L1 - Cost form-IAD Final.xlsx

XLSX spreadsheet 257 KB Posted

Attached to
INFLATABLE AERODYNAMIC DECELERATORS Final RFP Federal contract opportunity
Solicitation number
80LARC22R0016
Issued by
National Aeronautics and Space Administration Langley Research Center

About this file

This document package includes a final request for proposal (RFP) for Inflatable Aerodynamic Decelerators along with supporting documents. The National Aeronautics and Space Administration Langley Research Center seeks proposals to develop and demonstrate inflatable heat shield technologies to enable future planetary science missions. Offerors must propose designs for deployable entry systems capable of withstanding hypersonic entry, descent, and landing conditions on Mars. Proposals are due within 60 calendar days of release, with evaluations and contract awards to follow within 120 days. The total contract value may exceed $50 million over five years depending on available funding and project options exercised.

View the file

Other files for this federal contract opportunity

Other files attached to INFLATABLE AERODYNAMIC DECELERATORS Final RFP, newest first.
File Type Posted
IAD_Source Selection Decision_FINAL_v2_19OCT22.pdf PDF
IAD_Source Selection Decision_FINAL.9.19.2022.pdf PDF
Amendment 4 SF30 9 Mar 22.pdf PDF
Att L1 - Cost form-IAD-Amendment 4.xlsx XLSX spreadsheet
Amendment 4 QAs.pdf PDF
Amendment 3 SF30 8 Mar 22.pdf PDF
IAD FINAL RFP PPTO_Amended 8 MAR22.pdf PDF
Amendment 3 QAs.pdf PDF
Amendment 2 SF30 1 Mar 22.pdf PDF
Att L1 - Cost form-IAD-Amendment 2.xlsx XLSX spreadsheet
Amendment 2 QAs.pdf PDF
IAD FINAL RFP PPTO_Amended 1MAR22.pdf PDF
Direct Labor Classification_IAD IDIQ 22Feb22.pdf PDF
Amendment 1 SF30-16c-2.pdf PDF
Copy of Att L1 - Cost form-IAD-Amended 22Feb22.xlsx XLSX spreadsheet
Final RFP QAs 22 Feb 2022.pdf PDF
IAD FINAL RFP PPTO_Amended22Feb2022.pdf PDF
IAD Pre Proposal_Conf_Presentation Feb 10 2022.pdf PDF
Bidders Library.zip ZIP file
L-5 Sample Past Performance Consent Letter.pdf PDF
L-4 IAD Direct Labor Classification_Descriptions.pdf PDF
IAD Exhibit B Final 31Jan22.pdf PDF
IAD FINAL RFP PPTO_31Jan22.pdf PDF
L-6 Small Business Subcontracting Plan Instructions.pdf PDF
L-3 SF1408.pdf PDF
SOW for IAD IDIQ Final 31Jan22.pdf PDF
L-2 Black Out Notice for IAD_Signed.pdf PDF
IAD_Final Request for Proposal (RFP) Cover Letter_signed.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 1 Track A Proposed Effort

