LOGCAP VI HTRO Matrix.xlsx
XLSX spreadsheet 43 KB Posted
- Solicitation number
- Not on record
About this file
This is an evaluation matrix and scoring guide for the Logistics Civil Augmentation Program (LOGCAP) VI Highest Technically Rated Offeror (HTRO) selection process. The matrix establishes the framework and criteria by which prospective prime contractors will be evaluated on their demonstrated capability to provide global logistics support services across six distinct Geographic Combatant Commands (AFRICOM, CENTCOM, EUCOM, PACOM, NORTHCOM, and SOUTHCOM). All experience submitted must have been performed within the ten years immediately preceding solicitation release and by the offeror acting as a prime contractor or formal joint venture; subcontractor experience is excluded. Experience must be derived from federal government contracts or task orders only, with commercial work ineligible for evaluation.
The matrix incorporates two mandatory pass/fail eligibility gates that must be cleared before technical scoring commences: Gate 1 requires a DCAA-approved accounting system (or equivalent) with demonstrated cost segregation capability at the task order level and audit readiness for cost-type contracts, with evidence no older than three years; Gate 2 mandates demonstrated financial capacity to sustain liquidity sufficient to support a $150 million operational float over a 60-day period (equivalent to $75 million per month). The technical scoring structure consists of four primary buckets: (1) Management, Planning & Rapid Response covering corporate governance, human capital management, subcontract management, mobilization capability, logistics support area establishment, contested logistics planning, and theater legal access; (2) Engineering & Construction addressing utilities, construction execution, expeditionary basing modules, and force protection; (3) Core Life Support Services; and (4) additional service areas, each with GCC-specific scoring requirements. Offerors self-score experience against tiered criteria (1000/800/600/400/200 points), with weighted factors applied to generate total sub-factor scores; government validation of self-reported scores against submitted work samples determines the final score. Offerors must achieve a government-validated score of at least 90 percent of the maximum possible weighted score to meet the minimum technical threshold requirement and remain eligible for MATOC award consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LOGCAP VI HTRO RFI.pdf | ||
| LOGCAP VI HTRO Data Dictionary.xlsx | XLSX spreadsheet | |
| LOGCAPVI_HTRO_MATRIX_DRAFT_20260511.xlsx | XLSX spreadsheet | |
| LOGCAP_VI_PWS_DRAFT_v6_20260209.pdf | ||
| 3.0 Feedback on Draft HTRO Matrix.pdf | ||
| LOGCAPVI_HTRO_MATRIX_DRAFT_20260511.xlsx | XLSX spreadsheet | |
| 5.0 CLIN Structure Feedback and White Paper Submission.pdf | ||
| 4.0 PWS Feedback and Future Capabilities.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions & Scoring Guide
| LOGCAP VI HTRO Self-Scoring Matrix (Revised Draft) — Instructions & Scoring Guide | ||
| SECTION 1 — HOW THE REVISED MATRIX WORKS | ||
| GENERAL GUIDELINES FOR EXPERIENCE SUBMISSIONS | All experience submitted for evaluation must have been actively performed within the ten (10) years immediately preceding the date of this solicitation. Experience older than 10 years will not be evaluated. |
All experience submitted for evaluation must have been performed by the Offeror acting as a Prime Contractor (or as a formal Joint Venture entity). Subcontractor experience will not be evaluated for this iteration of the matrix.
Submitted work samples must be from Federal Government contracts or task orders. Commercial or non-governmental projects will not be evaluated.
tc={043A2E82-5B23-4296-8222-490A00D91959}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Pending: All experience submitted for evaluation must have been performed by the Offeror acting as a Prime Contractor (or as a formal Joint Venture entity). Subcontractor experience will not be evaluated for this iteration of the matrix.
EVALUATION STRUCTURE AND COCOM SCORING To accurately capture an Offeror's true global depth and operational footprint, this HTRO Matrix evaluates demonstrated capability independently across six (6) distinct Geographic Combatant Commands (GCCs): AFRICOM, CENTCOM, EUCOM, PACOM, NORTHCOM, and SOUTHCOM.
For each sub-factor, the Offeror shall independently score their demonstrated Prime Contractor experience for each specific GCC in which that capability was executed. The Matrix will apply the designated Weight Factor to each GCC score to generate the Total Sub-Factor Score. Offerors must provide specific, verifiable evidence (Work Samples) that correspond to the exact GCC column where points are claimed.
ELIGIBILITY GATES (Pass/Fail) Two pass/fail gates must be cleared before technical scoring begins:
Gate 1: Adequate Accounting System — DCAA-approved or equivalent; cost segregation at task order level; audit-ready for cost-type contracts.
Gate 2: Financial Capacity — Demonstrated liquidity to sustain $8M/day ($240M/month) in expenditures.
Failure on either gate eliminates the offeror from further evaluation regardless of technical score.
STEP 1 — BASE EXPERIENCE SCORE For each sub-factor, the offeror selects the tier (1000 / 800 / 600 / 400 / 200) that best describes their highest demonstrated experience anywhere in the world on a relevant prior contract. This is the Base Experience Score.
Compound Metrics Rule: Where a scoring tier contains multiple quantitative metrics separated by a semi-colon, the criteria are evaluated as "AND" conditions unless explicitly stated otherwise. The Offeror’s cited Work Sample must meet or exceed all listed quantitative metrics within that tier to claim the corresponding Base Experience Score.
STEP 2 — WEIGHTED SCORE The Weighted Score for each sub-factor is: Offeror Criteria Total Score × Weight Factor.
The Weight Factor reflects the relative operational importance of the sub-factor to LOGCAP VI experience. Higher weight factors are assigned to sub-factors with direct LSCO mission impact.
| STEP 3 — TOTAL SCORE | All weighted sub-factor scores are summed to produce the Offeror's Total Self-Score. The Government validates self-reported scores against Work Samples (WS1–WS5) and citations. The Government-Validated Total Score governs for HTRO determination. |
| MINIMUM TECHNICAL THRESHOLD REQUIREMENT (MTTR) | Offerors must achieve a Government-Validated Score of at least 90% of the maximum possible weighted score to be eligible for MATOC award. Offerors below the MTTR are not further evaluated. |
| BURDEN OF PROOF / PROPRIETARY EVIDENCE | The Government will accept redacted or sanitized documentation (e.g., contract excerpts, performance summaries) to satisfy the Burden of Proof for classified or Special Access work sa+B5:C11mples. However, the redacted submission must keep all critical evaluative metrics (scale, dates, outcomes, and locations/COCOMs) visible. To be accepted, any sanitized summary must be accompanied by a validation letter or signature from the cognizant Government Procuring Contracting Officer (PCO) attesting to the accuracy of the unredacted performance metrics. |
Pending: All experience submitted for evaluation must have been performed by the Offeror acting as a Prime Contractor (or as a formal Joint Venture entity). Subcontractor experience will not be evaluated for this iteration of the matrix.
HTRO Self-Scoring Matrix
| LOGCAP VI HTRO Self-Scoring Matrix (Revised Draft) — Offeror Self-Scoring Instrument | ||||
| INSTRUCTIONS: (1) Complete Eligibility Gates. If either gate FAILS, stop — do not complete scoring matrix. (2) For each sub-factor, enter Base Performance Score (1000/800/600/400/200/0) in columns G through L. | ||||
| Bkt | Ref | Sub-Factor | Tier Criteria Summary | |
| (Highest tier that fully applies to offeror's documented experience) | REVISED | Weight | ||
| Factor | Perf |
Score (Offeror) CENTCOM Perf Score (Offeror) AFRICOM Perf Score (Offeror) NORTHCOM Perf Score (Offeror) PACOM Perf Score (Offeror) SOUTHCOM Perf Score (Offeror)
EUCOM
Offeror Criteria Total
| Score | Offeror |
| Weighted Total Score | Gov |
Validated
| Base | Gov |
| COCOMs | Gov |
Weighted
| Score | Work | |||
| Sample # | Citation | |||
| (Doc / Date / Page / Para) | Burden of Proof | |||
| ELIGIBILITY GATES (Pass/Fail) — Must Clear Both Gates Before Completing Scoring Matrix | ||||
| GATE | G-1 | Adequate Accounting System | PASS: Offeror possesses a DCAA-approved accounting system (or equivalent) with demonstrated ability to segregate costs at the task order level and maintain audit readiness for cost-type and hybrid task orders. Evidence must include audit agency determination letter dated within 3 years of solicitation release. |
| FAIL: No approved accounting system; unable to segregate costs at task order level; adverse audit findings not remediated. | PASS / FAIL | |||
| GATE | G-2 | Financial Capacity | PASS: Offeror demonstrates the financial capacity to maintain liquidity sufficient to support a continuous operational float of at least $150M over a 60-day period (equivalent to $75M per month). Evidence shall include audited financial statements, committed lines of credit, bonding capacity, or formal parent company guarantees. |
| FAIL: Offeror fails to demonstrate sufficient liquidity to support the $150M 60-day operational float. | PASS / FAIL | |||
| GATE RESULT: If BOTH gates receive a PASS determination, proceed to technical scoring. If EITHER gate is FAIL, the offeror is NOT FURTHER EVALUATED — do not complete remaining matrix. | ||||
| BUCKET 1.a. — MANAGEMENT, PLANNING & RAPID RESPONSE (PWS 02) - Single Overall Score for ALL GCCs | ||||
| 1 | 1.1 | Corporate Governance & Program Management Office (PMO) | 1000: Established and operated a centralized corporate PMO simultaneously managing 3+ Federal prime contracts/task orders across a 4+ GCC portfolio, directing 5+ simultaneous sites or service lines. |
800: Established and operated a centralized corporate PMO simultaneously managing 2+ Federal prime contracts/task orders across a 2+ GCC portfolio, directing 3+ simultaneous sites.
600: Established and operated a centralized corporate PMO managing 1+ Federal prime OCONUS contract/task order, directing 2+ simultaneous sites.
400: Established and operated a corporate PMO managing 1+ Federal prime contract/task order at a single site, or strictly within CONUS.
| 200: Established a corporate PMO structure for a Federal prime contract/task order; operations were limited to a single service line or did not achieve the scale/duration of higher tiers. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 1 | 1.2 | Global Human Capital Management | 1000: Recruited, mobilized, and sustained 5,000+ contractor personnel across 3+ GCCs simultaneously in contingency. |
800: 2,500–4,999 personnel across 2+ GCCs simultaneously in contingency.
600: 1,000–2,499 personnel across 2 GCCs simultaneously.
400: 100+ personnel in 1 GCC (contingency environment).
| 200: Plan only; limited evidence of contingency employment. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| BUCKET 1.b. — MANAGEMENT, PLANNING & RAPID RESPONSE (PWS 02) - GCC Specific Score Required | ||||||||||
| 1 | 1.3 | Subcontract Management & Supply Chain Governance | 1000: 30+ labor vendors (3,500+ subcontracted personnel); 100+ equipment/material vendors; documented SCRM assessments for critical subcontractors per RFO FAR Part 40. |
800: 20–29 labor vendors (2,500–3,499 personnel); 75+ equipment vendors; partial SCRM documentation.
600: 10–19 labor vendors (1,500–2,499 personnel); 50+ equipment vendors.
400: 1–9 labor vendors (500–1,499 personnel); 25+ equipment vendors.
| 200: Plan/advisory only; no executed subcontract management. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 1 | 1.4 | Mobilization & Surge Capability | 1000: Surge mobilization achieved at 5+ sites within 72-hour timelines. Executed reception, staging, onward movement, and integration (RSOI) across 3+ non-contiguous alternate points of debarkation (POD) during simulated or actual primary node denial. |
800: Surge mobilization achieved at 3–4 sites within 72-hour timelines. Executed RSOI utilizing at least 1 alternate POD during simulated or actual primary node disruption.
600: Surge mobilization achieved at 2 sites within defined timelines. Mobilization playbooks include documented alternate RSOI routes for primary node denial (executed surge, planned denial).
400: Surge mobilization achieved at 1 site within defined timelines. Standard permissive environment execution.
| 200: Surge plan or mobilization playbook only; no executed surge support. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 1 | 1.5 | Expeditionary LSA Establishment & Velocity | 1000: Established and operated LSAs supporting 10,000+ PAX across 5+ simultaneous sites. Demonstrated site activation for at least one major node (5,000+ PAX capacity) with Initial Operating Capability (IOC) within 14 days of Notice to Proceed (NTP) and Full Operational Capability (FOC) within 30 days. |
800: Established and operated LSAs supporting 5,000–9,999 PAX across 3–4 simultaneous sites. Demonstrated site activation with IOC within 21 days of NTP and FOC within 45 days.
600: Established and operated LSAs supporting 1,000–4,999 PAX across 2+ simultaneous sites. IOC within 30 days of NTP and FOC within 60 days.
400: Established and operated an LSA supporting 250–999 PAX at 1+ site. FOC within 90 days of NTP.
| 200: Executed steady-state base camp management; no demonstrated expeditionary site activation experience. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 1 | 1.6 | CONTESTED LOGISTICS PLANNING MATURITY [CRITICAL ADDITION] | 1000: Participated as principal contractor in 3+ ASCC/GCC-level exercises simulating contested logistics. Demonstrated sustainment continuity under simulated long-range fires against fixed nodes, PNT denial, and degraded SATCOM. Delivered validated AARs; mobilization playbooks include peer-threat APOD/SPOD denial branches; digital twin wargaming results documented with identified vulnerabilities and mitigations; PACE communications plan executed and shown to fail over gracefully. |
800: 2 qualifying exercises; playbooks address at least one peer-threat RSOI disruption scenario; digital twin capability demonstrated.
600: 1 qualifying exercise with documented contractor participation; formal Contested Logistics Plan or Annex accepted by the USG.
400: No exercise validation. Submitted a formal Contested Logistics Plan or Annex as a required CDRL deliverable on a USG contract; document was accepted by the USG without requiring resubmission for technical deficiency.
| 200: No exercise validation. Formally submitted a Contested Logistics concept, roadmap, or vulnerability assessment to the USG as part of a funded contract deliverable or study. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 2 | 1.7 | Theater Legal Access & Clearance (Non-SOFA / Contested Conditions) | 1000: Demonstrated executed, high-tempo theater and country clearance (APACS) across multiple countries lacking full CAAF SOFA coverage during a real-world or exercise deployment. Demonstrated a functioning country-by-country legal-status tracking system; a workforce-substitution plan for countries with entry/arming restrictions; and an established casualty/detention response process coordinated with DoS/SJA. |
800: Executed theater clearance operations in at least one non-SOFA country during a surge or exercise; maintained legal-status tracking and customs contingency plans.
600: Executed routine theater clearance operations in mature SOFA environments; documented contingency plans for non-SOFA access exist but lack exercise validation.
400: Documented country-clearance and legal-status management plan exists; no execution under surge or contested conditions.
| 200: Generic compliance statement or awareness of SOFA/clearance requirements only. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| BUCKET 2 — ENGINEERING & CONSTRUCTION (PWS 03) - GCC Specific Score Required | ||||||||||
| 2 | 2.1 | Utilities Engineering Planning & Design | ||||||||
| (Power, Water, Operational Energy) | 1000: 10,000+ PAX supported; 36+ months; 98%+ power and water uptime; 5+ energy/water reduction plans delivered; demonstrated distributed microgrid or mobile generation operation. |
800: 5,000–9,999 PAX; 24+ months; 95%+ uptime; 3–4 plans; some distributed generation experience.
600: 1,000–4,999 PAX; 12+ months; 92%+ uptime; 1–2 plans.
400: 250–999 PAX; 9+ months; 90%+ uptime.
| 200: <250 PAX; 6+ months; 85%+ uptime. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 2 | 2.2 | Horizontal Infrastructure & Vertical Structures | 1000: 25+ UFC-compliant horizontal projects; 25+ UFC-compliant vertical projects; combined project value >$100M. |
800: 20+ horizontal; 20+ vertical; combined >$75M.
600: 15+ horizontal; 15+ vertical; combined >$50M.
400: 10+ horizontal; 10+ vertical; combined >$25M.
| 200: 5+ horizontal; 5+ vertical; combined >$10M. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 2 | 2.3 | Expeditionary Basing Modules | ||||||||
| (Force Provider / BEAR Systems) | 1000: 5+ FP end-to-end deployments (1,000+ PAX each); 5+ BEAR end-to-end deployments (1,000+ PAX each). |
800: 4+ FP (750+ PAX); 4+ BEAR (750+ PAX).
600: 3+ FP (500+ PAX); 3+ BEAR (500+ PAX).
400: 2+ FP (250+ PAX); 2+ BEAR (250+ PAX).
| 200: 1+ FP (100+ PAX); 1+ BEAR (100+ PAX). | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 2 | 2.4 | Force Protection Engineering | 1000: Executed 4 project types (earthworks, barriers, defensive structures, guard facilities) totaling 25,000+ linear ft of barriers and 100+ structures. Demonstrated integrated protection design and hardening or dispersal execution against air/missile threat posture, including C-UAS sensor integration. |
800: Executed 3 project types (15,000+ linear ft; 75+ structures). Demonstrated hardening or dispersal execution under simulated or actual threat conditions.
600: Executed 2 project types (10,000+ linear ft; 50+ structures). Force protection designs included contingency plans for air/missile threats.
400: Executed 1 project type (7,500+ linear ft; 30+ structures). Standard perimeter security focus.
| 200: Executed 1 project type (5,000+ linear ft; 10+ structures). Standalone elements only. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| BUCKET 3 — CORE LIFE SUPPORT SERVICES (PWS 04) - GCC Specific Score Required |
tc={A1C0F6DB-E112-4C30-A3DD-0130C07F04D7}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Same comment as above for bucket 2 3 3.1 Shelter & Billeting / Occupancy Management 1000: 10,000+ PAX managed; 15+ simultaneous sites; includes demonstrated expeditionary/dispersed billeting at 3+ non-contiguous sites.
800: 5,000–9,999 PAX; 10–15 sites.
600: 1,000–4,999 PAX; 5–10 sites.
400: 250–999 PAX; 2–5 sites.
| 200: <250 PAX; 1 site. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 3 | 3.2 | Power Generation & Distribution | ||||||||
| (24/7 Utility Operations) | 1000: 25+ MW managed; 15+ critical facilities with uninterruptible power; 15+ microgrids; demonstrated distributed microgrid or hybrid power system at 3+ dispersed nodes simultaneously. |
800: 10–24.9 MW; 10–15 critical facilities; 10–15 microgrids; some distributed generation.
600: 1–9.9 MW; 5–9 critical facilities; 5–9 microgrids.
400: 250 kW–999 kW; 2–4 critical facilities; 1–5 microgrids.
| 200: <250 kW; 1 critical facility; no microgrid. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 3 | 3.3 | Water & Ice Service / Water Resource Management | 1000: 1,000,000+ GPD fixed plant AND 250,000+ GPD ROWPU; demonstrated ROWPU employment in austere/expeditionary environment with alternate source identification. |
800: 250,000–999,999 GPD; 50,000–249,999 GPD ROWPU.
600: 50,000–249,999 GPD (ROWPU operations primary).
400: 5,000–49,999 GPD (field operations).
| 200: <5,000 GPD. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 3 | 3.4 | Food Service Operations | ||||||||
| (Fixed DFAC & Expeditionary Feeding) | 1000: 30,000+ meals/day; 15+ simultaneous DFACs; documented MKT operations or dispersed unitized ration delivery to units below battalion level. |
800: 15,000–29,999 meals/day; 10–15 DFACs.
600: 5,000–14,999 meals/day; 5–9 DFACs.
400: 1,000–4,999 meals/day; 2–4 DFACs.
| 200: <1,000 meals/day; 1 DFAC/field kitchen. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 3 | 3.5 | Waste Management Services | 1000: 80,000+ tons/month; full hazardous/medical/solid waste streams; landfill operations. |
800: 50,000–79,999 tons/month.
600: 25,000–49,999 tons/month.
400: 1,000–24,999 tons/month; comprehensive services.
| 200: 100–1,999 tons/month; expeditionary waste ops. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 | |
| BUCKET 4 — SUPPLY & MATERIEL MANAGEMENT (PWS 05) - GCC Specific Score Required | ||||||||||
| 4 | 4.1 | SSA Operations & GCSS-Army Supply Support | 1000: 7+ supply classes; 10,000,000+ transaction lines/month; 50+ GCSS-Army qualified personnel; documented SSA operations during AIS outage or supply disruption event. |
800: 5–6 classes; 1,000,000–9,999,999 lines; 40–49 personnel.
600: 3–4 classes; 500,000–999,999 lines; 30–39 personnel.
400: 1–2 classes; 10,000–499,999 lines; 20–29 personnel.
| 200: Warehouse support only; <10,000 lines; 10 personnel. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 4 | 4.2 | Inventory Management & Distribution Nodes | ||||||||
| (CRSP / FRP Operations) | 1000: 5+ supply classes at 100% accountability; <0.1% asset loss; >99% ITV accuracy; documented ITV maintenance during GPS-degraded operations. |
800: 4 classes at stated standards.
600: 3 classes at stated standards.
400: 2 classes at stated standards.
| 200: 1 class at stated standards. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 4 | 4.3 | Property Book & GFP Accountability | 1000: 100,000+ line items or $1B+ GFP managed; full accountability per AR 735-5; zero sensitive item losses. |
800: 75,000–99,999 line items or $750M–$999M.
600: 50,000–74,999 line items or $500M–$749M.
400: 25,000–49,999 line items or $250M–$499M.
| 200: 10,000–24,999 line items or $100M–$249M. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 4 | 4.4 | Class III Bulk Operations | ||||||||
| (Storage, Distribution, Quality Assurance) | 1000: 5,000,000+ GPM all fuel types. Demonstrated dispersed or tactical bulk fuel distribution executed with simulated or actual resupply interdiction, sustaining consumption for ≥7 days without primary-farm resupply. |
800: 1,000,000–4,999,999 GPM. Demonstrated dispersed fuel point operations with activation of at least one alternate fuel source or delivery method during a disruption.
600: 500,000–999,999 GPM. Maintained contingency plans for resupply interdiction; execution limited to standard distribution.
400: 25,000–499,999 GPM. Standard permissive fuel operations.
| 200: <25,000 GPM. Standard permissive fuel operations. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 4 | 4.5 | CLASS V AMMUNITION OPERATIONS [CRITICAL ADDITION] | 1000: Operated ASP, AHA, and ATHP processing 5,000+ lines/month; SAAS proficient (50+ qualified operators). Demonstrated ammunition throughput at LSCO-projected tonnage floors under mass-consumption surge and munitions-security threat, maintaining SAAS and AR 190-11 compliance during dispersal. |
800: Operated ASP and AHA processing 2,000–4,999 lines/month; SAAS proficient (30–49 qualified operators). Demonstrated ammunition operations during a surge event or elevated threat posture.
600: Operated ASP processing 500–1,999 lines/month; SAAS proficient (10–29 qualified operators). Maintained SAAS and AR 190-11 physical security compliance under standard conditions.
400: ASP support role; SAAS access demonstrated; <500 lines/month.
| 200: Limited ammunition handling; no SAAS proficiency documented. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| BUCKET 5 — MAINTENANCE — FACILITIES AND EQUIPMENT (PWS 06) - GCC Specific Score Required | ||||||||||
| 5 | 5.1 | Maintenance Management & Equipment Fault Repair | 1000: 35,000+ pieces of equipment under management; 5,000+ fault repairs/period; demonstrated forward support maintenance in austere environment; tele-maintenance operations documented. |
800: 18,000–34,999 pieces; 2,000–4,999 fault repairs; some forward/austere maintenance documented.
600: 4,000–17,999 pieces; 400–1,999 fault repairs.
400: 1,000–3,999 pieces; 100–399 fault repairs.
| 200: 750–999 pieces; 50–99 fault repairs. | 5 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 30,000 | |
| 5 | 5.2 | Equipment PMCS & Preventive Maintenance | ||||||||
| (incl. Additive Manufacturing / Tele-Maintenance) | 1000: Scheduled PMCS maintained at 95%+ compliance per applicable TM; additive manufacturing employed in deployed environment with digital parts catalog; tele-maintenance sessions conducted with Army depot/OEM; FIPS 140-2 encrypted comms for tele-maintenance. |
800: 95%+ PMCS compliance; tele-maintenance capability demonstrated; additive manufacturing roadmap in place.
600: 95%+ PMCS compliance; one of tele-maintenance or additive manufacturing demonstrated.
400: 95%+ PMCS compliance; neither tele-maintenance nor additive manufacturing demonstrated.
| 200: <95% PMCS compliance. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 5 | 5.3 | Facilities Maintenance & Service Order Response | 1000: 20,000+ service orders/month; 13,000+ facilities; 20,000,000+ sq ft; 95%+ on-time completion. |
800: 10,000–19,999 orders; 5,000–12,999 facilities; 5,000,000–19,999,999 sq ft.
600: 2,000–9,999 orders; 1,000–4,999 facilities; 1,000,000–4,999,999 sq ft.
400: 200–1,999 orders; 100–999 facilities; 200,000–999,999 sq ft.
| 200: 50–199 orders; 10–99 facilities; 40,000–199,999 sq ft. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| BUCKET 6 — TRANSPORTATION & MOVEMENT CONTROL (PWS 07) - GCC Specific Score Required | ||||||||||
| 6 | 6.1 | Transportation Planning & Movement Control | ||||||||
| (AIS Operations / Multi-Modal) | 1000: 7,500+ movement requests/month; 2,000+ TMP vehicles; 4,000+ clearances/month; TC-AIMS II certified operators. Demonstrated distribution movement under GPS/PNT denial along contested lines of communication, with attrition-resilient routing and demonstrated re-route on Point of Debarkation (POD) loss. |
800: 5,000–7,499 requests/month; 1,000–1,999 TMP vehicles; 2,000–3,999 clearances/month. Demonstrated alternate modal transportation or re-routing due to simulated or actual primary route/POD disruption.
600: 2,500–4,999 requests/month; 500–999 TMP vehicles; 500–1,999 clearances/month. Maintained contingency routing plans; standard permissive conditions.
400: 100–2,499 requests/month; 100–499 TMP vehicles; 20–499 clearances/month. Standard permissive movement control.
200: <100 requests/month; <100 TMP vehicles; <20 clearances/month. Standard permissive movement control.
tc={AED96F72-B902-4D48-9050-AA5AA7520176}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Define contested lines of communication and attrition-resilient routing | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 6 | 6.2 | Cargo & Passenger Movements / Container Operations | ||||||||
| (incl. Autonomous Vehicle Employment) | 1000: 25,000+ pieces of cargo/month; 7,500+ truck movements; 2,500+ containers; documented autonomous or semi-autonomous vehicle employment (UAS delivery or ground ADR) in operational or exercise environment per PWS 07.02. |
800: 15,000–24,999 pieces; 3,500–7,499 truck movements; 1,500–2,499 containers.
600: 5,000–14,999 pieces; 1,000–3,499 movements; 500–1,499 containers.
400: 500–4,999 pieces; 50–999 movements; 50–499 containers.
| 200: <500 pieces; <50 movements; <50 containers. | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| BUCKET 7 — MEDICAL SERVICES & CROSS-CUTTING LSCO CAPABILITIES (PWS 08 / PWS 04.09 / PWS 02.01.04) - GCC Specific Score Required | ||||||||||
| 7 | 7.1 | Clinical Governance & Credentialing Program | 1000: Demonstrated credentialing, privileging, and clinical governance of a large-scale medical workforce (100+ healthcare providers) across 5+ medical facilities during a surge, contingency, or mass-mobilization event. Operations in compliance with DHAPM 6025.13, Vol 4 (or Federal equivalent). |
800: Demonstrated credentialing, privileging, and clinical governance of 50–99 healthcare providers across 3–4 medical facilities during a surge, contingency, or mass-mobilization event.
600: Demonstrated credentialing and clinical governance of 25–49 healthcare providers during a surge event; OR steady-state credentialing and clinical governance for 100+ healthcare providers across 2+ medical facilities.
400: Steady-state clinical governance and credentialing for 10–99 healthcare providers across 1+ medical facilities.
| 200: Steady-state clinical governance and credentialing for fewer than 10 healthcare providers; or documented credentialing policies only. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 | |
| 7 | 7.2 | Role 1 & Role 2 Medical Facility Operations | ||||||||
| (incl. MASCAL Capability) | 1000: Operated 5+ Role 1 facilities AND 2+ Role 2 facilities. Demonstrated mass-casualty (MASCAL) surge management at LSCO-projected casualty rates with field care through interrupted or delayed MEDEVAC. Operated Mortuary Affairs Collection Point (MACP) or Theater Mortuary Affairs Evacuation Point (TMEP). |
800: Operated 4+ Role 1 facilities AND 1+ Role 2 facility. Demonstrated MASCAL incident management under standard MEDEVAC timelines.
600: Operated 3+ Role 1 facilities AND 1+ Role 2 facility. MASCAL plans documented; no executed MASCAL response.
400: Operated 2+ Role 1 facilities OR 1+ Role 2 facility.
200: Operated 1+ Role 1 facility.
tc={C71DDAAB-C105-41BC-8EE6-6AEB458390E5}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Are LSCO-projected casualty rates defined? | 3 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 18,000 | |
| 7 | 7.3 | Preventive Medicine, Medical Logistics & Veterinary Services | 1000: 5+ PM sites; 5+ medical logistics sites; 5+ veterinary sites; all positions fully staffed. |
800: 4 sites each.
600: 3 sites each.
400: 2 sites each.
| 200: 1 site each. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 | |
| 7 | 7.4 | CYBERSECURITY & NETWORK RESILIENCE [CRITICAL ADDITION] | 1000: 24/7 SOC operational supporting deployed logistics networks; all applicable systems patched for Critical vulnerabilities within 14 days of IAVM release; PACE communications architecture validated in exercise with GPS-denied and SATCOM-degraded injects; zero Category 1 incidents resulting from contractor negligence; DISA STIG compliance documented. |
800: SOC operations demonstrated; High vulnerability patching within 30 days; PACE architecture exists and partially validated.
600: SOC capability demonstrated; IAVM compliance track record documented; PACE plan in place.
400: Cybersecurity program documented; IAVM compliance demonstrated; no PACE validation.
| 200: Cybersecurity policy only; no operational SOC; no PACE documentation. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 | |
| 7 | 7.5 | MODERNIZATION & INNOVATION CAPABILITY [CRITICAL ADDITION] | 1000: Predictive logistics (AI/ML) transitioned into an operational supply chain with documented efficiencies/forecast accuracy AND digital twin/logistics modeling utilized to identify vulnerabilities and mitigations on a Federal contract. |
800: Demonstrated a funded, limited-scope technical pilot or demonstration of a predictive logistics (AI/ML) or digital twin capability on a Federal contract, with formal pilot results accepted by the USG.
600: Demonstrated at least one (1) Value Engineering Change Proposal (VECP) or formally approved engineering proposal for a modernization initiative under a Federal contract.
400: Demonstrated a Modernization Roadmap or technology integration plan as a required CDRL deliverable on a Federal contract.
| 200: Internal corporate R&D, unrequested white papers, or conceptual capability only. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 |
| 7.6 | Automated Data Integration & API Interoperability | 1000: Demonstrated automated, system-to-system data integration pushing contractor execution data into a Federal/DoD System of Record (e.g., utilizing Robotic Process Automation [RPA] or API integration). |
800: Managed data synchronization using scheduled, secure batch flat-file transfers (e.g., CSV/JSON via SFTP) formatted to specific Federal/DoD system specifications.
600: Operated Government-provided systems (e.g., manual direct-entry into GCSS-Army, GFEBS, or equivalent Federal system) as the primary execution method.
400: Provided data primarily via structured electronic deliverables (e.g., formatted Excel reporting); no system-to-system integration or system operation.
| 200: Manual/paper-based reporting only. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 |
| 7.7 | Autonomous Systems (UxS) Delivery & Counter-UAS (C-UAS) Operations | 1000: Demonstrated operational deployment of Autonomous Systems (UxS) for logistics, reconnaissance, or recovery OR operated C-UAS detection/early warning systems in a deployed OCONUS or contingency environment. |
800: Demonstrated a technical pilot or demonstration of a UxS or C-UAS capability.
600: Conducted certified UxS operations strictly for site survey or infrastructure inspection (e.g., FAA Part 107 roof/facility inspections).
400: Submitted a UxS or C-UAS integration plan, SOP, or mobilization playbook as a required CDRL deliverable.
| 200: Internal corporate R&D, unrequested white papers, or conceptual capability only. | 1 | 1000 | 1000 | 1000 | 1000 | 1000 | 1000 | 6,000 | 6,000 | ||||
| OFFEROR SELF-SCORE TOTAL / GOVERNMENT VALIDATED TOTAL | 198,000 | 690,000 | 0 | ||||||||||
| MINIMUM TECHNICAL THRESHOLD REQUIREMENT (MTTR) — Gov Validated Score must equal or exceed 90% of maximum possible weighted score to be eligible for MATOC award. |
Same comment as above for bucket 2
Define contested lines of communication and attrition-resilient routing
Are LSCO-projected casualty rates defined?