This document is a mechanical legend, general notes, and sheet index related to a state and local contract opportunity for the Steam Central Plant Surge and Deaerator Tank Replacement project at Eastern Oregon University in La Grande, Oregon. The document provides details on mechanical systems, including piping, symbols, abbreviations, and demolition requirements. Addendum no. 1 has been issued, which includes 5 additional attachments with specifications for roofing, building automation systems, and boiler plant mechanical equipment.
The contract opportunity is for Union County, with a project description of "FP-2021-15A DA Tank Replacement." The project involves replacement of the surge and deaerator tanks in the steam central plant. The document outlines the scope of work, including demolition requirements and protection of existing systems. Pricing terms, set-asides, and funding details are not provided in this specific document, but may be available in the full solicitation package.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M E C H A N I C A L L E G E N D
PIPING GENERAL GENERAL NOTES
ABBREVIATIONS
SYMBOL ABBREV. DESCRIPTION
A
S
SD
SRV
CFR
W
CFS
MAV
AAV
M
RP
DV
BV
BFV
CHV
GV
GBV
PRV
AV
SV
AV
AV
AV
RV
SRV
SSV
TPS
FMS
FCV
ACH AIR CHANGES PER HOUR
AFF ABOVE FINISHED FLOOR
AFS AUTOMATIC FIRE SPRINKLER
AL ALUMINUM
ALT ALTERNATE
APD AIR PRESSURE DROP
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BTUH BRITISH THERMAL UNITS PER HOUR
CFH CUBIC FEET per HOUR CFM CUBIC FEET per MINUTE
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
CONT CONTINUATION
(D) DEMOLITION
DB DRY BULB
dBa DECIBELS ACOUSTIC
DEMO DEMOLITION
DN DOWN
DP DIFFERENTIAL PRESSURE
(E) EXISTING
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EFF EFFICIENCY
EG EXHAUST GRILLE
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FT FEET
FT WC FEET WATER COLUMN
FUT FUTURE
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GYP BD GYPSUM WALL BOARD
HP HORSEPOWER
HSPF HEATING SEASONAL
PERFORMANCE FACTOR
HVAC HEATING, VENTILATING, &
AIR CONDITIONING
HZ HERTZ (CYCLES PER SECOND)
IAQ INDOOR AIR QUALITY
IN INCHES
IN WC INCHES WATER COLUMN
IPLV INTEGRATED PART LOAD VALUE
IW INDIRECT WASTE
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
mA MILLIAMPERE
MAX MAXIMUM
MBH THOUSAND BTUs per HOUR
MCA MINIMUM CIRCUIT AMPS
MFGR MANUFACTURER
MIN MINIMUM
MOP MAX. OVERCURRENT PROTECTION
(N) NEW
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
OFCI OWNER FURNISHED/CONTRACTOR
INSTALLED
OSA OUTSIDE AIR
PD PRESSURE DROP
PH PHASE
PPH POUNDS per HOUR PSI POUNDS per SQUARE INCH
REQ'D REQUIRED
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RPM REVOLUTIONS per MINUTE
SD SUPPLY DIFFUSER
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SUPPLY FAN
SS STAINLESS STEEL
STL STEEL
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
VFD VARIABLE FREQUENCY DRIVE
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
PIPING UP
PIPING DOWN
DIRECTION OF SLOPE
CAPPED PIPE
PIPE REDUCING FITTING:
CONCENTRIC, ECCENTRIC
DIRECTION OF FLOW
DRAIN VALVE
UNION
PUMP
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
GLOBE VALVE
BALANCING VALVE /
ECCENTRIC PLUG VALVE
AUTOMATIC CONTROL
VALVE: 2-WAY
AUTOMATIC CONTROL
VALVE: 3-WAY
AUTOMATIC BUTTERFLY VALVE
FLEXIBLE PIPE CONNECTION
PUMP SUCTION DIFFUSER
WYE STRAINER
BASKET STRAINER
PRESSURE REGULATING VALVE
THREE-WAY BYPASS VALVE
SOLENOID VALVE
RELIEF VALVE
SAFETY RELIEF VALVE
(HYDRONIC)
STEAM SAFETY VALVE
TEMPERATURE/PRESSURE
SAFETY VALVE
SELF CONTAINED CONTROL VALVE
CONSOLIDATED FITTING RETURN
CONSOLIDATED FITTING SUPPLY
THERMOMETER
PRESSURE GAUGE
TEST PLUG
SIGHT FLOW INDICATOR
SENSOR WELL
MANUAL AIR VENT
AUTOMATIC AIR VENT
AUTOMATIC FLOW CONTROL VALVE
VENTURI
WATER FLOW METER
STEAM TRAP
VACUUM BREAKER (STEAM)
FLOW MEASURING STATION
REDUCED PRESSURE
BACKFLOW PREVENTER
1. THE FACILITY WILL REMAIN IN OPERATION DURING CONSTRUCTION. COORDINATE ALL
SHUTDOWNS AND CONSTRUCTION ACTIVITY WITH FACILITIES STAFF.
2. SIZE AND LOCATION OF ALL PIPING AND OTHER MECHANICAL EQUIPMENT IS APPROXIMATE.
CONTRACTOR SHALL SITE VERIFY THE LOCATION OF EXISTING PIPING AND EQUIPMENT AND
CONSTRUCT WORK FROM FIELD DIMENSIONS. CONTRACTOR SHALL MAKE ADJUSTMENTS NECESSARY
TO ACCOMMODATE MINOR DEVIATIONS AT NO COST TO OWNER.
3. FINE (LIGHT) LINE WORK INDICATES EXISTING PIPING AND OTHER MECHANICAL EQUIPMENT. BOLD
(HEAVY) LINE WORK INDICATES NEW PIPING AND OTHER MECHANICAL EQUIPMENT.
4. IT IS RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE CUTTING AND PATCHING TO
ALLOW THE INSTALLATION OF MATERIALS AND EQUIPMENT AS SPECIFIED AND SHOWN ON DRAWINGS.
SYMBOL ABBREV. DESCRIPTION SYMBOL DESCRIPTION
(E)
OR diaø
SHEET NUMBER
SECTION LETTER
SHEET NUMBER
EQUIPMENT TYPE
EQUIPMENT NUMBER
EXISTING
DIAMETER
NEW TO EXISTING POINT OF CONNECTION
NOTE REFERENCE MARKER
PLAN OR DETAIL REFERENCE MARKER
SECTION REFERENCE MARKER W/VIEW DIRECTION
EQUIPMENT MARKER
ROOM NUMBER
EXISTING SHOWN LIGHT
NEW WORK SHOWN BOLD
EXISTING TO BE REMOVED
M-301
AHU
PLAN OR DETAIL NUMBER
DEMOLITION NOTES
1. REVIEW DEMOLITION DRAWINGS FOR ITEMS TO REMAIN, TO BE RETAINED FOR RELOCATION, OR TO BE SALVAGED TO THE OWNER. REFER TO ARCHITECTURAL DOCUMENTS FOR ADDITIONAL REQUIREMENTS.
2. DEMOLISH EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES INTERIOR TO THE BUILDING THAT ARE MADE OBSOLETE BY THE NEW WORK AND/OR ARE ABANDONED
AND NO LONGER IN USE.
3. PROTECT AND MAINTAIN OPERABILE EXISTING EQUIPMENT, FIXTURES, OR SYSTEMS THAT ARE
INDICATED TO REMAIN, INCLUDING ELECTRICAL POWER, CONTROLS, AND RELATED SYSTEMS
REQUIRED TO MAINTAIN OPERABILITY.
4. EXISTING CONDITIONS SHOWN ARE BASED ON RECORD DOCUMENTS AND LIMITED FIELD
OBSERVATIONS OF ACCESSIBLE AREAS AND MAY NOT SHOW THE ENTIRE SCOPE OF DEMOLITION
WORK. OMISSION OF EXISTING EQUIPMENT, FIXTURES, DEVICES, PIPING, CONDUIT, FITTINGS, AND APPURTENANCES FROM THE DEMOLITION DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE DEMOLITION OF SYSTEMS THAT ARE MADE OBSOLETE BY THE NEW WORK, ARE ABANDONED, OR AS OTHERWISE REQUIRED TO PERFORM THE WORK DESCRIBED HEREIN.
5. PROTECT AND MAINTAIN SERVICES TO REMAIN OPERATIONAL THAT PASS THROUGH THE AREA OF CONSTRUCTION. WHERE IT IS NOT POSSIBLE TO MAINTAIN THESE SERVICES INTACT, REPLACE, REROUTE, MODIFY, OR PROVIDE NEW AS REQUIRED TO MAINTAIN SERVICES.
6. EQUIPMENT REMOVAL INCLUDES EXISTING PNEUMATIC CONTROLS COMPONENTS AND PERIPHERALS.
PNEUMATIC CONTROLS REMOVAL INCLUDES, BUT IS NOT LIMITED TO: COMPRESSED AIR TUBING, THERMOSTATS, SWITCHES, PNEUMATIC CONTROLLERS, AND DAMPER OPERATORS.
PACKAGE EQUIPMENT BOUNDRY
M-521
M101
A
A
A
FD FLOOR DRAIN
FWPD
FWPS
CTPD
CTPS
CPD
R
BD
CBD
BWS
FWS
CF
BFW
BOILER PLANT PIPING:
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP SUCTION
CONDENSATE PUMP DISCHARGE
PUMP RECIRCULATION
BOILER BLOWDOWN
CONTINUOUS BLOWDOWN
BOILER WATER SAMPLE
FEEDWATER SAMPLE (FROM DEAERATOR)
CHEMICAL FEED
BOILER FEEDWATER
STEAM & CONDENSATE PIPING:
HYDRONIC PIPING:
HS
HR
CDS
CDR
LPS
MPS
HPS
LPR
MPR
HPR
VR
PR
HEATING WATER SUPPLY
HEATING WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAM
HIGH PRESSURE STEAM
LOW PRESSURE RETURN
MEDIUM PRESSURE RETURN
HIGH PRESSURE RETURN
VACUUM RETURN
PUMPED RETURN
CWS
CWR
CHILLED WATER SUPPLY
CHILLED WATER RETURN
PLUMBING PIPING:
CW POTABLE COLD WATER
HW POTABLE HOT WATER
HWR POTABLE HOT WATER RETURN
NP NON-POTABLE COLD WATER
W SANITARY WASTE
V SANITARY PLUMBING VENT
IRW NON-POTABLE COLD WATER (IRRIGATION)
HTHW POTABLE HOT WATER - HIGH TEMP (140°F OR HIGHER)
PAW PUMPED ACID WASTE
CONTROLS
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
BCS INPUT/OUTPUT POINT
AI = ANALOG INPUT
AO = ANALOG OUTPUT
C = COMMUNICATION
DI = DIGITAL INPUT
DO = DIGITAL OUTPUT
FUNCTION DESIGNATION
S/S = START/STOP
MOTOR STARTER (W/EQUIPMENT
INDICATED UNDERLINE)
EQUIPMENT CONTROL PANEL (W/EQUIP.
INDICATED UNDERLINED)
BCP = BOILER CONTROL PANEL
CP = CONTROL PANEL
VFD = VARIABLE FREQUENCY DRIVE
FAP = FIRE ALARM PANEL
CCP = CHILLER CONTROL PANEL
CWP-2
CWP-2
VFD
AI
ALARM
PROCESS PIPING SIGNAL
ELECTRICAL SIGNAL
FT
FUNCTIONAL IDENTIFIER
FIELD MOUNTED
INSTRUMENT NUMBER
1** STEAM SYSTEMS
2** BOILER WATER SYSTEMS
3** FUEL SYSTEMS
4** FUEL OIL
5** BOILER No. 1 6** BOILER No. 2 7** BOILER No. 3
8** INDUSTRIAL WATER
PANEL FRONT MOUNTED
INSIDE PANEL MOUNTED
CONTROL PANEL
PCP = PLANT CONTROL PANEL
BCP = BOILER CONTROL PANEL
PCP
FUNCTIONS
BC BURNER CONTROL
BS BURNER SAFETY
CT CONDUCTIVITY TRANSMITTER
CE CONDUCTIVITY SENSOR
FCS FLOW CONTROL SWITCH
FCV FLOW CONTROL VALVE
FI FLOW INDICATOR
FSS FLOW SAFETY SWITCH
FT FLOW TRANSMITTER
IS CURRENT SWITCH
LCH LEVEL CONTROLLER HIGH
LCS LEVEL CONTROL SWITCH
LE LEVEL SENSOR
LI LEVEL INDICATOR
LSHH LEVEL SWITCH HIGH
LSLL LEVEL SWITCH LOW
LT LEVEL TRANSMITTER
M MOTOR POSITIONER
MT HUMIDITY TRANSMITTER
OS OXYGEN SENSOR
OT OXYGEN TRANSMITTER
PCV PRESSURE CONTROL VALVE
PI PRESSURE INDICATOR
PSS PRESSURE SAFETY SWITCH
PSH PRESSURE SWITCH HIGH
PSL PRESSURE SWITCH LOW
PSV PRESSURE SAFETY VALVE
PT PRESSURE TRANSMITTER
SH SPRING HANGER
TI TEMPERATURE INDICATOR
TT TEMPERATURE TRANSMITTER
US MULTI-CHANNEL ANNUNCIATOR
UC MULTI-CHANNEL CONTROLLER
UR MULTI-CHANNEL RECORDER
ZS POSITION SWITCH
PPPP
DATE:
DRAWN:
CHECKED:
PROJECT:
DESIGNED:
725 A Street
Springfield, OR 97477
541.342.7210 systemswestengineers.com
SYSTEMS WEST ENGINEERS
OWNER:
LOCATION:
MARK DATE DESCRIPTION
/2
/2
:4 :0
P
M
STEAM CENTRAL
PLANT SURGE &
DEAERATOR TANK
REPLACEMENT
P
LO
T T E D
B Y
JS
H
O N
PHYSICAL
PLANT
ONE UNIVERSITY
BLVD, LA GRAND, OR
97850
EASTERN OREGON
UNIVERSITY
LEGEND,
GENERAL
NOTES, &
SHEET INDEX
03/16/2022
X033.01
M001
MLO
JSH
GNL
© Systems West Engineers, Inc. 2022. The signature in this document is encrypted. Editing this document is prohibited. (OAR 820)
1 22/03/2022 ADDENDUM #1
sgw
| Sheets |
| M001 - LEGEND, GENERAL NOTES, & SHEET INDEX |
| M123 - FLOOR PLAN - ROOF |
| 2022-03-22T15:53:47-0700 | |
| Gregory Langdon |
File details come from the government source that posted it. Updated .