Attachment_12-_Cross_Reference_Matrix.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Range Training Systems
Solicitation number
M67854-13-R-7803
Issued by

About this file

Attachment 12

View the file

Other files

File Type Posted
Att.10_Solicitation_Questions_Response_Form.docx DOCX document
M67854-13-R-7803_0002.docx DOCX document
Att.10_Solicitation_Questions_Response_Form-31.docx DOCX document
Att.10__Solicitation_Question_Response_Form.docx DOCX document
M67854-13-R-7803_0001.docx DOCX document
Attachment_1-_Revised_RTS_II_SOW.doc DOC document
Att_10_Solicitation_Question_Response_Form-24.docx DOCX document
Attachment_11-_Evaluation_Pricing_Worksheet.xls XLS spreadsheet
CDRL_A00B.docx DOCX document
Attachment_2-__RTS-II_SPEC.doc DOC document
Attachment_1-_Revised_RTS_II_SOW.doc DOC document
CDRL_A00D.docx DOCX document
Att._10_Solicitation__Question_Response_Form-23.docx DOCX document
Att.10_Soliocitation__Questions_Response_Form-22.docx DOCX document
Att.10_Solicitation__Questions_Response_Form-21_.docx DOCX document
CDRL_A00C.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-17.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-04.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-02.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-05.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-10.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-13.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-14.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-12.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-19.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-15.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-06.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-20.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-03.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-16.docx DOCX document
Att_10_-_Solicitation_Question_Response_Form-11.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-09.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-07.docx DOCX document
Attachment_1-_Statement_of_Work.pdf PDF
Attachment_11-_Evaluation_Pricing_Worksheet.xlsx XLSX spreadsheet
Att.10_-_Solicitation_Question_Response_Form.docx DOCX document
Att.9_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_3.pdf PDF
Attachment_4.pdf PDF
Attachment_7.pdf PDF
M67854-13-R-7803.pdf PDF
Att.6-_CDRLs_C001-C004.pdf PDF
Att.3_-CDRLs_A00A-A00F.pdf PDF
Att.10_-_Solicitation_Question_Response_Form.docx DOCX document
Revised_Draft_M67854-13-R-7803.pdf PDF
Att.4_-CDRLs_A001-A009.pdf PDF
Att.12_-Cross_Reference_Matrix_.xlsx XLSX spreadsheet
Att.2_-_RTS-II_SPEC_.pdf PDF
Att.7-_CDRL_E001.pdf PDF
Att.8-_CDRLs_F001-F003.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SOW/RFPSPECTechnical Criteria (SEC L) - RFPSection MPROPOSAL REFERENCE
General Instructions
VOLUME I – Technical
N/AN/AThis section of the technical proposal shall demonstrate the offeror's ability to perform technical requirements.Area I- Technical

A. Technical Proposals will be evaluated to assess the offeror’s ability to successfully perform the prospective contract. The proposal will be evaluated against two Factors: Factor 1, Technical Understanding and Factor 2, Safety. To be eligible for award, a proposal must be found acceptable for each Factor. All information provided will be considered in determining the offeror's ability to perform.

3.2-3.2.1;

3.3.1-3.3.3.2.2;

3.3.3.2.4-3.3.3.10.2;

3.3.3.11-3.3.3.18.1;

3.4.3.2-3.4.3.5;

4.1.2.2-4.6

3-3.5.1;

3.5.1.3-3.5.1.4;

3.5.2 – 3.5.2.1.1;

3.5.2.2 – 3.7.1.1.5;

3.8.1.1 - 5 1. FACTOR 1 – Technical Understanding: TThis section of the technical proposal shall demonstrate the offeror's ability to perform the technical requirements.

a. Discuss your solution to provide contract line items that meet all the requirements of the Statement of Work (SOW) and System Specification (SPEC).

b. Describe the technical aspects of your design. Provide a Requirements Traceability Matrix that identifies each technical solution mapped to the SPEC/SOW requirements

a. Factor 1- Technical Understanding: The proposal will be evaluated to determine the offeror's technical knowledge and ability to perform technical requirements under Statement of Work paragraphs 3.2-3.2.1;3.3.1-3.3.3.2.2;3.3.3.2.4-3.3.3.10.2;3.3.3.11-3.3.3.18.1;3.4.3.2-3.4.3.5;4.1.2.2-4.6 and Specification paragraphs 3-3.5.1;3.5.1.3-3.5.1.4;3.5.2 – 3.5.2.1.1;3.5.2.2 – 3.7.1.1.5; 3.8.1. The Government’s evaluation will include:

i. Whether your Proposed approach, methodology, demonstrates an ability to accomplish the CLIN items requirements identified in the SOW and SPEC.

4-4.1.2.1 3.5.1.1-3.5.1.2;

3.5.1.5;

3.7.2 – 3.7.2.1;

3.7.4-3.7.5; 2. FACTOR 2 – SAFETY: This section of the technical proposal shall include operational policies and procedures that will demonstrate the offeror’s capability in meeting requirements of the SOW.

a. Provide a draft Safety Assessment of 2 systems, the Stationary Infantry Target (SIT RF, Battery Powered, Solar Panel) and Dust Generator. Address your approach to fulfill related safety requirements Safety: The proposal will be evaluated to determine the offeror's technical knowledge and ability to perform technical requirements under Statement of Work paragraphs section 4 - 4.1.2.2 and SPEC sections are 3.5- 3.9 in total. The Government’s evaluation will include:

i. Whether your Proposed Safety Assessment Report methodology demonstrates adequate safety precautions

ii. Assessment of whether your proposed approach fulfills safety requirements robert.platt: robert.platt:

Does this include the evaluation of safety approach, or just SARs?

VOLUME II – Program Management/Logistics
N/AN/AThis section of the proposal shall demonstrate the offeror's ability to perform management/logistics requirements.Area II- Program Management/Logistics

Program Management/Logistics Proposal will be evaluated to assess the offerors ability to successfully perform the prospective contract. The proposal will be evaluated against four Factors: Factor 1, Integrated Master Schedule; Factor 2, Life Cycle Support, Factor 3, Technical Documentation, Factor 4, Quality Assurance Program.

3.1;

3.2.1 – 3.3;

3.4-3.4.3.1;

5.2.4.7-6 N/A 1. FACTOR 1 – Program Management/ IMS- multiple concurrent delivery orders

a. Discuss your planned Integrated Master Schedule for the RTS contract with two delivery orders from receipt of the delivery order through Government Final Inspection to include all milestones identified in the RFP.

a. Factor 1- Integrated Master Schedule (IMS) The proposal will be evaluated to determine the offeror's knowledge and ability to perform the requirements under Statement of Work paragraphs 3.1; 3.2.1 – 3.3;3.4-3.4.3.1 and 5.2.4.7-6. The Government’s evaluations will include:

i. Whether your Proposed IMS properly details milestones, tasks and prerequisite events and indicates resources within the project team for concurrent projects

Typo, should be "IMS" instead of "MS" " " " " " " " " b. Discuss your Program Management plan that outlines an ability to manage and deliver multiple Delivery Orders (DOs) concurrently; include the Work Breakdown structure from the Program Management team down to the installation team. The management plan should provide an overview of daily operations and procedures/policies to be implemented ii. Whether your Proposed management plan outlines your ability to meet the technical requirements, and provides an overview of daily operations and procedures/policies to be implemented robert.platt: robert.platt:

Section L type language, but in Section M

a. Provide a Subcontractor Management Plan that identifies all subcontractors to be utilized and describes their role under the contract. iii. Whether your proposed Subcontract Management Plan properly identifies subcontractors to be utilized and describes their role under the contract.

robert.platt: robert.platt:

Does not trace to section L. Language does not fit section L.

3.3.3.2.3;

3.3.3.10.3;

5 - 5.2.4.6 3.7.3;

3.7.6 – 3.7.6.2.4

2. FACTOR 2 - Life Cycle Support

a. Discuss your life cycle support strategy for the systems under RTS

b. Discuss your strategy to meeting the requirements for spare parts with the CLS contractor.

b. Factor 2- Life Cycle Support The proposal will be evaluated to determine the offeror's knowledge and ability to perform the requirements under Statement of Work paragraphs 3.3.3.2.3; 3.3.3.10.3; 5 - 5.2.4.6 and SPEC paragraphs 3.7.3; 3.7.6 – 3.7.6.2.4

i. Whether your proposed life cycle support strategy demonstrates an ability to accomplish the requirements identified in the SOW and SPEC

All CDRLs N/A 3. FACTOR 3 - Technical Documentation

a. Discuss your Technical Documentation strategy to include format, access and approach to each drawing package submittal.

b. Discuss your New Equipment Training Plan

c. Provide an example of your O&M manual

c. Factor 3- Technical Documentation. The proposal will be evaluated to determine the offeror's knowledge and ability to perform the requirements under Statement of Work paragraphs 3.4, 4.0, and 7.0

i. Whether your proposed TD Format and access process properly addresses the requirements of the solicitation

ii. Whether your proposed drawing package properly addresses the requirements of the solicitation

iii. Whether your proposed New Equipment Training plan meets the requirements identified in the SOW

iv. Whether your proposed O&M Manuals meet the requirements identified in the SOW

3.4.4 N/A 4. FACTOR 4- Quality Assurance Program

a. Discuss your Quality Assurance Program/System, any certifications you may have received, and methods for continuous quality improvement. Describe your Quality Assurance (QA) plan that discusses the QA program and incorporates inspections as part of the overall QA plan

d. Factor 4, Quality Assurance Program The proposal will be evaluated to determine the offeror's knowledge and ability to perform the requirements under Statement of Work paragraphs 3.4.4 and whether

i. Your proposed Quality Assurance Program and methods demonstrates an adequate approach for continuous quality improvement.

VOLUME III – Price Proposal/Administrative
N/AN/Aa) In lieu of completing Section B, Offerors shall submit prices using Attachment 11- Evaluation Pricing Worksheet. The Offeror shall also state the total proposed price in the proposal. The quantities identified in Attachment 11- Evaluation Pricing Worksheet are for EVALUATION PURPOSES ONLY. Offerors who do not submit a completed Attachment 11- Evaluation Pricing Worksheet may be considered deficient and ineligible for award. b) The only items that do not require a price are those that have been so designated by the Government as Not Seperately Priced (NSP), To Be Determined (TBD) or Not To Exceed (NTE). Individual or multiple Delivery Orders may be issued for each CLIN.The price proposal/administrative proposal will be evaluated for total price, reasonableness and materially unbalanced pricing of the basic and option quantities.

(i) Total Price. The price of all Firm Fixed Price (FFP) Contract Line Item Numbers (CLINS) (basic).

Utilizing Attachment 11- Evaluation Pricing Worksheet the Total Evaluated Price will be derived as follows:

- Example - Each CLIN unit price will be multiplied by the CLIN quantity stated in Attachment 11- Evaluation Pricing Worksheet = Total Evaluated CLIN Price.

The Total Evaluated CLIN Prices will then be summed.

