Att.10_-_Solicitation_Question_Response_Form-17.docx

DOCX document 23 KB Posted

Attached to
Range Training Systems
Solicitation number
M67854-13-R-7803
Issued by

About this file

Government response to question.

View the file

Other files

File Type Posted
Att.10_Solicitation_Questions_Response_Form.docx DOCX document
M67854-13-R-7803_0003.docx DOCX document
Att.10_Solicitation_Questions_Response_Form-31.docx DOCX document
Att.10__Solicitation_Question_Response_Form.docx DOCX document
M67854-13-R-7803_0001.docx DOCX document
Attachment_1-_Revised_RTS_II_SOW.doc DOC document
Att_10_Solicitation_Question_Response_Form-24.docx DOCX document
Attachment_11-_Evaluation_Pricing_Worksheet.xls XLS spreadsheet
CDRL_A00B.docx DOCX document
Attachment_2-__RTS-II_SPEC.doc DOC document
Attachment_1-_Revised_RTS_II_SOW.doc DOC document
CDRL_A005.docx DOCX document
Attachment_12-_Matrix.xlsx XLSX spreadsheet
Att._10_Solicitation__Question_Response_Form-23.docx DOCX document
Att.10_Soliocitation__Questions_Response_Form-22.docx DOCX document
Att.10_Solicitation__Questions_Response_Form-21_.docx DOCX document
CDRL_A00C.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-04.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-02.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-01.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-15.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-06.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-20.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-03.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-16.docx DOCX document
Att_10_-_Solicitation_Question_Response_Form-11.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-09.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-07.docx DOCX document
Attachment_1-_Statement_of_Work.pdf PDF
Attachment_5.pdf PDF
Attachment_12-_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_8.pdf PDF
Attachment_6.pdf PDF
Attachment_2.-Performance_Spec.pdf PDF
Attachment_3.pdf PDF
Attachment_4.pdf PDF
Attachment_7.pdf PDF
M67854-13-R-7803.pdf PDF
Att.6-_CDRLs_C001-C004.pdf PDF
Att.3_-CDRLs_A00A-A00F.pdf PDF
Att.10_-_Solicitation_Question_Response_Form.docx DOCX document
Att.11_-_Pricing_Worksheet.xls XLS spreadsheet
Att.1_-_RTS_II_SOW_.pdf PDF
Att.5-_CDRLs_B001-B005.pdf PDF
Att.9_-_Past_Performance_Questionnaire.docx DOCX document
Att.4_-CDRLs_A001-A009.pdf PDF
Att.12_-Cross_Reference_Matrix_.xlsx XLSX spreadsheet
Att.2_-_RTS-II_SPEC_.pdf PDF
Att.7-_CDRL_E001.pdf PDF
Att.8-_CDRLs_F001-F003.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M6785413R7803Attachment 10
SOLICITATION QUESTION/RESPONSE FORM

RFP M67854-13-R-7803

DATE:

2/19/2013

CONTRACTOR QUESTION

SUBJECT:

Range Control Network Switch

SPECIFIC QUESTION:

3.3.1.9.3 Range Control Network Switch

For all communication equipment the contractor shall provide all patch cables necessary to complete the installation. All switches shall have a MTBF greater than 2MIL hours and a five year warranty.

It appears the number quoted for MTBF (“greater than 2MIL hours”) of 2 million hours (228 years) is a mistype. Will the Government update the document to reflect a more appropriate number?

REFERENCE: Attachment_1-_Statement_of_Work.pdf dated Jan 2013

PAGE NUMBER:18PARAGRAPH:3.3.1.9.3
PAGE NUMBER:PARAGRAPH:

GOVERNMENT RESPONSE

We are expecting the MTBF to be empirically-predicted for the sake of this contract. In this situation, MTBF can be confusing because when measured as an experimental value, it gives counter-intuitive results. An empirically-predicted MTBF of 228 years is unlikely to result in a usable life of 228 years, nor anything close. This is because the failure rate increases as the system approaches the end of its service life. When conducting MTBF predictions, on the other hand, we will be operating early enough during the service life, that λ will be comparatively small.

We are expecting the MTBF to be determined empirically, calculated as the inverse of the failure rate, λ.

Predicted MTBF=1/ λ= The MTBF of 2,000,000 hours equates to approximately 2% of systems burning out during the first five years.

This should be achievable with industrial quality switches.

FOR GOVERNMENT USE ONLY:CONTROL NUMBER: 17
PREPARED BY:DATE: 20FEB2013