- Ammonia Preconditioner
- Solicitation number
- 5-S176-Q-00687-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is an Addendum (No. 003) to a Request for Quotation (RFQ) 5-S176-Q-00687-00 issued by Argonne National Laboratory for an ammonia preconditioner system. The addendum provides detailed technical responses to eight specific vendor questions, including clarifications on valve actuation (pneumatic preferred), nitrogen supply availability at 100 psig, physical space requirements (standard 20 ft container footprint), piping material specifications (high nickel alloy for hot parts over 400°C, 304 stainless steel for others), and process design constraints.
The solicitation, managed by the Department of Energy Office of Science, seeks a supplier to integrate Argonne-supplied components and design a preconditioner system capable of harnessing waste heat from a gas turbine/combustor to partially crack incoming fuel and produce a pressurized gas mixture of ammonia, hydrogen, and nitrogen. The procurement will use a Lowest Price Technically Acceptable (LPTA) methodology, with an offer deadline extended to September 12th. The vendor must develop a LabView-based human-machine interface for data acquisition and control, and design the unit to facilitate utility connections and combustor exhaust integration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Optidrive E3 IP66 - STD Flyer USA V1.3.pdf | ||
| D04-datasheet-04-2024.pdf | ||
| HX 3 and HX4 DWG-(2024-11-04).pdf | ||
| Addendum and Acknowledgement Doc 002.doc | DOC document | |
| HX1-(2025-01-10).pdf | ||
| Addendum and Acknowledgement Doc.doc | DOC document | |
| Instructions to Offerors G5-192028.doc | DOC document | |
| ANL-70B Reps and Certs Long-14-FEB-2025.PDF | ||
| Appendix A-71COM-13-FEB-2023.PDF | ||
| ANL-70 Request for Quotation.doc | DOC document | |
| SOW_Preconditioner Integration-V5.docx | DOCX document | |
| Property Requirements-08-MAY-2025.PDF | ||
| LPTA_Form - Ammonia Preconditioner.doc | DOC document | |
| Appendix D8C-12-DEC-2023.PDF | ||
| Special Cl-Progress Pmts-02-SEP-2015.PDF | ||
| Property Questionnaire-08-SEP-2023.PDF |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOLLY HUNTER
Procurement Specialist 3 Office of the Chief Financial Officer
Procurement Department
Argonne National Laboratory
9700 South Cass Avenue, Bldg. 201
Lemont, IL 60439
(630)252-3094 mollyhunter@anl.gov
8/28/2025
TO ALL OFFERORS:
Subject:
Request for 5-S176-Q-00687-00 No.
Addendum No. 003 Attached herewith for your information and use in preparing your proposal for subject project is one (1) copy of Addendum No. 003.
Kindly acknowledge receipt of this Addendum by signing and returning one (1) copy of this letter.
Please email receipt to Procurement at mollyhunter@anl.gov .
Sincerely, MOLLY HUNTER
Procurement Specialist 3 Procurement Department
Receipt Acknowledged:
Company:
By:
cc:
File
CF
Addendum No.
TO
REQUEST FOR 5-S176-Q-00687-00
FOR
Argonne National Laboratory
BLDG. 201 OCF
9700 S. Cass Ave.
Lemont, IL 60439
8/28/2025 This addendum is being issued to modify the subject REQUEST FOR Quotation (RFQ) 5-S176-Q-00687-00 as follows:
1. Are the valves pneumatically or electrically actuated? Which option is preferred?
A1: Either will be fine. However, we are cognizant of the fact that pneumatically activated valves are a lot cheaper.
2. In the case of pneumatic valves, does the laboratory have an air supply? If so, what is the available operating pressure?
A2: The lab has nitrogen supply available at 100 psig which they can use. It is a lot cleaner than compressed air.
3. Regarding the ammonia recovery unit, are there any requirements concerning its physical space (footprint, clearances, installation constraints)?
A3: standard 20 ft. container footprint, i.e., 8 ft x 20 ft. would be ideal. It may be packaged in two skids/ containers/ trailers.
4. Do you have cold water available for cooling purposes?
A4: Yes.
5. What is the preferred piping material for this application?
A5: For hot parts (T > 400 DEG C, especially at stations 6 & 7) that get in touch with ammonia or H2, try to use high nickel alloy like SAE 330. For all others, you can use 304 ss.
6. Please confirm the reduction of P4. Would you agree to eliminate P1 and have the entire process operate at P4?
A6: The catalyzed heat exchanger, HX-1, is designed to operate at 1.1 barg. So, it is not possible for the entire process to operate at P4.
7. Would you be willing to modify the flow control strategy if technically advantageous?
A7: Yes.
8. Is insulation required for piping?
A8: Please use insulation to reduce heat losses for most of the piping, except at station 8, where the cracked gas will be cooled to a temperature that is acceptable by the compressor P2.
U. S. Department of Energy laboratory managed by UChicago Argonne, LLC