N/AN/Ab) To facilitate contract administration, offerors shall submit line/sub-line item unit prices rounded to the nearest whole dollar d) If any line items are not priced, provide a detailed rationale, including but not limited to the specific references within the Technical Volume that support the offeror’s pricing approach (i.e. not pricing out a battery charger where the use of a primary battery is determined to be more cost effective). The contracting officer will determine if the rationale provided is sufficient to allow the offeror’s proposed pricing approach.(ii) Reasonableness. Normally, competition establishes price reasonableness. In limited situations, additional analysis will be required by the Government to determine reasonableness. Offeror's are encouraged to provide any applicable pricing support referred to in section L. If, after receipt of a proposal, the PCO determines that adequate price competition does not exist for the firm, fixed-price efforts and a determination is made that none of the exceptions in FAR 15.403-1(b) apply, the offeror shall be required to provide certified cost and pricing data in accordance with FAR 15.403-4.
N/AN/Ae) No performance based or progress payments shall be offered. Offerors proposing to receive any type of performance based or progress payment will be considered deficient and ineligible for award.

f) No stepladder or incremental pricing shall be proposed. Offerors proposing stepladder or incremental pricing will be considered deficient and ineligible for award.

g) No ordering restrictions, aside from those set forth in 52.216-18 and 52.216-19, shall be proposed. Offerors proposing incremental ordering requirements or other restrictions beyond what is stated in 52.216-18 and 52.216-19 will be considered deficient and ineligible for award.

h) No economic price adjustment shall be proposed. Offerors proposing a variation in price or economic price adjustment will be considered deficient and ineligible for award.

There is no section M factor for stability robert.platt: robert.platt:

Does this include the evaluation of safety approach, or just SARs?

robert.platt: robert.platt:

Typo, should be "IMS" instead of "MS" robert.platt: robert.platt:

Section L type language, but in Section M robert.platt: robert.platt:

Does not trace to section L. Language does not fit section L. N/A N/A i) Small Business Subcontracting Plan; Small Disadvantaged Business (SDB) Utilization. Describe the extent to which the offeror proposes to utilize SDB in the performance of the contract. Where possible describe firms to include NAICS Code qualifications germane to this effort, the type of arrangement to be used, along with the complexity and variety of the work. Indicate the dollar amount of the proposed effort and give its relative impact with respect to total price of the proposal. Detail how the offeror will meet the DoD’s goal of a minimum of 5% small disadvantaged business subcontracting utilization.

(iii) The offeror’s Small Business Subcontracting Plan will be evaluated on a pass/fail basis only. Offerors that include a small disadvantaged business goal of at least 5% will “pass” this area of evaluation.

N/A N/A Offerors must provide the following documents in order to be considered for award:

(a) A completed and signed SF 33.

(b) All applicable representations, certifications, acknowledgements, and statements set forth in Section K and any other section, as applicable.

(c) A brief corporate history.

(d) A corporate organizational (wiring) diagram (identify Demo POC and Negotiations POC).

(e) Defense Contracts Management Agency (DCMA) Quality Assurance Representative (QAR) information.

(f) Defense Contract Audit Agency (DCAA) auditor contact information.

N/A N/A (g) The government will not make multiple awards as a result of this solicitation. Only one contractor will be selected for award. Thus, for purposes of the government's application of the Buy American Act price adjustment evaluation factor, the RFP is a solicitation that evaluates a group of line items and specifies that award can be made only on all line items contained in the solicitation. Accordingly, the government will first determine whether each offeror's offer is a "domestic offer." If the proposed price of domestic end products exceeds 50 percent of the total proposed price for the contract, the government will evaluate the offer as a domestic offer. If all offers received are domestic offers, then there will be no application of a Buy American Act evaluation factor.

If an offer is not a domestic offer, however, then it will be considered a foreign offer. Pursuant to FAR 25.503(c), FAR 25.504-4(b), and DFARS 225.502(c)(iii), the government will apply a 50 percent Buy American Act evaluation factor to the price of all foreign end products of the foreign offer. Thus, if the price of foreign end products comprises 60% of the foreign offer's total proposed price, the government will apply a 50 percent evaluation factor to that 60% of the foreign offer's total proposed price.

N/A N/A

Squad Immersive Training Environment (SITE) Live Enhancements Cross Reference Matrix M67854-13-R-7802

RFP

Reqts

DocumentSectionEvaluation FactorRequirementsProposalMeets Req (y/n)
SOW33. REQUIREMENTS
SOW3.13.1 General
SOW3.1II-1 IMSThe contractor shall ensure compliance with the contract requirements and the timely delivery of products and services identified in Section B of the contract as it pertains to individual Delivery Orders (DOs).
SOW3.1II-1 IMSBased on the scope of work for each DO, the contractor shall deliver supplies identified on the contract line items (CLINs) in Section B as part of a larger RTS II.
SOW3.1II-1 IMSThe contractor shall include delivery and installation costs into each CLIN item.
SOW3.1II-1 IMSInstallation and shipping requirements will be further defined in this SOW.
SOW3.23.2 Installation
SOW3.2I-1 - Technical UnderstandingThe Government’s expectation of installation is one that, upon Government acceptance, is fully ready for commencement of Marine Corps training.
SOW3.2I-1 - Technical UnderstandingThe contractor shall install products identified in Section B on Military Construction (MILCON) ranges, legacy ranges, Military Operations in Urban Terrain (MOUTs), and other training venues as directed in the DOs.
SOW3.2I-1 - Technical UnderstandingThe contractor shall include pricing for associated RTS II design, shipping, installation, testing, labor, materials, and integrated program management in each CLIN.
SOW3.2I-1 - Technical UnderstandingTechnical Data shall be included in the CLIN pricing.
SOW3.2I-1 - Technical UnderstandingFiber optic cabling and Ethernet cabling will be terminated and labeled by others unless, specifically addressed in the DO.
SOW3.2I-1 - Technical UnderstandingThe contractor shall provide and install the required communication equipment to complete the network, to include but not limited to media converters/switches, data surge protection, power supply, etc., at the Range Tower and the Target Enclosures, as well as all CLIN items procured in the DO.
SOW3.2I-1 - Technical UnderstandingAt the completion of MILCON or other Naval Facilities Engineering Command (NAVFAC) managed construction and prior to mobilization, the contractor shall complete a Target Interface Inspection (TII) of the range.
SOW3.2I-1 - Technical UnderstandingAdditionally, a physical inspection of all target enclosures, range tower, cables and connectors shall be conducted to ensure the range is ready for installation of range targets and devices.
SOW3.2.13.2.1 Deliveries
SOW3.2.1II-1 IMSThe contractor is solely responsible for delivering, receiving, accounting, and storing all Targetry, components, devices, and materials that comprise the complete DO to the point of final turnover at Government Final Inspection (GFI).
SOW3.2.2II-1 IMSThe Government will not sign for or store equipment on behalf of the contractor. The contractor shall be present to accept deliveries for items that require installation.
SOW3.2.2II-1 IMSThe contractor shall contact the Government ten (10) working days prior to actual delivery of items or materials to conduct final coordination with the delivery location.
SOW3.33.3 Range Training Systems (RTS) Requirements
SOW3.3II-1 IMSThe contractor shall deliver, install, and test training systems as part of a larger RTS, in accordance with (IAW) the SOW and specification, and the requirements of each DO.
SOW3.3.13.3.1 Live Fire Ground Based Training Systems
SOW3.3.1I-1 - Technical UnderstandingLive Fire Ground based training systems are comprised of a mix of Stationary Infantry Target (SIT), Stationary Armor Target (SAT), Moving Infantry Target (MIT), and Moving Armor Target (MAT) plus associated simulator equipment.
SOW3.3.1I-1 - Technical UnderstandingAll hardware shall be controlled by a Stationary and/or Portable Range Control Station utilizing integrated software.
SOW3.3.1I-1 - Technical UnderstandingThe following targets and effects systems shall be controlled from a single controller utilizing integrated software.
SOW3.3.1.13.3.1.1 Range Control Stations (RCS)
SOW3.3.1.1I-1 - Technical UnderstandingEach RCS shall provide a single, integrated control interface that controls all RCS-controlled devices.
SOW3.3.1.1I-1 - Technical UnderstandingEach RCS shall use Microsoft Windows 7 Professional operating system.
SOW3.3.1.1I-1 - Technical UnderstandingThe contractor shall provide the following RCS variants according to the requirements below and the specification.
SOW3.3.1.1I-1 - Technical UnderstandingAll RCS systems delivered on this contract shall be integrated and capable of controlling target systems and effects devices installed as part of the complete RTS.
SOW3.3.1.1I-1 - Technical UnderstandingThe contractor shall provide the current version of integrated software and firmware to all RCS computers.
SOW3.3.1.1.13.3.1.1.1 RCS (Stationary) – Radio Frequency (RF) Communications with Integrated Software
SOW3.3.1.1.1I-1 - Technical UnderstandingThe contractor shall provide RCS hardware suite, which includes a desktop PC, two (2) monitors, keyboard, mouse, printer, power cords, RF link box, antenna, cabling, and software to control all Targetry and range effects devices via two-way communications IAW the specification.
SOW3.3.1.1.1I-1 - Technical UnderstandingThe RCS shall include a CD and DVD burner, with all software necessary to record to CDs and DVDs.
SOW3.3.1.1.1I-1 - Technical UnderstandingThe contractor shall also provide an Uninterruptible Power Supply (UPS) for the Stationary RCS.
SOW3.3.1.1.23.3.1.1.2 RCS (Portable) - RF Communications with Integrated Software
SOW3.3.1.1.2I-1 - Technical UnderstandingThe contractor shall provide a Portable RCS IAW the specification.
SOW3.3.1.1.2I-1 - Technical UnderstandingThe contractor shall provide a portable ruggedized laptop computer with RF capability to control all targets and effects devices.
SOW3.3.1.1.2I-1 - Technical UnderstandingThe contractor shall provide an additional lithium computer battery and radio battery, chargers, charger cables, and carrying backpack.
SOW3.3.1.1.33.3.1.1.3 RCS (Stationary) - Hard Wired (H/W) LAN Communications with Integrated Software
SOW3.3.1.1.3I-1 - Technical UnderstandingThe contractor shall provide RCS hardware suite, which includes a desktop PC, two (2) monitors, keyboard, mouse, printer, power cords, LAN cabling, and software to control all targetry and range effects devices via H/W LAN communications, IAW the specification.
SOW3.3.1.1.3I-1 - Technical UnderstandingThe RCS shall include a CD and DVD burner, with all software necessary to record to CDs and DVDs.
SOW3.3.1.1.3I-1 - Technical UnderstandingThe contractor shall also provide an Uninterruptible Power Supply (UPS) for the Stationary RCS.
SOW3.3.1.1.43.3.1.1.4 RCS (Portable) – H/W LAN with Integrated Software
SOW3.3.1.1.4I-1 - Technical UnderstandingThe contractor shall provide a Portable RCS IAW the specification.
SOW3.3.1.1.4I-1 - Technical UnderstandingThe contractor shall provide a portable ruggedized laptop computer with an H/W LAN connection and capability to perform as a back-up to the Stationary RCS to control all targets and effects devices when connected to the Range LAN network.
SOW3.3.1.1.4I-1 - Technical UnderstandingThe contractor shall provide an additional lithium computer battery, charger, charger cables, and carrying backpack.
SOW3.3.1.1.53.3.1.1.5 RCS (Stationary) - H/W LAN and RF (Dual Capable) COMM with Integrated Software
SOW3.3.1.1.5I-1 - Technical UnderstandingThe contractor shall provide RCS hardware suite, which includes a desktop PC, two (2) monitors, keyboard, mouse, printer, power cords, LAN cabling, RF radio, RF converter box, software, and other components needed to achieve a dual control capability.
SOW3.3.1.1.5I-1 - Technical UnderstandingThe contractor shall provide two-way communications to control and receive information between the portable RF RCS and stationary RCS to control a combination of H/W LAN and RF targetry and range effects devices.
SOW3.3.1.1.5I-1 - Technical UnderstandingDual capability control shall be transparent to the RCS operator and not hinder his or her ability to display, control, and program all targets and effects devices installed on the range.
SOW3.3.1.1.5I-1 - Technical UnderstandingThe RCS shall include a CD and DVD burner, with all software necessary to record to CDs and DVDs.
SOW3.3.1.1.5I-1 - Technical UnderstandingThe contractor shall also provide an Uninterruptible Power Supply (UPS) for the Stationary RCS.
SOW3.3.1.23.3.1.2 SITs
SOW3.3.1.2I-1 - Technical UnderstandingSITs shall be modular and combine required components (Target Lifter and Silhouettes) and optional devices (LOMAH, Effects Simulators, and IR signatures) IAW the DO.
SOW3.3.1.2I-1 - Technical UnderstandingAll SITs shall operate using available power. SITs shall come complete with all necessary cables and interfacing devices to make it compatible with the power and signal interfaces.
SOW3.3.1.2I-1 - Technical UnderstandingAll power and communication wires/cables within the target position shall be installed in a neat and workmanlike manner per NEC Article 110.
SOW3.3.1.2I-1 - Technical UnderstandingAs required, the contractor shall provide SITs IAW the specification.
SOW3.3.1.2I-1 - Technical UnderstandingSITs shall have the following configurations:
SOW3.3.1.2.13.3.1.2.1 RF, Battery Powered SIT (not installed)
SOW3.3.1.2.1I-1 - Technical UnderstandingThe contractor shall provide, deliver, offload, and test battery-operated, RF controlled SITs with attached silhouette per the specification.
SOW3.3.1.2.23.3.1.2.2 RF, Battery Powered SIT
SOW3.3.1.2.2I-1 - Technical UnderstandingThe contractor shall deliver, install, and test battery-operated, RF controlled SITs with attached silhouette per the specification.
SOW3.3.1.2.2I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.2.2I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled SITs in existing target enclosures, consisting of standard materials such as concrete, wood, SACON, and/or rubber as specified in the DO.
SOW3.3.1.2.2I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.2.2I-1 - Technical Understandinga. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.2.2I-1 - Technical Understandingb. Connect target battery cable to 12V battery
SOW3.3.1.2.2I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.2.2I-1 - Technical UnderstandingMOUT Installation
SOW3.3.1.2.2I-1 - Technical Understandinga. Mount SIT to building wall adjacent to doorways, window, hallway, etc. as specified in the DO
SOW3.3.1.2.2I-1 - Technical Understandingb. Connect target battery cable to 12V battery
SOW3.3.1.2.2I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes into the doorway, window, or hallway or beyond the ballistic protection provided
SOW3.3.1.2.33.3.1.2.3 RF, Battery Powered SIT with Solar Power System
SOW3.3.1.2.3I-1 - Technical UnderstandingThe contractor shall deliver, install, and test battery-operated, RF controlled SITs with attached silhouette and solar power system for power regeneration per the specification.
SOW3.3.1.2.3Target Enclosure Installation
SOW3.3.1.2.3I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled SITs in existing target enclosures, consisting of standard materials such as concrete, wood, SACON, and/or rubber as specified in the DO.
SOW3.3.1.2.3I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.2.3I-1 - Technical Understandinga. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.2.3I-1 - Technical Understandingb. Connect target battery cable to 12V battery
SOW3.3.1.2.3I-1 - Technical Understandingc. Connect the solar power system cable to 12V battery with charging controller and align solar power system for optimum sun exposure
SOW3.3.1.2.3I-1 - Technical Understandingd. Attach radio antenna ensuring it doesn’t protrude beyond the ballistic protection
SOW3.3.1.2.43.3.1.2.4 RF, Shore Powered SIT
SOW3.3.1.2.4I-1 - Technical UnderstandingThe contractor shall deliver, install, and test RF controlled, shore powered SITs with attached silhouette per the specification.
SOW3.3.1.2.4RF, Shore Powered SIT
SOW3.3.1.2.4I-1 - Technical UnderstandingThe contractor shall install RF controlled shore powered SITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.2.4I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.2.4I-1 - Technical Understandinga. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.2.4I-1 - Technical Understandingb. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification
SOW3.3.1.2.4I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.2.4I-1 - Technical UnderstandingMOUT Installation
SOW3.3.1.2.4I-1 - Technical Understandinga. Mount SIT to building wall adjacent to doorways, window, hallway, etc. as specified in the DO
