AIDATS_CDRLs_16_Dec_2013.doc
DOC document 2 MB Posted
- Attached to
- Abrams Integrated Display and Targeting System (AIDATS) Federal contract opportunity
- Solicitation number
- M67854-14-R-6002
- Issued by
- United States Marine Corps
About this file
AIDATS CDRLs
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _«TDP» IF = "True" "X" " "
_ TM _ «TM» IF = "True" "X" " "
_ OTHER __«OTHER» IF = "True" "X" " "
X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
M67854-14-R-6002
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Critical Design Review Package
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81757A
DI-SESS-81757A
5. CONTRACT REFERENCE
Sow Para 3.2.5
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
DD
9. DIST
STATEMENT
E
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
10 days prior to CDR
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: Paragraph 2.7, Sections 8 and 9 apply.
Block 9: Distribution Statement E: Distribution authorized to Department of Defense Agencies. Other requests for this document shall be referred to addressee below.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
Quantico, VA 22134 MarCor SysCom
(PdM Tanks)
15. TOTAL ---------(
G. PREPARED BY
Michael Kreiner
| H. DATE |
| I. APPROVED BY |
LtCol John E. Smith, USMC
J. DATE
| DD Form 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page 1 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _«TDP» IF = "True" "X" " "
_ TM _ «TM» IF = "True" "X" " "
_ OTHER __«OTHER» IF = "True" "X" " "
X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Safety Assessment Report
3. SUBTITLE
EMD phase SAR
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102B
5. CONTRACT REFERENCE
Sow Para 3.3.1.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
270DAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MarCor SysCom
(PdM Tanks)
15. TOTAL ---------(
G. PREPARED BY
| H. DATE |
| I. APPROVED BY |
LtCol John E. Smith, USMC
J. DATE
| DD Form 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page 2 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Hazardous Materials Management Program Plan
3. SUBTITLE
DI-MGMT-81398B
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81398B
DI-MGMT-81398B
5. CONTRACT REFERENCE
SOW para 3.3.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ONE
12. DATE OF 1ST SUBMISSION
120DAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MarCor SysCom
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
LtCol John E. Smith, USMC
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 3 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _«TDP» IF = "True" "X" " "
_ TM _ «TM» IF = "True" "X" " "
_ OTHER __«OTHER» IF = "True" "X" " "
X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Qualification Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) DI-NDTI-80566A
5. CONTRACT REFERENCE
Sow Para 3.7.1
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
180DAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MarCor SysCom
(PdM Tanks)
15. TOTAL ---------(
G. PREPARED BY
| H. DATE |
| I. APPROVED BY |
LtCol John E. Smith, USMC
J. DATE
| DD Form 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page 4 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Qualification Test Procedures
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW para 3.7.1
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
240DAC
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 5 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Qualification Test/Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SOW para 3.7.1.
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
30 days after Test Completion
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 6 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Qualification Test Failure Summary and Analysis Preliminary and Final Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-RELI-80255
5. CONTRACT REFERENCE
SOW para 3.7.1
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As Required
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Preliminary failure report shall be delivered 10 days after failure occurance. Final failure report shall be delivered 30 days after failure occurs. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 7 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Meeting Minutes
3. SUBTITLE
EMD Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81505
5. CONTRACT REFERENCE
SOW para 3.2.1
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As Req
12. DATE OF 1ST SUBMISSION
3 days after meeting
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 3 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 1 calendar day for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 8 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Interface Control Document
3. SUBTITLE
CDR ICD
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81248A
5. CONTRACT REFERENCE
SOW para 3.2.5
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
5 days after CDR
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 10 calendar days to review & comment.
Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 9 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A00A
2. TITLE OF DATA ITEM
Commercial Drawings and Associated Lists
3. SUBTITLE
CDR Drawings
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81003E
5. CONTRACT REFERENCE
SOW para 3.2.5
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 10 calendar days to review & comment.
Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 10 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A00B
2. TITLE OF DATA ITEM
Performance Specification Documents
3. SUBTITLE
System and Sub-System Specifications
4. AUTHORITY (Data Acquisition Document No.)
DI-SDMP-81465A
DI-SDMP-81465A
5. CONTRACT REFERENCE
SOW para 3.2.5
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 4: Paragraph 2.a applies.
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 10 calendar days to review & comment.
Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 11 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A00C
2. TITLE OF DATA ITEM
Software Product Specification
3. SUBTITLE
CDR Display Software Specification
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A
5. CONTRACT REFERENCE
SOW para 3.2.5
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Government requires 10 calendar days to review & comment.
Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 12 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Safety Assessment Report
3. SUBTITLE
Full Rate Production SAR
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102B
5. CONTRACT REFERENCE
SOW para 3.3.1.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: SAR shall be delivered 90 days after LRIP is exercised. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 13 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Acceptance Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW para 3.7.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: ATP shall be delivered 120 days after LRIP is exercised. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 14 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
First Article Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80566A
5. CONTRACT REFERENCE
SOW para 3.7.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: FAT Test Plan shall be delivered 120 days after LRIP is exercised. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 15 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
First Article Test Procedure
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW para 3.7.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: FAT Test Procedure shall be delivered 60 days after FAT Test Plan is appproved. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 16 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
First Article Test/Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
SOW para 3.7.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: FAT Test Report shall be delivered 30 days after FAT Test is completed. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 17 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B006
2. TITLE OF DATA ITEM
FAT Failure Summary and Analysis Preliminary and Final Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW para 3.7.2
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As Required
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Preliminary failure report shall be delivered 10 days after failure occurance. Final failure report shall be delivered 30 days after failure occurs. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MCSC:
(PdM TANKS)
| 15. TOTAL ---------( |
| 0 |
| 2 |
| 0 |
G. PREPARED BY
Michael Kreiner
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page 18 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _«TDP» IF = "True" "X" " "
_ TM _ __ OTHER __X_
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B007
2. TITLE OF DATA ITEM
Supportability Demonstration Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN 80858B
5. CONTRACT REFERENCE
SOW para 3.8.2.1
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Supportability Demonstration Test Plan shall be delivered 120 days after execution of the LRIP option. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MarCor SysCom
(PdM Tanks)
| 15. TOTAL ---------( |
| 0 |
| 3 |
| 0 |
G. PREPARED BY
Michael Kreiner
| H. DATE |
| I. APPROVED BY |
LtCol John E. Smith, USMC
J. DATE
| DD Form 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page 19 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _«TDP» IF = "True" "X" " "
_ TM _ «TM» IF = "True" "X" " "
_ OTHER __«OTHER» IF = "True" "X" " "
X__
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B008
2. TITLE OF DATA ITEM
Supportability Demonstration Final Test/Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
SOW paragraph 3.8.2.1 SOW Para 3.4.4
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
One
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: FinalTest report shall be delivered 30 days after completion of the Supportability Demonstration. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.
Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.
Addressee:
Commander
Marine Corps Systems Command
PdM Tanks Systems (Michael Kreiner)
2200 Lester Street
MarCor SysCom
(PdM Tanks)
15. TOTAL ---------(
G. PREPARED BY
| H. DATE |
| I. APPROVED BY |
LtCol John E. Smith, USMC
J. DATE
| DD Form 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page 20 of 36 Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
TDP _«TDP» IF = "True" "X" " "
_ TM _ _«TM» IF = "True" "X" " "
_ OTHER __X«OTHER» IF = "True" "X" " "
D. SYSTEM/ITEM
AIDATS
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B009
2. TITLE OF DATA ITEM
Logistics Management Information (LMI) Data Products and Summaries
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ALSS-81530
5. CONTRACT REFERENCE
SOW PARAGRAPH 3.8.4.3
6. REQUIRING OFFICE
MARCORSYSCOM (PdM TANKS)
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
As Required
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.
Block 12: Initial LMI data shall be delivered 120 days after exercising the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .