Att L1 - Cost form-IAD-Amendment 2.xlsx
XLSX spreadsheet 239 KB Posted
- Attached to
- INFLATABLE AERODYNAMIC DECELERATORS Final RFP Federal contract opportunity
- Solicitation number
- 80LARC22R0016
About this file
This is a final request for proposal (RFP) from the National Aeronautics and Space Administration Langley Research Center for Inflatable Aerodynamic Decelerators. The agency seeks proposals for the development of advanced technologies to enable future Mars exploration missions. Offerors must submit proposals using the provided cost forms and rate sheets to detail their labor rates, overhead costs, and pricing for the base period and option years. Proposals are due by the date and time specified in the solicitation instructions. The RFP includes detailed instructions on how offerors should structure their proposals across multiple tabs in the provided spreadsheet template, including forms to identify prime and subcontractor labor rates, composite rate schedules, and buildup of pricing for evaluation. Labor categories, contract periods, and templates are pre-populated for a standardized response.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Form 5: |
| (1) Enter Prime(Offeror) Labor rates in Form 5, add formulas to convert from Offeror Fiscal Year(OFY) to Contract Year (CY) rates. |
| (2) Enter mapping from Schedule of Rates Labor Category to Offeror Internal Labor Category. |
| *Offerors may map multiple Schedule of Rates Labor Categories to the same Offeror Internal Labor Category, as long as the Offeror Internal Labor Category is qualified to perform the work. |
| Examples: |
| Engineers I-V may be mapped to fewer than 5 Internal Engineering Categories as long as the Education and experience minimums are met. |
| A higher qualified labor category can always do the work of a lower level labor category when that labor category is unavailable, and can be mapped that way. |
| If, as an example, an Internal Labor Category of 'Technician' qualifies as a Mechanical Technician AND a Rigger, it can be mapped to both. |
| (3) Enter Prime(Offeror) Indirect rates in Form 5, add formulas to convert from Offeror Fiscal Year(OFY) to Contract Year (CY) rates. |
| Form 4x: |
| (1)Bring Prime(Offeror) Labor and Indirect Rates in Form 5 over to this form and build up burdened rate, excluding profit, assign percentage of effort for labor category to Offeror and SubKs. |
| (2)Enter each Subcontractor Bill Rates (Fully Burdened Rates with fee/profit) in Form 4x, assign percentage for labor category. Make sure each labor category percentage of effort adds to 100%. |
| *Insert lines as necessary to accommodate subcontractors. |
| *Insure that significant subcontractors have been allocated adequate effort to be considered significant in accordance with solicitation. |
| *Make sure Significant Subcontractors submit to NASA the unredacted forms required. |
| (3) Build out all years. Copying year 1, once complete to years 2-10 may be the most efficient method, if mix of effort between prime and subcontractors is projected to be consistent. |
| Form 3x1, 3x2, and so on: |
| (1)Bring SubK Bill Rates in Form 4x over to the appropriate 3xN form and apply any Offeror subcontractor burdens to bill rate. |
| Form 3x: |
| (1)Bring Prime(Offeror) burdened Labor rates(excluding profit) in Form 4x, bring over percentage of effort assigned. |
| Form 2x: |
| (1) Develop formulas to created weighted average rate by labor category based upon percentage of effort(s) provede by Prime and subcontractors. |
| (2) Enter any indirect rates applied to ODCS, by year |
| (3) Enter Firm Fixed Price (FFP) and Cost Plus Fixed Fee (CPFF) Rates. |
| Form 1 Track x: |
| (1) Bring over appropriate weighte average rate from Form 2x |
| (2) Bring over offeror's indirect burden rates on ODCS from Form 2x, if any |
| (3) Bring over average of fee rates, applying equal weight to FFP qand CPFF. |
| Ensure accuracy of all formulas, do not hard code formulas. |
Flowchart
| Flow of data from Worksheet to Worksheet | ||
| Add additional Forms 3x3,3x4, and so on as necessasry for additional subcontractors. | ||
| x = Track |
Form 1 Track x Proposed Effort Form 2x Composite Rate Schedule Form 3x1 Schedule of Rates SubK1 Form 3x Schedule of Rates Prime Form 4x Labor rate Buildup Form 5 Conversion from OFY Form 3x2 Schedule of Rates SubK2
Form 1 Track A Proposed Effort
Form 1 Track A - Base Period Proposed Effort
Offeror: _________________________________________________
| Track | Proposed | NOTE: only selected rates and formulas were created as a guide. |
| A | Yes | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. |
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total | ||||||||||||
| Track A | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost |
| Engineer I | 800 | $92.52 | $ 74,017 | 3000 | $95.30 | $ 285,890 | 4000 | $98.16 | $ 392,627 | 8000 | $101.10 | $ 808,792 | 8000 | $104.13 | $ 833,061 | 23800 | $ 2,394,387 |
| Engineer II | 1200 | $99.86 | $ 119,835 | 4000 | $102.86 | $ 411,434 | 5000 | $105.95 | $ 529,737 | 10000 | $109.13 | $ 1,091,297 | 10000 | $112.41 | $ 1,124,052 | 10200 | $ 3,276,355 |
| Engineer III | 800 | $0.00 | $ - 0 | 1600 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 6000 | $0.00 | $ - 0 | 6000 | $0.00 | $ - 0 | 5400 | $ - 0 |
| Fabricator/Manufacturer I | 100 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1500 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 2800 | $ - 0 |
| Fabricator/Manufacturer II | 400 | $0.00 | $ - 0 | 2500 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5900 | $ - 0 |
| Fabricator/Manufacturer III | 400 | $0.00 | $ - 0 | 2500 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5900 | $ - 0 |
| Fabricator/Manufacturer IV | 200 | $0.00 | $ - 0 | 1500 | $0.00 | $ - 0 | 2000 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 3700 | $ - 0 |
| Quality Inspector III | 80 | $0.00 | $ - 0 | 500 | $0.00 | $ - 0 | 800 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1380 | $ - 0 |
| Project Manager III | 400 | $0.00 | $ - 0 | 1800 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 4000 | $0.00 | $ - 0 | 4000 | $0.00 | $ - 0 | 5200 | $ - 0 |
| Subtotal Labor | $ 193,852 | $ 697,323 | $ 922,365 | $ 1,900,089 | $ 1,957,113 | $ 5,670,742 | |||||||||||
| ODC's Travel Plug Number | $ - 0 | $ 8,000 | $ 12,000 | $ 20,000 | $ 20,000 | $ 60,000 | |||||||||||
| Travel indirect Burden | 2.00% | $ - 0 | 2.00% | $ 160 | 2.00% | $ 240 | 2.00% | $ 400 | 2.00% | $ 400 | $ 1,200 | ||||||
| ODC's Other Plug number | $ 100,000 | $ 292,000 | $ 388,000 | $ 780,000 | $ 780,000 | $ 2,340,000 | |||||||||||
| ODC indirect Burden | 2.00% | $ 2,000 | 2.00% | $ 5,840 | 2.00% | $ 7,760 | 2.00% | $ 15,600 | 2.00% | $ 15,600 | $ 46,800 | ||||||
| Subtotal | $ 295,852 | $ 1,003,323 | $ 1,330,365 | $ 2,716,089 | $ 2,773,113 | $ 8,118,742 | |||||||||||
| Profit/Fee | 3.00% | $ 8,876 | 3.00% | $ 30,100 | 3.00% | $ 39,911 | 3.00% | $ 81,483 | 3.00% | $ 83,193 | $ 243,562 | ||||||
| Total Evaluated Price | 4380 | $ 304,727 | 18600 | $ 1,033,423 | 25300 | $ 1,370,276 | 45200 | $ 2,797,572 | 45200 | $ 2,856,307 | 64280 | $ 8,362,304 |
(1) Form 1 - This Form should be completely self-calculating from other TABs of the spreadsheet (i.e. all necessary calculations are included in the cells of the worksheet). Offerors shall verify formulas in the cells; these cells are provided to indicate which Track(s) are being proposed. Offerors shall not make changes to the remaining portions of this form; this form inputs the labor rates from the Composite Rate Schedule which will be used for price analysis.
Yellow Highlighted, government provided hours and ODC's
Form 1 Track B Proposed Effort
Form 1 Track B - Base Period Proposed Effort
Offeror: _________________________________________________
| Track | Proposed | NOTE: only selected rates and formulas were created as a guide. |
| B | Yes | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. |
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total | ||||||||||||
| Track B | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost |
| Engineer I | 800 | $91.08 | $ 72,860 | 3000 | $94.89 | $ 284,667 | 4000 | $97.74 | $ 390,945 | 8000 | $100.67 | $ 805,322 | 8000 | $103.69 | $ 829,488 | 23800 | $ 2,383,283 |
| Engineer II | 1200 | $99.86 | $ 119,835 | 4000 | $102.86 | $ 411,434 | 5000 | $105.95 | $ 529,737 | 10000 | $109.13 | $ 1,091,297 | 10000 | $112.41 | $ 1,124,052 | 10200 | $ 3,276,355 |
| Engineer III | 800 | $0.00 | $ - 0 | 1600 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 6000 | $0.00 | $ - 0 | 6000 | $0.00 | $ - 0 | 5400 | $ - 0 |
| Fabricator/Manufacturer I | 100 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1500 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 2800 | $ - 0 |
| Fabricator/Manufacturer II | 400 | $0.00 | $ - 0 | 2500 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5900 | $ - 0 |
| Fabricator/Manufacturer III | 400 | $0.00 | $ - 0 | 2500 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5000 | $0.00 | $ - 0 | 5900 | $ - 0 |
| Fabricator/Manufacturer IV | 200 | $0.00 | $ - 0 | 1500 | $0.00 | $ - 0 | 2000 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 3700 | $ - 0 |
| Quality Inspector III | 80 | $0.00 | $ - 0 | 500 | $0.00 | $ - 0 | 800 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1380 | $ - 0 |
| Project Manager III | 400 | $0.00 | $ - 0 | 1800 | $0.00 | $ - 0 | 3000 | $0.00 | $ - 0 | 4000 | $0.00 | $ - 0 | 4000 | $0.00 | $ - 0 | 5200 | $ - 0 |
| Subtotal Labor | $ 192,695 | $ 696,100 | $ 920,683 | $ 1,896,620 | $ 1,953,541 | $ 5,659,638 | |||||||||||
| ODC's Travel Plug Number | $ - 0 | $ 8,000 | $ 12,000 | $ 20,000 | $ 20,000 | $ 60,000 | |||||||||||
| 3.00% | $ - 0 | 3.00% | $ 240 | 3.00% | $ 360 | 3.00% | $ 600 | 3.00% | $ 600 | $ 1,800 | |||||||
| ODC's Other Plug number | $ 100,000 | $ 292,000 | $ 388,000 | $ 780,000 | $ 780,000 | $ 2,340,000 | |||||||||||
| ODC indirect Burden | 3.00% | $ 3,000 | 3.00% | $ 8,760 | 3.00% | $ 11,640 | 3.00% | $ 23,400 | 3.00% | $ 23,400 | $ 70,200 | ||||||
| Subtotal | $ 295,695 | $ 1,005,100 | $ 1,332,683 | $ 2,720,620 | $ 2,777,541 | $ 8,131,638 | |||||||||||
| Profit/Fee | 4.00% | $ 11,828 | 4.00% | $ 40,204 | 4.00% | $ 53,307 | 4.00% | $ 108,825 | 4.00% | $ 111,102 | $ 325,266 | ||||||
| Total Evaluated Price | 4380 | $ 307,523 | 18600 | $ 1,045,304 | 25300 | $ 1,385,990 | 45200 | $ 2,829,444 | 45200 | $ 2,888,642 | 64280 | $ 8,456,904 |
(1) Form 1 - This Form should be completely self-calculating from other TABs of the spreadsheet (i.e. all necessary calculations are included in the cells of the worksheet). Offerors shall verify formulas in the cells; these cells are provided to indicate which Track(s) are being proposed. Offerors shall not make changes to the remaining portions of this form; this form inputs the labor rates from the Composite Rate Schedule which will be used for price analysis.
Yellow Highlighted, government provided hours and ODC's
Form 1 Track C Proposed Effort
Form 1 Track C - Base Period Proposed Effort
Offeror: _________________________________________________
| Track | Proposed | NOTE: only selected rates and formulas were created as a guide. |
| C | Yes | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. |
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total | ||||||||||||
| Track C | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Rate | Cost | Hours | Cost |
| Engineer I | 200 | $83.86 | $ 16,772 | 400 | $96.38 | $ 38,551 | 400 | $99.27 | $ 39,708 | 1800 | $102.25 | $ 184,042 | 1800 | $105.31 | $ 189,564 | 4600 | $ 468,638 |
| Engineer II | 400 | $99.86 | $ 39,945 | 800 | $102.86 | $ 82,287 | 800 | $105.95 | $ 84,758 | 2500 | $109.13 | $ 272,824 | 2500 | $112.41 | $ 281,013 | 7000 | $ 760,827 |
| Engineer III | 200 | $0.00 | $ - 0 | 400 | $0.00 | $ - 0 | 400 | $0.00 | $ - 0 | 1600 | $0.00 | $ - 0 | 1600 | $0.00 | $ - 0 | 4200 | $ - 0 |
| Fabricator/Manufacturer I | 100 | $0.00 | $ - 0 | 200 | $0.00 | $ - 0 | 200 | $0.00 | $ - 0 | 800 | $0.00 | $ - 0 | 800 | $0.00 | $ - 0 | 2100 | $ - 0 |
| Fabricator/Manufacturer II | 200 | $0.00 | $ - 0 | 400 | $0.00 | $ - 0 | 400 | $0.00 | $ - 0 | 2000 | $0.00 | $ - 0 | 2000 | $0.00 | $ - 0 | 5000 | $ - 0 |
| Fabricator/Manufacturer III | 200 | $0.00 | $ - 0 | 400 | $0.00 | $ - 0 | 400 | $0.00 | $ - 0 | 2000 | $0.00 | $ - 0 | 2000 | $0.00 | $ - 0 | 5000 | $ - 0 |
| Fabricator/Manufacturer IV | 100 | $0.00 | $ - 0 | 200 | $0.00 | $ - 0 | 200 | $0.00 | $ - 0 | 1000 | $0.00 | $ - 0 | 1000 | $0.00 | $ - 0 | 2500 | $ - 0 |
| Quality Inspector III | 40 | $0.00 | $ - 0 | 80 | $0.00 | $ - 0 | 80 | $0.00 | $ - 0 | 300 | $0.00 | $ - 0 | 300 | $0.00 | $ - 0 | 800 | $ - 0 |
| Project Manager III | 200 | $0.00 | $ - 0 | 300 | $0.00 | $ - 0 | 300 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 1200 | $0.00 | $ - 0 | 3200 | $ - 0 |
| Subtotal Labor | $ 56,717 | $ 120,838 | $ 124,466 | $ 456,866 | $ 470,578 | $ 1,229,465 | |||||||||||
| ODC's Travel Plug Number | $ - 0 | $ 8,000 | $ 20,000 | $ 30,000 | $ 30,000 | $ 88,000 | |||||||||||
| 4.00% | $ - 0 | 4.00% | $ 320 | 4.00% | $ 800 | 4.00% | $ 1,200 | 4.00% | $ 1,200 | $ 3,520 | |||||||
| ODC's Other Plug number | $ 50,000 | $ 92,000 | $ 180,000 | $ 270,000 | $ 270,000 | $ 862,000 | |||||||||||
| ODC indirect Burden | 4.00% | $ 2,000 | 4.00% | $ 3,680 | 4.00% | $ 7,200 | 4.00% | $ 10,800 | 4.00% | $ 10,800 | $ 34,480 | ||||||
| Subtotal | $ 108,717 | $ 224,838 | $ 332,466 | $ 768,866 | $ 782,578 | $ 2,217,465 | |||||||||||
| Profit/Fee | 5.00% | $ 5,436 | 5.00% | $ 11,242 | 5.00% | $ 16,623 | 5.00% | $ 38,443 | 5.00% | $ 39,129 | $ 110,873 | ||||||
| Total Evaluated Price | 1640 | $ 114,153 | 3180 | $ 236,080 | 3180 | $ 349,090 | 13200 | $ 807,310 | 13200 | $ 821,706 | 34400 | $ 2,328,338 |
(1) Form 1 - This Form should be completely self-calculating from other TABs of the spreadsheet (i.e. all necessary calculations are included in the cells of the worksheet). Offerors shall verify formulas in the cells; these cells are provided to indicate which Track(s) are being proposed. Offerors shall not make changes to the remaining portions of this form; this form inputs the labor rates from the Composite Rate Schedule which will be used for price analysis.
Yellow Highlighted, government provided hours and ODC's
Form 2a Composite Rate sched A
| Form 2a - Composite Rate Schedule Track A |
| Offeror: _________________________________________________ |
| Composite Burdened Labor Rates (excluding Offeror Profit/Fee) | NOTE: only selected rates and formulas were created as a guide. | ||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. | ||||||||||
| Labor Category | Track | Identify if category is a prime, subcontract, or composite rate | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Technical/Professional | |||||||||||||
| Engineer I | A | Composite | $ 92.52 | $ 95.30 | $ 98.16 | $ 101.10 | $ 104.13 | $ 107.26 | $ 110.47 | $ 113.79 | $ 117.21 | $ 119.77 | (1) Form 2 - This Form is a table of composite burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding offeror profit / fee rates to be used for price analysis. Subcontractor profit/fee should be included. Form 2 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 1, and Offerors shall not propose multiple sets of rates for one labor category (e.g. prime Offeror’s rates for a particular labor category and a subcontractor’s rates for the same labor category). For each labor category for each contract year the following information is required in Form 2: |
i. Identify if the labor category is prime, subcontractor, or a composite (i.e. a blended rate consisting of prime and subcontract labor). If a proposed rate is a composite, Offerors shall explain the calculation of that rate based on the rates proposed in Form 3 and 3a and so on (e.g. providing the specific weightings applied to the prime and subcontractor’s rates from Form 3 and 3a which were used to calculate the proposed composite rate).
ii. The proposed burdened labor rate thru all applicable indirect rates [excluding profit/fee] for each contract year.
iii. The proposed indirect rate(s) for ODCs for each contract year.
iv. The proposed profit rate for FFP task orders.
v. The proposed fee rate for CPFF task orders.
Form 2 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).
| Engineer II | A | Solely Prime | $ 99.86 | $ 102.86 | $ 105.95 | $ 109.13 | $ 112.41 | $ 115.77 | $ 119.25 | $ 122.83 | $ 126.52 | $ 130.31 | |
| Engineer III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer V | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager V | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Subject Matter expert III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Support | |||||||||||||
| Administrative Assistant II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabrication and Testing | |||||||||||||
| Fabricator/Manufacturer I | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Link to forms 3, 3a and so on as applicable |
| Engineering Associate II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Make sure all composite rate percentages add to 100%, add additional subK to formulas as appropriate. |
| Engineering Associate III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineering Associate IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor II | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor III | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor IV | A | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Indirect Rate Percentage | |||||||||||||
| Total Indirect Rate Burden for Travel | 2.00% | 2.00% | 2.00% | 2.00% | 2.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |||
| Total Indirect Rate Burden for ODCs | 2.00% | 2.00% | 2.00% | 2.00% | 2.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Profit/Fee | Rate |
| FFP task orders | 4.00% |
| CPFF task orders | 2.00% |
Form 2b Composite Rate sched B
| Form 2b - Composite Rate Schedule Track B |
| Offeror: _________________________________________________ |
| Composite Burdened Labor Rates (excluding Offeror Profit/Fee) | NOTE: only selected rates and formulas were created as a guide. | ||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. | ||||||||||
| Labor Category | Track | Identify if category is a prime, subcontract, or composite rate | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Technical/Professional | |||||||||||||
| Engineer I | B | Composite | $ 91.08 | $ 94.89 | $ 97.74 | $ 100.67 | $ 103.69 | $ 106.80 | $ 110.00 | $ 113.30 | $ 116.70 | $ 119.44 | (1) Form 2 - This Form is a table of composite burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding offeror profit / fee rates to be used for price analysis. Subcontractor profit/fee should be included. Form 2 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 1, and Offerors shall not propose multiple sets of rates for one labor category (e.g. prime Offeror’s rates for a particular labor category and a subcontractor’s rates for the same labor category). For each labor category for each contract year the following information is required in Form 2: |
i. Identify if the labor category is prime, subcontractor, or a composite (i.e. a blended rate consisting of prime and subcontract labor). If a proposed rate is a composite, Offerors shall explain the calculation of that rate based on the rates proposed in Form 3 and 3a and so on (e.g. providing the specific weightings applied to the prime and subcontractor’s rates from Form 3 and 3a which were used to calculate the proposed composite rate).
ii. The proposed burdened labor rate thru all applicable indirect rates [excluding profit/fee] for each contract year.
iii. The proposed indirect rate(s) for ODCs for each contract year.
iv. The proposed profit rate for FFP task orders.
v. The proposed fee rate for CPFF task orders.
Form 2 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).
| Engineer II | B | Solely Prime | $ 99.86 | $ 102.86 | $ 105.95 | $ 109.13 | $ 112.41 | $ 115.77 | $ 119.25 | $ 122.83 | $ 126.52 | $ 130.31 | |
| Engineer III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer V | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager V | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Subject Matter expert III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Support | |||||||||||||
| Administrative Assistant II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabrication and Testing | |||||||||||||
| Fabricator/Manufacturer I | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Link to forms 3, 3a and so on as applicable |
| Engineering Associate II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Make sure all composite rate percentages add to 100%, add additional subK to formulas as appropriate. |
| Engineering Associate III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineering Associate IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor II | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor III | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor IV | B | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Indirect Rate Percentage | |||||||||||||
| Total Indirect Rate Burden for Travel | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |||
| Total Indirect Rate Burden for ODCs | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Profit/Fee | Rate |
| FFP task orders | 5.00% |
| CPFF task orders | 3.00% |
Form 2c Composite Rate sched C
| Form 2c - Composite Rate Schedule Track C |
| Offeror: _________________________________________________ |
| Composite Burdened Labor Rates (excluding Offeror Profit/Fee) | NOTE: only selected rates and formulas were created as a guide. | ||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. | ||||||||||
| Labor Category | Track | Identify if category is a prime, subcontract, or composite rate | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Technical/Professional | |||||||||||||
| Engineer I | C | Composite | $ 83.86 | $ 96.38 | $ 99.27 | $ 102.25 | $ 105.31 | $ 108.48 | $ 111.73 | $ 115.08 | $ 118.53 | $ 120.76 | (1) Form 2 - This Form is a table of composite burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding offeror profit / fee rates to be used for price analysis. Subcontractor profit/fee should be included. Form 2 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 1, and Offerors shall not propose multiple sets of rates for one labor category (e.g. prime Offeror’s rates for a particular labor category and a subcontractor’s rates for the same labor category). For each labor category for each contract year the following information is required in Form 2: |
i. Identify if the labor category is prime, subcontractor, or a composite (i.e. a blended rate consisting of prime and subcontract labor). If a proposed rate is a composite, Offerors shall explain the calculation of that rate based on the rates proposed in Form 3 and 3a and so on (e.g. providing the specific weightings applied to the prime and subcontractor’s rates from Form 3 and 3a which were used to calculate the proposed composite rate).
ii. The proposed burdened labor rate thru all applicable indirect rates [excluding profit/fee] for each contract year.
iii. The proposed indirect rate(s) for ODCs for each contract year.
iv. The proposed profit rate for FFP task orders.
v. The proposed fee rate for CPFF task orders.
Form 2 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).
| Engineer II | C | Solely Prime | $ 99.86 | $ 102.86 | $ 105.95 | $ 109.13 | $ 112.41 | $ 115.77 | $ 119.25 | $ 122.83 | $ 126.52 | $ 130.31 | |
| Engineer III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineer V | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Project Manager V | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Subject Matter expert III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Quality Inspector IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Support | |||||||||||||
| Administrative Assistant II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Scheduler/Cost analyst IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabrication and Testing | |||||||||||||
| Fabricator/Manufacturer I | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fabricator/Manufacturer IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Riggers IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Link to forms 3, 3a and so on as applicable |
| Engineering Associate II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Make sure all composite rate percentages add to 100%, add additional subK to formulas as appropriate. |
| Engineering Associate III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Engineering Associate IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical Technician IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Assistant IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor II | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor III | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Test Conductor IV | C | - | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Indirect Rate Percentage | |||||||||||||
| Total Indirect Rate Burden for Travel | 4.00% | 4.00% | 4.00% | 4.00% | 4.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |||
| Total Indirect Rate Burden for ODCs | 4.00% | 4.00% | 4.00% | 4.00% | 4.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Profit/Fee | Rate |
| FFP task orders | 6.00% |
| CPFF task orders | 4.00% |
Form 3a Sched of Rates Prime A
| Form 3a - Schedule of Rates Prime Track A |
| Offeror: _________________________________________________ |
| Burdened Labor Rates (excluding Profit/Fee) - Prime | NOTE: only selected rates and formulas were created as a guide. | |||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. | |||||||||||
| Labor Category | Offeror Internal Labor Category Mapping | Track | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Composite Weight Percent | |
| Technical/Professional | ||||||||||||||
| Engineer I | A | $ 90.54 | $ 93.26 | $ 96.05 | $ 98.93 | $ 101.90 | $ 104.96 | $ 108.10 | $ 111.35 | $ 114.70 | $ 118.13 | 50% | (1) Form 3 - This Form is a table of prime burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding profit / fee rates to be used for price analysis. Form 3 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 3. |
Form 3 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).
| Engineer II | A | $ 99.86 | $ 102.86 | $ 105.95 | $ 109.13 | $ 112.41 | $ 115.77 | $ 119.25 | $ 122.83 | $ 126.52 | $ 130.31 | 100% | |
| Engineer III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineer IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineer V | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager V | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Subject Matter expert III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Quality Inspector II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Quality Inspector III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | Link to form 4 by year |
| Quality Inspector IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Support | |||||||||||||
| Administrative Assistant II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabrication and Testing | |||||||||||||
| Fabricator/Manufacturer I | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% |
Escalation 3% 3% 3% 3% 3% 3% 3% 3% 3%
| Profit/Fee | Rate |
| FFP task orders | 4.00% |
| CPFF task orders | 2.00% |
Form 3b Sched of Rates Prime B
| Form 3b - Schedule of Rates Prime Track B |
| Offeror: _________________________________________________ |
| Burdened Labor Rates (excluding Profit/Fee) - Prime | NOTE: only selected rates and formulas were created as a guide. | |||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. | |||||||||||
| Labor Category | Offeror Internal Labor Category Mapping | Track | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Composite Weight Percent | |
| Technical/Professional | ||||||||||||||
| Engineer I | B | $ 90.54 | $ 93.26 | $ 96.05 | $ 98.93 | $ 101.90 | $ 104.96 | $ 108.10 | $ 111.35 | $ 114.70 | $ 118.13 | 60% | (1) Form 3 - This Form is a table of prime burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding profit / fee rates to be used for price analysis. Form 3 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 3. |
Form 3 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).
| Engineer II | B | $ 99.86 | $ 102.86 | $ 105.95 | $ 109.13 | $ 112.41 | $ 115.77 | $ 119.25 | $ 122.83 | $ 126.52 | $ 130.31 | 100% | |
| Engineer III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineer IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineer V | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager V | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Subject Matter expert III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Quality Inspector II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Quality Inspector III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | Link to form 4 by year |
| Quality Inspector IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Support | |||||||||||||
| Administrative Assistant II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabrication and Testing | |||||||||||||
| Fabricator/Manufacturer I | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor II | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor III | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor IV | B | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% |
Escalation 3% 3% 3% 3% 3% 3% 3% 3% 3%
| Profit/Fee | Rate |
| FFP task orders | 5.00% |
| CPFF task orders | 3.00% |
Form 3c Sched of Rates Prime C
| Form 3c - Schedule of Rates Prime Track C |
| Offeror: _________________________________________________ |
| Burdened Labor Rates (excluding Profit/Fee) - Prime | NOTE: only selected rates and formulas were created as a guide. | |||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. | |||||||||||
| Labor Category | Offeror Internal Labor Category Mapping | Track | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Composite Weight Percent | |
| Technical/Professional | ||||||||||||||
| Engineer I | C | $ 90.54 | $ 93.26 | $ 96.05 | $ 98.93 | $ 101.90 | $ 104.96 | $ 108.10 | $ 111.35 | $ 114.70 | $ 118.13 | 50% | (1) Form 3 - This Form is a table of prime burdened labor rates (thru all applicable labor indirect burdens), indirect rate(s) for ODCs, and excluding profit / fee rates to be used for price analysis. Form 3 is already populated with the labor categories Offerors must propose rates for. Offerors shall not add or delete any labor category listed in Form 3. |
Form 3 shall be submitted by each significant subcontractor [as defined in Section L.15 of the RFP] in its own proposal and shall be submitted directly to NASA no later than the date and time specified in the instructions for receipt of offers for this solicitation. Subcontractors not meeting the thresholds at Section L.15 are not required to provide this Form nor any supporting cost detail (i.e. no cost forms are required); the prime Offeror only needs to provide the fully-burdened rate(s) for these subcontractor(s) and rationale for reasonableness of the fully-burdened rate(s).
| Engineer II | C | $ 99.86 | $ 102.86 | $ 105.95 | $ 109.13 | $ 112.41 | $ 115.77 | $ 119.25 | $ 122.83 | $ 126.52 | $ 130.31 | 100% | |
| Engineer III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineer IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineer V | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Project Manager V | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Subject Matter expert III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Quality Inspector II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Quality Inspector III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | Link to form 4 by year |
| Quality Inspector IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Support | |||||||||||||
| Administrative Assistant II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Scheduler/Cost analyst IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabrication and Testing | |||||||||||||
| Fabricator/Manufacturer I | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Fabricator/Manufacturer IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Riggers IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Engineering Associate IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Mechanical Technician IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Assistant IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor II | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor III | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% | |
| Test Conductor IV | C | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 100% |
Escalation 3% 3% 3% 3% 3% 3% 3% 3% 3%
| Profit/Fee | Rate |
| FFP task orders | 6.00% |
| CPFF task orders | 4.00% |
Form 3a1 Sched of Rates SubK1
| Form 3a1 - Schedule of Rates SubK1 Track A | |
| NOTE: only selected rates and formulas were created as a guide. | |
| Offeror: _________________________________________________ | Offerors are to create their own formulas for the spreadsheet linking TABS together where applicable. |
| Subcontractor Name | Add Additional Form 3xn and so on for additional Subcontractors proposed. | |||||||||||||||||||||
| Similarly Situated(Track B) | Yes | |||||||||||||||||||||
| Burdened Labor Rates (Including SubK Profit/Fee) - SubK1 | Burdened Labor Rates (Including Offeror Burdens excluding offeror Profit/Fee) - SubK1 | |||||||||||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Base Period | Option Period 1 | Option Period 2 | |||||||||||||||||
| Labor Category | Track | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | Composite Weight Percent |
| Technical/Professional | ||||||||||||||||||||||
| Engineer I | A | $ 95.00 | $ 97.85 | $ 100.79 | $ 103.81 | $ 106.92 | $ 110.13 | $ 113.43 | $ 116.83 | $ 120.33 | $ 120.33 | $ 99.75 | $ 102.74 | $ 105.83 | $ 109.00 | $ 112.27 | $ 115.64 | $ 119.10 | $ 122.67 | $ 126.35 | $ 126.35 | 25% |
| Engineer II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Engineer III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Engineer IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Engineer V | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Project Manager III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Project Manager IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Project Manager V | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Subject Matter expert III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Quality Inspector II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Quality Inspector III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Quality Inspector IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Support | ||||||||||||||||||||||
| Administrative Assistant II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Scheduler/Cost analyst II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Scheduler/Cost analyst III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Scheduler/Cost analyst IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Fabrication and Testing | ||||||||||||||||||||||
| Fabricator/Manufacturer I | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Fabricator/Manufacturer II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Fabricator/Manufacturer III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Fabricator/Manufacturer IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Riggers II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Riggers III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Riggers IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Engineering Associate II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Engineering Associate III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Engineering Associate IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Mechanical Technician II | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Mechanical Technician III | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |
| Mechanical Technician IV | A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0% |