This is a Past Performance Questionnaire template to be completed by references for offerors responding to NASA Johnson Space Center's Lunar Freezer System RFP (80JSC025DA006). The questionnaire must be submitted directly to the Contracting Officer Jonathan Anzures and Contract Specialist Linda Benitez.
The questionnaire evaluates contractor performance across multiple categories including technical performance, schedule performance, contract management, cost performance, and general performance areas. It uses a rating scale from Poor/Unsatisfactory to Exceptional. Key evaluation areas include program planning/control, technical services quality, safety/mission assurance, risk management, cost control, schedule adherence, workforce management, and small business utilization. The form requires detailed contract information, performance ratings, narrative explanations, and specific information about contract values, personnel turnover, safety incidents, and organizational conflicts of interest. The reference must provide their contact information and role in evaluating the contractor's performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Source Selection Statement_Final.pdf | ||
| LFS Interested Parties List_Final.pdf | ||
| Prime-Subcontractor Idenitification and SOW Division.xlsx | XLSX spreadsheet | |
| SF33-22.pdf | ||
| Pre-Proposal Conference and Final RFP Questions and Answers.pdf | ||
| LFS Pre-Proposal Conference - Final.pdf | ||
| Final RFP 80JSC025DA006 Lunar Freezer System.pdf | ||
| L-4 Past Performance Matrix.xlsx | XLSX spreadsheet | |
| Questions and Answers template - FRFP - LFS.xlsx | XLSX spreadsheet | |
| J1 Data Requirements List (DRL) and Data Requirements Description (DRDs).pdf | ||
| L-3 Past Performance Consent Letter.docx | DOCX document | |
| L-1 Cost Reimbursable Cost Template.xlsx | XLSX spreadsheet | |
| LFS_Technical_Library_Request_Form.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L-4 Past Performance Questionnaire
Complete one set of letters and forms for each Past Performance reference. Additional space or blank sheets may be added to answer any question.]
Transmittal Letter to Accompany Present/Past Performance Questionnaire
FROM:
SUBJECT: Present/Past Performance Questionnaire for Contract(s):
We are currently responding to NASA Johnson Space Center’s (JSC’s) Request for Proposal (RFP). This RFP requires Offerors to identify customers and solicit their response regarding our performance.
We are providing present and past performance data to NASA JSC relating to our performance identified on contract ___________________ (contract name/number). The RFP instructs that we provide our customers with the attached questionnaire and requests that you provide the requested data and submit it by email directly to:
| Contracting Officer (CO): Jonathan Anzures | |
| Contract Specialist (CS): Linda Benitez | |
| Email address: jonathan.anzures@nasa.gov | |
| Email address: linda.b.benitezrivera@nasa.gov | |
| Subject Line: Present/Past Performance Questionnaire for Contract(s): |
The information contained in the completed Past Performance Questionnaire is considered sensitive and cannot be released to us, the Offeror. If you have any questions about the acquisition or the attached questionnaire, your questions must be directed back to the JSC point of contact identified above. Thank you for your timely assistance.
Sincerely, (Company Official)
Offeror Identification
Please provide the following information:
1. Contractor Information Company:
Division:
Mailing Address:
2. Contract Number:
3. Contract Type:
4. Product/Service Description:
5. Contract Award Date:
6. Period of Performance (basic and any options):
7. During this contract period of performance, this firm was the: |_| Prime Contractor |_| Significant Subcontractor |_| Team Member |_| Other (please describe): _____________________________
What percentage of the Total Contract Value for this contract did the firm perform, and what is the Total Contract Value? Percentage of work performed by contractor ___________; total contract value ___________
8. Does a corporate or ownership relationship exist between the contractor being evaluated and your organization? |_| No |_| Yes – If yes, please describe the relationship:_______________________
9. Unusual contract features or conditions: __________________________________________________________________________
Past Performance Evaluation
Based on your knowledge of the contract identified above, please provide your assessment of how well the contractor/key personnel performed on each of the following questions. It is very important to keep in mind that only performance in the past 7 years is relevant.
Please rate the contractor as described below in the following technical, schedule, contract management and cost performance, and general areas.
Exceptional (E) – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good (VG) – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory (S) – Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal (M) – Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Poor/Unsatisfactory (P) – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Not Applicable – Contractor not required to provide the service or product indicated.
| Technical Performance Category |
| N/A |
| P/U |
| M |
| S |
| VG |
| E |
1. Overall performance in planning and controlling the program
2. Overall quality of technical services and support
3. Compliance with technical requirements and performance standards in providing safety and mission assurance support and services
4. Insight in understanding customer requirements and priorities
5. Initiative in identifying and resolving unforeseen technical and schedule problems (causes, impacts, and resolutions)
6. Surveillance, and management of major/critical subcontractors
7. Contractor’s ability to correct performance deficiencies
8. Ability to use metrics and other tools to accurately measure and track program
9. Record in demonstrating a thorough understanding of the nature of the work required and the disciplines required to accomplish them
10. Record in identifying and mitigating risks
11. Effectiveness of technical training program
12. Please give a narrative as to why you chose the adjective you did for the 11 areas above, especially for those answers that are other than “satisfactory.”
13. Other particular strong/weak points of contractor’s technical performance.
14. If applicable, please list and describe the results of previous freezer projects developed by the contractor, with emphasis on assets that were operated in a spaceflight environment.
| Schedule Performance Category |
| N/A |
| P/U |
| M |
| S |
| VG |
| E |
1. Ability to provide a qualified workforce to fulfill schedule requirements
2. Content, accuracy, and timeliness of technical reports
3. Adherence to task schedules
4. Timeliness and accuracy of cost and business reports
5. Record in completing technical tasks/milestones, deliverables within established schedules
| Contract Management And Cost Performance |
| N/A |
| P/U |
| M |
| S |
| VG |
| E |
1. Adherence to estimated costs and contract cost targets
2. Ability to effectively plan efforts, provide realistic cost and schedule estimates, etc
3. Ability to forecast and control costs
4. Ability to submit accurately and timely financial reports and credible forecasts of future resource requirements
5. Rate the degree of monitoring/guidance required in contract administration
6. Contract change order management (discuss contractor commitment to negotiate and implement contract changes in a timely manner)
7. Rate the contractor’s record in effectively selecting and managing subcontractors
8. Rate the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction
9. Rate the contractor’s record in reacting quickly and adjusting staffing levels and make-up to meet changing requirements
10. Performance in managing problems and implementing corrective actions:
11. Record in managing multiple and diverse projects/tasks from planning through execution phases
12. Record in managing complex projects at multiple, geographically dispersed sites
13. Record in adhering to or ability to meet goals for Small Business Subcontracting Goals
14. Overall effectiveness in communications, including lines of authority and reporting relationships
15. Contract Value:
| Initial Value | Current/Final Value | ||
| Estimated Cost | $______________ | $______________ |
Fee/Fee $______________ $______________
Total Value $______________ $______________
Describe any change(s) from original contract value:
16. Was there a cost overrun/under-run? |_| No |_| Yes – If yes, what was the magnitude? Please explain:
17. Does the contract have ceilings rates? |_| No |_| Yes – If yes, what are the rates?
18. Has the contractor exceeded the rates? |_| No |_| Yes – If yes, please explain:
19. If an award/incentive fee type contract, percent of available fee earned? _____%
20. Has the contract been partially or completely terminated for default or convenience? |_| No |_| Yes – If yes, please explain the reason for termination (i.e., inability to meet cost or delivery schedules, performance, etc:
21. What has been the key personnel turnover rate for this contract? _____________________
| General |
| N/A |
| P/U |
| M |
| S |
| VG |
| E |
1. Rate the contractor’s record in identifying key positions, filling these positions with individuals with required skills, and providing back-ups:
2. Rate the contractor’s record in recruiting, maintaining, and managing a workforce with the required skill mix:
3. Rate the contractor’s compliance with export control requirements:
4. Rate the contractor’s record in complying with safety, health, and environmental procedures/requirements:
5. Record in establishing and maintaining an effective quality assurance program and meeting quality improvement requirements:
6. Approximately how many people were/are employed under this contract? ______________
7. Did any accidents or industrial illnesses resulting in lost time occur under this contract? |_| No |_| Yes – If yes, please provide details:
8. In what areas below do you feel the contractor is strong?
| |_| Program/Project Management |
| |_| Risk Identification and Mitigation |
| |_| Attracting and Retaining Qualified Personnel |
| |_| Communication |
| |_| Technical Performance |
| |_| Technical Innovation |
| |_| Small Business Utilization |
| |_| Safety and Environmental Performance |
| |_| Cost Performance |
| |_| Response to Change |
9. In what areas below do you feel the contractor is weak?
| |_| Program/Project Management |
| |_| Risk Identification and Mitigation |
| |_| Attracting and Retaining Qualified Personnel |
| |_| Communication |
| |_| Technical Performance |
| |_| Technical Innovation |
| |_| Small Business Utilization |
| |_| Safety and Environmental Performance |
| |_| Cost Performance |
| |_| Response to Change |
7. Provide an example of an OCI issue that arose during contract performance, if any. |_| No |_| Explain how the Contractor mitigated the OCI issue?:
RESPONDENT INFORMATION
1. Name of evaluator: _________________________________________________________
2. Position title: ______________________________________________________________
3. Agency/Company
| Name: | ___________________________________________________ | |
| Mailing Address: | _______________________________ | |
| _______________________________ | ||
| _______________________________ | ||
| Telephone Number:_______________________________ |
| Facsimile Number: _______________________________ | |
| E-Mail Address: | _______________________________ |
4. Your role in the program/contract:
5. Length of involvement in this program/contract: _____________________
6. Date questionnaire completed: _______________________
File details come from the government source that posted it. Updated .