1.0-RFP 357769 LAr Pumps.pdf

PDF 113 KB Posted

Attached to
LAr Circulation and Condenser Pumps
Solicitation number
LBNF-357769-BF
Issued by

About this file

This document is a Request for Proposals (RFP) for the acquisition of LAr (Liquid Argon) circulation and condenser pumps, variable frequency drives (VFDs), overhaul kits, and spare impellers for the Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) project.

The RFP seeks proposals for the engineering, manufacturing, testing, certification, installation, and repair manuals for 6 LAr condenser pumps, 6 LAr circulation pumps, and 12 VFDs (one for each circulation pump) for Cryostats #1 and #2. The proposal due date is August 29, 2024 by 5:00 p.m. local time. The issuing office is Fermi Research Alliance, LLC, and the procuring agency is the Department of Energy Fermi National Accelerator Laboratory. No specific pricing terms, set asides, or incumbents are mentioned in the RFP summary.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

FERMI RESEARCH ALLIANCE, LLC

REFERENCE

REQUEST FOR PROPOSAL NUMBER

LBNF-357769 BF

ISSUING OFFICE

Fermi Research Alliance, LLC

DATE ISSUED

7/30/2024

168 Ross Street Lead, SD 57754 Procurement Department

CLOSING DATE:

August 29, 2024, 5:00 p.m./Local Prevailing Time Proposals shall be electronically submitted. Email Proposals for the work described herein will be received until CLOSING

TIME STATED ABOVE.

PROCUREMENT SPECIALIST

Bridget Fugett Telephone No. (815)-245-9847 Email Address bridget@fnal.gov

INFORMATION REGARDING REQUEST FOR PROPOSAL (RFP) ENCLOSURES:

• RFP 357769 LAr Pump Cover Page

• RFP LBNF-357769-BF

• J-1 General Terms and Conditions (Supplies)

• J-2 PUR-466 Fermilab Proposal Certificates

• J-3 SARC Subcontractor Annual Reps and Certs

• J-4 Statement of Work Liquid Argon Pumps V2

• J-5 General requirements Circulation pumps

• J-6 General requirements Condenser pumps

• J-7 Supplier Online Registration Instructions

• J-8 LBNF/DUNE-US Argon Cryogenics Packages Project Management requirements, QA, QC

Plan

• J-9 Subcontractor’s Corporate Quality Control Plan TBD

• J-10 Small Business Subcontracting Plan Template

• J-11 Sub-Tier Subcontractors and Outside Associates and Consultants TBD

• J-13 LBNF/DUNE-US Argon Cryogenics Packages Project Schedule.

REQUEST FOR PROPOSALS