Form 1 Track A - Base Period Proposed Effort

Offeror: _________________________________________________

TrackProposedNOTE: only selected rates and formulas were created as a guide.
AYesOfferors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Year 1Year 2Year 3Year 4Year 5Total
Track AHoursRateCostHoursRateCostHoursRateCostHoursRateCostHoursRateCostHoursCost
Engineer I800$92.52$ 74,0173000$95.30$ 285,8904000$98.16$ 392,6278000$101.10$ 808,7928000$104.13$ 833,06123800$ 2,394,387
Engineer II1200$99.86$ 119,8354000$102.86$ 411,4345000$105.95$ 529,73710000$109.13$ 1,091,29710000$112.41$ 1,124,05210200$ 3,276,355
Engineer III800$0.00$ - 01600$0.00$ - 03000$0.00$ - 06000$0.00$ - 06000$0.00$ - 05400$ - 0
Fabricator/Manufacturer I100$0.00$ - 01200$0.00$ - 01500$0.00$ - 03000$0.00$ - 03000$0.00$ - 02800$ - 0
Fabricator/Manufacturer II400$0.00$ - 02500$0.00$ - 03000$0.00$ - 05000$0.00$ - 05000$0.00$ - 05900$ - 0
Fabricator/Manufacturer III400$0.00$ - 02500$0.00$ - 03000$0.00$ - 05000$0.00$ - 05000$0.00$ - 05900$ - 0
Fabricator/Manufacturer IV200$0.00$ - 01500$0.00$ - 02000$0.00$ - 03000$0.00$ - 03000$0.00$ - 03700$ - 0
Quality Inspector III80$0.00$ - 0500$0.00$ - 0800$0.00$ - 01200$0.00$ - 01200$0.00$ - 01380$ - 0
Project Manager III400$0.00$ - 01800$0.00$ - 03000$0.00$ - 04000$0.00$ - 04000$0.00$ - 05200$ - 0
Subtotal Labor$ 193,852$ 697,323$ 922,365$ 1,900,089$ 1,957,113$ 5,670,742
ODC's Plug number$ 100,000$ 300,000$ 400,000$ 800,000$ 800,000$ 2,400,000
ODC indirect Burden2.00%$ 2,0002.00%$ 6,0002.00%$ 8,0002.00%$ 16,0002.00%$ 16,000$ 48,000
Subtotal$ 295,852$ 1,003,323$ 1,330,365$ 2,716,089$ 2,773,113$ 8,118,742
Profit/Fee3.00%$ 8,8763.00%$ 30,1003.00%$ 39,9113.00%$ 81,4833.00%$ 83,193$ 243,562
Total Evaluated Price4380$ 304,72718600$ 1,033,42325300$ 1,370,27645200$ 2,797,57245200$ 2,856,30764280$ 8,362,304

(1) Form 1 - This Form should be completely self-calculating from other TABs of the spreadsheet (i.e. all necessary calculations are included in the cells of the worksheet). Offerors shall verify formulas in the cells; these cells are provided to indicate which Track(s) are being proposed. Offerors shall not make changes to the remaining portions of this form; this form inputs the labor rates from the Composite Rate Schedule which will be used for price analysis.

Form 1 Track B Proposed Effort

Form 1 Track B - Base Period Proposed Effort

Offeror: _________________________________________________

TrackProposedNOTE: only selected rates and formulas were created as a guide.
BYesOfferors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Year 1Year 2Year 3Year 4Year 5Total
Track CHoursRateCostHoursRateCostHoursRateCostHoursRateCostHoursRateCostHoursCost
Engineer I800$91.08$ 72,8603000$94.89$ 284,6674000$97.74$ 390,9458000$100.67$ 805,3228000$103.69$ 829,48823800$ 2,383,283
Engineer II1200$99.86$ 119,8354000$102.86$ 411,4345000$105.95$ 529,73710000$109.13$ 1,091,29710000$112.41$ 1,124,05210200$ 3,276,355
Engineer III800$0.00$ - 01600$0.00$ - 03000$0.00$ - 06000$0.00$ - 06000$0.00$ - 05400$ - 0
Fabricator/Manufacturer I100$0.00$ - 01200$0.00$ - 01500$0.00$ - 03000$0.00$ - 03000$0.00$ - 02800$ - 0
Fabricator/Manufacturer II400$0.00$ - 02500$0.00$ - 03000$0.00$ - 05000$0.00$ - 05000$0.00$ - 05900$ - 0
Fabricator/Manufacturer III400$0.00$ - 02500$0.00$ - 03000$0.00$ - 05000$0.00$ - 05000$0.00$ - 05900$ - 0
Fabricator/Manufacturer IV200$0.00$ - 01500$0.00$ - 02000$0.00$ - 03000$0.00$ - 03000$0.00$ - 03700$ - 0
Quality Inspector III80$0.00$ - 0500$0.00$ - 0800$0.00$ - 01200$0.00$ - 01200$0.00$ - 01380$ - 0
Project Manager III400$0.00$ - 01800$0.00$ - 03000$0.00$ - 04000$0.00$ - 04000$0.00$ - 05200$ - 0
Subtotal Labor$ 192,695$ 696,100$ 920,683$ 1,896,620$ 1,953,541$ 5,659,638
ODC's Plug number$ 100,000$ 300,000$ 400,000$ 800,000$ 800,000$ 2,400,000
ODC indirect Burden3.00%$ 3,0003.00%$ 9,0003.00%$ 12,0003.00%$ 24,0003.00%$ 24,000$ 72,000
Subtotal$ 295,695$ 1,005,100$ 1,332,683$ 2,720,620$ 2,777,541$ 8,131,638
Profit/Fee4.00%$ 11,8284.00%$ 40,2044.00%$ 53,3074.00%$ 108,8254.00%$ 111,102$ 325,266
Total Evaluated Price4380$ 307,52318600$ 1,045,30425300$ 1,385,99045200$ 2,829,44445200$ 2,888,64264280$ 8,456,904

