DRAFT LOGCAP VI HTRO Matrix v.4.0_16NOV2026.xlsx
XLSX spreadsheet 40 KB Posted
- Solicitation number
- Not on record
About this file
This is a Draft Logistics Civil Augmentation Program (LOGCAP) VI Highest Technically Rated Offeror (HTRO) Self-Scoring Matrix and Instructions Guide. The document establishes the evaluation framework for assessing contractor capability to support the Army's unified global logistics enterprise, which consolidates legacy LOGCAP, Army Pre-Positioned Stock (APS), and Enhanced Army Global Logistics Enterprise (EAGLE) programs. The matrix evaluates offerors across eight capability buckets: Management, Planning & Rapid Response (Buckets 1-2); Engineering & Construction (Bucket 3); Core Life Support Services (Bucket 4); Contingency Logistics Operations (Bucket 5); Specialized Support Services (Bucket 6); Program & Operational Management (Bucket 7); and Quality Assurance & Compliance (Bucket 8). Tactical capabilities in Buckets 2 and 3 are scored independently across six Geographic Combatant Commands (AFRICOM, CENTCOM, EUCOM, NORTHCOM, PACOM, SOUTHCOM), while enterprise capabilities are evaluated globally.
Offerors must pass two eligibility gates before technical scoring: (1) possession of a DCAA-approved accounting system with task order-level cost segregation capability, and (2) demonstrated financial capacity to maintain $150 million liquidity over a 60-day period. All submitted experience must derive from federal government contracts where the offeror served as prime contractor or joint venture member within the ten years preceding solicitation release; subcontractor experience is not acceptable. Offerors may claim experience from one major teaming partner if a current, binding teaming arrangement exists. The scoring methodology employs five performance tiers (1000, 800, 600, 400, 200 points) for each sub-factor, with weighted scores calculated by applying designated weight factors to base experience scores. Offerors must achieve a government-validated score of at least 80 percent of the maximum possible weighted score to meet the minimum technical threshold requirement (MTTR) for MATOC award eligibility. Work samples must correspond precisely to claimed geographic scoring columns, and classified or sensitive documentation may be submitted in redacted form with accompanying validation letters from cognizant government contracting officers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LOGCAP_VI_PWS_DRAFT_v6_20260209.pdf | ||
| LOGCAP VI HTRO RFI.pdf | ||
| LOGCAP VI HTRO Matrix.xlsx | XLSX spreadsheet | |
| LOGCAP VI HTRO RFI.pdf | ||
| LOGCAP VI HTRO Data Dictionary.xlsx | XLSX spreadsheet | |
| LOGCAPVI_HTRO_MATRIX_DRAFT_20260511.xlsx | XLSX spreadsheet | |
| LOGCAP_VI_PWS_DRAFT_v6_20260209.pdf | ||
| 4.0 PWS Feedback and Future Capabilities.pdf | ||
| 3.0 Feedback on Draft HTRO Matrix.pdf | ||
| 5.0 CLIN Structure Feedback and White Paper Submission.pdf | ||
| LOGCAPVI_HTRO_MATRIX_DRAFT_20260511.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions & Scoring Guide
| LOGCAP VI HTRO Self-Scoring Matrix (Revised Draft) — Instructions & Scoring Guide | ||
| SECTION 1 — HOW THE REVISED MATRIX WORKS | ||
| GENERAL GUIDELINES FOR EXPERIENCE SUBMISSIONS | All experience submitted for evaluation must have been actively performed within the ten (10) years immediately preceding the date of this solicitation. Unless a specified performance period is required within the Tier Criteria Summary. Experience older than 10 years will not be evaluated. |
The Government will evaluate only those corporate experience examples in which the performing entity acted as:
| 1. | Prime Contractor, or |
| 2. | A Joint Venture (JV) entity, provided the Offeror was a named, legally recognized JV member during the period in which the experience was performed. |
Experience performed solely as a subcontractor, lower tier subcontractor, vendor, supplier, or consultant will not be accepted or evaluated.
Use of Teaming Partner Experience The Government will allow an Offeror to claim the corporate experience of no more than one (1) major named teaming partner.
To claim teaming partner experience, the Offeror shall meet all of the following requirements:
| 1. | A current, binding teaming arrangement, specific to this procurement, must exist between the Offeror and the teaming partner at the time of proposal submission. |
| 2. | Each teaming partner whose experience is claimed must have performed the cited experience as a Prime Contractor or JV entity. Subcontractor experience is not permitted for teaming partners. |
Submitted work samples must be from Federal Government contracts or task orders. Commercial or non-governmental projects will not be evaluated.
EVALUATION STRUCTURE AND COCOM SCORING To accurately capture an Offeror's true global depth and operational footprint, this HTRO Matrix evaluates capability using a Split-Logic structure. Enterprise Capabilities (Buckets 1, 4, 5, 6, 7, and 8) are evaluated via a Single Overall Score reflecting global corporate capacity. Tactical Capabilities (Buckets 2 and 3) are evaluated independently across six (6) distinct Geographic Combatant Commands (GCCs): AFRICOM, CENTCOM, EUCOM, PACOM, NORTHCOM, and SOUTHCOM.
For sub-factors scored by GCC, the Offeror shall independently score their demonstrated experience for each specific GCC in which that capability was executed. The Matrix will apply the designated Weight Factor to the inputted score(s) to generate the Total Sub-Factor Score. Offerors must provide specific, verifiable evidence (Work Samples) that correspond to the exact scoring column (Global or GCC) where points are claimed.
ELIGIBILITY GATES (Pass/Fail) Two pass/fail gates must be cleared before technical scoring begins:
Gate 1: Adequate Accounting System — DCAA-approved or equivalent; cost segregation at task order level; audit-ready for cost-type contracts.
Gate 2: Financial Capacity — Demonstrated liquidity to support a continuous operational float of at least $150M over a 60-day period (equivalent to $75M/month).
Failure on any gate eliminates the offeror from further evaluation regardless of technical score."
| Demonstrated Period of Performance (PoP) | PoP is defined as the continous, uniterrupted timeframe during which the offeror actively performed qualifiying services under a single contract, task order, or delivery order. Unless an individual Tier Criteria Summary explicitly states otherwise, all submitted projects must demonstrate consecutive months of active performance under a single contract or task order to be consided for evaluation and scoring. |
| STEP 1 — BASE EXPERIENCE SCORE | For each sub-factor, the offeror selects the tier (1000 / 800 / 600 / 400 / 200) that best describes their highest demonstrated experience. This is the Base Experience Score. |
Compound Metrics Rule: Where a scoring tier contains multiple quantitative metrics separated by a semi-colon, the criteria are evaluated as "OR" conditions unless explicitly stated otherwise. The Offeror’s cited Work Sample must list all quantitative metrics within that tier to claim the corresponding Base Experience Score.
STEP 2 — WEIGHTED SCORE The Weighted Score for each sub-factor is: Offeror Criteria Total Score × Weight Factor.
The Weight Factor reflects the relative operational importance of the sub-factor to LOGCAP VI experience. Higher weight factors are assigned to sub-factors with direct LSCO mission impact.
| STEP 3 — TOTAL SCORE | All weighted sub-factor scores are summed to produce the Offeror's Total Self-Score. The Government validates self-reported scores against Work Samples (number of allowed work samples TBD) and citations. The Government-Validated Total Score governs for HTRO determination. |
| MINIMUM TECHNICAL THRESHOLD REQUIREMENT (MTTR) | Offerors must achieve a Government-Validated Score of at least 80% of the maximum possible weighted score to be eligible for MATOC award. Offerors below the MTTR are not further evaluated. |
| BURDEN OF PROOF / PROPRIETARY EVIDENCE | The Government will accept redacted or sanitized documentation (e.g., contract excerpts, performance summaries) to satisfy the Burden of Proof for classified or Special Access work samples. However, the redacted submission must keep all critical evaluative information (scale, dates, and locations/COCOMs) visible. To be accepted, any sanitized summary must be accompanied by a validation letter or signature from the cognizant Government Procuring Contracting Officer (PCO). |
HTRO Self-Scoring Matrix
| LOGCAP VI HTRO Self-Scoring Matrix (Revised Draft) — Offeror Self-Scoring Instrument |
| INSTRUCTIONS: (1) Complete Eligibility Gates If either gate FAILS, stop — do not complete scoring matrix (2) For each sub-factor, enter Base Performance Score (1000/800/600/400/200/0) in columns F through L |
tc={5A085CA5-7347-4304-A291-1F9C50060614}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Before it goes out, make sure the correct column is being referenced
| Bkt | Ref | Sub-Factor | Tier Criteria Summary | |||||
| (Highest tier that fully applies to offeror's documented experience) | Weight | |||||||
| Factor | Global Score | Perf Score (Offeror) AFRICOM | Perf Score (Offeror) CENTCOM | Perf Score (Offeror) EUCOM | Perf Score (Offeror) NORTHCOM | Perf Score (Offeror) PACOM | Perf Score (Offeror) SOUTHCOM | Offeror |
Criteria Total
| Score | Offeror |
| Weighted Total Score | Gov Global |
Validated Perf Score (GOV) AFRICOM Perf Score (Global) CENTCOM Perf Score (Global) EUCOM Perf Score (Global) NORTHCOM Perf Score (Global) PACOM Perf Score (Global) SOUTHCOM Government Criteria Total
| Score | Government | |||
| Weighted Total Score | Work | |||
| Sample # | Citation | |||
| (Doc / Date / Page / Para) | Burden of Proof | |||
| ELIGIBILITY GATES (Pass/Fail) — Must Clear Both Gates Before Completing Scoring Matrix | ||||
| GATE | G-1 | Adequate Accounting System | PASS: Offeror possesses a DCAA-approved accounting system (or equivalent) with demonstrated ability to segregate costs at the task order level and maintain audit readiness for cost-type and hybrid task orders Evidence must include audit agency determination letter dated within 3 years of solicitation release |
| FAIL: No approved accounting system; unable to segregate costs at task order level; adverse audit findings not remediated | PASS / FAIL | |||
| GATE | G-2 | Financial Capacity | PASS: Offeror demonstrates the financial capacity to maintain liquidity sufficient to support a continuous operational float of at least $150M over a 60-day period (equivalent to $75M per month). Evidence shall include audited financial statements, committed lines of credit, bonding capacity, or formal parent company guarantees. |
| FAIL: Offeror fails to demonstrate sufficient liquidity to support the $150M 60-day operational float. | PASS / FAIL | |||
| GATE RESULT: If BOTH gates receive a PASS determination, proceed to technical scoring. If EITHER gate is FAIL, the offeror is NOT FURTHER EVALUATED — do not complete remaining matrix. | ||||
| BUCKET 1 — MANAGEMENT, PLANNING & RAPID RESPONSE (PWS 02) | ||||
| 1 | 1.1 | Corporate Governance & Program Management Office (PMO) | 1000: Established and operated a centralized corporate PMO simultaneously managing 3+ Federal prime contracts/task orders, directing 5+ simultaneous sites or service lines in a Contingency Environment. |
800: Established and operated a centralized corporate PMO simultaneously managing 2+ Federal prime contracts/task orders, directing 3-4 simultaneous sites or service lines in a Contingency Environment.
600: Established and operated a centralized corporate PMO managing 1+ Federal prime contract/task order, directing 2+ simultaneous sites/service lines in a Contingency Environment.
400: Established and operated a corporate PMO managing 1+ Federal prime contract/task order under steady-state/garrison conditions (e.g., routine CONUS or OCONUS installation logistics) or limited operational scope.
| 200: Established a corporate PMO structure for a Federal prime contract; operations were limited to a single service line or did not achieve the scale of higher tiers. | 5 | 0 | 0 | 0 | 0 | |||
| 1 | 1.2 | Global Human Capital Management | 1000: Recruited, mobilized, and sustained 5,000+ contractor personnel across 3+ GCCs simultaneously in contingency. |
800: 2,500–4,999 personnel across 2+ GCCs simultaneously in contingency.
600: 1,000–2,499 personnel across 2 GCCs simultaneously.
400: 100+ personnel in 1 GCC (contingency environment).
| 200: Plan only; limited evidence of contingency employment. | 5 | 0 | 0 | 0 | 0 | |||
| 1 | 1.3 | Subcontract Management & Supply Chain Governance | 1000: Managed a global supply chain consisting of 100+ total active subcontractors/vendors (labor, materials, and equipment combined). Demonstrated implementation of Supply Chain Risk Management (SCRM) assessments for subcontractors (e.g., per FAR Part 40 or equivalent DoD standards). |
800: Managed 75–99 total active subcontractors/vendors. Documented partial or developing SCRM assessment processes.
600: Managed 50–74 total active subcontractors/vendors.
400: Managed 20–49 total active subcontractors/vendors.
| 200: Managed 1–19 total active subcontractors/vendors. | 3 | 0 | 0 | 0 | 0 | |||
| BUCKET 2 — MANAGEMENT, PLANNING & RAPID RESPONSE (PWS 02) | ||||||||
| 2 | 2.1 | Mobilization & Surge Capability | 1000: Surge mobilization achieved at 5+ sites within 72-hour timelines. Executed reception, staging, onward movement, and integration (RSOI) across 3+ non-contiguous points of debarkation (POD) simultaneously [AND] documented execution of surge/mobilization while maintaining steady-state baseline operations (no degradation of core scope) at the originating/hub installation. |
800: Surge mobilization achieved at 3–4 sites within 72-hour timelines. Executed RSOI utilizing at least 2 non-contiguous PODs simultaneously, [AND] documented execution of surge/mobilization while maintaining steady-state baseline operations (no degradation of core scope) at the originating/hub installation.
600: Surge mobilization achieved at 2 sites within defined timelines. Executed RSOI utilizing at least 1 primary POD with a fully documented alternate RSOI routing plan.
400: Surge mobilization achieved at 1 site within defined timelines. Standard execution utilizing a single POD.
| 200: Surge plan or mobilization playbook developed; no executed surge support demonstrated. | 5 | 0 | 0 | 0 | 0 | |||
| 2 | 2.2 | Expeditionary LSA Establishment & Velocity | 1000 Tier: Established and operated LSAs supporting 10,000+ PAX across 3+ simultaneous sites within the GCC [OR] demonstrated a "Start from Zero (Total absence of pre-existing lodging, messing, or other LSA facilities. Site consist solely of raw or rough graded terrain)" bare-base deployment supporting 3,000+ PAX that achieved verified initial services/occupancy within 72 hours of NTP in an austere environment. |
800 Tier: Established and operated LSAs supporting 5,000–9,999 PAX... [OR] demonstrated a "Start from Zero (Total absence of pre-existing lodging, messing, or other LSA facilities. Site consist solely of raw or rough graded terrain)" bare-base deployment supporting 1,500+ PAX that achieved verified initial services/occupancy within 96 hours of NTP.
600: Established and operated LSAs supporting 1,000–4,999 PAX. Demonstrated site activation achieving initial services/occupancy within 60 days of NTP.
400: Established and operated an LSA supporting 250–999 PAX. Achieved full services/occupancy within 90 days of NTP.
| 200: Executed steady-state base camp management; no demonstrated rapid expeditionary site activation experience. | 5 | 0 | 0 | 0 | 0 | |||
| 2 | 2.3 | Theater Legal Access & Clearance (Non-SOFA Operations) | 1000: Demonstrated executed, theater and country clearance (e.g., APACS) across 3+ countries lacking full CAAF SOFA coverage simultaneously. Maintained a functioning legal-status tracking system and rapid workforce-substitution plan. |
800: Executed theater clearance operations across 2 countries lacking full CAAF SOFA coverage simultaneously. Maintained legal-status tracking and customs contingency plans.
600: Executed theater clearance operations in 1 country lacking full CAAF SOFA coverage, OR executed routine clearance operations across 3+ mature SOFA environments simultaneously.
400: Executed routine theater clearance operations in 1-2 mature SOFA environments. Documented contingency plans for non-SOFA access exist.
| 200: Generic compliance statement or awareness of SOFA/clearance requirements only. | 3 | 0 | 0 | 0 | 0 | ||
| BUCKET 3 — ENGINEERING & CONSTRUCTION (PWS 03) | |||||||
| 3 | 3.1 | Utilities Engineering Planning & Design | |||||
| (Power, Water, Operational Energy) | 1000: 10,000+ PAX for 24+ consecutive months while providing sustained power and water service availability. |
800: 5,000–9,999 PAX for 12+ consecutive months while providing sustained power and water service availability.
600: 1,000–4,999 PAX for 12+ consecutive months while providing sustained power and water service availability.
400: 250–999 PAX for 6+ consecutive months while providing sustained power and water service availability.
| 200: < 250 PAX for 6+ consecutive months while providing sustained power and water service availability. | 5 | 0 | 0 | 0 | 0 | |||
| 3 | 3.2 | Horizontal Infrastructure & Vertical Structures | 1000: Completed 50+ combined UFC-compliant horizontal and vertical construction projects (must include at least 10 horizontal and at least 10 vertical); combined project value > $100M. |
800: Completed 40+ combined UFC-compliant horizontal and vertical construction projects, (must include at least 5 horizontal and at least 5 vertical); combined project value >$75M.
600: Completed 30+ combined UFC-compliant horizontal and vertical construction projects, (must include at least 4 horizontal and at least 4 vertical); combined project value > $50M.
400: Completed 20+ combined UFC-compliant horizontal and vertical construction projects, (must include at least 3 horizontal and at least 3 vertical); combined project value > $25M.
| 200: Completed 10+ combined UFC-compliant horizontal and vertical construction projects, (must include at least 2 horizontal and at least 2 vertical); combined project value > $10M. | 5 | 0 | 0 | 0 | 0 | ||
| 3 | 3.3 | Expeditionary Basing Modules | |||||
| (Force Provider / BEAR Systems) | 1000: 10+ end-to-end deployments of Force Provider, BEAR, and/or equivalent military expeditionary basing systems, with each deployment supporting 1,000+ PAX; at least one deployment must have been completed within the five years preceding the proposal submission date. |
800: 8+ end-to-end deployments of Force Provider, BEAR, and/or equivalent military expeditionary basing systems, with each deployment supporting 750+ PAX; at least one deployment must have been completed within the five years preceding the proposal submission date.
600: 6+ end-to-end deployments of Force Provider, BEAR, and/or equivalent military expeditionary basing systems, with each deployment supporting 500+ PAX; at least one deployment must have been completed within the five years preceding the proposal submission date.
400: 4+ end-to-end deployments of Force Provider, BEAR, and/or equivalent military expeditionary basing systems, with each deployment supporting 250+ PAX; at least one deployment must have been completed within the five years preceding the proposal submission date.
| 200: 2+ end-to-end deployments of Force Provider, BEAR, and/or equivalent military expeditionary basing systems, with each deployment supporting 100+ PAX; at least one deployment must have been completed within the five years preceding the proposal submission date. | 3 | 0 | 0 | 0 | 0 | |||
| 3 | 3.4 | Force Protection Engineering | 1000: Executed 4 project types (earthworks, barriers, defensive structures, guard facilities) totaling 25,000+ linear ft of barriers and 100+ structures. Demonstrated integrated protection design including 5+ complex Access Control Points (ACPs). |
800: Executed 3 project types totaling 15,000+ linear ft of barriers and 75+ structures. Demonstrated integrated protection design including 3+ ACPs.
600: Executed 2 project types totaling 10,000+ linear ft of barriers and 50+ structures. Demonstrated integrated protection design including 1+ ACPs.
400: Executed 1 project type totaling 7,500+ linear ft of barriers and 30+ structures. Standard perimeter security focus.
| 200: Executed 1 project type totaling 5,000+ linear ft of barriers and 10+ structures. Standalone elements only. | 5 | 0 | 0 | 0 | 0 | |||
| BUCKET 4 — CORE LIFE SUPPORT SERVICES (PWS 04) | ||||||||
| 4 | 4.1 | Shelter & Billeting / Occupancy Management | 1000: 10,000+ PAX managed across 5+ simultaneous sites; including demonstrated expeditionary/dispersed billeting at 2+ non-contiguous sites [OR] established billeting supporting 3,000+ PAX in an austere environment within 72 hours of NTP. |
800: 5,000–9,999 PAX managed across 3+ simultaneous sites; includes demonstrated expeditionary/dispersed billeting [OR] established billeting supporting 1,500+ PAX in an austere environment within 96 hours of NTP.
600: 1,000–4,999 PAX managed across 2+ simultaneous sites.
400: 250–999 PAX managed (single or multiple sites).
| 200: <250 PAX managed. | 3 | 0 | 0 | 0 | 0 | ||
| 4 | 4.2 | Power Generation & Distribution | |||||
| (24/7 Utility Operations) | 1000: 25+ MW managed across operations. Maintained uninterruptible power for 15+ facilities AND demonstrated distributed microgrid or hybrid power systems at 3+ dispersed nodes simultaneously. |
800: 10–24.9 MW managed. Maintained uninterruptible power for 10–14 facilities AND demonstrated distributed microgrid or hybrid power systems at 1–2 dispersed nodes.
600: 1–9.9 MW managed. Maintained uninterruptible power for 5–9 facilities AND operated at least 1 microgrid.
400: 250 kW–999 kW managed. Maintained uninterruptible power for 2–4 facilities (microgrid experience not required).
| 200: <250 kW managed. Standard power generation for a single site/facility. | 5 | 0 | 0 | 0 | 0 | |||
| 4 | 4.3 | Water & Ice Service / Water Resource Management | 1000: Produced 1,000,000+ GPD via fixed plant operations AND produced 50,000+ GPD via ROWPU/expeditionary purification systems. Demonstrated ROWPU employment in an austere/expeditionary environment with alternate source identification. |
800: Produced 250,000–999,999 GPD via fixed plant AND produced 25,000–49,999 GPD via ROWPU.
600: Produced 50,000–249,999 GPD (fixed plant OR ROWPU operations).
400: Produced 5,000–49,999 GPD (field or fixed operations).
| 200: Produced <5,000 GPD. | 5 | 0 | 0 | 0 | 0 | ||
| 4 | 4.4 | Food Service Operations | |||||
| (Fixed DFAC & Expeditionary Feeding) | 1000 Tier: 30,000+ meals/day. Managed 10+ simultaneous DFACs/large-scale Mobile Kitchen Trailer (MKT) operations / dispersed unitized ration delivery [OR] achieved operational expeditionary feeding (minimum 9,000 meals/day) at a bare-base site within 72 hours of NTP. |
800 Tier: 15,000–29,999 meals/day. Managed 5-9 DFACS OR documented dispersed feeding operations [OR] achieved operational expeditionary feeding (minimum 4,500 meals/day) at a bare-base site within 96 hours of NTP.
600: 5,000–14,999 meals/day. Managed 2–4 DFACs.
400: 1,000–4,999 meals/day.
| 200: <1,000 meals/day. | 5 | 0 | 0 | 0 | 0 | |||
| 4 | 4.5 | Waste Management Services | 1000: 25,000+ tons/month; full hazardous/medical/solid waste streams; landfill operations. |
800: 15,000–24,999 tons/month.
600: 5,000–14,999 tons/month.
400: 1,000–4,999 tons/month; comprehensive services.
| 200: 100–999 tons/month; expeditionary waste ops. | 1 | 0 | 0 | 0 | 0 | |||
| BUCKET 5 — SUPPLY & MATERIEL MANAGEMENT (PWS 05) | ||||||||
| 5 | 5.1 | SSA Operations & GCSS-Army Supply Support | 1000: 7+ supply classes; 10,000,000+ transaction lines/month (defined as total recorded receipts, issues, and adjustments verified via authoritative LIS reporting); 50+ GCSS-Army (or equivalent ERP system) qualified personnel. |
800: 5–6 classes; 1,000,000–9,999,999 transaction lines/month; 40–49 personnel.
600: 3–4 classes; 500,000–999,999 transaction lines/month; 30–39 personnel.
400: 1–2 classes; 10,000–499,999 transaction lines/month; 20–29 personnel.
| 200: Warehouse support only; <10,000 transaction lines/month; 10 personnel. | 5 | 0 | 0 | 0 | 0 | ||
| 5 | 5.2 | Inventory Management & Distribution Nodes | |||||
| (CRSP / FRP Operations) | 1000: 5+ supply classes at >99% accountability; <0.1% asset loss; >99% In-Transit Visibility (ITV) accuracy. |
800: 4 classes at stated standards.
600: 3 classes at stated standards.
400: 2 classes at stated standards.
| 200: 1 class at stated standards. | 3 | 0 | 0 | 0 | 0 | |||
| 5 | 5.3 | Property Book & GFP Accountability | 1000: 100,000+ line items or $1B+ GFP managed; full accountability per AR 735-5; zero sensitive item losses. |
800: 75,000–99,999 line items or $750M–$999M.
600: 50,000–74,999 line items or $500M–$749M.
400: 25,000–49,999 line items or $250M–$499M.
| 200: 10,000–24,999 line items or $100M–$249M. | 5 | 0 | 0 | 0 | 0 | ||
| 5 | 5.4 | Class III Bulk Operations | |||||
| (Storage, Distribution, Quality Assurance) | 1000: 5,000,000+ Gallons Per Month (all fuel types). Demonstrated dispersed or tactical bulk fuel distribution across 3+ simultaneous nodes, utilizing multiple delivery methods (e.g., line haul, retail point, bulk transfer). |
800: 1,000,000–4,999,999 Gallons Per Month. Demonstrated dispersed fuel point operations utilizing at least 2 delivery methods.
