AIDATS_CDRLs_16_Dec_2013.doc

DOC document 2 MB Posted

Attached to
Abrams Integrated Display and Targeting System (AIDATS) Federal contract opportunity
Solicitation number
M67854-14-R-6002
Issued by
United States Marine Corps

About this file

AIDATS CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Abrams Integrated Display and Targeting System (AIDATS), newest first.
File Type Posted
AIDATS_FINAL_RFP_M67854-14-R-6002_Amendment_0004_14_May_14.doc DOC document
Attachment_9_-_M67854-14-R-6002_AIDATS_FINAL_RFP_Q As_14_May_14.xlsx XLSX spreadsheet
AIDATS_FINAL_RFP_M67854-14-R-6002_Amendment_0003_30_Apr_14.doc DOC document
Attachment_9_-_M67854-14-R-6002_AIDATS_FINAL_RFP_Q As_30_Apr_14.PDF PDF
Attachment_1_-_AIDATS_System_Performance_Spec_22_Apr_14_ECP_1.docx DOCX document
Attachment_7_-_AIDATS_Section_B_-_Description_of_Supplies_Services_-_22_Apr_14.xlsx XLSX spreadsheet
AIDATS_FINAL_RFP_M67854-14-R-6002_Amendment_0002_22_Apr_14.doc DOC document
Attachment_1_-_AIDATS_Performance_Specification_dtd_13_Mar_2014.docx DOCX document
AIDATS_FINAL_RFP_M67854-14-R-6002_Amendment_0001_7_Apr_14.doc DOC document
Attachment_7_-_AIDATS_Section_B_-_Description_of_Supplies_Services_dtd_4_Apr_14.xlsx XLSX spreadsheet
AIDATS_FINAL_RFP_31_MAR_14.doc DOC document
Attachment_5_-_ATPD-2404_-_Environmental_Conditions_for_the_HBCT_Tracked_Vehicle_Systems_dtd_21_Oct_2011.pdf PDF
Attachment_3_-_Equilibrator_Bracket_19200_13052895_dtd_19_Mar_2014.pdf PDF
Attachment_7_-_AIDATS_Section_B_-_Description_of_Supplies_Services_-_19_Mar_2014.xls XLS spreadsheet
Attachment_2_-_AIDATS_CDRLs_List.PDF PDF
Attachment_6_-_TOP_6_3_040_dtd_20_Jul_2009.pdf PDF
Attachment_4_-_NVESD_ASP_100_dtd_20_Mar_2014.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire_-_18_Mar_2014.docx DOCX document
Attachment_1_-_AIDATS_Performance_Specification_dtd_13_Mar_2014.pdf PDF
M67854-14-R-6002_AIDATS_DRAFT_RFP_QAs_14_Mar_14.xlsx XLSX spreadsheet
DRAFT_RFP_6_Jan_14.doc DOC document
DRAFT_RFP_Cover_Letter.pdf PDF
M1A1_AIDATS_Solicitation_System_Performance_Specification_ver1.0.0_20131125.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _«TDP» IF = "True" "X" " "

_ TM _ «TM» IF = "True" "X" " "

_ OTHER __«OTHER» IF = "True" "X" " "

X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

M67854-14-R-6002

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Critical Design Review Package

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

DI-SESS-81757A

5. CONTRACT REFERENCE

Sow Para 3.2.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

DD

9. DIST

STATEMENT

E

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

10 days prior to CDR

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

Block 4: Paragraph 2.7, Sections 8 and 9 apply.

Block 9: Distribution Statement E: Distribution authorized to Department of Defense Agencies. Other requests for this document shall be referred to addressee below.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

Quantico, VA 22134 MarCor SysCom

(PdM Tanks)

15. TOTAL ---------(

G. PREPARED BY

Michael Kreiner

H. DATE
I. APPROVED BY

LtCol John E. Smith, USMC

J. DATE

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 1 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _«TDP» IF = "True" "X" " "

_ TM _ «TM» IF = "True" "X" " "

_ OTHER __«OTHER» IF = "True" "X" " "

X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Safety Assessment Report

3. SUBTITLE

EMD phase SAR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102B

5. CONTRACT REFERENCE

Sow Para 3.3.1.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

270DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE
13. DATE OF SUBSEQUENT
Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MarCor SysCom

(PdM Tanks)

15. TOTAL ---------(

G. PREPARED BY

H. DATE
I. APPROVED BY

LtCol John E. Smith, USMC

J. DATE

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 2 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Hazardous Materials Management Program Plan

3. SUBTITLE

DI-MGMT-81398B

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81398B

DI-MGMT-81398B

5. CONTRACT REFERENCE

SOW para 3.3.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

120DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MarCor SysCom

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

LtCol John E. Smith, USMC

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 3 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _«TDP» IF = "True" "X" " "

_ TM _ «TM» IF = "True" "X" " "

_ OTHER __«OTHER» IF = "True" "X" " "

X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Qualification Test Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) DI-NDTI-80566A

5. CONTRACT REFERENCE

Sow Para 3.7.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

180DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MarCor SysCom

(PdM Tanks)

15. TOTAL ---------(

G. PREPARED BY

H. DATE
I. APPROVED BY

LtCol John E. Smith, USMC

J. DATE

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 4 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Qualification Test Procedures

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)DI-NDTI-80603A

5. CONTRACT REFERENCE

SOW para 3.7.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

240DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 5 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Qualification Test/Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

SOW para 3.7.1.

