop MH 01 8.51 8.41 738.00* 730.17 731.5 731.68 10.12 10.01 731.63 731.84
PRO-FilterInlet 1.62 1.61 738.66 731.04 731.98 731.8 1.92 1.92 732.07 731.88 PRO-OilGrit 1.62 1.62 738.02 722.45 734.5 734.39 1.92 1.92 734.59 734.47 WS-Junction
Box 0.12 0.12 741.72 738 738.18 738.18 0.15 0.14 738.2 738.2
Existing Headwall_Do not disturb (N/A) 9.27 730.24 (N/A) 727.87 727.87 (N/A) 11.05 727.94 727.94
Note: **Cash Basin invert elevation should match the pipe invert elevation.
a RIM elevation of the proposed Drop MH will be above the existing ground.
FOFOFOtion
FOx FOFOORRRR1 R R8RROOROR1.62
ORR1ROOROOOROR2 ORR1OROOR
0.12 OOFOOFFg FoFFF
NFORMATIO
NNNNN
0.55
NNONONONON0.23 N NONNONON1.31
ONON1.2
ONON
IOIIO
N
IO
N3 ONONON
IOO
N
TIOTI6.37
TIOTIO6.02OOIOTIOO
ATIO
ATI736.77TIOTIO2.0TIOTIO
AA
ATAT4TTATAT
MAMA6.
MAT
MAT736.16AT
MAMAMA5.62
MAMA7MAMMA
RMRRMA
RMA
735.51MAMAMA
RMMA
RMR4.73 RMRM735.66RMRM
ORM
OR.73**RMRM737RMRM
OOOROR29.77 RROROR
FOFO92
FOFO.2OFO
NFO
NFO738.22 FOFOFOFO
ININ61 IN
F
IN738 25
FNF
IN
F
ININI7ININ
PURPOSESSSSSSSS8.46 SS73SSEESES735.52 S S73SES
OSESE30. SES
SE731.6
SES
SES
POOPOSOS0.1 SOS
POS
POPO38.66 POPO731.0POPO
RPO
RPO738.02 POPOPO
RPO
URUR2
URP
URP741.72PRP
URP
PUP
PUR
PUR9 URURUR
PUPUPUUR
sin invert elevatisin invert tion of the prtion o
ONLYYYYY
YYYYLLYLY
0.51 YYYLYLL6 LYLYYYLYLYNLNL.88
NLYNLY66 LYNL
ONOONL
ONL11.21 NLNL10NL
ONNL
ONO
5.67
ONON3.6NNONONNONO36 ONON0.28ONONOO1.3 OOOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Overflow Parking Lot Catch Basin and Inlet Summary
Q10 Q50
Label Flow
(Captured) (cfs)
Flow (Total
Bypassed) (cfs)
Capture Efficiency
(Calculated)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
Flow (Captured)
(cfs)
Flow (Total
Bypassed) (cfs)
Capture Efficiency
(Calculated)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
CB-15 0.46 0 100 2.65 4.69 0.55 0 100 2.81 5.36
CB-16b 0.08 0 100 1.47 1.48 0.1 0 100 1.67 1.67 CB-17b 0.91 0.01 99 2.16 2.68 1.08 0.03 97 2.31 3.29
CB-19 1.86 0.07 96 2.34 3.43 2.17 0.15 94 2.49 4.04
CB-20 1.53 0 100 3.89 9.88 1.9 0 100 4.26 11.42
CB-22b 1.35 0.09 94 2.51 4.14 1.57 0.16 91 2.66 4.76 CB-23b 0.43 0 100 1.63 1.63 0.51 0 100 1.75 1.75
CB-24 0.29 0.01 96 2.51 4.12 0.34 0.02 95 2.66 4.74
CB-25b 0.74 0 100 2.97 6.06 0.89 0 100 3.17 6.88 CB-26b 1.68 0 100 4.04 10.52 2.02 0 100 4.37 11.89 CB-27b 1.07 0 100 3.57 8.54 1.28 0 100 3.85 9.70
INLT-01 0.24 0 100 2.05 2.20 0.28 0 100 2.15 2.64
INLT-06 1.23 0 100 3.69 9.03 1.48 0 100 4.01 10.36
INLT-10b 0.12 0 100 1.73 1.73 0.15 0 100 1.81 1.81
Overflow Parking Lot Catch Basin and Inlet Summary
Label Grate width (+/- ft)
Grate length (+/- ft)
Type of inlet On-grade vs Sag
Clogging
CB-15 2 3 6A(limited) Sag 50% CB-16b 2 3 6A(limited) Sag 50% CB-17b 2 3 6A(headroom) On-grade 0% CB-19 2 4 6A(limited) On-grade 0% CB-20 2 4 6A(limited) Sag 50% CB-21 2 3 6A (headroom) On-grade 0%
CB-22b 2 3 6A(limited) On-grade 0% CB-23b 2 3 6A(limited) On-grade 0% CB-24b 2 3 6A(limited) On-grade 50% CB-25b 2 3 6A (minimum) Sag 50%
CB-26b 2 4 6A(limited) but may end up be (minimum) if there are field adjustments Sag 50%
CB-27b 2 3 6A(limited) Sag 50% INLT-1 3 3 604-08 Sag 50% INLT-6 3 3 604-08 Sag 50%
INLT-10b 3 3 604-08 Sag 50%
FORRRR(+/- ft)RRROOOROR2 ROROOb OROR2 OROR FOFOB-17b OOOOFOFOCB-19 OOFOOFFCB-2FFF2F
IN
FORMATIO
NNNNNNONONONON 100NONONON0.03
ONONONON
IO
N
IO
N0 ONONONON
TTTIOTIO0 OIOT O
ATAT57
ATIOTIO0.16TIO
ATATAT0.
ATTATAT
MMAT
MAT0.34 ATTAT
MAT
MMMAMA.89
MAMRMRM0.52 MAMA
2.0MAMRRRMRM8.54 MMRMRM
ORORORM
ORM2 20 MRM
ORM
OROR3.69OROR9.OROR
FOFFOFO1 OOOFOFOFOO
IN
FO
NFNFCatcFO IININGrateINlength INININ
PPPUPUPPURPOSES SSSSS0.15SSSS
SES
SESParking Lot
SEin and Inlet SumES
OSE
OSTypSE
POPOPOP
RPO
RPOPO
RP3 3 RPRPRPRP
UU
4 4 RPRRP
URP
UU4 4 2 URUR
PUPU3 32 UPUPU2 PUPPUPP2PP2P
ONLYYYY
YLLLYLY
10YLYLL2 LYLY5LYLYNLNL0
NLYLY1LYNLY
ONL
ONL0 NLLNLNL
OOONON0 NONONOOONONONOOOOOOOOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Overflow Parking Lot Pipe Summary
Label Diameter (in)
Length (ft)
Invert Start (ft)
Invert Stop
(ft) Material
Pipe-12b 15 39 737.54 736.81 RCP Pipe-13b 15 26 736.81 736.61 RCP Pipe-14 18 106 736.61 735.27 RCP Pipe-15 15 64 736.10 735.27 RCP Pipe-16b 18 64 735.27 734.44 RCP Pipe-17b 18 23 734.44 733.92 RCP Pipe-18b 18 179 734.73 733.92 RCP Pipe-19b 15 44 735.39 734.73 RCP Pipe-20b 15 71 736.05 735.39 RCP Pipe-21b 15 145 737.60 736.05 RCP Pipe-23 15 38 736.73 735.27 RCP Pipe-31 15 47 738.26 738.00 RCP Pipe-32 15 77 738.00 737.54 RCP
Pipe-Bypass01 24 44 733.86 732.34 HDPE Pipe-Bypass02 24 90 730.24 729.77 HDPE Pipe-Loop01 15 36 733.86 733.72 HDPE Pipe-Loop02 12 34 733.63 733.44 HDPE Pipe-Loop03 12 15 731.04 730.90 HDPE Pipe-Loop04 18 57 730.80 730.34 HDPE
Pipe-Pro OilGrit 01 18 16 733.92 733.88 HDPE Existing Pipe_Do not disturb 24 64 729.77 727.24 RCP
Note: Proposed oil grit loop pipes matches the size and material of the Route 908 asbuilt existing oil grit loop pipes, except for Pipe-Loop01.
Washing Station Node Summary
Label Diameter
(in) Type
Manhole or Junction Box 42 Preliminary Memo, Attachment #22, Sheet 35 of 37, Typical 1-C33
FOR RRR
l grit loop pl grit loo
OROROOROOOO
IN
FORMATIO
NNNNNNN27 NNNNONON34.44 NN NNONON733.92 NONN
TITTIOTIO733.92 OTITIT.39 TIOTIO734.TIOTI
ATI
AT36 05 TITI7TITI
AAATAT737.6 TTATAT
MAMAMAT
MA736.73 AT
MAMAMA4 MAMA738MAMA
RRRMRM77 MMMRM
ORRORMRM44 MRM
ORM
OROR24
OROROROR
FFOROROROROR
FOR
FFFOFO12 OFOFO
NFNFNFOFOFO
NFNFNFNFFNFNF
ININit 01 NNNININdisturb INIm
PURPOSESSSSS
SESESESES 733.6SESESES15ESES731.ESES
SSSES
SES57 ESESES
SES
SSSESE16 ESESE
OSOS24
OSS64SOSOSOShe size and materiasize and ma
RPO
RPPO
URP
URabel RPRPDiaRRPRP
PUR
PURManhole or
PUJunction BoUR
PPU
ONLYYYYYYYYYYYLYLYLYLYYLYNLYNLY735.27 LYLYLYLYNLNL38.00 LNLL
OOONL
ONL
737.54 NL
OOO86 ONON732ONOOO24 OOOOOOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Mammoth Cave Parkway (Route 010) Storm Drain System (Alternative)
Route 010 Link Summary
Q10 Q50
Label Q10 Flow (cfs)
Velocity (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Q50 Flow (cfs)
Velocity (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Pipe-28 1.22 3.25 740.72 740.73 0.86 1.16 1.37 3.36 740.74 740.74 0.88 1.17 Pipe-29 7.41 5.23 740.54 740.23 0.97 0.92 7.63 5.27 740.55 740.24 0.98 0.94
Route 010 Node Summary
Q10 Q50
Label
Q10 Flow (Total
In) (cfs)
Q10 Flow (Total Out) (cfs)
Elev (Ground)
(ft)
Elev (Invert)
(ft)
EGL
In (ft
EGL
Out (ft)
Q50 Flow (Total
In) (cfs)
Q50 Flow (Total Out) (cfs)
EGL
In (ft
EGL
Out (ft)
CB-21 7.43 7.41 745.53 739.57 740.73 740.91 7.64 7.63 745.53 739.57
INLT-4 1.22 1.22 744.67 739.86 740.74 740.74 1.37 1.37 744.67 739.86
HW-
Rte10 (N/A) 7.4 742.3 (N/A) 740.23 740.23 (N/A) 7.61 742.3 (N/A)
Route 010 Catch Basin and Inlet Summary
Q10 Q50
Label Flow
(Capture
d) (cfs)
Flow (Total Bypass
ed) (cfs)
Bypass Target
Capture Efficiency (Calculate
d) (%)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
Flow (Capt ured) (cfs)
Flow (Total Bypass
ed) (cfs)
Bypass Target
Capture Efficiency (Calculate
d) (%)
Depth (Gutter ) (in)
Spread / Top Width
(ft)
CB-21 3.21 1.44 (N/A) 70 3.07 6.47 3.27 1.53 (N/A) 70 3.10 6.59
INLT-4 1.22 1.3 (N/A) 48.4 2.56 4.34 1.37 1.66 (N/A) 45 2.71 4.97
Route 010 Inlet Summary
Label Grate width (ft)
Grate length (ft) Type of inlet On-grade vs Sag
Clogging CB-21 2 3 6A(headroom) Sag 50% INLT-4 3 3 604-08 Sag 50%
FORRRRQR
FOFF
fs)
FOROROR(Total
FORB
FOed)
FOcfs)ORORBypOR
FOOR
FOF1 FOFOFOFOFFFFFF
IN
FORMATIO
NNNN
N NN(NOOONON740.74NN740NONOOONON0.5 NNONOOON
ATI
ATI
ATyary TI
MAT
MATATATATAT
ORR
t)
Rt)
ORMA
RMEGL
RMIn (ft MAMAEGLMAMA
ORMAA
OOROR739.57 ORR74OROOR
FOFO7
FOFO739.86 OOFOO
NFO
NFO42.3 FOFOFO
NFFOF
INININ
PURPOSESSSSSSS40.74SSESES40.2
ESES740.23
SESESES
OSRoute 01
OStch Basin and InSOS
POSSOSS
URURPOPOaptur
RPOEfficiency
RP(Calculate
URPd) (%) POPOPPPO
URPO
URUR)URUR7URUR
PPUR
PUR(N/ URUR4UR
PPPUURUPUPUPPU
ONLYLYYLYYNLYLYLY
OOONNNlow
ON(Total
ONIn) ON) NLYNLYQ50
NLFlow N(TotaNNLYNLY
ONLY
OOO7.64 OOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Route 010 Pipe Summary
Label Diameter (in)
Length (ft)
Invert Start (ft)
Invert Stop (ft)
Material
Pipe-28 24 47 739.86 739.57 RCP Pipe-29 24 47 739.57 739.3 RCP
Service Road (Route 910C) Storm Drain System (Alternative)
Route 901C (Service Road) Link Summary
Q10 Q50
Label Q10 Flow (cfs)
