Att_7_-_Sample_FACAR_5Y_8D_Form.pdf

PDF 184 KB Posted

Attached to
Plate Carrier Generation III (PC Gen III)
Solicitation number
M67854-18-R-1309
Issued by

About this file

Attachment 7 - Failure Analysis Corrective Action Report (FACAR) Sample

View the file

Other files

File Type Posted
180315_M67854-18-R-1309_QA_III_(Am_4).pdf PDF
180313_PC_Gen_III_JA_Carrier_(R)(D).pdf PDF
M67854-18-R-1309_Amendment_0004.pdf PDF
M67854-18-R-1309_Amendment_0003.pdf PDF
180306_M67854-18-R-1309_QA_II.pdf PDF
M67854-18-R-1309_Amendment_0002.pdf PDF
180212_M67854-18-R-1309_QA_I.pdf PDF
Amendment_0001_M67854-18-R-1309.pdf PDF
Att_8_-_PC_Gen_III_PPQ.doc DOC document
Att_4_-_PC_Gen_III_CM_Plan_Annex_V1_Final_01312018.pdf PDF
Ex_B_-_PC_Gen_III_Individual_Repair_Kit.pdf PDF
M67854-18-R-1309_PC_Gen_III_(Carrier)_Solicitation.pdf PDF
Att_6_-_PC_Gen_III_Carrier_FAT_Plan_Final_01312018.pdf PDF
Ex_C_-_PC_Gen_III_Organizational_Repair_Kit.pdf PDF
Att_1_-_Schedule_of_GFP_(PC_Gen_III).pdf PDF
Att_5_-_PC_Gen_III_Carrier_LAT_Plan_Final_01312018.pdf PDF
Att_9_-_Soft_Armor_Cummerbund_Carrier_Description.pdf PDF
Ex_A_-_PC_Gen_III_CDRLS_Final_180126_(Carrier).pdf PDF
Att_3_-_PC_Gen_III_Drawings.pdf PDF
180103_PC_Gen_III_Pre_Solicitation_Questions_II.docx DOCX document
171221_PC_Gen_III_Industry_Day_Questions.docx DOCX document
171214_PC_Gen_III_Components_v8.xlsx XLSX spreadsheet
171128_PC_Gen_III_Industry_Brief_29_Nov_2017.pptx PPTX presentation
171120_Amendment_0001_PC_Gen_III_Pre_Solicitation_Notice.pdf PDF
PC_Gen_III_NB_Past_Performance_Questionnaire.doc DOC document
171113_PC_Gen_III_Pre_Solicitation_Notice.pdf PDF
171109_PC_Gen_III_SOW.docx DOCX document
PC_GEN_III_COMPLETE_SYSTEM_SOFT_ARMOR_CLIN_STRUCTURE.DOCX DOCX document
PC_Gen_III_DTL_SPEC_PreSolicitation_Draft_Nov2017.docx DOCX document
PC_GEN_III_COMPLETE_SYSTEM_CLIN_STRUCTURE.docx DOCX document
171114_Section_L_and_M_Draft_Soft_Armor_-_Copy.docx DOCX document
171108_PC_Gen_III_RFP_L_and_M.docx DOCX document
171110_PC_Gen_III_Soft_Armor_SOW_Draft.docx DOCX document
PC_Gen_III_Soft_Armor_Past_Performance_Questionnaire.doc DOC document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8D - Corrective Actions Report

Status: Open Closed Recurrent failure? Yes: NO:

Supplier: Contact: Phone number:

Address: Fax:

Affected Part Number: Part Name :

CAR number: CAR Date:

1 Problem Description Specific description of the problem:

How many parts have the problem?

When were the parts found?

Where were the parts found?

How were the parts found?

2 Problem Solution Team

Name Position Phone number E-mail address

3 Containment Actions

At Customer Facility

Action: Date : Responsible : Verification : (Date and result)

Material at Customer facility disposition:

Scrap Vendor return No. RMA:______________

Other (explain):

Material in Transit:

Action: Date : Responsible : Verification : (Date and result)

At Supplier’s facility / Other locations:

Action: Date : Responsible : Verification : (Date and result)

Total number of parts sorted:

Total number of defective parts:

Percentage Defective:

What is the identification mark to signify

Initial Response Date:

Revision Date:

M67854-18-R-1309 Attachment 7 certification?

Other locations :

Action: Date : Responsible : Verification : (Date and result)

Total number of parts sorted:

Total number of defective parts:

Percentage Defective:

What is the identification mark to signify certification?

Containment Actions Clean Date:

4 Root Cause

5 Why’s Analysis

Why did the failure happen?

1st Cause 2nd Cause 3rd Cause

1. Why?

2. Why?

3. Why?

4. Why?

5. Why?

Why was the failure not detected?

1st Cause 2nd Cause 3rd Cause

1. Why?

2. Why?

3. Why?

4. Why?

5. Why?

Root cause verification Explain in detail what tests where taken to assure that the root cause was found:

5 Corrective Actions / Verification of the Actions

Applicable to occurrence of failure Actions Date Responsible

How was it proven that the actions taken eliminate the failure? Date Responsible

Applicable to non detection of failure Actions Date Responsible

How was it proven that the actions taken detect the failure? Date Responsible

Poke-Yokes implemented because of this failure

Yes (description of the operation) No (Why not?)

6 Standardization and Control Document Date What changed?

FMEA

Control Plan

Flow Process diagram

Visual Aid

Operation Standards

Preventive Maintenance Plans

Others

7 Verification of Effectiveness of Preventive Actions

Can the verified effective improvements from this corrective action be implemented to similar parts or processes?

Action Date Responsible i

Actions or Controls for others causes that can produce the same failure Action Date Responsible i

Describe the Methods used Date Status of Corrective Actions Produced Quantity Defects

Date Actions for failure detection Shipped Quantity Defects

8 Congratulate Team Date Team Member Team Member Congratulated / Team Member Comments file:///C:/Users/kathryn.hurd/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/Local%20Settings/Temporary%20Internet%20Files/Content.Outlook/bgesford.GRWTECHNOLOGIES/daten/users/MX_vee4tl/explorer_cache/OLK4B/8D's%20requisitos.doc file:///C:/Users/kathryn.hurd/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/Local%20Settings/Temporary%20Internet%20Files/Content.Outlook/bgesford.GRWTECHNOLOGIES/daten/users/MX_vee4tl/explorer_cache/OLK4B/8D's%20requisitos.doc