600: 500,000–999,999 Gallons Per Month. Execution limited to standard distribution.
400: 25,000–499,999 Gallons Per Month. Standard permissive fuel operations.
| 200: <25,000 Gallons Per Month. Standard permissive fuel operations. | 5 | 0 | 0 | 0 | 0 | |||
| 5 | 5.5 | Class V Ammunition Operations | 1000: Operated ASP, AHA, and ATHP processing 5,000+ lines/month; SAAS proficient (50+ qualified operators). Demonstrated ammunition throughput at mass-consumption surge levels, maintaining SAAS and AR 190-11 physical security compliance across multiple dispersed nodes. |
800: Operated ASP and AHA processing 2,000–4,999 lines/month; SAAS proficient (30–49 qualified operators). Demonstrated compliance during a mass-consumption surge event.
600: Operated ASP processing 500–1,999 lines/month; SAAS proficient (10–29 qualified operators). Maintained SAAS and AR 190-11 compliance under standard conditions.
400: ASP support role; SAAS access demonstrated; <500 lines/month.
| 200: Limited ammunition handling; no SAAS proficiency documented. | 5 | 0 | 0 | 0 | 0 | |||
| BUCKET 6 — MAINTENANCE — FACILITIES AND EQUIPMENT (PWS 06) | ||||||||
| 6 | 6.1 | Maintenance Management & Equipment Fault Repair | 1000: 35,000+ pieces of equipment under management; Scheduled PMCS maintained at 95%+ compliance per applicable TM. |
800: 18,000–34,999 pieces of equipment; 95%+ PMCS compliance.
600: 4,000–17,999 pieces of equipment; 95%+ PMCS compliance.
400: 1,000–3,999 pieces of equipment; 90%+ PMCS compliance.
| 200: 750–999 pieces of equipment; <90% PMCS compliance. | 5 | 0 | 0 | 0 | 0 | ||
| 6 | 6.2 | Equipment PMCS & Preventive Maintenance | |||||
| (incl. Additive Manufacturing / Tele-Maintenance) | 1000: 5,000+ fault repairs per month; demonstrated forward support maintenance in an austere environment. Demonstrated additive manufacturing employed in a deployed environment OR tele-maintenance sessions conducted with Army depot/OEM. |
800: 2,000–4,999 fault repairs per month. Additive manufacturing roadmap in place OR tele-maintenance capability demonstrated.
600: 400–1,999 fault repairs per month.
400: 100–399 fault repairs per month.
| 200: 50–99 fault repairs per month. | 3 | 0 | 0 | 0 | 0 | |||
| 6 | 6.3 | Facilities Maintenance & Service Order Response | 1000: 20,000+ service orders/month; 13,000+ facilities; 20,000,000+ sq ft; 95%+ on-time completion. |
800: 10,000–19,999 orders; 5,000–12,999 facilities; 5,000,000–19,999,999 sq ft.
600: 2,000–9,999 orders; 1,000–4,999 facilities; 1,000,000–4,999,999 sq ft.
400: 200–1,999 orders; 100–999 facilities; 200,000–999,999 sq ft.
| 200: 50–199 orders; 10–99 facilities; 40,000–199,999 sq ft. | 3 | 0 | 0 | 0 | 0 | ||
| BUCKET 7 — TRANSPORTATION & MOVEMENT CONTROL (PWS 07) | |||||||
| 7 | 7.1 | Transportation Planning & Movement Control | |||||
| (AIS Operations / Multi-Modal) | 1000: 7,500+ movement requests/month; 2,000+ TMP or equivalent fleet vehicles; 4,000+ clearances/month; TC-AIMS II (or equivalent DOD system) certified operators. Demonstrated distribution movement utilizing multiple alternate routes and attrition-resilient multi-modal planning. |
800: 5,000–7,499 requests/month; 1,000–1,999 TMP or equivalent fleet vehicles; 2,000–3,999 clearances/month. Demonstrated alternate modal transportation or re-routing execution.
600: 2,500–4,999 requests/month; 500–999 TMP or equivalent fleet vehicles; 500–1,999 clearances/month. Maintained contingency routing plans; standard conditions.
400: 100–2,499 requests/month; 100–499 TMP or equivalent fleet vehicles; 20–499 clearances/month. Standard permissive movement control.
| 200: <100 requests/month; <100 TMP or equivalent fleet vehicles; <20 clearances/month. Standard permissive movement control. | 3 | 0 | 0 | 0 | 0 | ||
| 7 | 7.2 | Cargo & Passenger Movements / Container Operations | |||||
| (incl. Autonomous Vehicle Employment) | 1000: 25,000+ pieces of cargo/month; 7,500+ truck movements/month; 2,500+ containers processed/month. |
800: 15,000–24,999 pieces of cargo/month; 3,500–7,499 truck movements/month; 1,500–2,499 containers processed/month.
600: 5,000–14,999 pieces of cargo/month; 1,000–3,499 truck movements/month; 500–1,499 containers processed/month.
400: 500–4,999 pieces of cargo/month; 50–999 truck movements/month; 50–499 containers processed/month.
| 200: <500 pieces of cargo/month; <50 truck movements/month; <50 containers processed/month. | 3 | 0 | 0 | 0 | 0 | |||
| BUCKET 8 — MEDICAL SERVICES (PWS 04.08, 08.00) | ||||||||
| 8 | 8.1 | Clinical Governance & Credentialing Program | 1000: Demonstrated credentialing, privileging, and clinical governance of a large-scale medical workforce (100+ healthcare providers) in compliance with DHAPM 6025.13, Vol 4 (or Federal equivalent). Executed across 5+ medical facilities OR demonstrated rapid credentialing execution during a surge/contingency deployment. |
800: Demonstrated credentialing, privileging, and clinical governance of 50–99 healthcare providers. Executed across 3–4 medical facilities OR demonstrated rapid credentialing execution during a surge/contingency deployment.
600: Demonstrated credentialing and clinical governance of 25–49 healthcare providers during a surge/contingency deployment; OR steady-state credentialing and clinical governance for 100+ healthcare providers (regardless of facility count).
400: Steady-state clinical governance and credentialing for 10–99 healthcare providers.
| 200: Steady-state clinical governance and credentialing for fewer than 10 healthcare providers; or documented credentialing policies only. | 1 | 0 | 0 | 0 | 0 | ||
| 8 | 8.2 | Role 1 & Role 2 Medical Facility Operations | |||||
| (incl. MASCAL Capability) | 1000: Operated 5+ Role 1 facilities AND 2+ Role 2 facilities. Demonstrated mass-casualty (MASCAL) surge management—defined as 10+ simultaneous casualties—via actual events OR Government-validated MASCAL exercises/drills. Documented operation of a Mortuary Affairs Collection Point (MACP) OR equivalent medical evacuation/logistics node. |
800: Operated 4+ Role 1 facilities AND 1+ Role 2 facility. Demonstrated MASCAL incident management under standard MEDEVAC timelines (actual or exercised).
600: Operated 3+ Role 1 facilities AND 1+ Role 2 facility. MASCAL plans documented; no executed MASCAL response required.
400: Operated 2+ Role 1 facilities OR 1+ Role 2 facility.
| 200: Operated 1+ Role 1 facility. | 3 | 0 | 0 | 0 | 0 | |||
| 8 | 8.3 | Preventive Medicine, Medical Logistics & Veterinary Services | 1000: Executed Preventive Medicine, Medical Logistics, AND Veterinary Services across a combined total of 15+ specialized sites/nodes. Maintained a >95% personnel fill rate across all required positions. |
800: Executed all three services across a combined total of 10–14 sites/nodes; >95% fill rate.
600: Executed all three services across a combined total of 5–9 sites/nodes; >90% fill rate.
400: Executed at least two of the three services across a combined total of 2–4 sites/nodes; >90% fill rate.
| 200: Executed at least one of the services at 1 site/node. | 1 | 0 | 0 | 0 | 0 | |||||
| OFFEROR SELF-SCORE TOTAL / GOVERNMENT VALIDATED TOTAL | 0 | 0 | 0 | 0 | ||||||
| MINIMUM TECHNICAL THRESHOLD REQUIREMENT (MTTR) — Gov Validated Score must equal or exceed 80% of maximum possible weighted score to be eligible for MATOC award. | 0.00% | 0.00% | Not Eligible for Award |