Velocity (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Q50 Flow (cfs)
Velocity (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Pipe-25b 6.83 6.93 736.03 735.66 0.93 0.76 7.22 7.04 736.05 735.69 0.95 0.79 Pipe-26 9.86 8.76 735.37 735.14 1.12 1.40 10.61 8.93 735.42 735.2 1.17 1.46 Pipe-27 10.46 7.36 734.9 734.57 1.16 1.00 11.33 7.51 734.95 734.61 1.21 1.04
Route 901C (Service Road) Node Summary
Q10 Q50
Label
Q10 Flow (Total
In) (cfs)
Q10 Flow (Total Out) (cfs)
Elevation (Ground)
(ft)
Elevation (Invert)
(ft)
EGL
In (ft
EGL
Out (ft)
Q50 Flow (Total
In) (cfs)
Q50 Flow (Total Out) (cfs)
EGL
In (ft
EGL
Out (ft)
CB-01 9.86 9.86 739.04 734.25 736.2 735.83 10.62 10.61 739.04 734.25
CB-02 10.47 10.46 737.95 733.74 735.41 735.38 11.35 11.33 737.95 733.74
HW-901C-2 (N/A) 10.45 736.57 (N/A) 734.57 734.57 (N/A) 11.32 736.57 (N/A)
Route 901C (Service Road) Catch Basin and Inlet Summary
Q10 Q50
Label Flow
(Captured) (cfs)
Flow (Total
Bypassed) (cfs)
Bypass Target
Capture Efficiency
(Calculated)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
Flow (Captured)
(cfs)
Flow (Total
Bypassed) (cfs)
Bypass Target
Capture Efficiency
(Calculated)
Depth (Gutter)
(in)
Spread / Top Width
(ft)
CB-01 3.04 1.17 (N/A) 72.1 3.00 6.15 3.4 1.66 (N/A) 70 3.16 6.84
CB-02 0.61 0 (N/A) 100 1.50 1.51 0.74 0 (N/A) 100 1.612 1.61
FFF01C-FFOROORRRlow
ORTotal
ORIn)
ORfs) RRRR(TotRRROR
FOFO-01
FOO86 OFOFOFOCB-02 FOO10FOFOFFF
NINININ
FORMATIO
N
ATI
ATATTI
MMMAT
MATAT
MRRMMpth
RMut
RM(ft)
RMAMAQ50MFlow M(cf
AMA
RRMA
ORORORM
ORM0.76 RMMRM
ORRM
OROR1.12
OROR1.4
OROR
FFOR
FOR1 OROR0OR
FFFOORO
IN
FNFR
IN
FNF
INININININN
PPPURUURPO
RPOSES SSSS
11.33
SSSS
SES
SESC (Service Roa
SENode Summary ES
OSE
OSESE
RRPOPOon
POGround)
POft) POSOSevaO(InvOSOS
RPOS
RR86 RPRP9.04RPRURUR10.46 RR737RRUURUR0.45 RRURUUUR
PUPUPPUP
ONLYLYYLYYNLYNLYLY
ONNcity city
ON(ft/s)
ONLNLHGL NIn (ft
LLNLY
ONL
OOONONONN7ONOONOOO8.93 OOOOOO
Geotech, Env, HD Eng, TS Engineer, Bridge Engineer
Route 910C (Service Road) Inlet Summary
Label Grate width (ft)
Grate length (ft) Type of inlet On-grade vs Sag
Clogging CB-01 2 3 6A(limited) On-grade 0% CB-02 2 3 6A(limited) On-grade 0%
Route 910C (Service Road) Pipe Summary
Label Diameter (in)
Length (ft)
Invert Start (ft)
Invert Stop (ft)
Material
Pipe-25b 24 15 735.10 734.90 RCP Pipe-26 24 27 734.25 733.74 RCP Pipe-27* 24 15 733.74 733.57 RCP
Note: *Grading will be needed at outfall.
Trail#4 Storm Drain System (Alternative)
Trail #4 Link Summary
Q10 Q50
Label Q10 Flow (cfs)
Velocity (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Q50 Flow (cfs)
Velocity (ft/s)
HGL
In (ft)
HGL
Out (ft)
Depth In (ft)
Depth Out (ft)
Pipe-30 1.01 3.69 736.82 736.2 0.39 0.34 1.15 3.83 736.85 736.22 0.42 0.37
Trail#4 Node Summary
Q10 Q50
Label
Q10 Flow (Total
In) (cfs)
Q10 Flow (Total Out) (cfs)
Elevation (Ground)
(ft)
Elevation (Invert)
(ft)
EGL
In (ft
EGL
Out (ft)
Q50 Flow (Total
In) (cfs)
Q50 Flow (Total Out) (cfs)
EGL
In (ft
EGL
Out (ft)
INLT-05b 1.01 1.01 738.83 736.43* 737.04 736.97 1.15 1.15 737.08 737.01
HW-Trail04 (N/A) 1 738.11 (N/A) 736.2 736.2 (N/A) 1.13 736.22 736.22 Note: *Cash Basin elevation invert should match the pipe invert
RROORRocit
OR(ft/s) RRR In (fROR
FOFO0
FOR
FOR9 ROR
FOFOFOR
FFFF
NFORMATIO
N
ONONONNNN
TIOOTIOtop
TIO(ftTIO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .