1.0-RFP 357769 LAr Pumps.pdf
PDF 113 KB Posted
- Attached to
- LAr Circulation and Condenser Pumps
- Solicitation number
- LBNF-357769-BF
About this file
This document is a Request for Proposals (RFP) for the acquisition of LAr (Liquid Argon) circulation and condenser pumps, variable frequency drives (VFDs), overhaul kits, and spare impellers for the Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) project.
The RFP seeks proposals for the engineering, manufacturing, testing, certification, installation, and repair manuals for 6 LAr condenser pumps, 6 LAr circulation pumps, and 12 VFDs (one for each circulation pump) for Cryostats #1 and #2. The proposal due date is August 29, 2024 by 5:00 p.m. local time. The issuing office is Fermi Research Alliance, LLC, and the procuring agency is the Department of Energy Fermi National Accelerator Laboratory. No specific pricing terms, set asides, or incumbents are mentioned in the RFP summary.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
FERMI RESEARCH ALLIANCE, LLC
REFERENCE
REQUEST FOR PROPOSAL NUMBER
LBNF-357769 BF
ISSUING OFFICE
Fermi Research Alliance, LLC
DATE ISSUED
7/30/2024
168 Ross Street Lead, SD 57754 Procurement Department
CLOSING DATE:
August 29, 2024, 5:00 p.m./Local Prevailing Time Proposals shall be electronically submitted. Email Proposals for the work described herein will be received until CLOSING
TIME STATED ABOVE.
PROCUREMENT SPECIALIST
Bridget Fugett Telephone No. (815)-245-9847 Email Address bridget@fnal.gov
INFORMATION REGARDING REQUEST FOR PROPOSAL (RFP) ENCLOSURES:
• RFP 357769 LAr Pump Cover Page
• RFP LBNF-357769-BF
• J-1 General Terms and Conditions (Supplies)
• J-2 PUR-466 Fermilab Proposal Certificates
• J-3 SARC Subcontractor Annual Reps and Certs
• J-4 Statement of Work Liquid Argon Pumps V2
• J-5 General requirements Circulation pumps
• J-6 General requirements Condenser pumps
• J-7 Supplier Online Registration Instructions
• J-8 LBNF/DUNE-US Argon Cryogenics Packages Project Management requirements, QA, QC
Plan
• J-9 Subcontractor’s Corporate Quality Control Plan TBD
• J-10 Small Business Subcontracting Plan Template
• J-11 Sub-Tier Subcontractors and Outside Associates and Consultants TBD
• J-13 LBNF/DUNE-US Argon Cryogenics Packages Project Schedule.
REQUEST FOR PROPOSALS
File details come from the government source that posted it. Updated .