(1) Form 1 - This Form should be completely self-calculating from other TABs of the spreadsheet (i.e. all necessary calculations are included in the cells of the worksheet). Offerors shall verify formulas in the cells; these cells are provided to indicate which Track(s) are being proposed. Offerors shall not make changes to the remaining portions of this form; this form inputs the labor rates from the Composite Rate Schedule which will be used for price analysis.

Form 1 Track C Proposed Effort

Form 1 Track C - Base Period Proposed Effort

Offeror: _________________________________________________

TrackProposedNOTE: only selected rates and formulas were created as a guide.
CYesOfferors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Year 1Year 2Year 3Year 4Year 5Total
Track CHoursRateCostHoursRateCostHoursRateCostHoursRateCostHoursRateCostHoursCost
Engineer I200$83.86$ 16,772400$96.38$ 38,551400$99.27$ 39,7081800$102.25$ 184,0421800$105.31$ 189,5644600$ 468,638
Engineer II400$99.86$ 39,945800$102.86$ 82,287800$105.95$ 84,7582500$109.13$ 272,8242500$112.41$ 281,0137000$ 760,827
Engineer III200$0.00$ - 0400$0.00$ - 0400$0.00$ - 01600$0.00$ - 01600$0.00$ - 04200$ - 0
Fabricator/Manufacturer I100$0.00$ - 0200$0.00$ - 0200$0.00$ - 0800$0.00$ - 0800$0.00$ - 02100$ - 0
Fabricator/Manufacturer II200$0.00$ - 0400$0.00$ - 0400$0.00$ - 02000$0.00$ - 02000$0.00$ - 05000$ - 0
Fabricator/Manufacturer III200$0.00$ - 0400$0.00$ - 0400$0.00$ - 02000$0.00$ - 02000$0.00$ - 05000$ - 0
Fabricator/Manufacturer IV100$0.00$ - 0200$0.00$ - 0200$0.00$ - 01000$0.00$ - 01000$0.00$ - 02500$ - 0
Quality Inspector III40$0.00$ - 080$0.00$ - 080$0.00$ - 0300$0.00$ - 0300$0.00$ - 0800$ - 0
Project Manager III200$0.00$ - 0300$0.00$ - 0300$0.00$ - 01200$0.00$ - 01200$0.00$ - 03200$ - 0
Subtotal Labor$ 56,717$ 120,838$ 124,466$ 456,866$ 470,578$ 1,229,465
ODC's Plug number$ 50,000$ 100,000$ 200,000$ 300,000$ 300,000$ 950,000
ODC indirect Burden4.00%$ 2,0004.00%$ 4,0004.00%$ 8,0004.00%$ 12,0004.00%$ 12,000$ 38,000
Subtotal$ 108,717$ 224,838$ 332,466$ 768,866$ 782,578$ 2,217,465
Profit/Fee5.00%$ 5,4365.00%$ 11,2425.00%$ 16,6235.00%$ 38,4435.00%$ 39,129$ 110,873
Total Evaluated Price1640$ 114,1533180$ 236,0803180$ 349,09013200$ 807,31013200$ 821,70634400$ 2,328,338

(1) Form 1 - This Form should be completely self-calculating from other TABs of the spreadsheet (i.e. all necessary calculations are included in the cells of the worksheet). Offerors shall verify formulas in the cells; these cells are provided to indicate which Track(s) are being proposed. Offerors shall not make changes to the remaining portions of this form; this form inputs the labor rates from the Composite Rate Schedule which will be used for price analysis.

Form 2a Composite Rate sched A

Form 2a - Composite Rate Schedule Track A
Offeror: _________________________________________________
Composite Burdened Labor Rates (excluding Profit/Fee)NOTE: only selected rates and formulas were created as a guide.
Base PeriodOption Period 1Option Period 2Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Labor CategoryTrackIdentify if category is a prime, subcontract, or composite rateYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10
Technical/Professional
Engineer IAComposite$ 92.52$ 95.30$ 98.16$ 101.10$ 104.13$ 107.26$ 110.47$ 113.79$ 117.21$ 119.77(1) Form 2 - This Form is a table of composite burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding profit / fee rates to be used for price analysis. Form 2 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 1, and Offerors shall not propose multiple sets of rates for one labor category (e.g. prime Offeror’s rates for a particular labor category and a subcontractor’s rates for the same labor category). For each labor category for each contract year the following information is required in Form 2:

i. Identify if the labor category is prime, subcontractor, or a composite (i.e. a blended rate consisting of prime and subcontract labor). If a proposed rate is a composite, Offerors shall explain the calculation of that rate based on the rates proposed in Form 3 and 3a and so on (e.g. providing the specific weightings applied to the prime and subcontractor’s rates from Form 3 and 3a which were used to calculate the proposed composite rate).

ii. The proposed burdened labor rate thru all applicable indirect rates [excluding profit/fee] for each contract year.

iii. The proposed indirect rate(s) for ODCs for each contract year.

iv. The proposed profit rate for FFP task orders.

v. The proposed fee rate for CPFF task orders.

Form 2 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).

Engineer IIASolely Prime$ 99.86$ 102.86$ 105.95$ 109.13$ 112.41$ 115.77$ 119.25$ 122.83$ 126.52$ 130.31
Engineer IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer VA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor VA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager VA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert VA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support
Administrative Assistant IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Administrative Assistant IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Administrative Assistant IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Link to forms 3, 3a and so on as applicable
Technical Illustrator IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Make sure all composite rate percentages add to 100%, add additional subK to formulas as appropriate.
Technical Illustrator IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Illustrator IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabrication and Testing
Fabricator/Manufacturer IA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IIIA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IVA-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Indirect Rate Percentage
Total Indirect Rate Burden for ODCs2.00%2.00%2.00%2.00%2.00%0.00%0.00%0.00%0.00%0.00%
Profit/FeeRate
FFP task orders4.00%
CPFF task orders2.00%

Form 2b Composite Rate sched B

Form 2b - Composite Rate Schedule Track B
Offeror: _________________________________________________
Composite Burdened Labor Rates (excluding Profit/Fee)NOTE: only selected rates and formulas were created as a guide.
Base PeriodOption Period 1Option Period 2Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Labor CategoryTrackIdentify if category is a prime, subcontract, or composite rateYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10
Technical/Professional
Engineer IBComposite$ 91.08$ 94.89$ 97.74$ 100.67$ 103.69$ 106.80$ 110.00$ 113.30$ 116.70$ 119.44(1) Form 2 - This Form is a table of composite burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding profit / fee rates to be used for price analysis. Form 2 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 1, and Offerors shall not propose multiple sets of rates for one labor category (e.g. prime Offeror’s rates for a particular labor category and a subcontractor’s rates for the same labor category). For each labor category for each contract year the following information is required in Form 2:

i. Identify if the labor category is prime, subcontractor, or a composite (i.e. a blended rate consisting of prime and subcontract labor). If a proposed rate is a composite, Offerors shall explain the calculation of that rate based on the rates proposed in Form 3 and 3a and so on (e.g. providing the specific weightings applied to the prime and subcontractor’s rates from Form 3 and 3a which were used to calculate the proposed composite rate).

ii. The proposed burdened labor rate thru all applicable indirect rates [excluding profit/fee] for each contract year.

iii. The proposed indirect rate(s) for ODCs for each contract year.

iv. The proposed profit rate for FFP task orders.

v. The proposed fee rate for CPFF task orders.

Form 2 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).

Engineer IIBSolely Prime$ 99.86$ 102.86$ 105.95$ 109.13$ 112.41$ 115.77$ 119.25$ 122.83$ 126.52$ 130.31
Engineer IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer VB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor VB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager VB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert VB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support
Administrative Assistant IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Administrative Assistant IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Administrative Assistant IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Link to forms 3, 3a and so on as applicable
Technical Illustrator IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Make sure all composite rate percentages add to 100%, add additional subK to formulas as appropriate.
Technical Illustrator IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Illustrator IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabrication and Testing
Fabricator/Manufacturer IB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IIIB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IVB-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Indirect Rate Percentage
Total Indirect Rate Burden for ODCs3.00%3.00%3.00%3.00%3.00%0.00%0.00%0.00%0.00%0.00%
Profit/FeeRate
FFP task orders5.00%
CPFF task orders3.00%

Form 2c Composite Rate sched C

Form 2c - Composite Rate Schedule Track C
Offeror: _________________________________________________
Composite Burdened Labor Rates (excluding Profit/Fee)NOTE: only selected rates and formulas were created as a guide.
Base PeriodOption Period 1Option Period 2Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Labor CategoryTrackIdentify if category is a prime, subcontract, or composite rateYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10
Technical/Professional
Engineer ICComposite$ 83.86$ 96.38$ 99.27$ 102.25$ 105.31$ 108.48$ 111.73$ 115.08$ 118.53$ 120.76(1) Form 2 - This Form is a table of composite burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding profit / fee rates to be used for price analysis. Form 2 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 1, and Offerors shall not propose multiple sets of rates for one labor category (e.g. prime Offeror’s rates for a particular labor category and a subcontractor’s rates for the same labor category). For each labor category for each contract year the following information is required in Form 2:

i. Identify if the labor category is prime, subcontractor, or a composite (i.e. a blended rate consisting of prime and subcontract labor). If a proposed rate is a composite, Offerors shall explain the calculation of that rate based on the rates proposed in Form 3 and 3a and so on (e.g. providing the specific weightings applied to the prime and subcontractor’s rates from Form 3 and 3a which were used to calculate the proposed composite rate).

ii. The proposed burdened labor rate thru all applicable indirect rates [excluding profit/fee] for each contract year.

iii. The proposed indirect rate(s) for ODCs for each contract year.

iv. The proposed profit rate for FFP task orders.

v. The proposed fee rate for CPFF task orders.

Form 2 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).

Engineer IICSolely Prime$ 99.86$ 102.86$ 105.95$ 109.13$ 112.41$ 115.77$ 119.25$ 122.83$ 126.52$ 130.31
Engineer IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer VC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer Supervisor VC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Project Manager VC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subject Matter expert VC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Quality Inspector IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Support
Administrative Assistant IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Administrative Assistant IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Administrative Assistant IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler/Cost analyst IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Systems Analyst IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Link to forms 3, 3a and so on as applicable
Technical Illustrator IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0Make sure all composite rate percentages add to 100%, add additional subK to formulas as appropriate.
Technical Illustrator IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technical Illustrator IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabrication and Testing
Fabricator/Manufacturer IC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Fabricator/Manufacturer IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Riggers IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineering Associate IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Mechanical Technician IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Assistant IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IIIC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Test Conductor IVC-$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Indirect Rate Percentage
Total Indirect Rate Burden for ODCs4.00%4.00%4.00%4.00%4.00%0.00%0.00%0.00%0.00%0.00%
Profit/FeeRate
FFP task orders6.00%
CPFF task orders4.00%

Form 3a Sched of Rates Prime A

Form 3a - Schedule of Rates Prime Track A
Offeror: _________________________________________________
Burdened Labor Rates (excluding Profit/Fee) - PrimeNOTE: only selected rates and formulas were created as a guide.
Base PeriodOption Period 1Option Period 2Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Labor CategoryTrackYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Composite Weight Percent
Technical/Professional
Engineer IA$ 90.54$ 93.26$ 96.05$ 98.93$ 101.90$ 104.96$ 108.10$ 111.35$ 114.70$ 118.1350%(1) Form 3 - This Form is a table of prime burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and profit / fee rates to be used for price analysis. Form 3 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 3.

Form 3 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).

Engineer IIA$ 99.86$ 102.86$ 105.95$ 109.13$ 112.41$ 115.77$ 119.25$ 122.83$ 126.52$ 130.31100%
Engineer IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Subject Matter expert IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%Link to form 4 by year
Subject Matter expert IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Subject Matter expert VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Support
Administrative Assistant IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Administrative Assistant IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Administrative Assistant IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabrication and Testing
Fabricator/Manufacturer IA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%

Escalation 3% 3% 3% 3% 3% 3% 3% 3% 3%

Form 3b Sched of Rates Prime B

Form 3b - Schedule of Rates Prime Track B
Offeror: _________________________________________________
Burdened Labor Rates (excluding Profit/Fee) - PrimeNOTE: only selected rates and formulas were created as a guide.
Base PeriodOption Period 1Option Period 2Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Labor CategoryTrackYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Composite Weight Percent
Technical/Professional
Engineer IB$ 90.54$ 93.26$ 96.05$ 98.93$ 101.90$ 104.96$ 108.10$ 111.35$ 114.70$ 118.1360%(1) Form 3 - This Form is a table of prime burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and profit / fee rates to be used for price analysis. Form 3 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 3.

Form 3 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).

Engineer IIB$ 99.86$ 102.86$ 105.95$ 109.13$ 112.41$ 115.77$ 119.25$ 122.83$ 126.52$ 130.31100%
Engineer IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer VB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor VB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager VB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Subject Matter expert IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%Link to form 4 by year
Subject Matter expert IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Subject Matter expert VB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Support
Administrative Assistant IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Administrative Assistant IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Administrative Assistant IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabrication and Testing
Fabricator/Manufacturer IB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IIIB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IVB$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%

Escalation 3% 3% 3% 3% 3% 3% 3% 3% 3%

Form 3c Sched of Rates Prime C

Form 3c - Schedule of Rates Prime Track C
Offeror: _________________________________________________
Burdened Labor Rates (excluding Profit/Fee) - PrimeNOTE: only selected rates and formulas were created as a guide.
Base PeriodOption Period 1Option Period 2Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Labor CategoryTrackYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Composite Weight Percent
Technical/Professional
Engineer IC$ 90.54$ 93.26$ 96.05$ 98.93$ 101.90$ 104.96$ 108.10$ 111.35$ 114.70$ 118.1350%(1) Form 3 - This Form is a table of prime burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and profit / fee rates to be used for price analysis. Form 3 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 3.

Form 3 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).

Engineer IIC$ 99.86$ 102.86$ 105.95$ 109.13$ 112.41$ 115.77$ 119.25$ 122.83$ 126.52$ 130.31100%
Engineer IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer VC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineer Supervisor VC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Project Manager VC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Subject Matter expert IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%Link to form 4 by year
Subject Matter expert IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Subject Matter expert VC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Quality Inspector IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Support
Administrative Assistant IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Administrative Assistant IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Administrative Assistant IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Scheduler/Cost analyst IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Systems Analyst IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Technical Illustrator IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabrication and Testing
Fabricator/Manufacturer IC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Fabricator/Manufacturer IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Riggers IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Engineering Associate IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Mechanical Technician IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Assistant IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IIIC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%
Test Conductor IVC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0100%

Escalation 3% 3% 3% 3% 3% 3% 3% 3% 3%

Form 3a1 Sched of Rates SubK1

Form 3a1 - Schedule of Rates SubK1 Track A
NOTE: only selected rates and formulas were created as a guide.
Offeror: _________________________________________________Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable.
Subcontractor NameAdd Additional Form 3xn and so on for additional Subcontractors proposed.
Similarly Situated(Track B)Yes
Burdened Labor Rates (Including SubK Profit/Fee) - SubK1Burdened Labor Rates (Including Offeror Burdens excluding offeror Profit/Fee) - SubK1
Base PeriodOption Period 1Option Period 2Base PeriodOption Period 1Option Period 2
Labor CategoryTrackYear 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 10Composite Weight Percent
Technical/Professional
Engineer IA$ 95.00$ 97.85$ 100.79$ 103.81$ 106.92$ 110.13$ 113.43$ 116.83$ 120.33$ 120.33$ 99.75$ 102.74$ 105.83$ 109.00$ 112.27$ 115.64$ 119.10$ 122.67$ 126.35$ 126.3525%
Engineer IIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Engineer IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Engineer IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Engineer VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Engineer Supervisor IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Engineer Supervisor IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Engineer Supervisor VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Project Manager IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Project Manager IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Project Manager VA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Subject Matter expert IIIA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%
Subject Matter expert IVA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00%

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .