This file is a draft self-scoring matrix and evaluation framework for the Logistics Civil Augmentation Program VI (LOGCAP VI) Highest Technically Rated Offeror (HTRO) selection process. The matrix is designed to evaluate contractor qualifications across multiple technical factors organized into four primary categories: Financial & Accounting (eligibility gate), Management/Planning/Rapid Response, Core Life Support Services, and Supply & Materiel Management. Evaluation is geographically segmented across six combatant commands (AFRICOM, CENTCOM, EUCOM, INDOPACOM, NORTHCOM, and SOUTHCOM), with specific experience requirements tailored to each theater. The matrix employs a five-tier scoring system (1000/800/600/400/200 points) for which contractors can self-score based on demonstrated experience, with government validation potentially adjusting scores downward only. The minimum technical rating threshold and total available points are marked as redacted (XXXXX), and offerors must provide citations linking claimed experience to supporting documentation. Contractors must substantiate experience as prime contractors only—joint ventures are permitted if actively established, but teaming agreements are not accepted to ensure single-point accountability.
Key evaluation factors include corporate governance and program management office experience managing 4+ geographic combatant commands with logistical sustainment planning across multiple simultaneous sites; global human capital management experience recruiting and sustaining 5,000+ personnel across contingency environments; subcontract management across 30+ labor vendors and 100+ equipment vendors per theater; mobilization and surge capabilities achieving 72-hour deployment timelines to 5+ sites; life support area establishment managing 10,000+ personnel per site across multiple locations with 36+ months of operational data; horizontal and vertical infrastructure projects totaling $100M+ in value per theater; expeditionary basing systems deployment (Force Provider and BEAR systems) supporting 1,000+ personnel populations; force protection engineering covering 4 distinct project types with 25,000+ linear feet of barriers; shelter and billeting operations managing 10,000+ PAX across 15+ simultaneous sites; power generation and distribution managing 25+ megawatts with 15+ critical facilities; water production exceeding 1,000,000 gallons per day with 12+ months operational history; food service operations at 30,000+ meals per day across 15+ dining facilities; waste management handling 80,000+ tons per month; supply support activities processing 10,000,000+ lines per month across 7+ supply classes; inventory management maintaining 100% accountability and 99% in-transit visibility accuracy; property book management of 100,000+ line items or $1B+ in government-furnished property; and Class III bulk fuel operations managing 5,000,000+ gallons per month across all fuel types. All experience submissions require 12+ months of sustained operations and must be documented with specific citations to contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LOGCAP VI HTRO Matrix.xlsx | XLSX spreadsheet | |
| LOGCAP VI HTRO RFI.pdf | ||
| LOGCAP VI HTRO Data Dictionary.xlsx | XLSX spreadsheet | |
| LOGCAP_VI_PWS_DRAFT_v6_20260209.pdf | ||
| 3.0 Feedback on Draft HTRO Matrix.pdf | ||
| LOGCAPVI_HTRO_MATRIX_DRAFT_20260511.xlsx | XLSX spreadsheet | |
| 5.0 CLIN Structure Feedback and White Paper Submission.pdf | ||
| 4.0 PWS Feedback and Future Capabilities.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 1 - Instructions LOGCAP HTRO Self-Scoring Matrix Instructions (Draft)
| Total Number of Points Available: |
| Minimum Technical Rating Threshold: |
| Guidelines for Experience Submissions: |
We are seeking industry feedback on our proposed experience requirements. Please note our current stance on acceptable submissions:
| • | Prime Experience Only: All submitted proof of workload and experience must come from projects where your organization was the Prime Contractor. |
| • | Joint Ventures Allowed: We will accept submissions from current, actively established Joint Ventures. |
| • | No Teaming Agreements: Teaming Agreements will not be accepted. The Government's intent is to ensure the Prime Contractor maintains single-point accountability and operational control, rather than distributing the core workload across multiple teamed vendors. |
| 1. WORK SAMPLE INDEX: Offeror will provide up to XXXXX |
| 2. TAB 2 - MATRIX: Offeror will use the drop-downs in Column I to select their self-score (1000/800/600/400/200) for each Evaluation Category they can substantiate. |
| 3. TAB 2 - MATRIX: Evaluation Categories the Offeror cannot substantiate shall be left blank (blank = 0 points). |
| 4. TAB 2 - MATRIX: Points are automatically calculated using the Weight Factor in Column G. |
| 5. TAB 2 - MATRIX: Cell J (Offeror Weighted Score) sums to the Offeror Self-Score Total shown at the bottom of TAB 2. |
| 6. CROSS REFERENCE MATRIX: For each scored Evaluation Category, the Offeror shall provide citations (document title/date/page/paragraph, etc.) tied to XXXX |
| 7. Government will validate scores and may only adjust scores downward (no upward adjustments). |
| NOTE: Only Offerors who meet or exceed the MTTR and are otherwise eligible for award will be considered qualifying for award. |
Tab 2 - Matrix
| LOGCAP Highest Technically Rated Offeror (HTRO) SELF-SCORING MATRIX (Draft) |
| Factor: LOGCAP Experience Self-Scoring Matrix (No Price Evaluation for MATOC award) |
| Offeror/Team Name: |
| Evaluation Category (Bucket / Subfactor / COCOM) | 1000 | 800 | 600 | 400 | 200 | Weight Factor | Max Possible Pts | Offeror's Response | Offeror's Weighted Score | Gov Validated Response | Gov Validated Score | Work Sample # | Citation (Doc Title/Date/Page/Para) |
| Financial & Accounting (Pass/Fail – Eligibility Gate) | |||||||||||||
| Adequate Accounting System and Cost Management CapabilityThis factor evaluates whether the offeror possesses an approved accounting system, the ability to segregate costs at the task order level, and the necessary system controls and documentation to maintain audit readiness for cost-type and hybrid task orders. | |||||||||||||
| Financial Capability for maintaining liquidity for rapid action expenditures at a scale of $8M per day or $240M per month. | |||||||||||||
| Eligibility Gate Result (auto-calculated): if FAIL, Offeror is NOT FURTHER EVALUATED | |||||||||||||
| 1. Management, Planning, and Rapid Response PWS 02 |
Corporate Governance & Program Management Office (PMO) (PWS 02.01 / 10.02) - The contractor shall provide documented proof of program management experience overseeing large and complex logistics requirements, with specific examples of ensuring mission success under contested conditions, detailing the centralized strategic management, planning, and reach-back support provided.
| Corporate Governance & PMO | Program Management Plan (PMP) Demonstrates global portfolio (4+ GCCs) and has been accepted on 3+ contracts that include logistic sustainment planning and operations executed for 5+ sites / multiple service lines, occuring simultaneously | PMP Demonstrates global portfolio (2+ GCCs) and has been accepted on 2+ contracts that include logistic sustainment planning and operations executed for 3+ sites / multiple service lines, occuring simultaneously | PMP Demonstrates global portfolio (1+ GCCs) and has been accepted on 1+ contracts that include logistic sustainment planning and operations executed for 1+ sites / multiple service lines | Comprehensive PMP. No evidence of USG acceptance. | A basic PMP or collection of corporate policies |
| Global Human Capital Mgmt. | |||||
| Evidence of recruiting, mobiliizing and sustaining a workforce (5,000+ personnel) across 3+ GCCs in contingency environment, occuring simultaneously | Evidence of recruiting, mobilizing and sustaining a workforce (2,500 - 4,999 personnel) across 2 GCCs in contingency, occuring simultaneously | Evidence of recruiting, mobilizing and sustaining a workforce (1,000 - 2,499 personnel) across 2 GCCs in contingency, occuring simultaneously | 100+ PAC in 1 GCC (contingency) | Plan with limited evidence of contingency | |
| Subcontract Management (PWS 02.01) - |
The contractor shall provide documented proof of its subcontract management execution and strategic procurement capabilities.
| AFRICOM | 30+ subcontracted labor vendors (3,500+ total subcontracted personnel); 100+ Subcontracted equipment material vendors | ||||
| 20 -29 subcontracted labor vendors (2,500 - 3,499 total subcontracted personnel); 75+ Subcontracted equipment material vendors | 10-19 subcontracted labor vendors (1,500 - 2,499 total subcontracted personnel); 50+ Subcontracted equipment material vendors | 1-9 subcontracted labor vendors (500 - 1,499 total subcontracted personnel); 25+ Subcontracted equipment material vendors | Plan/advisory only; no executed subcontract mgmt | ||
| CENTCOM | 30+ subcontracted labor vendors (3,500+ total subcontracted personnel); 100+ Subcontracted equipment material vendors | ||||
| 21 -29 subcontracted labor vendors (2,500 - 3,499 total subcontracted personnel); 75+ Subcontracted equipment material vendors | 10-19 subcontracted labor vendors (1,500 - 2,499 total subcontracted personnel); 50+ Subcontracted equipment material vendors | 1-9 subcontracted labor vendors (500 - 1,499 total subcontracted personnel); 25+ Subcontracted equipment material vendors | Plan/advisory only; no executed subcontract mgmt | ||
| EUCOM | 30+ subcontracted labor vendors (3,500+ total subcontracted personnel); 100+ Subcontracted equipment material vendors | ||||
| 22 -29 subcontracted labor vendors (2,500 - 3,499 total subcontracted personnel); 75+ Subcontracted equipment material vendors | 10-19 subcontracted labor vendors (1,500 - 2,499 total subcontracted personnel); 50+ Subcontracted equipment material vendors | 1-9 subcontracted labor vendors (500 - 1,499 total subcontracted personnel); 25+ Subcontracted equipment material vendors | Plan/advisory only; no executed subcontract mgmt | ||
| INDOPACOM | 30+ subcontracted labor vendors (3,500+ total subcontracted personnel); 100+ Subcontracted equipment material vendors | ||||
| 23 -29 subcontracted labor vendors (2,500 - 3,499 total subcontracted personnel); 75+ Subcontracted equipment material vendors | 10-19 subcontracted labor vendors (1,500 - 2,499 total subcontracted personnel); 50+ Subcontracted equipment material vendors | 1-9 subcontracted labor vendors (500 - 1,499 total subcontracted personnel); 25+ Subcontracted equipment material vendors | Plan/advisory only; no executed subcontract mgmt | ||
| NORTHCOM | 30+ subcontracted labor vendors (3,500+ total subcontracted personnel); 100+ Subcontracted equipment material vendors | ||||
| 24 -29 subcontracted labor vendors (2,500 - 3,499 total subcontracted personnel); 75+ Subcontracted equipment material vendors | 10-19 subcontracted labor vendors (1,500 - 2,499 total subcontracted personnel); 50+ Subcontracted equipment material vendors | 1-9 subcontracted labor vendors (500 - 1,499 total subcontracted personnel); 25+ Subcontracted equipment material vendors | Plan/advisory only; no executed subcontract mgmt | ||
| SOUTHCOM | 30+ subcontracted labor vendors (3,500+ total subcontracted personnel); 100+ Subcontracted equipment material vendors | ||||
| 25 -29 subcontracted labor vendors (2,500 - 3,499 total subcontracted personnel); 75+ Subcontracted equipment material vendors | 10-19 subcontracted labor vendors (1,500 - 2,499 total subcontracted personnel); 50+ Subcontracted equipment material vendors | 1-9 subcontracted labor vendors (500 - 1,499 total subcontracted personnel); 25+ Subcontracted equipment material vendors | Plan/advisory only; no executed subcontract mgmt | ||
| Mobilization & surge capability (rapid onboarding, in-theater sourcing, compliance) supporting surge/execution phases - (PWS 02.03.01) | |||||
| AFRICOM | Surge mobilization achieved for 5+ sites / 72-hr timelines suppted | Surge mobilization achieved for 3–4 sites / 72-hr timelines suppted | Surge mobilization achieved for 2 sites / timelines suppted | Surge mobilization achieved for 1 site / timelines suppted | Plan only / no executed surge support |
| CENTCOM | Surge mobilization achieved for 5+ sites / 72-hr timelines suppted | Surge mobilization achieved for 3–4 sites / 72-hr timelines suppted | Surge mobilization achieved for 2 sites / timelines suppted | Surge mobilization achieved for 1 site / timelines suppted | Plan only / no executed surge support |
| EUCOM | Surge mobilization achieved for 5+ sites / 72-hr timelines suppted | Surge mobilization achieved for 3–4 sites / 72-hr timelines suppted | Surge mobilization achieved for 2 sites / timelines suppted | Surge mobilization achieved for 1 site / timelines suppted | Plan only / no executed surge support |
| INDOPACOM | Surge mobilization achieved for 5+ sites / 72-hr timelines suppted | Surge mobilization achieved for 3–4 sites / 72-hr timelines suppted | Surge mobilization achieved for 2 sites / timelines suppted | Surge mobilization achieved for 1 site / timelines suppted | Plan only / no executed surge support |
| NORTHCOM | Surge mobilization achieved for 5+ sites / 72-hr timelines suppted | Surge mobilization achieved for 3–4 sites / 72-hr timelines suppted | Surge mobilization achieved for 2 sites / timelines suppted | Surge mobilization achieved for 1 site / timelines suppted | Plan only / no executed surge support |
| SOUTHCOM | Surge mobilization achieved for 5+ sites / 72-hr timelines suppted | Surge mobilization achieved for 3–4 sites / 72-hr timelines suppted | Surge mobilization achieved for 2 sites / timelines suppted | Surge mobilization achieved for 1 site / timelines suppted | Plan only / no executed surge support |
| Program/Project management for establishing Life Support Areas (LSAs) (site assessments, schedules, risk & environmental assessments) - (PWS 02.0 / 03.0) |
The contractor shall provide documented proof of its project management experience in establishing Life Support Areas (LSAs).
| AFRICOM | >=10,000 PAX per site at 5+ sites | 5,000+ per site at 3-4 sites | 1,000+ per site at 2 sites | 250+ per site at 1 site | <250 (meets minimum) |
| CENTCOM | >=10,000 PAX per site at 5+ sites | 5,000+ per site at 3-4 sites | 1,000+ per site at 2 sites | 250+ per site at 1 site | <250 (meets minimum) |
| EUCOM | >=10,000 PAX per site at 5+ sites | 5,000+ per site at 3-4 sites | 1,000+ per site at 2 sites | 250+ per site at 1 site | <250 (meets minimum) |
| INDOPACOM | >=10,000 PAX per site at 5+ sites | 5,000+ per site at 3-4 sites | 1,000+ per site at 2 sites | 250+ per site at 1 site | <250 (meets minimum) |
| NORTHCOM | >=10,000 PAX per site at 5+ sites | 5,000+ per site at 3-4 sites | 1,000+ per site at 2 sites | 250+ per site at 1 site | <250 (meets minimum) |
| SOUTHCOM | >=10,000 PAX per site at 5+ sites | 5,000+ per site at 3-4 sites | 1,000+ per site at 2 sites | 250+ per site at 1 site | <250 (meets minimum) |
| 2. Engineering & Construction PWS 03.0 | |||||
| Utilities Engineering Planning & Design (Power, Water, Operational Energy) (PWS 03.0) |
The contractor shall provide documented proof of its comprehensive planning and design capabilities for essential utility systems.
AFRICOM Population Support >10K Duration > 36 Months Power Uptime >98% Water Uptime >98% Operational Data >36 Months Energy Reduction Plans 5+ Water system plans 5+ Population Support >5K Duration > 24 Months Power Uptime >95% Water Uptime >95% Operational Data >24 Months Energy Reduction Plans 3-4 Water system plans 3-4 Population Support >1K Duration > 12 Months Power Uptime >92% Water Uptime >92% Operational Data >12 Months Energy Reduction Plans 1-2 Water system plans 1-2 Population Support >250 Duration > 9 Months Power Uptime >90% Water Uptime >90% Operational Data >9 Months Population Support <250 Duration > 6 Months Power Uptime >85% Water Uptime >85% Operational Data >6 Months CENTCOM Population Support >10K Duration > 36 Months Power Uptime >98% Water Uptime >98% Operational Data >36 Months Energy Reduction Plans 5+ Water system plans 5+ Population Support >5K Duration > 24 Months Power Uptime >95% Water Uptime >95% Operational Data >24 Months Energy Reduction Plans 3-4 Water system plans 3-5 Population Support >1K Duration > 12 Months Power Uptime >92% Water Uptime >92% Operational Data >12 Months Energy Reduction Plans 1-2 Water system plans 1-3 Population Support >250 Duration > 9 Months Power Uptime >90% Water Uptime >90% Operational Data >9 Months Population Support <250 Duration > 6 Months Power Uptime >85% Water Uptime >85% Operational Data >6 Months EUCOM Population Support >10K Duration > 36 Months Power Uptime >98% Water Uptime >98% Operational Data >36 Months Energy Reduction Plans 5+ Water system plans 5+ Population Support >5K Duration > 24 Months Power Uptime >95% Water Uptime >95% Operational Data >24 Months Energy Reduction Plans 3-4 Water system plans 3-6 Population Support >1K Duration > 12 Months Power Uptime >92% Water Uptime >92% Operational Data >12 Months Energy Reduction Plans 1-2 Water system plans 1-4 Population Support >250 Duration > 9 Months Power Uptime >90% Water Uptime >90% Operational Data >9 Months Population Support <250 Duration > 6 Months Power Uptime >85% Water Uptime >85% Operational Data >6 Months INDOPACOM Population Support >10K Duration > 36 Months Power Uptime >98% Water Uptime >98% Operational Data >36 Months Energy Reduction Plans 5+ Water system plans 5+ Population Support >5K Duration > 24 Months Power Uptime >95% Water Uptime >95% Operational Data >24 Months Energy Reduction Plans 3-4 Water system plans 3-7 Population Support >1K Duration > 12 Months Power Uptime >92% Water Uptime >92% Operational Data >12 Months Energy Reduction Plans 1-2 Water system plans 1-5 Population Support >250 Duration > 9 Months Power Uptime >90% Water Uptime >90% Operational Data >9 Months Population Support <250 Duration > 6 Months Power Uptime >85% Water Uptime >85% Operational Data >6 Months NORTHCOM Population Support >10K Duration > 36 Months Power Uptime >98% Water Uptime >98% Operational Data >36 Months Energy Reduction Plans 5+ Water system plans 5+ Population Support >5K Duration > 24 Months Power Uptime >95% Water Uptime >95% Operational Data >24 Months Energy Reduction Plans 3-4 Water system plans 3-8 Population Support >1K Duration > 12 Months Power Uptime >92% Water Uptime >92% Operational Data >12 Months Energy Reduction Plans 1-2 Water system plans 1-6 Population Support >250 Duration > 9 Months Power Uptime >90% Water Uptime >90% Operational Data >9 Months Population Support <250 Duration > 6 Months Power Uptime >85% Water Uptime >85% Operational Data >6 Months SOUTHCOM Population Support >10K Duration > 36 Months Power Uptime >98% Water Uptime >98% Operational Data >36 Months Energy Reduction Plans 5+ Water system plans 5+ Population Support >5K Duration > 24 Months Power Uptime >95% Water Uptime >95% Operational Data >24 Months Energy Reduction Plans 3-4 Water system plans 3-9 Population Support >1K Duration > 12 Months Power Uptime >92% Water Uptime >92% Operational Data >12 Months Energy Reduction Plans 1-2 Water system plans 1-7 Population Support >250 Duration > 9 Months Power Uptime >90% Water Uptime >90% Operational Data >9 Months Population Support <250 Duration > 6 Months Power Uptime >85% Water Uptime >85% Operational Data >6 Months Horizontal Infrastructure & Vertical Structures and Facilities (PWS 03.06) The contractor shall provide documented proof of its experience across the full spectrum of horizontal infrastructure and vertical construction.
AFRICOM Horizontal Projects >25 UFC 1-201-01 Vertical Projects > 25 Project Scale (Total Horizontal & Vertical) >$100M Horizontal Projects >20 UFC 1-201-01 Vertical Projects > 20 Project Scale (Total Horizontal & Vertical) >$75M Horizontal Projects >15 UFC 1-201-01 Vertical Projects > 15 Project Scale (Total Horizontal & Vertical) >$50M Horizontal Projects >10 UFC 1-201-01 Vertical Projects > 10 Project Scale (Total Horizontal & Vertical) >$25M Horizontal Projects >5 UFC 1-201-01 Vertical Projects > 5 Project Scale (Total Horizontal & Vertical) >$10M CENTCOM Horizontal Projects >25 UFC 1-201-01 Vertical Projects > 25 Project Scale (Total Horizontal & Vertical) >$100M Horizontal Projects >20 UFC 1-201-01 Vertical Projects > 20 Project Scale (Total Horizontal & Vertical) >$75M Horizontal Projects >15 UFC 1-201-01 Vertical Projects > 15 Project Scale (Total Horizontal & Vertical) >$50M Horizontal Projects >10 UFC 1-201-01 Vertical Projects > 10 Project Scale (Total Horizontal & Vertical) >$25M Horizontal Projects >5 UFC 1-201-01 Vertical Projects > 5 Project Scale (Total Horizontal & Vertical) >$10M EUCOM Horizontal Projects >25 UFC 1-201-01 Vertical Projects > 25 Project Scale (Total Horizontal & Vertical) >$100M Horizontal Projects >20 UFC 1-201-01 Vertical Projects > 20 Project Scale (Total Horizontal & Vertical) >$75M Horizontal Projects >15 UFC 1-201-01 Vertical Projects > 15 Project Scale (Total Horizontal & Vertical) >$50M Horizontal Projects >10 UFC 1-201-01 Vertical Projects > 10 Project Scale (Total Horizontal & Vertical) >$25M Horizontal Projects >5 UFC 1-201-01 Vertical Projects > 5 Project Scale (Total Horizontal & Vertical) >$10M INDOPACOM Horizontal Projects >25 UFC 1-201-01 Vertical Projects > 25 Project Scale (Total Horizontal & Vertical) >$100M Horizontal Projects >20 UFC 1-201-01 Vertical Projects > 20 Project Scale (Total Horizontal & Vertical) >$75M Horizontal Projects >15 UFC 1-201-01 Vertical Projects > 15 Project Scale (Total Horizontal & Vertical) >$50M Horizontal Projects >10 UFC 1-201-01 Vertical Projects > 10 Project Scale (Total Horizontal & Vertical) >$25M Horizontal Projects >5 UFC 1-201-01 Vertical Projects > 5 Project Scale (Total Horizontal & Vertical) >$10M NORTHCOM Horizontal Projects >25 UFC 1-201-01 Vertical Projects > 25 Project Scale (Total Horizontal & Vertical) >$100M Horizontal Projects >20 UFC 1-201-01 Vertical Projects > 20 Project Scale (Total Horizontal & Vertical) >$75M Horizontal Projects >15 UFC 1-201-01 Vertical Projects > 15 Project Scale (Total Horizontal & Vertical) >$50M Horizontal Projects >10 UFC 1-201-01 Vertical Projects > 10 Project Scale (Total Horizontal & Vertical) >$25M Horizontal Projects >5 UFC 1-201-01 Vertical Projects > 5 Project Scale (Total Horizontal & Vertical) >$10M SOUTHCOM Horizontal Projects >25 UFC 1-201-01 Vertical Projects > 25 Project Scale (Total Horizontal & Vertical) >$100M Horizontal Projects >20 UFC 1-201-01 Vertical Projects > 20 Project Scale (Total Horizontal & Vertical) >$75M Horizontal Projects >15 UFC 1-201-01 Vertical Projects > 15 Project Scale (Total Horizontal & Vertical) >$50M Horizontal Projects >10 UFC 1-201-01 Vertical Projects > 10 Project Scale (Total Horizontal & Vertical) >$25M Horizontal Projects >5 UFC 1-201-01 Vertical Projects > 5 Project Scale (Total Horizontal & Vertical) >$10M Expeditionary Basing Modules (PWS 03.04) The contractor shall provide documented proof of rapid deployment, configuration, sustainment, and deconstruction of standardized, modular expeditionary basing systems - Force Provider (FP) Systems and Base Expeditionary Airfield Resources (BEAR) Systems.
AFRICOM 5+ Force Provider (FP) systems End-to-End deployments- Supported Population: >1K PAX;
5+ BEAR End-to-End Deployments- Supported Population: >1K PAX 4+ FP systems End-to-End deployments- Supported Population: >750 PAX
4+ BEAR End-to-End Deployments- Supported Population: >750 PAX 3+ FP systems End-to-End deployments- Supported Population: >500 PAX
3+ BEAR End-to-End Deployments- Supported Population: >500 PAX 2+ FP systems End-to-End deployments- Supported Population: >250 PAX
2+ BEAR End-to-End Deployments- Supported Population: >250 PAX 1+ FP systems End-to-End deployments- Supported Population: >100 PAX
1+ BEAR End-to-End Deployments- Supported Population: >100 PAX CENTCOM 5+ Force Provider (FP) systems End-to-End deployments- Supported Population: >1K PAX;
5+ BEAR End-to-End Deployments- Supported Population: >1K PAX 4+ FP systems End-to-End deployments- Supported Population: >750 PAX
4+ BEAR End-to-End Deployments- Supported Population: >750 PAX 3+ FP systems End-to-End deployments- Supported Population: >500 PAX
3+ BEAR End-to-End Deployments- Supported Population: >500 PAX 2+ FP systems End-to-End deployments- Supported Population: >250 PAX
2+ BEAR End-to-End Deployments- Supported Population: >250 PAX 1+ FP systems End-to-End deployments- Supported Population: >100 PAX
1+ BEAR End-to-End Deployments- Supported Population: >100 PAX EUCOM 5+ Force Provider (FP) systems End-to-End deployments- Supported Population: >1K PAX;
5+ BEAR End-to-End Deployments- Supported Population: >1K PAX 4+ FP systems End-to-End deployments- Supported Population: >750 PAX
4+ BEAR End-to-End Deployments- Supported Population: >750 PAX 3+ FP systems End-to-End deployments- Supported Population: >500 PAX
3+ BEAR End-to-End Deployments- Supported Population: >500 PAX 2+ FP systems End-to-End deployments- Supported Population: >250 PAX
2+ BEAR End-to-End Deployments- Supported Population: >250 PAX 1+ FP systems End-to-End deployments- Supported Population: >100 PAX
1+ BEAR End-to-End Deployments- Supported Population: >100 PAX INDOPACOM 5+ Force Provider (FP) systems End-to-End deployments- Supported Population: >1K PAX;
5+ BEAR End-to-End Deployments- Supported Population: >1K PAX 4+ FP systems End-to-End deployments- Supported Population: >750 PAX
4+ BEAR End-to-End Deployments- Supported Population: >750 PAX 3+ FP systems End-to-End deployments- Supported Population: >500 PAX
3+ BEAR End-to-End Deployments- Supported Population: >500 PAX 2+ FP systems End-to-End deployments- Supported Population: >250 PAX
2+ BEAR End-to-End Deployments- Supported Population: >250 PAX 1+ FP systems End-to-End deployments- Supported Population: >100 PAX
1+ BEAR End-to-End Deployments- Supported Population: >100 PAX NORTHCOM 5+ Force Provider (FP) systems End-to-End deployments- Supported Population: >1K PAX;
5+ BEAR End-to-End Deployments- Supported Population: >1K PAX 4+ FP systems End-to-End deployments- Supported Population: >750 PAX
4+ BEAR End-to-End Deployments- Supported Population: >750 PAX 3+ FP systems End-to-End deployments- Supported Population: >500 PAX
3+ BEAR End-to-End Deployments- Supported Population: >500 PAX 2+ FP systems End-to-End deployments- Supported Population: >250 PAX
2+ BEAR End-to-End Deployments- Supported Population: >250 PAX 1+ FP systems End-to-End deployments- Supported Population: >100 PAX
1+ BEAR End-to-End Deployments- Supported Population: >100 PAX SOUTHCOM 5+ Force Provider (FP) systems End-to-End deployments- Supported Population: >1K PAX;
5+ BEAR End-to-End Deployments- Supported Population: >1K PAX 4+ FP systems End-to-End deployments- Supported Population: >750 PAX
4+ BEAR End-to-End Deployments- Supported Population: >750 PAX 3+ FP systems End-to-End deployments- Supported Population: >500 PAX
3+ BEAR End-to-End Deployments- Supported Population: >500 PAX 2+ FP systems End-to-End deployments- Supported Population: >250 PAX
2+ BEAR End-to-End Deployments- Supported Population: >250 PAX 1+ FP systems End-to-End deployments- Supported Population: >100 PAX
1+ BEAR End-to-End Deployments- Supported Population: >100 PAX Force Protection Engineering (Ditches/Berms, Barriers, Defense Structures, Guard Facilities) (PWS 03.06) The contractor shall provide documented proof of its capability to construct and install non-lethal engineering solutions to enhance the security and survivability of a location.
AFRICOM Project Diversity: 4 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >25000 linear ft;
Defensive/Guard Structures: >100;
Integrated System: >5 Access Control Points (ACP) Project Diversity: 3 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >15000 linear ft;
Defensive/Guard Structures: >75;
Integrated System: >3 ACPs Project Diversity: 2 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >10000 linear ft;
Defensive/Guard Structures: >50;
Integrated System: >1 ACPs Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >7500 linear ft;
Defensive/Guard Structures: >30;
Integrated System: >Multiple Elements of an ACP (Berm and Barriers) Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >5000 linear ft;
Defensive/Guard Structures: >10;
Integrated System: Standalone elements Only (Berm or Barriers) CENTCOM Project Diversity: 4 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >25000 linear ft;
Defensive/Guard Structures: >100;
Integrated System: >5 Access Control Points (ACP) Project Diversity: 3 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >15000 linear ft;
Defensive/Guard Structures: >75;
Integrated System: >3 ACPs Project Diversity: 2 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >10000 linear ft;
Defensive/Guard Structures: >50;
Integrated System: >1 ACPs Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >7500 linear ft;
Defensive/Guard Structures: >30;
Integrated System: >Multiple Elements of an ACP (Berm and Barriers) Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >5000 linear ft;
Defensive/Guard Structures: >10;
Integrated System: Standalone elements Only (Berm or Barriers) EUCOM Project Diversity: 4 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >25000 linear ft;
Defensive/Guard Structures: >100;
Integrated System: >5 Access Control Points (ACP) Project Diversity: 3 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >15000 linear ft;
Defensive/Guard Structures: >75;
Integrated System: >3 ACPs Project Diversity: 2 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >10000 linear ft;
Defensive/Guard Structures: >50;
Integrated System: >1 ACPs Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >7500 linear ft;
Defensive/Guard Structures: >30;
Integrated System: >Multiple Elements of an ACP (Berm and Barriers) Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >5000 linear ft;
Defensive/Guard Structures: >10;
Integrated System: Standalone elements Only (Berm or Barriers) INDOPACOM Project Diversity: 4 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >25000 linear ft;
Defensive/Guard Structures: >100;
Integrated System: >5 Access Control Points (ACP) Project Diversity: 3 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >15000 linear ft;
Defensive/Guard Structures: >75;
Integrated System: >3 ACPs Project Diversity: 2 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >10000 linear ft;
Defensive/Guard Structures: >50;
Integrated System: >1 ACPs Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >7500 linear ft;
Defensive/Guard Structures: >30;
Integrated System: >Multiple Elements of an ACP (Berm and Barriers) Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >5000 linear ft;
Defensive/Guard Structures: >10;
Integrated System: Standalone elements Only (Berm or Barriers) NORTHCOM Project Diversity: 4 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >25000 linear ft;
Defensive/Guard Structures: >100;
Integrated System: >5 Access Control Points (ACP) Project Diversity: 3 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >15000 linear ft;
Defensive/Guard Structures: >75;
Integrated System: >3 ACPs Project Diversity: 2 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >10000 linear ft;
Defensive/Guard Structures: >50;
Integrated System: >1 ACPs Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >7500 linear ft;
Defensive/Guard Structures: >30;
Integrated System: >Multiple Elements of an ACP (Berm and Barriers) Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >5000 linear ft;
Defensive/Guard Structures: >10;
Integrated System: Standalone elements Only (Berm or Barriers) SOUTHCOM Project Diversity: 4 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >25000 linear ft;
Defensive/Guard Structures: >100;
Integrated System: >5 Access Control Points (ACP) Project Diversity: 3 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >15000 linear ft;
Defensive/Guard Structures: >75;
Integrated System: >3 ACPs Project Diversity: 2 distinct project types: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >10000 linear ft;
Defensive/Guard Structures: >50;
Integrated System: >1 ACPs Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >7500 linear ft;
Defensive/Guard Structures: >30;
Integrated System: >Multiple Elements of an ACP (Berm and Barriers) Project Diversity: 1 distinct project type: Earthworks, Barriers, Defensive Structures, Guard Facilities;
Barrier Distance: >5000 linear ft;
Defensive/Guard Structures: >10;
Integrated System: Standalone elements Only (Berm or Barriers)
3. Core Life Support Services PWS 04.00:
Shelter & Billeting / Occupancy Management (PWS 04.02.01) The contractor shall provide documented proof of its experience in operating, inspecting, and maintaining personnel housing and billeting facilities.
AFRICOM Major Installation / Theater Level:
PAX Managed >= 10,000 PAX Total Number of separate sites managed simultaneously >= 15 12+ Months Large Installation / Brigade Level:
PAX Managed 5,000-9,999 PAX Total Number of separate sites managed simultaneously 10-15 12+ Months Medium Installation / Battalion Level: PAX Managed 1,000-4,999 PAX Total Number of separate sites managed simultaneously 5-10 12+ Months Small Installation / Company Level:
PAX Managed 250-999 PAX Total Number of separate sites managed simultaneously 2-5 12+ Months Detachment / Small Site Level:
PAX Managed 1-249 PAX Total 12+ Months CENTCOM Major Installation / Theater Level:
PAX Managed >= 10,000 PAX Total Number of separate sites managed simultaneously >= 15 12+ Months Large Installation / Brigade Level:
PAX Managed 5,000-9,999 PAX Total Number of separate sites managed simultaneously 10-15 12+ Months Medium Installation / Battalion Level: PAX Managed 1,000-4,999 PAX Total Number of separate sites managed simultaneously 5-10 12+ Months Small Installation / Company Level:
PAX Managed 250-999 PAX Total Number of separate sites managed simultaneously 2-5 12+ Months Detachment / Small Site Level:
PAX Managed 1-249 PAX Total 12+ Months EUCOM Major Installation / Theater Level:
PAX Managed >= 10,000 PAX Total Number of separate sites managed simultaneously >= 15 12+ Months Large Installation / Brigade Level:
PAX Managed 5,000-9,999 PAX Total Number of separate sites managed simultaneously 10-15 12+ Months Medium Installation / Battalion Level: PAX Managed 1,000-4,999 PAX Total Number of separate sites managed simultaneously 5-10 12+ Months Small Installation / Company Level:
PAX Managed 250-999 PAX Total Number of separate sites managed simultaneously 2-5 12+ Months Detachment / Small Site Level:
PAX Managed 1-249 PAX Total 12+ Months INDOPACOM Major Installation / Theater Level:
PAX Managed >= 10,000 PAX Total Number of separate sites managed simultaneously >= 15 12+ Months Large Installation / Brigade Level:
PAX Managed 5,000-9,999 PAX Total Number of separate sites managed simultaneously 10-15 12+ Months Medium Installation / Battalion Level: PAX Managed 1,000-4,999 PAX Total Number of separate sites managed simultaneously 5-10 12+ Months Small Installation / Company Level:
PAX Managed 250-999 PAX Total Number of separate sites managed simultaneously 2-5 12+ Months Detachment / Small Site Level:
PAX Managed 1-249 PAX Total 12+ Months NORTHCOM Major Installation / Theater Level:
PAX Managed >= 10,000 PAX Total Number of separate sites managed simultaneously >= 15 12+ Months Large Installation / Brigade Level:
PAX Managed 5,000-9,999 PAX Total Number of separate sites managed simultaneously 10-15 12+ Months Medium Installation / Battalion Level: PAX Managed 1,000-4,999 PAX Total Number of separate sites managed simultaneously 5-10 12+ Months Small Installation / Company Level:
PAX Managed 250-999 PAX Total Number of separate sites managed simultaneously 2-5 12+ Months Detachment / Small Site Level:
PAX Managed 1-249 PAX Total 12+ Months SOUTHCOM Major Installation / Theater Level:
PAX Managed >= 10,000 PAX Total Number of separate sites managed simultaneously >= 15 12+ Months Large Installation / Brigade Level:
PAX Managed 5,000-9,999 PAX Total Number of separate sites managed simultaneously 10-15 12+ Months Medium Installation / Battalion Level: PAX Managed 1,000-4,999 PAX Total Number of separate sites managed simultaneously 5-10 12+ Months Small Installation / Company Level:
PAX Managed 250-999 PAX Total Number of separate sites managed simultaneously 2-5 12+ Months Detachment / Small Site Level:
PAX Managed 1-249 PAX Total 12+ Months Power Generation & Distribution (24/7 Utility Ops) - PWS 04.02.04 The contractor shall provide documented proof of its capability to produce, manage, operate, maintain, and distribute reliable and continuous electrical power throughout a camp, base, or installation.
AFRICOM Installation / City-Scale Utility Power Capacity Managed >=25 MW Number of critical facilities requiring uninterruptible power > 15 Number of microgrids operated > 15 12+ Months Large Base / Campus Level Power Capacity Managed 10-24.9 MW Number of critical facilities requiring uninterruptible power 10-15 Number of microgrids operated 10-15 12+ Months Medium Base / FOB Level Power Capacity Managed 1-9.9 MW Number of critical facilities requiring uninterruptible power 5-9 Number of microgrids operated 5-9 12+ Months Small Camp / Contingency Site Power Capacity Managed 250kW-999 kW Number of critical facilities requiring uninterruptible power 2-4 Number of microgrids operated 1-5 12+ Months Small-Scale Power Capacity Managed <250 kW Number of critical facilities requiring uninterruptible power 1 Number of microgrids operated 0 12+ Months CENTCOM Installation / City-Scale Utility Power Capacity Managed >=25 MW Number of critical facilities requiring uninterruptible power > 15 Number of microgrids operated > 15 12+ Months Large Base / Campus Level Power Capacity Managed 10-24.9 MW Number of critical facilities requiring uninterruptible power 10-15 Number of microgrids operated 10-15 12+ Months Medium Base / FOB Level Power Capacity Managed 1-9.9 MW Number of critical facilities requiring uninterruptible power 5-9 Number of microgrids operated 5-9 12+ Months Small Camp / Contingency Site Power Capacity Managed 250kW-999 kW Number of critical facilities requiring uninterruptible power 2-4 Number of microgrids operated 1-5 12+ Months Small-Scale Power Capacity Managed <250 kW Number of critical facilities requiring uninterruptible power 1 Number of microgrids operated 0 12+ Months EUCOM Installation / City-Scale Utility Power Capacity Managed >=25 MW Number of critical facilities requiring uninterruptible power > 15 Number of microgrids operated > 15 12+ Months Large Base / Campus Level Power Capacity Managed 10-24.9 MW Number of critical facilities requiring uninterruptible power 10-15 Number of microgrids operated 10-15 12+ Months Medium Base / FOB Level Power Capacity Managed 1-9.9 MW Number of critical facilities requiring uninterruptible power 5-9 Number of microgrids operated 5-9 12+ Months Small Camp / Contingency Site Power Capacity Managed 250kW-999 kW Number of critical facilities requiring uninterruptible power 2-4 Number of microgrids operated 1-5 12+ Months Small-Scale Power Capacity Managed <250 kW Number of critical facilities requiring uninterruptible power 1 Number of microgrids operated 0 12+ Months INDOPACOM Installation / City-Scale Utility Power Capacity Managed >=25 MW Number of critical facilities requiring uninterruptible power > 15 Number of microgrids operated > 15 12+ Months Large Base / Campus Level Power Capacity Managed 10-24.9 MW Number of critical facilities requiring uninterruptible power 10-15 Number of microgrids operated 10-15 12+ Months Medium Base / FOB Level Power Capacity Managed 1-9.9 MW Number of critical facilities requiring uninterruptible power 5-9 Number of microgrids operated 5-9 12+ Months Small Camp / Contingency Site Power Capacity Managed 250kW-999 kW Number of critical facilities requiring uninterruptible power 2-4 Number of microgrids operated 1-5 12+ Months Small-Scale Power Capacity Managed <250 kW Number of critical facilities requiring uninterruptible power 1 Number of microgrids operated 0 12+ Months NORTHCOM Installation / City-Scale Utility Power Capacity Managed >=25 MW Number of critical facilities requiring uninterruptible power > 15 Number of microgrids operated > 15 12+ Months Large Base / Campus Level Power Capacity Managed 10-24.9 MW Number of critical facilities requiring uninterruptible power 10-15 Number of microgrids operated 10-15 12+ Months Medium Base / FOB Level Power Capacity Managed 1-9.9 MW Number of critical facilities requiring uninterruptible power 5-9 Number of microgrids operated 5-9 12+ Months Small Camp / Contingency Site Power Capacity Managed 250kW-999 kW Number of critical facilities requiring uninterruptible power 2-4 Number of microgrids operated 1-5 12+ Months Small-Scale Power Capacity Managed <250 kW Number of critical facilities requiring uninterruptible power 1 Number of microgrids operated 0 12+ Months SOUTHCOM Installation / City-Scale Utility Power Capacity Managed >=25 MW Number of critical facilities requiring uninterruptible power > 15 Number of microgrids operated > 15 12+ Months Large Base / Campus Level Power Capacity Managed 10-24.9 MW Number of critical facilities requiring uninterruptible power 10-15 Number of microgrids operated 10-15 12+ Months Medium Base / FOB Level Power Capacity Managed 1-9.9 MW Number of critical facilities requiring uninterruptible power 5-9 Number of microgrids operated 5-9 12+ Months Small Camp / Contingency Site Power Capacity Managed 250kW-999 kW Number of critical facilities requiring uninterruptible power 2-4 Number of microgrids operated 1-5 12+ Months Small-Scale Power Capacity Managed <250 kW Number of critical facilities requiring uninterruptible power 1 Number of microgrids operated 0 12+ Months Water & Ice Service / Water Resource Management Plan (WRMP) (PWS 04.02.04.07) The contractor shall provide documented proof of its capability to source, produce, treat, and manage both potable and non-potable water services.
AFRICOM Major Utility-Scale Production:
>=1,000,000 GPD; through water treatment plant;
and ROWPU Ops >250,000 GPD 12+ Months Large-Scale Water Production:
250,000-999,999 GPD;
and ROWPU Ops 50,000-249,999 GDP 12+ Months Medium-Scale Production / ROWPU Ops:
50,000-249,999 GPD
12+ Months Small-Scale Production / Field Ops:
5,000-49,999 GPD
12+ Months Point-of-Use / Small Detachment:
<5,000 GPD
12+ Months CENTCOM Major Utility-Scale Production:
>=1,000,000 GPD; through water treatment plant;
and ROWPU Ops >250,000 GPD 12+ Months Large-Scale Water Production:
250,000-999,999 GPD;
and ROWPU Ops 50,000-249,999 GDP 12+ Months Medium-Scale Production / ROWPU Ops:
50,000-249,999 GPD
12+ Months Small-Scale Production / Field Ops:
5,000-49,999 GPD
12+ Months Point-of-Use / Small Detachment:
<5,000 GPD
12+ Months EUCOM Major Utility-Scale Production:
>=1,000,000 GPD; through water treatment plant;
and ROWPU Ops >250,000 GPD 12+ Months Large-Scale Water Production:
250,000-999,999 GPD;
and ROWPU Ops 50,000-249,999 GDP 12+ Months Medium-Scale Production / ROWPU Ops:
50,000-249,999 GPD
12+ Months Small-Scale Production / Field Ops:
5,000-49,999 GPD
12+ Months Point-of-Use / Small Detachment:
<5,000 GPD
12+ Months INDOPACOM Major Utility-Scale Production:
>=1,000,000 GPD; through water treatment plant;
and ROWPU Ops >250,000 GPD 12+ Months Large-Scale Water Production:
250,000-999,999 GPD;
and ROWPU Ops 50,000-249,999 GDP 12+ Months Medium-Scale Production / ROWPU Ops:
50,000-249,999 GPD
12+ Months Small-Scale Production / Field Ops:
5,000-49,999 GPD
12+ Months Point-of-Use / Small Detachment:
<5,000 GPD
12+ Months NORTHCOM Major Utility-Scale Production:
>=1,000,000 GPD; through water treatment plant;
and ROWPU Ops >250,000 GPD 12+ Months Large-Scale Water Production:
250,000-999,999 GPD;
and ROWPU Ops 50,000-249,999 GDP 12+ Months Medium-Scale Production / ROWPU Ops:
50,000-249,999 GPD
12+ Months Small-Scale Production / Field Ops:
5,000-49,999 GPD
12+ Months Point-of-Use / Small Detachment:
<5,000 GPD
12+ Months SOUTHCOM Major Utility-Scale Production:
>=1,000,000 GPD; through water treatment plant;
and ROWPU Ops >250,000 GPD 12+ Months Large-Scale Water Production:
250,000-999,999 GPD;
and ROWPU Ops 50,000-249,999 GDP 12+ Months Medium-Scale Production / ROWPU Ops:
50,000-249,999 GPD
12+ Months Small-Scale Production / Field Ops:
5,000-49,999 GPD
12+ Months Point-of-Use / Small Detachment:
<5,000 GPD
12+ Months Food Service Operations (PWS 04.01) The contractor shall provide documented proof of its comprehensive management of all food service operations, covering both fixed dining facilities (DFACs) and expeditionary feeding solutions.
AFRICOM Multi-DFAC / Theater Level:
>=30,000 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously > 15 12+ Months Multi-DFAC / Country Level:
15,000-29,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 10-15 12+ Months Multi-DFAC / Installation Level:
5,000-14,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 5-9 12+ Months Standard DFAC Operation:
1,000-4,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 2-4 12+ Months Small DFAC / Field Kitchen:
<1,000 meals/day total Number of separate Dining Facilities (DFACs) managed 1 12+ Months CENTCOM Multi-DFAC / Theater Level:
>=30,000 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously > 15 12+ Months Multi-DFAC / Country Level:
15,000-29,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 10-15 12+ Months Multi-DFAC / Installation Level:
5,000-14,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 5-9 12+ Months Standard DFAC Operation:
1,000-4,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 2-4 12+ Months Small DFAC / Field Kitchen:
<1,000 meals/day total Number of separate Dining Facilities (DFACs) managed 1 12+ Months EUCOM Multi-DFAC / Theater Level:
>=30,000 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously > 15 12+ Months Multi-DFAC / Country Level:
15,000-29,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 10-15 12+ Months Multi-DFAC / Installation Level:
5,000-14,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 5-9 12+ Months Standard DFAC Operation:
1,000-4,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 2-4 12+ Months Small DFAC / Field Kitchen:
<1,000 meals/day total Number of separate Dining Facilities (DFACs) managed 1 12+ Months INDOPACOM Multi-DFAC / Theater Level:
>=30,000 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously > 15 12+ Months Multi-DFAC / Country Level:
15,000-29,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 10-15 12+ Months Multi-DFAC / Installation Level:
5,000-14,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 5-9 12+ Months Standard DFAC Operation:
1,000-4,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 2-4 12+ Months Small DFAC / Field Kitchen:
<1,000 meals/day total Number of separate Dining Facilities (DFACs) managed 1 12+ Months NORTHCOM Multi-DFAC / Theater Level:
>=30,000 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously > 15 12+ Months Multi-DFAC / Country Level:
15,000-29,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 10-15 12+ Months Multi-DFAC / Installation Level:
5,000-14,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 5-9 12+ Months Standard DFAC Operation:
1,000-4,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 2-4 12+ Months Small DFAC / Field Kitchen:
<1,000 meals/day total Number of separate Dining Facilities (DFACs) managed 1 12+ Months SOUTHCOM Multi-DFAC / Theater Level:
>=30,000 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously > 15 12+ Months Multi-DFAC / Country Level:
15,000-29,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 10-15 12+ Months Multi-DFAC / Installation Level:
5,000-14,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 5-9 12+ Months Standard DFAC Operation:
1,000-4,999 meals/day total Number of separate Dining Facilities (DFACs) managed simultaneously 2-4 12+ Months Small DFAC / Field Kitchen:
<1,000 meals/day total Number of separate Dining Facilities (DFACs) managed 1 12+ Months Waste Management Services (Solid Waste, Collection, Disposal) - PWS 04.02.05 The contractor shall provide documented proof of its ability to execute comprehensive waste management functions (collection, transportation, recovery, and disposal activities).
| AFRICOM |
| Theater Level / Landfill Operations: Total Waste Managed (Tons/Month) |
>=80,000 tons/month 12+ Months Country-Level / Landfill Operations:
50,000-79,999 tons/month 12+ Months Installation-Level / Landfill Operations:
25,000-49,999 tons/month 12+ Months Medium-Scale Comprehensive Services:
1,000-24,999 tons/month 12+ Months Small-Scale / Expeditionary Waste Ops:
100-1,999 tons/month 12+ Months
| CENTCOM |
| Theater Level / Landfill Operations: Total Waste Managed (Tons/Month) |
>=80,000 tons/month 12+ Months Country-Level / Landfill Operations:
50,000-79,999 tons/month 12+ Months Installation-Level / Landfill Operations:
25,000-49,999 tons/month 12+ Months Medium-Scale Comprehensive Services:
1,000-24,999 tons/month 12+ Months Small-Scale / Expeditionary Waste Ops:
100-1,999 tons/month 12+ Months
| EUCOM |
| Theater Level / Landfill Operations: Total Waste Managed (Tons/Month) |
>=80,000 tons/month 12+ Months Country-Level / Landfill Operations:
50,000-79,999 tons/month 12+ Months Installation-Level / Landfill Operations:
25,000-49,999 tons/month 12+ Months Medium-Scale Comprehensive Services:
1,000-24,999 tons/month 12+ Months Small-Scale / Expeditionary Waste Ops:
100-1,999 tons/month 12+ Months
| INDOPACOM |
| Theater Level / Landfill Operations: Total Waste Managed (Tons/Month) |
>=80,000 tons/month 12+ Months Country-Level / Landfill Operations:
50,000-79,999 tons/month 12+ Months Installation-Level / Landfill Operations:
25,000-49,999 tons/month 12+ Months Medium-Scale Comprehensive Services:
1,000-24,999 tons/month 12+ Months Small-Scale / Expeditionary Waste Ops:
100-1,999 tons/month 12+ Months
| NORTHCOM |
| Theater Level / Landfill Operations: Total Waste Managed (Tons/Month) |
>=80,000 tons/month 12+ Months Country-Level / Landfill Operations:
50,000-79,999 tons/month 12+ Months Installation-Level / Landfill Operations:
25,000-49,999 tons/month 12+ Months Medium-Scale Comprehensive Services:
1,000-24,999 tons/month 12+ Months Small-Scale / Expeditionary Waste Ops:
100-1,999 tons/month 12+ Months
| SOUTHCOM |
| Theater Level / Landfill Operations: Total Waste Managed (Tons/Month) |
>=80,000 tons/month 12+ Months Country-Level / Landfill Operations:
50,000-79,999 tons/month 12+ Months Installation-Level / Landfill Operations:
25,000-49,999 tons/month 12+ Months Medium-Scale Comprehensive Services:
1,000-24,999 tons/month 12+ Months Small-Scale / Expeditionary Waste Ops:
100-1,999 tons/month 12+ Months
4. Supply & Materiel Management PWS 05.00 Excerpt:
SSA operations & GCSS-Army supply support - PWS 05.01.01 The contractor shall provide documented proof of its comprehensive management and operation of a Supply Support Activity (SSA) for supply classes I, II, III (Packaged), IV, VI, VII, IX, and X.
AFRICOM 7+ classes of supply > 10,000,000 lines per month; 50+ GCSS-Army qualified personnel 12+ Months 5-6 classes of supply 1,000,000-9,999,999 lines per month; 40-49 GCSS-Army qualified personnel 12+ Months 3-4 classes of supply 500,000-999,999 lines per month; 30-39 GCSS-Army qualified personnel 12+ Months 1-2 classes of supply 10,000-599,999 lines per month; 20-29 GCSS-Army qualified personnel 12+ Months Warehouse support only < 10,000 lines per month; 10 GCSS-Army…