SOW3.3.1.2.4I-1 - Technical Understandingb. Connect target power cable to the power outlet provided at the target location, per the DO and the specification. Power outlets will be provided within six (6) feet of the target location
SOW3.3.1.2.4I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes into the doorway, window, or hallway or beyond the ballistic protection provided
SOW3.3.1.2.53.3.1.2.5 H/W LAN, Shore Powered SIT
SOW3.3.1.2.5I-1 - Technical UnderstandingThe contractor shall deliver, install, and test H/W LAN controlled, shore powered SITs with attached silhouette per the specification.
SOW3.3.1.2.5I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.2.5I-1 - Technical UnderstandingThe contractor shall install H/W LAN controlled; shore powered SITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.2.5I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.2.5I-1 - Technical Understandinga. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.2.5I-1 - Technical Understandingb. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification
SOW3.3.1.2.5I-1 - Technical Understandingc. Mount the media switch inside the existing data panel
SOW3.3.1.2.5I-1 - Technical Understandingd. Mount surge protection for the data lines, as required, in the data panels to ensure the target and all communications components are protected from line surges or lightning
SOW3.3.1.2.5I-1 - Technical Understandinge. Connect the target data lines and media switch within the target data panel
SOW3.3.1.2.5I-1 - Technical UnderstandingMOUT/Shoot house Installation
SOW3.3.1.2.5I-1 - Technical Understandinga. Mount SIT to building wall adjacent to doorways, window, hallway, etc. as specified in the DO
SOW3.3.1.2.5I-1 - Technical Understandingb. Connect target power cable to the power outlet provided at the target location, per the DO and the specification. Power outlets will be within six (6) feet of the target location
SOW3.3.1.2.5I-1 - Technical Understandingc. Connect the target data line to the existing data receptacle or target data panel. Data outlets/panels will be within six (6) feet of the target location
SOW3.3.1.33.3.1.3 Double Arm -Stationary Infantry Targets (DSITs)
SOW3.3.1.3I-1 - Technical UnderstandingAs required, the contractor shall provide DSITs IAW the specification. DSITs shall have following configurations:
SOW3.3.1.3.13.3.1.3.1 RF, Battery Powered DSITs (not installed)
SOW3.3.1.3.1I-1 - Technical UnderstandingThe contractor shall provide, deliver, offload and test battery-operated, RF controlled DSITs with attached silhouette per the specification.
SOW3.3.1.3.1I-1 - Technical UnderstandingThis item is for portable range usage and will not require installation.
SOW3.3.1.3.23.3.1.3.2 RF, Battery Powered DSITs
SOW3.3.1.3.2I-1 - Technical UnderstandingThe contractor shall deliver, install, and test battery-operated, RF controlled DSITs with attached silhouettes per the specification.
SOW3.3.1.3.2I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.3.2I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled DSITs in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.3.2I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.3.2I-1 - Technical Understandinga. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.3.2I-1 - Technical Understandingb. Connect target battery cable to 12V battery
SOW3.3.1.3.2I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.3.33.3.1.3.3 RF, Battery Powered DSITs, with Solar Power Systems
SOW3.3.1.3.3I-1 - Technical UnderstandingThe contractor shall deliver, install, and test battery-operated, RF controlled DSITs with attached silhouettes and solar power system for power regeneration per the specification.
SOW3.3.1.3.3I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.3.3I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled DSITs with appropriate solar power systems in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.3.3The contractor shall:
SOW3.3.1.3.3I-1 - Technical Understandinga. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.3.3I-1 - Technical Understandingb. Connect target battery cable to 12V battery
SOW3.3.1.3.3I-1 - Technical Understandingc. Connect the solar power system cable to 12V battery with charging controller and align solar power systems for optimum sun exposure
SOW3.3.1.3.3I-1 - Technical Understandingd. Attach radio antenna ensuring it doesn’t protrude beyond the ballistic protection
SOW3.3.1.3.43.3.1.3.4 RF, Shore Power DSITs
SOW3.3.1.3.4I-1 - Technical UnderstandingThe contractor shall deliver, install, and test RF controlled, shore powered DSITs with attached silhouettes per the specification.
SOW3.3.1.3.4I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.3.4I-1 - Technical UnderstandingThe contractor shall install RF controlled, shore powered DSITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.3.4The contractor shall:
SOW3.3.1.3.4I-1 - Technical Understandinga. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.3.4I-1 - Technical Understandingb. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification
SOW3.3.1.3.4I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.3.53.3.1.3.5 H/W LAN, Shore Power DSITs
SOW3.3.1.3.5I-1 - Technical UnderstandingThe contractor shall deliver, install, and test H/W LAN controlled, shore powered DSITs with attached silhouettes per the specification.
SOW3.3.1.3.5I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.3.5I-1 - Technical UnderstandingThe contractor shall install H/W LAN; controlled, shore powered DSITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.3.5The contractor shall:
SOW3.3.1.3.5I-1 - Technical Understandinga. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.3.5I-1 - Technical Understandingb. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification.
SOW3.3.1.3.5I-1 - Technical Understandingc. Mount the media switch inside the existing data panel
SOW3.3.1.3.5I-1 - Technical Understandingd. Mount surge protection for the data lines, as required, in the data panels to ensure the target and all communications components are protected from line surges
SOW3.3.1.3.5I-1 - Technical Understandinge. Connect the target data lines and media switch within the target data panel
SOW3.3.1.43.3.1.4 Moving Infantry Targets (MITs)
SOW3.3.1.4I-1 - Technical UnderstandingMITs shall be modular and combine required components (Target Lifter and Silhouettes) and optional devices (LOMAH, Effects Simulators, and IR signatures) IAW the DO.
SOW3.3.1.4I-1 - Technical UnderstandingThe MIT shall incorporate a SIT target lifter.
SOW3.3.1.4I-1 - Technical UnderstandingAll moving targets shall come complete with all necessary cables and/or interfacing devices to be compatible with the commercial power and signal cables available as part of the target area configurations IAW CEHNC 1110-1-23, USACE Design Manual for Ranges.
SOW3.3.1.4I-1 - Technical UnderstandingWhen using an alternate or additional power source, the moving target shall come with all necessary cables, hardware and/or interfacing devices to support the use of any such power source.
SOW3.3.1.4I-1 - Technical UnderstandingEach MIT shall include a docking station.
SOW3.3.1.4I-1 - Technical UnderstandingThe docking station shall provide the required electrical power and connections to power the mover and recharge the mover’s batteries.
SOW3.3.1.4I-1 - Technical UnderstandingThe docking station shall provide a network connection to interface the mover to the RCS.
SOW3.3.1.4I-1 - Technical UnderstandingAs required, the contractor shall provide MITs IAW the specification.
SOW3.3.1.4I-1 - Technical UnderstandingThe contractor shall provide MITs with fifty (50) feet of track with each MIT with all mounting components and hardware required to install a fully functioning MIT track.
SOW3.3.1.4I-1 - Technical UnderstandingMITs shall have the following configurations:
SOW3.3.1.4.13.3.1.4.1 RF, Battery Powered MITs (not installed)
SOW3.3.1.4.1I-1 - Technical UnderstandingThe contractor shall deliver, offload, and test battery-operated, RF controlled MITs with attached silhouette per the specification.
SOW3.3.1.4.23.3.1.4.2 RF, Battery Powered MITs
SOW3.3.1.4.2I-1 - Technical UnderstandingThe contractor shall deliver, install, and test battery-operated, RF controlled MITs with attached silhouette per the specification.
SOW3.3.1.4.2I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.4.2I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled MITs in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.4.2I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.4.2I-1 - Technical Understandinga. Mount MIT metal footers and track within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.4.2I-1 - Technical Understandingb. Connect MIT battery cables to the systems 24V batteries
SOW3.3.1.4.2I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection or interferes with the operation of the MIT movement or target actuation
SOW3.3.1.4.33.3.1.4.3 RF, Shore Powered MITs
SOW3.3.1.4.3I-1 - Technical UnderstandingThe contractor shall deliver, install, and test RF controlled, shore powered MITs with attached silhouette per the specification.
SOW3.3.1.4.3I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.4.3I-1 - Technical UnderstandingThe contractor shall install RF controlled, shore powered MITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.4.3I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.4.3I-1 - Technical Understandinga. Mount MIT metal footers and track within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.4.3I-1 - Technical Understandingb. Mount the 24V battery charging system with MIT docking station to the end of the MIT track as designated in the DO
SOW3.3.1.4.3I-1 - Technical Understandingc. Connect MIT battery cables to the systems 24V batteries
SOW3.3.1.4.3I-1 - Technical Understandingd. Connect the 24V battery charging system power cord to the existing power outlet provided in the enclosure, per the DO and the specification
SOW3.3.1.4.3I-1 - Technical Understandinge. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection or interferes with the operation of the MIT movement or target actuation
SOW3.3.1.4.43.3.1.4.4 H/W LAN, Shore Powered MITs
SOW3.3.1.4.4I-1 - Technical UnderstandingThe contractor shall deliver, install, and test H/W LAN controlled, shore powered MITs with attached silhouettes per the specification.
SOW3.3.1.4.4I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.4.4I-1 - Technical UnderstandingThe contractor shall install H/W LAN controlled, shore powered MITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.4.4I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.4.4I-1 - Technical Understandinga. Mount MIT metal footers and track within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.4.4I-1 - Technical Understandingb. Mount the 24V battery charging system with MIT docking station to the end of the MIT track as designated in the DO
SOW3.3.1.4.4I-1 - Technical Understandingc. Connect MIT battery cables to the 24V batteries
SOW3.3.1.4.4I-1 - Technical Understandingd. Connect the 24V battery charging system power cord to the existing power outlet provided in the enclosure, per the DO and the specification
SOW3.3.1.4.4I-1 - Technical Understandinge. Connect the MIT data cable to the existing target data panel
SOW3.3.1.4.4I-1 - Technical Understandingf. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection or interferes with the operation of the MIT movement or target actuation
SOW3.3.1.4.4I-1 - Technical Understandingg. Mount the media switch inside the existing data panel
SOW3.3.1.4.4I-1 - Technical Understandingh. Mount surge protection for the data lines, as required, in the data panels to ensure the target and all communications components are protected from line surges or lightning
SOW3.3.1.4.4I-1 - Technical Understandingi. Connect the target data lines and media switch within the target data panel
SOW3.3.1.4.53.3.1.4.5 MIT Track Requirements
SOW3.3.1.4.5I-1 - Technical UnderstandingThe moving target rail system shall include a stabilization mechanism to ensure that the rail systems is not tipped or twisted during the actuations (expose and conceal) of a target moving along the rail.
SOW3.3.1.4.5I-1 - Technical UnderstandingThe Moving Target Rails shall be joined with appropriate expansion joint material between rail segments to allow for the expansion and contraction of the rails without the creation of warping or gaps.
SOW3.3.1.4.5I-1 - Technical UnderstandingThe Moving Target Rails shall not be fabricated from plated materials where chipping or wear can cause either oxidation or galvanic reactions.
