This document contains questions and answers regarding an amendment to a National Aeronautics and Space Administration solicitation for inflatable aerodynamic decelerators. The amendment provides revised cost forms to make the labor categories consistent between years in the cost model. It also addresses questions about compositing labor rates between the offeror and any subcontractors. Specifically, it clarifies that the composite weight percentage in the cost form is calculated as the sum of effort from the offeror and any subs for a labor category. If no subs are included, the offeror is assumed to provide 100% of effort. It advises offerors to add or delete rows for subs as applicable for each labor category.

View the file

Other files for this federal contract opportunity

Other files attached to INFLATABLE AERODYNAMIC DECELERATORS Final RFP, newest first.
File Type Posted
IAD_Source Selection Decision_FINAL_v2_19OCT22.pdf PDF
IAD_Source Selection Decision_FINAL.9.19.2022.pdf PDF
Amendment 4 SF30 9 Mar 22.pdf PDF
Att L1 - Cost form-IAD-Amendment 4.xlsx XLSX spreadsheet
Amendment 3 SF30 8 Mar 22.pdf PDF
IAD FINAL RFP PPTO_Amended 8 MAR22.pdf PDF
Amendment 3 QAs.pdf PDF
Amendment 2 SF30 1 Mar 22.pdf PDF
Att L1 - Cost form-IAD-Amendment 2.xlsx XLSX spreadsheet
Amendment 2 QAs.pdf PDF
IAD FINAL RFP PPTO_Amended 1MAR22.pdf PDF
Direct Labor Classification_IAD IDIQ 22Feb22.pdf PDF
Amendment 1 SF30-16c-2.pdf PDF
Copy of Att L1 - Cost form-IAD-Amended 22Feb22.xlsx XLSX spreadsheet
Final RFP QAs 22 Feb 2022.pdf PDF
IAD FINAL RFP PPTO_Amended22Feb2022.pdf PDF
IAD Pre Proposal_Conf_Presentation Feb 10 2022.pdf PDF
Bidders Library.zip ZIP file
L-5 Sample Past Performance Consent Letter.pdf PDF
L-4 IAD Direct Labor Classification_Descriptions.pdf PDF
IAD Exhibit B Final 31Jan22.pdf PDF
IAD FINAL RFP PPTO_31Jan22.pdf PDF
L-6 Small Business Subcontracting Plan Instructions.pdf PDF
L-3 SF1408.pdf PDF
L1 - Cost form-IAD Final.xlsx XLSX spreadsheet
SOW for IAD IDIQ Final 31Jan22.pdf PDF
L-2 Black Out Notice for IAD_Signed.pdf PDF
IAD_Final Request for Proposal (RFP) Cover Letter_signed.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As of March 9, 2022

Amendment 4 Final RFP Questions (Solicitation 80LARC22R0016)

Q1. Questions regarding the cost form:

1. Form 4 – The equation to calculate Total Burdened Labor Rate (column J) does not appear to function correctly. An example:

2. Form 4 – There are Labor Categories listed in Years after Year 1 that are not listed on Form

5. For example, Technical Illustrators and Systems Analysts. Since Form 5 feeds Form 4, please advise. Listing different categories year to year makes it difficult to copy paste as advised in the instructions, requiring rates to be mapped individually.

3. Form 4 – If no subs are listed, should the composite weight (column K) always be 100%?

4. Form 4 – If no subs are listed, should rows 9 and 10 be deleted?

Response:

1. The composite weight percent is correct in the form (column J) as intended. It is the sum of the effort applied by the offeror and each subcontractor providing effort for a particular labor category. Example provided for Engineer I: Offeror 50%, subK1 25%, subk2 25% = 100% effort. This is used to calculate the weighted labor rates on form 2.

2. Yes, all labor categories in years 2-10 should be the same as year 1. Revised cost forms are included in this Amendment 4 to make years 2-10 consistent with year 1.

3. Yes, if no subs, then offeror is providing 100% of the effort for the particular labor category.

4. Engineer I was provided as an example. An offeror will need to add/delete rows for subcontractors as appropriate for each and every labor category and provide formulas linking the spreadsheet forms.