This document contains questions and answers regarding a forthcoming solicitation for a Rough Terrain Container Handler Service Life Extension Program. The United States Marine Corps intends to issue a request for proposal in the next two months for restoring 117 Rough Terrain Container Handlers to like-new condition and implementing improvements. The anticipated contract type is firm-fixed price indefinite delivery/indefinite quantity with a ten-year ordering period and optional additional five years. The questions and answers provide clarification on the scope of work, configuration management, training requirements, and certification pertaining to modifications under the service life extension rather than the entire system. Pricing preference for small businesses will be included in the amended solicitation.

Industry Question and Answers (Attachment 9)

View the file

Other files for this federal contract opportunity

Other files attached to Rough Terrain Container Handler, newest first.
File Type Posted
Attachment_2_Performance_Specification_20190619.pdf PDF
Amendment0004.docx DOCX document
Attachment_9_RFP_Questions_June_19.docx DOCX document
Attachment_2_Performance_Specification.doc DOC document
Amendment_0003.docx DOCX document
Attachment_6_Section_L.docx DOCX document
Amendment_0002.docx DOCX document
Exhibit_G_RTCH_SLEP_Spare_Parts_Kit(5.29.2019).xlsx XLSX spreadsheet
Exhibit_A-F_and_T_CDRLs_(5.29.2019).docx DOCX document
Amendment0001_with_Q&A.docx DOCX document
Attachment_1_Statement_of_Work_for_Rough_Terrain_Container_Handler_5302019.docx DOCX document
Exhibit_G_RTCH_SLEP_Spare_Parts_Kit_(DSP).xlsx XLSX spreadsheet
RFP.docx DOCX document
Attachment_3_Section_C_RTCH_SLEP_Government_Furnished_Property_List.pdf PDF
Attachment_5__Past_Performance_Questionnaire.docx DOCX document
Attachment_7_Section_M.docx DOCX document
Attachment_4_Section_D_Packaging_and_marking.docx DOCX document
Attachment_6_Section_L.docx DOCX document
Exhibit_A-F_and_T_CDRLs_(DSP).docx DOCX document
Attachment_2_Performance_Specefication_20190503(JWP.DS{).doc DOC document
Attachment_1_Statement_of_Work_20190503(JWP,DSP).docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9. RTCH QUESTIONS AND ANSWERS

Dated 6/4/2019

Question number
Document / Section
Paragraph
Question / Issue / Concern
Government Response
1.
Solicitation

Section D Packaging and Marking

Requirements of DAFARS 252.211-7003 Item Unique Identification and Valuation are included in the SOW and CLINS
Will the USMC clarify the current items that are labeled? How many items are separately labeled on the current RTCH? What data from those existing labels is contained in the IUID Registry?
Awardee shall request access to the IUID registry. IUIDs shall be updated for system updates or changes that occur as part of the RTCH SLEP.
2.
Solicitation
CLINS 0001, 0006, 0101, 0201 and sequence
For the items that are currently labeled, is there a mother daughter relationship between parts and assemblies or between a serialized RTCH that must be maintained?

Can the contractor relabel each required part with a new identifier as part of the SLEP Yes.

New required parts may be updated with a new identifier as part of the SLEP.

3.
SOW
SOW 3.1
We will track all property as GFE while performing SLEP, when the RTCH is fielded after SLEP will the parts have to be serialized as they were, or can we create new serialization?
Pre Existing Serial Numbers shall remain the same. New parts can be serialized by awardee.
4.
Solicitation

PSPEC

ALL, PSPEC 3.1 operational Requirements
Can the USMC provide the PSPEC dated September 2008, the ORD dated January 1998, and the O&O dated September 2003
Yes.
5.
Solicitation

PSPEC

ALL
Will the USMC certify to bidders that the RTCH had passed all requirements upon initial fielding which are now contained in the PSPEC, PSPEC dated September 2008, the ORD dated January 1998, and the O&O dated September 2003
Based on the data provided in the original contract Test Report, the legacy RTCH was authorized for production and fielding. The Configuration was accepted to meet the requirements of the original Purchase Description. We do not anticipate the modifications required from the scope of work should affect the legacy system. If a modification does affect a legacy system, reverification will be required for that system.
6.
Solicitation

PSPEC

General
The contractor will be responsible to not degrade the original performance – Will the USMC provide a copy of all Test Reports for the RTCH from the original FAT?
No. Test reports will not be provided.
7.
PSPEC

General

General
The legacy Cummins engine is Tier3 and will be maintained and our assumption is that the USMC will continue to require the ability to run JP-8. Does the USMC assure the contractor that they have and will continue to have the applicable emissions waivers to allow the contractor to supply new tier3 engines as/if needed?
Yes. The USMC will assure the contractor will continue to have the applicable emissions waivers to allow the contractor to supply new Tier 3 engines, as needed
8.
SOW
Section 5
Will the USMC provide dedicated hardware as GFE for ILS product development?
Yes
9.
Solicitation

SOW

CLINS and SOW Section 7 Training Materials and Training
Will the contractor be responsible for developing the training materials for the entire RTCH, or only those items modified or changed as part of the SLEP program?
Yes. Training will be developed for the entire RTCH.
10.
Solicitation

PSPEC

SOW

SOW 3.9 Configuration Management
Will the USMC clarify that these configuration management practices apply to the modifications made to the RTCH as part of the modernization and SLEP and NOT to the whole RTCH?
Yes, this applies to modifications made to the RTCH as part of the modernization and SLEP.
11.
Solicitation

PSPEC

SOW

SOW 6.1.4 Provisioning Technical Documentation
Will the USMC clarify that the Provisioning Technical Documentation will apply to the modifications made to the RTCH and NOT to the whole RTCH?
See 10.
12.
Solicitation

SOW

SOW 3.1.2
Will the USMC provide the list of current BII and SSRI for the RTCH?
Yes. Awardee shall be provided a list of current BII and SSRI for the RTCH.
13.
Solicitation

SOW

SOW 3.10.1 Verification and Contractor Certification
The paragraph requires Contractor Certification in compliance to Section 4 Verification and is to verify that the RTCH meets the performance requirements. Will the USMC clarify that this verification applies only to items impacted or modified by the modernization and SLEP and not to the whole RTCH?
See # 10
14.
PSPEC
PSPEC 3.2.3
This section references engine and transmission control that automatically engages the Park brake when shifting into Park. Can the USMC clarify what they are seeking to accomplish as the legacy RTCH has only forward, reverse, and neutral and cannot be shifted into Park
PSPEC 3.2.3 updated.
15.
PSPEC
PSPEC 3.2.3
This section also is seeking to prevent accidental reverse shift while in forward motion. The legacy RTCH already had safeguards against this (see ATPD 2215A dated 2008 section 3.3.29) Can the USMC clarify what experiences are driving this requirement and what the desired outcome is?

Maintain current capability.

16.
General
General
Will any small business receive a price preference in this RFP selection process?
RFP will be amended to include FAR 52.219-4
17.
General
General
If any small business will receive a pricing preference, please indicate which subcategory of small business will get the preference and what % will be applied
See the answer to question 16.