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

30 days after Test Completion

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 6 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Qualification Test Failure Summary and Analysis Preliminary and Final Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-RELI-80255

5. CONTRACT REFERENCE

SOW para 3.7.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

As Required

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Preliminary failure report shall be delivered 10 days after failure occurance. Final failure report shall be delivered 30 days after failure occurs. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 7 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Meeting Minutes

3. SUBTITLE

EMD Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81505

5. CONTRACT REFERENCE

SOW para 3.2.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

As Req

12. DATE OF 1ST SUBMISSION

3 days after meeting

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 3 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 1 calendar day for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 8 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Interface Control Document

3. SUBTITLE

CDR ICD

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81248A

5. CONTRACT REFERENCE

SOW para 3.2.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

5 days after CDR

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 10 calendar days to review & comment.

Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 9 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00A

2. TITLE OF DATA ITEM

Commercial Drawings and Associated Lists

3. SUBTITLE

CDR Drawings

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81003E

5. CONTRACT REFERENCE

SOW para 3.2.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 10 calendar days to review & comment.

Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 10 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00B

2. TITLE OF DATA ITEM

Performance Specification Documents

3. SUBTITLE

System and Sub-System Specifications

4. AUTHORITY (Data Acquisition Document No.)

DI-SDMP-81465A

DI-SDMP-81465A

5. CONTRACT REFERENCE

SOW para 3.2.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 4: Paragraph 2.a applies.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 10 calendar days to review & comment.

Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 11 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00C

2. TITLE OF DATA ITEM

Software Product Specification

3. SUBTITLE

CDR Display Software Specification

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81441A

5. CONTRACT REFERENCE

SOW para 3.2.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Government requires 10 calendar days to review & comment.

Block 13: Contractor shall incorporate comments and resubmit within 5 calendar days after CDR.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 12 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Safety Assessment Report

3. SUBTITLE

Full Rate Production SAR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102B

5. CONTRACT REFERENCE

SOW para 3.3.1.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: SAR shall be delivered 90 days after LRIP is exercised. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 13 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Acceptance Test Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: ATP shall be delivered 120 days after LRIP is exercised. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 14 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

First Article Test Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80566A

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: FAT Test Plan shall be delivered 120 days after LRIP is exercised. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 15 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

First Article Test Procedure

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: FAT Test Procedure shall be delivered 60 days after FAT Test Plan is appproved. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 16 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

First Article Test/Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: FAT Test Report shall be delivered 30 days after FAT Test is completed. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 17 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B006

2. TITLE OF DATA ITEM

FAT Failure Summary and Analysis Preliminary and Final Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

As Required

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Preliminary failure report shall be delivered 10 days after failure occurance. Final failure report shall be delivered 30 days after failure occurs. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MCSC:

(PdM TANKS)

15. TOTAL ---------(
0
2
0

G. PREPARED BY

Michael Kreiner

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 18 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _«TDP» IF = "True" "X" " "

_ TM _ __ OTHER __X_

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B007

2. TITLE OF DATA ITEM

Supportability Demonstration Test Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN 80858B

5. CONTRACT REFERENCE

SOW para 3.8.2.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Supportability Demonstration Test Plan shall be delivered 120 days after execution of the LRIP option. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MarCor SysCom

(PdM Tanks)

15. TOTAL ---------(
0
3
0

G. PREPARED BY

Michael Kreiner

H. DATE
I. APPROVED BY

LtCol John E. Smith, USMC

J. DATE

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 19 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _«TDP» IF = "True" "X" " "

_ TM _ «TM» IF = "True" "X" " "

_ OTHER __«OTHER» IF = "True" "X" " "

X__

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B008

2. TITLE OF DATA ITEM

Supportability Demonstration Final Test/Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW paragraph 3.8.2.1 SOW Para 3.4.4

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

One

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: FinalTest report shall be delivered 30 days after completion of the Supportability Demonstration. Government requires 30 calendar days to review & comment. Contractor shall incorporate comments and resubmit within 21 calendar days for approval.

Block 14: CDRL shall be electronically submitted via email to the points of contact identified in the contract unless the size of the file exceeds 5 Mbytes, then a disk of the file submission is acceptable.

Addressee:

Commander

Marine Corps Systems Command

PdM Tanks Systems (Michael Kreiner)

2200 Lester Street

MarCor SysCom

(PdM Tanks)

15. TOTAL ---------(

G. PREPARED BY

H. DATE
I. APPROVED BY

LtCol John E. Smith, USMC

J. DATE

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 20 of 36 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _«TDP» IF = "True" "X" " "

_ TM _ _«TM» IF = "True" "X" " "

_ OTHER __X«OTHER» IF = "True" "X" " "

D. SYSTEM/ITEM

AIDATS

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B009

2. TITLE OF DATA ITEM

Logistics Management Information (LMI) Data Products and Summaries

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ALSS-81530

5. CONTRACT REFERENCE

SOW PARAGRAPH 3.8.4.3

6. REQUIRING OFFICE

MARCORSYSCOM (PdM TANKS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

As Required

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT

Draft
Final
Reg
Repro

16. REMARKS

Block 9: Distribution Statement C: Distribution authorized to U.S. Government agencies and their contractors. Other requests for this document shall be referred to addressee below.

Block 12: Initial LMI data shall be delivered 120 days after exercising the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .