The document is a Lowest Price Technically Acceptable (LPTA) procurement form for an Ammonia Preconditioner solicitation issued by Argonne National Laboratory in partnership with Purdue Zucrow Labs. The procurement requires a supplier to design, fabricate, and integrate an ammonia preconditioner system that can harness waste heat from a gas turbine/combustor to partially crack incoming fuel and supply pressurized gases.

The procurement specifies a total performance period not to exceed 52 weeks, broken down into design drawings (8 weeks), procurement and fabrication (30 weeks), and testing and training (2 weeks). The vendor will be responsible for developing components, integrating Argonne-supplied parts, creating a human-machine interface in LabView, and ensuring utility and combustor exhaust connections. The solicitation, issued by the Department of Energy Office of Science, emphasizes that the evaluation will be based on the Lowest Price, Technically Acceptable methodology, with questions from potential offerors due by 5:00 pm CDT on August 15, 2026.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Purchase Req G5-192028

Lowest Price Technically Acceptable – Procurement Strategy

Dated _______ – Addendum to Supplier Quote (TO BE FILLED OUT BY ALL OFFEROR’S – areas in red below) PROCUREMENT DESCRIPTION: The vendor will integrate various Argonne supplied components along with some designed/specified by him to build an integrated ammonia preconditioner system.

1. Period of Performance is as follows:

Design Drawings

Max. 8 weeks Procurement & Fabrication

Max. 30 weeks Testing & training max. 2 weeks

Total

Not to exceed 52 weeks ___________________(Manufacturing Company Name) will provide all items under Schedule in SOW on Page _________based upon the above schedule.

OR

___________________(Manufacturing Company Name) will provide all items under Schedule in SOW under the below schedule: (STATE EXCEPTIONS)

2. Technical Requirements and Acceptance Criteria (as described under Requirements in SOW under Sections 4.0 Tasks, 5.0 Deliverables, and 6.0 Government Owned Property) ___________________(Manufacturing Company Name) takes the following exceptions to the technical requirements and Acceptance Criteria described in the SOW on Page ________

OR

List each exception (if there are no exceptions, please state all requirements will be met)

3. Delivery Requirements (as described under Requirements in SOW under Sections 8.0 Place of Performance, and 10.0 Details of Final Delivery Site) ___________________(Manufacturing Company Name) takes the following exceptions to the Delivery Requirements described in the SOW on Page ________

OR

List each exception (if there are no exceptions, please state all requirements will be met)

Please sign and date:

Approval ____________________________

Manufacturing Company Rep

Date