1.0-RFP 357769 LAr Pumps RV1.pdf
PDF 113 KB Posted
- Attached to
- LAr Circulation and Condenser Pumps
- Solicitation number
- LBNF-357769-BF
About this file
This document is a Request for Proposals (RFP) for the acquisition of Liquid Argon (LAr) circulation and condenser pumps, variable frequency drives, overhaul kits, and spare impellers for the Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) project. The scope includes the engineering, manufacturing, testing, certification, installation, and repair manuals for 6 LAr condenser pumps, 6 circulation pumps, and 12 variable frequency drives for two Cryostats. The RFP is issued by the Fermi Research Alliance, LLC on behalf of the Department of Energy's Fermi National Accelerator Laboratory. Proposals are due by August 29, 2024 at 5:00 p.m. local time and must be submitted electronically. The solicitation number is LBNF-357769-BF.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
FERMI RESEARCH ALLIANCE, LLC
REFERENCE
REQUEST FOR PROPOSAL NUMBER
LBNF-357769 BF
ISSUING OFFICE
Fermi Research Alliance, LLC
DATE ISSUED
8/2/2024
168 Ross Street Lead, SD 57754 Procurement Department
CLOSING DATE:
August 29, 2024, 5:00 p.m./Local Prevailing Time Proposals shall be electronically submitted. Email Proposals for the work described herein will be received until CLOSING
TIME STATED ABOVE.
PROCUREMENT SPECIALIST
Bridget Fugett Telephone No. (815)-245-9847 Email Address bridget@fnal.gov
INFORMATION REGARDING REQUEST FOR PROPOSAL (RFP) ENCLOSURES:
• RFP 357769 LAr Pump Cover Page
• RFP LBNF-357769-BF
• J-1 General Terms and Conditions (Supplies)
• J-2 PUR-466 Fermilab Proposal Certificates
• J-3 SARC Subcontractor Annual Reps and Certs
• J-4 Statement of Work Liquid Argon Pumps V2
• J-5 Reserved
• J-6 Reserved
• J-7 Supplier Online Registration Instructions
• J-8 LBNF/DUNE-US Argon Cryogenics Packages Project Management requirements, QA, QC
Plan
• J-9 Subcontractor’s Corporate Quality Control Plan TBD
• J-10 Small Business Subcontracting Plan Template
• J-11 Sub-Tier Subcontractors and Outside Associates and Consultants TBD
• J-12 Reserved
• J-13 LBNF/DUNE-US Argon Cryogenics Packages Project Schedule.
REQUEST FOR PROPOSALS
File details come from the government source that posted it. Updated .