Att._10_Solicitation__Question_Response_Form-23.docx

DOCX document 20 KB Posted

Attached to
Range Training Systems
Solicitation number
M67854-13-R-7803
Issued by

About this file

Government response to question

View the file

Other files

File Type Posted
Att.10_Solicitation_Questions_Response_Form.docx DOCX document
M67854-13-R-7803_0003.docx DOCX document
M67854-13-R-7803_0002.docx DOCX document
Att.10_Solicitation_Questions_Response_Form-31.docx DOCX document
Att.10__Solicitation_Question_Response_Form.docx DOCX document
M67854-13-R-7803_0001.docx DOCX document
Attachment_1-_Revised_RTS_II_SOW.doc DOC document
Att_10_Solicitation_Question_Response_Form-24.docx DOCX document
CDRL_A00D.docx DOCX document
Attachment_11-_Evaluation_Pricing_Worksheet.xls XLS spreadsheet
CDRL_A00B.docx DOCX document
Attachment_2-__RTS-II_SPEC.doc DOC document
Attachment_1-_Revised_RTS_II_SOW.doc DOC document
Att.10_Soliocitation__Questions_Response_Form-22.docx DOCX document
Att.10_Solicitation__Questions_Response_Form-21_.docx DOCX document
CDRL_A00C.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-05.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-10.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-13.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-14.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-12.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-19.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-17.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-04.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-02.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-15.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-06.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-20.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-03.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-16.docx DOCX document
Att_10_-_Solicitation_Question_Response_Form-11.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-09.docx DOCX document
Att.10_-_Solicitation_Question_Response_Form-07.docx DOCX document
Attachment_11-_Evaluation_Pricing_Worksheet.xlsx XLSX spreadsheet
Att.10_-_Solicitation_Question_Response_Form.docx DOCX document
Att.9_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_1-_Statement_of_Work.pdf PDF
Attachment_3.pdf PDF
Attachment_4.pdf PDF
Attachment_7.pdf PDF
M67854-13-R-7803.pdf PDF
Revised_Draft_M67854-13-R-7803.pdf PDF
Att.6-_CDRLs_C001-C004.pdf PDF
Att.3_-CDRLs_A00A-A00F.pdf PDF
Att.10_-_Solicitation_Question_Response_Form.docx DOCX document
Att.4_-CDRLs_A001-A009.pdf PDF
Att.12_-Cross_Reference_Matrix_.xlsx XLSX spreadsheet
Att.2_-_RTS-II_SPEC_.pdf PDF
Att.7-_CDRL_E001.pdf PDF
Att.8-_CDRLs_F001-F003.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M6785413R7803Attachment 10
SOLICITATION QUESTION/RESPONSE FORM

RFP M67854-13-R-7803

DATE:

12 Feb 2013

CONTRACTOR QUESTION

SUBJECT: Smoke Generator Power Requirements

SPECIFIC QUESTION:

Please clarify the smoke generator requirements to remove battery and solar power, as well as powered from SAT & MAT. To provide the smoke output (volume and duration) and other capabilities required will draw in excess of 1500Watts (this was verified with multiple vendors). This can not reasonably be supported by batteries or solar panels, or the SAT, and would severely limit MAT operability (would need to return to docking station after short duration) and would actually require a sizeable (portable) generator to do so.

The only smoke generators currently available that operate on battery power are very small hand held units, typically used to verify (low volume/velocity) airflow such as around wall penetrations

REFERENCE:
PAGE NUMBER:SOW 24 of 76PARAGRAPH: 3.3.2.3.1, 3.3.2.3.2, 2
PAGE NUMBER: SSD 16, 22, 30 of 63PARAGRAPH: 3.1.2.2.7.2, 3.1.2.3.12.2, 3.2.3.2

GOVERNMENT RESPONSE

SOW and SPEC have been updated. Solar Power has been removed. Battery Power requirements have been updated.

FOR GOVERNMENT USE ONLY:CONTROL NUMBER: 08
PREPARED BY:DATE: 25FEB2013

CODE:

File details come from the government source that posted it. Updated .