This document is a mechanical legend, general notes, and sheet index related to a state and local contract opportunity for the Steam Central Plant Surge and Deaerator Tank Replacement project at Eastern Oregon University in La Grande, Oregon. The document provides details on mechanical systems, including piping, symbols, abbreviations, and demolition requirements. Addendum no. 1 has been issued, which includes 5 additional attachments with specifications for roofing, building automation systems, and boiler plant mechanical equipment.

The contract opportunity is for Union County, with a project description of "FP-2021-15A DA Tank Replacement." The project involves replacement of the surge and deaerator tanks in the steam central plant. The document outlines the scope of work, including demolition requirements and protection of existing systems. Pricing terms, set-asides, and funding details are not provided in this specific document, but may be available in the full solicitation package.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M E C H A N I C A L L E G E N D

PIPING GENERAL GENERAL NOTES

ABBREVIATIONS

SYMBOL ABBREV. DESCRIPTION

A

S

SD

SRV

CFR

W

CFS

MAV

AAV

M

RP

DV

BV

BFV

CHV

GV

GBV

PRV

AV

SV

AV

AV

AV

RV

SRV

SSV

TPS

FMS

FCV

ACH AIR CHANGES PER HOUR

AFF ABOVE FINISHED FLOOR

AFS AUTOMATIC FIRE SPRINKLER

AL ALUMINUM

ALT ALTERNATE

APD AIR PRESSURE DROP

BAS BUILDING AUTOMATION SYSTEM

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BTUH BRITISH THERMAL UNITS PER HOUR

CFH CUBIC FEET per HOUR CFM CUBIC FEET per MINUTE

CMU CONCRETE MASONRY UNIT

CONC CONCRETE

CONT CONTINUATION

(D) DEMOLITION

DB DRY BULB

dBa DECIBELS ACOUSTIC

DEMO DEMOLITION

DN DOWN

DP DIFFERENTIAL PRESSURE

(E) EXISTING

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

EG EXHAUST GRILLE

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FT FEET

FT WC FEET WATER COLUMN

FUT FUTURE

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GYP BD GYPSUM WALL BOARD

HP HORSEPOWER

HSPF HEATING SEASONAL

PERFORMANCE FACTOR

HVAC HEATING, VENTILATING, &

AIR CONDITIONING

HZ HERTZ (CYCLES PER SECOND)

IAQ INDOOR AIR QUALITY

IN INCHES

IN WC INCHES WATER COLUMN

IPLV INTEGRATED PART LOAD VALUE

IW INDIRECT WASTE

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LWT LEAVING WATER TEMPERATURE

mA MILLIAMPERE

MAX MAXIMUM

MBH THOUSAND BTUs per HOUR

MCA MINIMUM CIRCUIT AMPS

MFGR MANUFACTURER

MIN MINIMUM

MOP MAX. OVERCURRENT PROTECTION

(N) NEW

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

OFCI OWNER FURNISHED/CONTRACTOR

INSTALLED

OSA OUTSIDE AIR

PD PRESSURE DROP

PH PHASE

PPH POUNDS per HOUR PSI POUNDS per SQUARE INCH

REQ'D REQUIRED

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RPM REVOLUTIONS per MINUTE

SD SUPPLY DIFFUSER

SEER SEASONAL ENERGY EFFICIENCY RATIO

SF SUPPLY FAN

SS STAINLESS STEEL

STL STEEL

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

VFD VARIABLE FREQUENCY DRIVE

WB WET BULB

WC WATER COLUMN

WG WATER GAUGE

PIPING UP

PIPING DOWN

DIRECTION OF SLOPE

CAPPED PIPE

PIPE REDUCING FITTING:

CONCENTRIC, ECCENTRIC

DIRECTION OF FLOW

DRAIN VALVE

UNION

PUMP

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

GATE VALVE

GLOBE VALVE

BALANCING VALVE /

ECCENTRIC PLUG VALVE

AUTOMATIC CONTROL

VALVE: 2-WAY

AUTOMATIC CONTROL

VALVE: 3-WAY

AUTOMATIC BUTTERFLY VALVE

FLEXIBLE PIPE CONNECTION

PUMP SUCTION DIFFUSER

WYE STRAINER

BASKET STRAINER

PRESSURE REGULATING VALVE

THREE-WAY BYPASS VALVE

SOLENOID VALVE

RELIEF VALVE

SAFETY RELIEF VALVE

(HYDRONIC)

STEAM SAFETY VALVE

TEMPERATURE/PRESSURE

SAFETY VALVE

SELF CONTAINED CONTROL VALVE

CONSOLIDATED FITTING RETURN

CONSOLIDATED FITTING SUPPLY

THERMOMETER

PRESSURE GAUGE

TEST PLUG

SIGHT FLOW INDICATOR

SENSOR WELL

MANUAL AIR VENT

AUTOMATIC AIR VENT

AUTOMATIC FLOW CONTROL VALVE

VENTURI

WATER FLOW METER

STEAM TRAP

VACUUM BREAKER (STEAM)

FLOW MEASURING STATION

REDUCED PRESSURE

BACKFLOW PREVENTER

1. THE FACILITY WILL REMAIN IN OPERATION DURING CONSTRUCTION. COORDINATE ALL

SHUTDOWNS AND CONSTRUCTION ACTIVITY WITH FACILITIES STAFF.

2. SIZE AND LOCATION OF ALL PIPING AND OTHER MECHANICAL EQUIPMENT IS APPROXIMATE.

CONTRACTOR SHALL SITE VERIFY THE LOCATION OF EXISTING PIPING AND EQUIPMENT AND

CONSTRUCT WORK FROM FIELD DIMENSIONS. CONTRACTOR SHALL MAKE ADJUSTMENTS NECESSARY

TO ACCOMMODATE MINOR DEVIATIONS AT NO COST TO OWNER.

3. FINE (LIGHT) LINE WORK INDICATES EXISTING PIPING AND OTHER MECHANICAL EQUIPMENT. BOLD

(HEAVY) LINE WORK INDICATES NEW PIPING AND OTHER MECHANICAL EQUIPMENT.

4. IT IS RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE CUTTING AND PATCHING TO

ALLOW THE INSTALLATION OF MATERIALS AND EQUIPMENT AS SPECIFIED AND SHOWN ON DRAWINGS.

SYMBOL ABBREV. DESCRIPTION SYMBOL DESCRIPTION

(E)

OR diaø

SHEET NUMBER

SECTION LETTER

SHEET NUMBER

EQUIPMENT TYPE

EQUIPMENT NUMBER

EXISTING

DIAMETER

NEW TO EXISTING POINT OF CONNECTION

NOTE REFERENCE MARKER

PLAN OR DETAIL REFERENCE MARKER

SECTION REFERENCE MARKER W/VIEW DIRECTION

EQUIPMENT MARKER

ROOM NUMBER

EXISTING SHOWN LIGHT

NEW WORK SHOWN BOLD

EXISTING TO BE REMOVED

M-301

AHU

PLAN OR DETAIL NUMBER

DEMOLITION NOTES

1. REVIEW DEMOLITION DRAWINGS FOR ITEMS TO REMAIN, TO BE RETAINED FOR RELOCATION, OR TO BE SALVAGED TO THE OWNER. REFER TO ARCHITECTURAL DOCUMENTS FOR ADDITIONAL REQUIREMENTS.

2. DEMOLISH EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES INTERIOR TO THE BUILDING THAT ARE MADE OBSOLETE BY THE NEW WORK AND/OR ARE ABANDONED

AND NO LONGER IN USE.

3. PROTECT AND MAINTAIN OPERABILE EXISTING EQUIPMENT, FIXTURES, OR SYSTEMS THAT ARE

INDICATED TO REMAIN, INCLUDING ELECTRICAL POWER, CONTROLS, AND RELATED SYSTEMS

REQUIRED TO MAINTAIN OPERABILITY.

4. EXISTING CONDITIONS SHOWN ARE BASED ON RECORD DOCUMENTS AND LIMITED FIELD

OBSERVATIONS OF ACCESSIBLE AREAS AND MAY NOT SHOW THE ENTIRE SCOPE OF DEMOLITION

WORK. OMISSION OF EXISTING EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES FROM THE DEMOLITION DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE DEMOLITION OF SYSTEMS THAT ARE MADE OBSOLETE BY THE NEW WORK, ARE ABANDONED, OR AS OTHERWISE REQUIRED TO PERFORM THE WORK DESCRIBED HEREIN.

5. PROTECT AND MAINTAIN SERVICES TO REMAIN OPERATIONAL THAT PASS THROUGH THE AREA OF CONSTRUCTION. WHERE IT IS NOT POSSIBLE TO MAINTAIN THESE SERVICES INTACT, REPLACE, REROUTE, MODIFY, OR PROVIDE NEW AS REQUIRED TO MAINTAIN SERVICES.

6. EQUIPMENT REMOVAL INCLUDES EXISTING PNEUMATIC CONTROLS COMPONENTS AND PERIPHERALS.

PNEUMATIC CONTROLS REMOVAL INCLUDES, BUT IS NOT LIMITED TO: COMPRESSED AIR TUBING, THERMOSTATS, SWITCHES, PNEUMATIC CONTROLLERS, AND DAMPER OPERATORS.

PACKAGE EQUIPMENT BOUNDRY

M-521

M101

A

A

A

FD FLOOR DRAIN

FWPD

FWPS

CTPD

CTPS

CPD

R

BD

CBD

BWS

FWS

CF

BFW

BOILER PLANT PIPING:

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

CONDENSATE TRANSFER PUMP SUCTION

CONDENSATE PUMP DISCHARGE

PUMP RECIRCULATION

BOILER BLOWDOWN

CONTINUOUS BLOWDOWN

BOILER WATER SAMPLE

FEEDWATER SAMPLE (FROM DEAERATOR)

CHEMICAL FEED

BOILER FEEDWATER

STEAM & CONDENSATE PIPING:

HYDRONIC PIPING:

HS

HR

CDS

CDR

LPS

MPS

HPS

LPR

MPR

HPR

VR

PR

HEATING WATER SUPPLY

HEATING WATER RETURN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

LOW PRESSURE STEAM

MEDIUM PRESSURE STEAM

HIGH PRESSURE STEAM

LOW PRESSURE RETURN

MEDIUM PRESSURE RETURN

HIGH PRESSURE RETURN

VACUUM RETURN

PUMPED RETURN

CWS

CWR

CHILLED WATER SUPPLY

CHILLED WATER RETURN

PLUMBING PIPING:

CW POTABLE COLD WATER

HW POTABLE HOT WATER

HWR POTABLE HOT WATER RETURN

NP NON-POTABLE COLD WATER

W SANITARY WASTE

V SANITARY PLUMBING VENT

IRW NON-POTABLE COLD WATER (IRRIGATION)

HTHW POTABLE HOT WATER - HIGH TEMP (140°F OR HIGHER)

PAW PUMPED ACID WASTE

CONTROLS

SYMBOL DESCRIPTION SYMBOL DESCRIPTION

BCS INPUT/OUTPUT POINT

AI = ANALOG INPUT

AO = ANALOG OUTPUT

C = COMMUNICATION

DI = DIGITAL INPUT

DO = DIGITAL OUTPUT

FUNCTION DESIGNATION

S/S = START/STOP

MOTOR STARTER (W/EQUIPMENT

INDICATED UNDERLINE)

EQUIPMENT CONTROL PANEL (W/EQUIP.

INDICATED UNDERLINED)

BCP = BOILER CONTROL PANEL

CP = CONTROL PANEL

VFD = VARIABLE FREQUENCY DRIVE

FAP = FIRE ALARM PANEL

CCP = CHILLER CONTROL PANEL

CWP-2

CWP-2

VFD

AI

ALARM

PROCESS PIPING SIGNAL

ELECTRICAL SIGNAL

FT

FUNCTIONAL IDENTIFIER

FIELD MOUNTED

INSTRUMENT NUMBER

1** STEAM SYSTEMS

2** BOILER WATER SYSTEMS

3** FUEL SYSTEMS

4** FUEL OIL

5** BOILER No. 1 6** BOILER No. 2 7** BOILER No. 3

8** INDUSTRIAL WATER

PANEL FRONT MOUNTED

INSIDE PANEL MOUNTED

CONTROL PANEL

PCP = PLANT CONTROL PANEL

BCP = BOILER CONTROL PANEL

PCP

FUNCTIONS

BC BURNER CONTROL

BS BURNER SAFETY

CT CONDUCTIVITY TRANSMITTER

CE CONDUCTIVITY SENSOR

FCS FLOW CONTROL SWITCH

FCV FLOW CONTROL VALVE

FI FLOW INDICATOR

FSS FLOW SAFETY SWITCH

FT FLOW TRANSMITTER

IS CURRENT SWITCH

LCH LEVEL CONTROLLER HIGH

LCS LEVEL CONTROL SWITCH

LE LEVEL SENSOR

LI LEVEL INDICATOR

LSHH LEVEL SWITCH HIGH

LSLL LEVEL SWITCH LOW

LT LEVEL TRANSMITTER

M MOTOR POSITIONER

MT HUMIDITY TRANSMITTER

OS OXYGEN SENSOR

OT OXYGEN TRANSMITTER

PCV PRESSURE CONTROL VALVE

PI PRESSURE INDICATOR

PSS PRESSURE SAFETY SWITCH

PSH PRESSURE SWITCH HIGH

PSL PRESSURE SWITCH LOW

PSV PRESSURE SAFETY VALVE

PT PRESSURE TRANSMITTER

SH SPRING HANGER

TI TEMPERATURE INDICATOR

TT TEMPERATURE TRANSMITTER

US MULTI-CHANNEL ANNUNCIATOR

UC MULTI-CHANNEL CONTROLLER

UR MULTI-CHANNEL RECORDER

ZS POSITION SWITCH

PPPP

DATE:

DRAWN:

CHECKED:

PROJECT:

DESIGNED:

725 A Street

Springfield, OR 97477

541.342.7210 systemswestengineers.com

SYSTEMS WEST ENGINEERS

OWNER:

LOCATION:

MARK DATE DESCRIPTION

/2

/2

:4 :0

P

M

STEAM CENTRAL

PLANT SURGE &

DEAERATOR TANK

REPLACEMENT

P

LO

T T E D

B Y

JS

H

O N

PHYSICAL

PLANT

ONE UNIVERSITY

BLVD, LA GRAND, OR

97850

EASTERN OREGON

UNIVERSITY

LEGEND,

GENERAL

NOTES, &

SHEET INDEX

03/16/2022

X033.01

M001

MLO

JSH

GNL

© Systems West Engineers, Inc. 2022. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)

1 22/03/2022 ADDENDUM #1

sgw

Sheets
M001 - LEGEND, GENERAL NOTES, & SHEET INDEX
M123 - FLOOR PLAN - ROOF
2022-03-22T15:53:47-0700
Gregory Langdon

File details come from the government source that posted it. Updated .