M123_FPR_ADD1.pdf
PDF 323 KB Posted
- Attached to
- FP-2021-15A DA Tank Replacement
- Solicitation number
- S-580100-00002584
- Issued by
- Umatilla County, Oregon
About this file
This document is an addendum to a state and local contract opportunity for the Steam Central Plant Surge & Deaerator Tank Replacement project at Eastern Oregon University in La Grande, Oregon. The addendum provides updates to the floor plan for the roof, including demolition of existing tank vent piping and patching and sealing of the roofing. The project is overseen by Systems West Engineers, Inc. and Eastern Oregon University.
The addendum includes revised drawings and specifications related to the roofing, building automation system sequence of operations, and mechanical equipment for the boiler plant. No additional details are provided regarding the timeline, bidding requirements, or contract term.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M301
M301
M301
M301
(E)
EF
(E)
CT
(E)
CT
1-1/2" V
6" V
1-1/4" V 2" V
4" V
DEMOLISH (E) TANK VENT
PIPING. PATCH AND SEAL
ROOFING TO MATCH EXISTING
DATE:
DRAWN:
CHECKED:
PROJECT:
DESIGNED:
725 A Street
Springfield, OR 97477
541.342.7210 systemswestengineers.com
SYSTEMS WEST ENGINEERS
OWNER:
LOCATION:
MARK DATE DESCRIPTION
/2
/2
:5 :2
P
M
STEAM CENTRAL
PLANT SURGE &
DEAERATOR TANK
REPLACEMENT
P
LO
T T E D
B Y
JS
H
O N
PHYSICAL
PLANT
ONE UNIVERSITY
BLVD, LA GRAND, OR
97850
EASTERN OREGON
UNIVERSITY
FLOOR PLAN -
ROOF
03/16/2022
X033.01
M123
MLO
JSH
GNL
NORTH
1/4" = 1'-0"1
FLOOR PLAN - ROOF
© Systems West Engineers, Inc. 2022. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)
1 22/03/2022 ADDENDUM #1
sgw Stamp
| Sheets |
| M123 - FLOOR PLAN - ROOF |
| 2022-03-22T15:54:13-0700 | |
| Gregory Langdon |
File details come from the government source that posted it. Updated .