SOW3.3.1.4.5I-1 - Technical UnderstandingThe “wheels” of the Moving Target shall maximize contact area with the rail, and preclude high stress contacts with the rail.
SOW3.3.1.4.5I-1 - Technical Understandinga. The MIT rails shall be height selectable at installation
SOW3.3.1.4.5I-1 - Technical Understandingb. The MIT rails segments shall be 10ft in length
SOW3.3.1.4.5I-1 - Technical Understandingc. There shall be two types of MIT rail segments: straight and curved
SOW3.3.1.4.5I-1 - Technical Understandingd. The MIT curved rail segments shall have a 30 degree rail bend
SOW3.3.1.4.5I-1 - Technical Understandinge. The MIT rails shall be fabricated from materials not subject to corrosion degradation or adverse oxidation weakening. The MIT rails shall support the combined weight of the MIT mover and silhouette.
SOW3.3.1.4.5I-1 - Technical Understandingf. The interconnection between MIT rail segments shall ensure smooth transition from one segment to the next without creating the potential of mover dislodgement, unwanted target movement, or premature target actuation
SOW3.3.1.4.63.3.1.4.6 MIT Track - Spare
SOW3.3.1.4.6I-1 - Technical UnderstandingThe contractor shall deliver and install spare ten (10) feet track sections to increase the track length of the MIT track IAW the DO.
SOW3.3.1.4.6I-1 - Technical UnderstandingThe spare track shall have all footers, hardware, railing, etc., per the specification, to form a complete and usable ten (10) feet section of track.
SOW3.3.1.53.3.1.5 SATs
SOW3.3.1.5I-1 - Technical UnderstandingSATs shall be modular and combine required components (Target Lifter and Silhouettes) and optional devices (LOMAH, Effects Simulators, and IR signatures) IAW the DO.
SOW3.3.1.5I-1 - Technical UnderstandingAll SATs shall operate using available power.
SOW3.3.1.5I-1 - Technical UnderstandingSATs shall come complete with all necessary cables and interfacing devices to make it compatible with the power and signal interfaces.
SOW3.3.1.5I-1 - Technical UnderstandingAll power and communication wires/cables within the target position shall be installed in a neat and workmanlike manner per NEC Article 110.
SOW3.3.1.5I-1 - Technical UnderstandingThe contractor shall provide SATs IAW the specification. SATs shall have the following configurations:
SOW3.3.1.5.13.3.1.5.1 RF, Battery Powered SATs (not installed)
SOW3.3.1.5.1I-1 - Technical UnderstandingThe contractor shall provide, deliver, offload, and test battery-operated, RF controlled SATs with attached wooden frontal threat vehicle silhouette per the specification.
SOW3.3.1.5.23.3.1.5.2 RF, Battery Powered SATs
SOW3.3.1.5.2I-1 - Technical UnderstandingThe contractor shall provide, deliver, install, and test battery-operated, RF controlled SATs with attached wooden frontal threat vehicle silhouette per the specification.
SOW3.3.1.5.2I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.5.2I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled SATs in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.5.2I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.5.2I-1 - Technical Understandinga. Mount SAT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.5.2I-1 - Technical Understandingb. Connect target battery cable to the 12V battery or battery eliminator, per the DO.
SOW3.3.1.5.2I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.5.2I-1 - Technical Understandingd. Assemble and attach the wooden frontal threat vehicle silhouette to the SAT lifter
SOW3.3.1.5.33.3.1.5.3 RF, Battery Powered SATs with Solar Power System
SOW3.3.1.5.3I-1 - Technical UnderstandingThe contractor shall provide, deliver, install, and test battery-operated, RF controlled SATs with appropriate solar power systems and attached wooden frontal threat vehicle silhouette per the specification.
SOW3.3.1.5.3I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.5.3I-1 - Technical UnderstandingThe contractor shall install battery-operated, RF controlled SATs and solar power systems in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.5.3I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.5.3I-1 - Technical Understandinga. Mount SAT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.5.3I-1 - Technical Understandingb. Connect target battery cable to the 12V battery or battery eliminator, per the DO
SOW3.3.1.5.3I-1 - Technical Understandingc. Connect the solar power system cable to 12V battery with charging controller and align solar power system for optimum sun exposure
SOW3.3.1.5.3I-1 - Technical Understandingd. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.5.3I-1 - Technical Understandinge. Assemble and attach the wooden frontal threat vehicle silhouette to the SAT lifter
SOW3.3.1.5.43.3.1.5.4 RF, Shore Powered SATs
SOW3.3.1.5.4I-1 - Technical UnderstandingThe contractor shall deliver, install, and test RF controlled, shore powered SATs with attached wooden threat vehicle silhouette per the specification.
SOW3.3.1.5.4I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.5.4I-1 - Technical UnderstandingThe contractor shall install RF controlled, shore powered SATs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.5.4The contractor shall:
SOW3.3.1.5.4I-1 - Technical Understandinga. Mount SAT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface
SOW3.3.1.5.4I-1 - Technical Understandingb. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification
SOW3.3.1.5.4I-1 - Technical Understandingc. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection
SOW3.3.1.5.4I-1 - Technical Understandingd. Assemble and attach the wooden frontal threat vehicle silhouette to the SAT lifter
SOW3.3.1.5.53.3.1.5.5 H/W LAN, Shore Powered SATs
SOW3.3.1.5.5I-1 - Technical UnderstandingThe contractor shall deliver, install, and test H/W LAN controlled, shore powered SATs with attached wooden threat vehicle silhouette per the specification.
SOW3.3.1.5.5I-1 - Technical UnderstandingTarget Enclosure Installation
SOW3.3.1.5.5I-1 - Technical UnderstandingThe contractor shall install H/W LAN controlled, shore powered SATs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO.
SOW3.3.1.5.5I-1 - Technical UnderstandingThe contractor shall:
SOW3.3.1.5.5I-1 - Technical Understandinga. Mount SAT within an existing target enclosure utilizing bolts, or appropriate hardware for the mounting surface

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .