This document contains a template for providing a divisional cost breakdown for project 654-21-103 to update the HVAC system and flooring for the Sterile Process Service at a Department of Veterans Affairs medical center. The template lists construction divisions with spaces to provide total costs for each division. These include divisions for general requirements, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and transportation. Spaces are also provided for subtotals, other costs, bonds and insurance, overhead, profit, and a total project cost. The contractor is to complete this template as part of their response to solicitation number 36C26122R0053 for the HVAC and flooring project.

View the file

Other files

File Type Posted
S02 - RFI FORM.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part2.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part11.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part1.pdf PDF
654-22-003A -Replace SPS Flooring-Bid Docs-Specs.pdf PDF
654-22-003A -Replace SPS Flooring-Bid Docs-Plans.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part10.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part3.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part9.pdf PDF
Wage Determination NV20220040 07.08.22.pdf PDF
Key Personnel Attachment for Evaluation 02.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
G. Infection Control Risk Assesment-SPS Flooring Replacement.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part6.pdf PDF
DIVISION CONSTRUCTION COSTS- SPS Flooring 654-22-003.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part5.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part7.pdf PDF
Total Combined Specs - 20220610.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part4.pdf PDF
36C26122R0053.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part8.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26122R0053 654-21-103

SOLICITATION: 36C26122R0053 PROJECT: 654-21-103

Security Deficiencies

PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 0-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$

06000

DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL

__________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)