Key Personnel Attachment for Evaluation 02.docx

DOCX document 18 KB Posted

Attached to
Y1DA--NRM: 654-21-103 -- SPS HVAC Requirements and Sterile Storage Humidity
Solicitation number
36C26122R0053
Issued by

About this file

This document contains a template for key personnel resumes to be submitted as an attachment to proposals for a federal contract opportunity. The template requests information on proposed key personnel including name, proposed assignment, experience with other firms, education background, professional registration if any, relevant training completed, familiarity with safety compliance and sustainability, and details on up to five recently completed relevant projects including contract number, title, value, dates, and the key personnel's role. Key personnel positions listed include elevator design project manager, elevator project superintendent, elevator project engineer, elevator safety officer, and elevator quality control manager. The opportunity aims to update the HVAC system and flooring for a Sterile Process Service at a Veterans Affairs medical center while providing swing space during construction, with separate plans and specifications for the HVAC work and flooring work.

View the file

Other files

File Type Posted
S02 - RFI FORM.docx DOCX document
DIVISION CONSTRUCTION COSTS- SPS HVAC 654-21-103.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part2.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part11.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part1.pdf PDF
654-22-003A -Replace SPS Flooring-Bid Docs-Specs.pdf PDF
654-22-003A -Replace SPS Flooring-Bid Docs-Plans.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part10.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part3.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part9.pdf PDF
Wage Determination NV20220040 07.08.22.pdf PDF
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
G. Infection Control Risk Assesment-SPS Flooring Replacement.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part6.pdf PDF
DIVISION CONSTRUCTION COSTS- SPS Flooring 654-22-003.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part5.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part7.pdf PDF
Total Combined Specs - 20220610.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part4.pdf PDF
36C26122R0053.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part8.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26122R0053

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

Replace and Modernize Elevators

Provide the following information, on separate sheets, to demonstrate the key personnel's experience (one for each: Elevator Design Project Manager, Elevator Project Superintendent, Elevator Project Engineer, Elevator Safety Officer, and Elevator QC Manager).

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 4:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

Description of Work (Description shall adequately describe building construction):

PROJECT 5:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.

File details come from the government source that posted it. Updated .