AIDATS_FINAL_RFP_M67854-14-R-6002_Amendment_0004_14_May_14.doc
DOC document 51 KB Posted
- Attached to
- Abrams Integrated Display and Targeting System (AIDATS) Federal contract opportunity
- Solicitation number
- M67854-14-R-6002
- Issued by
- United States Marine Corps
About this file
AIDATS FINAL RFP Amendment 0004
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS, EXHIBITS
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 1 |
| AIDATS Performance Specification |
| 36 |
| 22 Apr 2014 |
| Attachment 2 |
| AIDATS CDRLs List: |
· A001 - Critical Design Review Package
· A002 - Safety Assessment Report - EMD
· A003 - Hazardous Materials Management Program Plan
· A004 - Qualification Test Plan
· A005 - Qualification Test Procedures
· A006 - Qualification Test/Inspection Report
· A007 - Qualification Test Failure Summary and Analysis Preliminary and Final Report
· A008 - Meeting Minutes
· A009 - Interface Control Document
· A00A - Commercial Drawings and Associated Lists
· A00B - Performance Specification Documents
· A00C - Software Product Specification
· B001 - Safety Assessment Report - LRIP/FRP
· B002 - Acceptance Test Plan
· B003 - First Article Test Plan
· B004 - First Article Test Procedure
· B005 - First Article Test/Inspection Report
· B006 - FAT Failure Summary and Analysis Preliminary and Final Report
· B007 - Supportability Demonstration Test Plan
· B008 - Supportability Demonstration Final Test/ Inspection Report
· B009 - Logistics Management Information Data Products and Summaries
· B00A - Operator and Maintainer Technical Manuals Page Changes
· B00B - Physical Configuration Audit Plan
· B00C - Physical Configuration Audit Report
· B00D - Interface Control Document
· B00E - Commercial Drawings and Associated Lists
· B00F - Training Conduct Support Document
· B00G - Shipping Storage Container Test Procedure
· B00H - Shipping Storage Container Test Report
· B00J - Technical Data Package
· B00K - Meeting Minutes
· B00L - Equipment Installation Instructions
· B00M - Manufacturing Plan
· C001 - Configuration Status Accounting Information
· C002 - Safety Assessment Report - FD
· C003 - Engineering Change Proposal
· C004 - Request for Deviation
| 68 |
| 25 Mar 2014 |
| Attachment 3 |
| Equilibrator Bracket Mount 19200_13052895 |
| 1 |
| 19 Mar 2014 |
| Attachment 4 |
| NVESD Test Procedure for Advanced Signal Processing ASP 100 |
| 6 |
| 20 Mar 2014 |
| Attachment 5 |
| ATPD-2404 Environmental Conditions for the HBCT Tracked Vehicle Systems |
| 45 |
| 21 Oct 2011 |
| Attachment 6 |
| Test Operations Procedure 6-3-040 |
| 67 |
| 20 Jul 2009 |
| Attachment 7 |
| Section B – Description of Supplies/Services |
| 2 |
| 22 Apr 2014 |
Attachment 8
Attachment 9 Past Performance Questionnaire
Final RFP Questions & Answers
18 Mar 2014
14 May 2014
(End of Summary of Changes)
File details come from the government source that posted it. Updated .