Text version
1. I understand that the patterns/drawings require a proprietary software program to open and view. Is there another file available for non Gerber Inc customers or is it a requirement that the contract is only bid on by Gerber Inc customers?
a. At this time, PC Gen III patterns are only available in Accumark.
2. We were hoping to receive drawings to show us how to connect the pattern pieces and construct the plate carrier components as listed in paragraph 1.2.2 of specification DTL-14007A0000. However, we didn't see any. Do you have these drawings? Can you send them to us? If not, can you refer us to someone who can help us?
a. The Government will provide the drawings at the release of the final solicitation for reference only. Patterns are necessary for production as the Detail Specification links to the patterns and not the drawings. All verifications are done from the patterns.
3. Will the USMC consider including additional language in the Plate Carrier RFP to ensure offerors understand the requirements and costs of integrating Soft Armor as GFE? Storage Cost, Manufacturing Logistics, Adequate Product Liability Insurance, Loss and Remake responsibility. Are carrier manufacturers responsible for repairing damaged soft armor inserts? Access to Sonic Welding Equipment.
a. Other than the applicable clauses in the contract, there are no specific instructions on storing and safeguarding the Government property in the contractor’s possession. The carrier manufacturers will not be responsible for repairing damaged soft armor inserts.
4. The Industry Brief materials at p. 5 uses the term "Total Small Business Set Asides." Could you clarify for us whether this phrase is intended to mean all the proposed contractors in a given bid must be small businesses?
a. A total small business set aside indicates that the offeror proposing on the solicitation must be a small business. This doesn't mean, however, that a large business cannot be a subcontractor provided that the small business does more than 50% of the manufacturing work.