654-22-003A -Replace SPS Flooring-Bid Docs-Plans.pdf
PDF 3 MB Posted
- Solicitation number
- 36C26122R0053
About this file
This solicitation is for an HVAC system update and flooring replacement project at a Department of Veterans Affairs facility. The project scope includes upgrading the HVAC system serving the Sterile Process Service area and providing temporary swing space for the service during construction. Plans and specifications cover both the HVAC work and temporary relocation measures. The flooring component will be addressed under separate plans and specifications. Pricing terms, award dates, and other contractual details are not provided in this high-level project description document.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
ELEVATOR
ELEVATOR
G O
V T
G O
V T
G O
V T
G O
V T
G O
V T
G O
V T
G O
V T
DN
118.7023
0.0184
61.8518
STOP
STOP
S
ID
E
W A L K
RAMP
R A M P
BUMPER
BUMPER
AREA OF WORK
BLDG 10 BLDG 6
BLDG 1
BLDG 12
LOCUST STREET
PARKING LOT
BLDG 1A
TAYLOR
STREET
PARKING LOT
L O
C U
S T
S
T R
E E
T
K
I
R M
A N
V E
B U R N S S T R E E T
E A S T T A Y L O R S T R E E T
BLDG 10
BLDG 1D
BLDG 5
BLDG 4
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
SO/AA
GI-000
COVER SHEET
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
PROJECT
SITE
REMOVAL AND REPLACEMENT OF EXISTING FLOORING SYSTEMS IN THE
STERILE PROCESSING SERVICE (SPS) DECONTAMINATION SPACE.
PROJECT DESCRIPTION
VICINITY MAP
DEDUCT ALTERNATES
N/A
PROJECT TEAM
FACILITY
Department of Veterans Affairs VA Sierra Nevada Healthcare System Engineering Services 975 Kirman Avenue Reno, NV 89502
ARCHITECT
MA|Architects, Inc.
385 Van Ness Ave., Suite 110 Torrance, CA 90501
Contact: Sofie O'Brien P: 424.302.5271 E: s.obrien@ma-architects.net
PROJECT DATA
PROJECT ADDRESS: 975 KIRMAN AVENUE
RENO, NV 89502
BUILDING 1D
CONSTRUCTION TYPE: II (SPRINKLERED)
STORIES: 5
BLDG. OCCUPANCY: HEALTHCARE
AREA OF WORK: 973 SF
DEPARTMENT OF VETERANS AFFAIRS
VA Sierra Nevada Healthcare System
975 Kirman Avenue, Reno, NV 89502
VA Project No. 654-22-003 (A)
REPLACE SPS FLOORING
1" = 40'-0"
Reference Site Plan
Rev. Date Description
06.17.2022 Issue for Bid
SHEET INDEX
GENERAL
GI-000 COVER SHEET
GI-001 APPLICABLE STANDARDS & PROJ. GEN. NOTES
GI-002 ABBREVIATIONS & SYMBOLS
GI-003 ENLARGED REFERENCE PLAN
GI-101 PHOTO REFERENCE PLAN
ARCHITECTURAL
AE-201 DEMOLITION & RENOVATION PLANS
AE-900 ROOM FINISH SCHEDULE & DETAILS
06/17/2022
FENCE
6A
8A
ABCDEFG C1E9 C9E1
E
A
B
D
21 4
C
D
E
2C 43
A
B
C
B
A
R A M P
R A M P
RAMP DN
RAMP DOWN
RAMP
S L O P E
RAMP DN
CART
RAMP DN
DN
SLOPE
WASH
DISPENSING WINDOW
MOTION ACTI VATED
AUTOMATI C ENTRANCE
DISPENSING WINDOW
TRANSFER SLOT WALL
F1XD05
F1XD07
C1XD18
H1XD04
K1XD01
13'-5 1_
13'-3"
7 _ 8
DN
DN
UP
UP
UP
DN
UP
UP
UP
UP
O.H.D.R
OVERHEAD
DOOR
OVER HEAD
FOLDING DOOR
DOOR
ROLL DN
ROLL UP GRILLE
ROLL UP GRILLE
BS2D2
BS2D3
B1XD02
BGENXD1
BGENXD3
BGENXD2
BS1D2
B1XD01
B1CD01
C1CD04
C1CD05
C1XD16
GS1D2
GS1D1
G1XD01
GS2D1
G1CD09
G1XD03
J1CD03
J1CD04
G1CD01
J1CD01
J1CD02
J1XD03
J1XD02
J1CD01
J1CD02
J1XD01
H1XD05
HS1D3
HS1D2
HS1D4
H1CD01
H1XD01
H1XD02
H1XD03
D1XD04
D1XD03
C1XD11
C1XD12
C1XD13
C1XD14
C1XD15
CS6D1
DS101
D1XD02
D1XD01
D1XD05
C1CD03
C1CD02
C1XD07
C1XD08
C1CD01
CS1D1
CS1D3
C1XD01
C1XD02
C1XD03
C1XD04
C1XD05
CS2D4
C6ENXD2
C1XD10
C1XD09
CS3D2
C0XD05
C1XD17
L1CD05
L1CD06
L1XD07
L1XD06
L1XD08
L1XD04
L1CD04
L1CD03
LS2D2
LS2D4
LS1D1
L1XD02
L1CD01
L1CD02
L1XD01
L1CD09
L1CD11
L1CD08
LIXD09
L1CD09
L1XD12
L1XD11
L1CD10
L1XD10
L1XD03
LGENXD2
CS1D2
C1XD06
LOXD03 LOXD02
3 PANEL SLIDING AUTODOOR
3 PANEL SLIDING AUTODOOR
LGENXD1
F1XD06
F1XD09
F1XD08
F1XD04
F1XD03F1XD01 F1XD02
F1XD10
C0XD02
C0XD09
C0XD08
CGENXD3
C0XD02
CGENXD1
C0XD06
C0XD01
C1XD20
C1XD19
G0XD01
C0XD07
B1XD04
C0XD10
B1XD03
G0XD02
J0XD01
L1XD05
K1XD02
K1XD04
K1XD03
C0XD03
C0XD04
L0XD01
APPLICABLE STANDARDS:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
2021 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)
2021 NFPA 101 Life Safety Code
2019 NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations
2018 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
Occupational, Safety and Health Administration (OSHA) Standards
2019 VA Seismic Design Requirements, H-18-8
2020 National Electrical Code (NEC) (NFPA 70)
2018 International Plumbing Code (IPC)
2019 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
2017 ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
2015 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2005 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High- Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01 00 00 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN
THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)
GI-003
SPS
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY
THE "INDEX OF DRAWINGS".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE - SEE
"INDEX OF DRAWINGS".
3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT. NO PART OF THE CONTRACT
DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK CONTRARY TO AN
APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.
NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT
WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE,
OR LAW.
4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT
ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.
5. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE GOVERNMENT AND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S
EXPENSE. THE CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE
GOVERNMENT AS DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT
DOCUMENTS WHETHER OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND
WHETHER OR NOT FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL
BEAR ALL COSTS OF CORRECTING SUCH REJECTED WORK, NOT TO BE REIMBURSED.
6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,
WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE
SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "INDEX
OF DRAWINGS". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.
THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY
THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURE
INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH
OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND
QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.
7. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND
ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS
ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT
NOT ALL, EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE
SUPPLEMENTARY TO ARCHITECTURAL WORKING DRAWINGS. THE WORK DESCRIBED BY
THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON
DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURER INSTALLATION REQUIREMENTS.
SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH OTHER, BIDS SHALL BE BASED
ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK INDICATED.
ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.
8. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND
QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE
WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS
OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL
PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS
WITH RESPECT TO INFORMATION OF THIS NATURE.
9. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
• ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT
OR ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE
MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR
ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR
ASSEMBLY.
• THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN"
MAY VARY FROM THAT SHOWN BY THE DRAWINGS.
• THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY
GOVERNMENT’S REPRESENTATIVE. HOWEVER, THE CONTRACTOR IS RESPONSIBLE
(AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME
FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF
DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.
10. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR
EXAMINING CONTRACT DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT WORK IS
BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IT IS NOT INTENDED
THAT THE CONTRACT DOCUMENTS INCLUDE EACH & EVERY SUB-SYSTEM AND/OR SUB-
COMPONENT NECESSARY TO FULLY AND PROPERLY COMPLETE THE WORK. SUB-SYSTEMS,
SUB-COMPONENTS OR DETAILS REQUIRED OR NORMALLY INCLUDED AS TRADE PRACTICE
MAY NOT BE SPECIFICALLY MENTIONED NOR SHOWN.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE
ARCHITECT BEFORE PROCEEDING WITH WORK IN QUESTION OR RELATED WORK.
11. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A
CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE
CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO
COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY
GOVERNMENT, WHICH ARE UNDER SEPARATE CONTRACT WITH THE GOVERNMENT.
12. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT
BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
13. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK
OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING OR PATCHING THAT
MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT TOGETHER.
GENERAL NOTES CONTINUED:
13. THE THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION
DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES
AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF UTILITY LINES,
INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND
CONDUITS AND PIPES TWO INCHES AND LARGER IN DIAMETER. THESE DRAWINGS,
INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS APPROPRIATE, SHALL CLEARLY SHOW
THE MANNER IN WHICH THE UTILITIES FIT INTO THE AVAILABLE SPACE AND RELATE TO
EACH OTHER AND TO EXISTING BUILDING ELEMENTS. DRAWINGS SHALL BE OF
APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES, BUT NOT
SMALLER THAN 3/8-INCH SCALE. DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE
COLORS FOR THE VARIOUS TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED
DRAWINGS (SUCH AS SEPIAS OR PHOTOGRAPHIC PAPER REPRODUCIBLE) OF THE SAME
SCALE. SEPARATE DRAWINGS SHALL DEPICT IDENTICAL BUILDING AREAS OR SECTIONS
AND SHALL BE CAPABLE OF BEING OVERLAID IN ANY COMBINATION. THE SUBMITTED
DRAWINGS FOR A GIVEN AREA OF THE PROJECT SHALL SHOW THE WORK OF ALL TRADES
THAT WILL BE INVOLVED IN THAT PARTICULAR AREA. COMPLETE COMPOSITE DRAWINGS
OR SIX COMPLETE SETS OF SEPARATE REPRODUCIBLE DRAWINGS SHALL BE RECEIVED BY
THE GOVERNMENT NOT LESS THAN 20 DAYS PRIOR TO THE SCHEDULED START OF THE
WORK IN THE AREA ILLUSTRATED BY THE DRAWINGS, FOR THE PURPOSE OF SHOWING
THE CONTRACTOR’S PLANNED METHODS OF INSTALLATION. THE OBJECTIVES OF SUCH
DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK SEQUENCE AND PROPER
TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS SOLUTIONS OF
PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT AS CONTEMPLATED BY THE
CONTRACT DOCUMENTS WHILE AVOIDING OR MINIMIZING ADDITIONAL COSTS TO THE
CONTRACTOR AND TO THE GOVERNMENT. IN THE EVENT THE CONTRACTOR, IN
COORDINATING THE VARIOUS INSTALLATIONS AND IN PLANNING THE METHOD OF
INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE UTILITIES
WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION ITEMS,
HE/SHE SHALL BRING THIS CONFLICT TO THE ATTENTION OF THE CONTRACTING OFFICER
IMMEDIATELY. IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD
OF SOLVING THE PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW TO PROCEED
IF ADJUSTMENTS BEYOND THOSE OF USUAL TRADES’ COORDINATION ARE NECESSARY.
UTILITIES INSTALLATION WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE
SUBMISSION AND COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATED
DRAWINGS FOR THAT AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY
THE COORDINATION DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO THE
SATISFACTION OF THE CONTRACTING OFFICER. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO SUBMIT THE REQUIRED DRAWINGS IN A TIMELY MANNER CONSISTENT
WITH THE REQUIREMENTS TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN
THE PRESCRIBED CONTRACT TIME.
14. CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CUTTING, FITTING OR PATCHING THAT MAY BE REQUIRED TO COMPLETE WORK OR TO
MAKE ITS SEVERAL PARTS FIT TOGETHER. THE GENERAL CONTRACTOR IS RESPONSIBLE
TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND
SUPPLIERS WITH ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS.
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
SO/AA
GI-001
APPLICABLE STANDARDS & PROJ.
GEN. NOTES
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
PROJECT GENERAL NOTES
APPLICABLE STANDARDS
Rev. Date Description
06.17.2022 Issue for Bid
Not to Scale
1st Floor Reference Plan
ABC
AGGREGATE BASE COURSE
BB
B
BULLETIN BOARD
BD BOARD
BD FT
BHMA
BOARD FEET (FOOT)
BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BI FLD DR BIFOLDING DOORS
BEV BEVEL
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
CAB
C
CABINET
CB CATCH BASIN
CCT
CG
CUBICLE CURTAIN TRACK
CORNER GUARD
CEM
CER
CEMENT, CEMENTITIOUS
CERAMIC
CCTV CLOSED CIRCUIT TELEVISION
CH BD CHALKBOARD
CI CAST IRON
CJ CONTROL JOINT
CL
CLG
CLR
CMU
CNTR
COL
CONC
CONF
CONN
CONSTR
CONT
CONTR
CORR
CPT
CSK
CSP
CSWK
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COUNTER
COLUMN
CONCRETE
CONFERENCE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CARPET
COUNTERSUNK
COMBINATION STANDPIPE
CASEWORK
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DBL ACT DOUBLE ACTING
DEG DEGREE
DEMO DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIM PT DIMENSION POINT
DISP DISPENSER
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DSP DRY STANDPIPE
DT DRAPERY TRACK
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EG EDGE GUARD
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESCAL ESCALATOR
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXC EXCAVATED
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
FURN FURNITURE
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GFRP GLASS FIBER REINFORCED PLASTIC
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
GVL GRAVEL
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
ID
I
INSIDE DIAMETER
JAN
J
JANITOR
KG
K
KILOGRAM
L
L
LENGTH, LONG
M
(N) N
NA
NAAMM
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
N
NEW
NORTH
NOT APPLICABLE
NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL MANUFACTURERS
NATURAL
NATIONAL
NOISE CRITERIA
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION
ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS
ASSOCIATION
NONREMOVABLE
NARROW STILE
NUM NUMERAL
P
QA
QC
QRY
QT
QTB
QTF
QTR
QTY
QUAD
QUAL
Q
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARRY TILE
QUARRY TILE BASE
QUARRY TILE FLOOR
QUARTER
QUANTITY
QUADRANT
QUALITY
R
R
RISER
S
SA
SALV
SAMP
SAN
SAT
SATC
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRH
SHT
SHT MTL
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLD WDW
SLDG
SLNT
SM
SMK
SND
SND INS
SNDU
SPEC
SPKLR
SPKR
SPLY
SQ
SQ IN
SQ YD
SS
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
SUB
SURF
SUSP
SUSP CLG
SV
SW
SWDR
SYM
SYNTH
SYS
SOUTH
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SUSPENDED ACOUSTICAL TILE
SUSPENDED ACOUSTICAL TILE CEILING
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHADING COEFFICIENT OR SOLID CORE
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
STRUCTURAL CLAY TILE
SOLID CORE WOOD DOOR
SHOP DRAWINGS, SMOKE DETECTOR,
OR SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEET METAL
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
HORIZONTAL SLIDING WINDOW
SLIDING
SEALANT
SHEET METAL
SMOKE
SANITARY NAPKIN DISPENSER
SOUND INSULATION
SANITARY NAPKIN DISPOSAL UNIT
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SQUARE
SQUARE INCH
SQUARE YARD
SANITARY SEWER OR SERVICE SINK
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SHEET VINYL
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&G T&M
TB
TCA
TCP
TD
TECH
TEL
TEMP
TER
THD
THERM
THK
THRES
THRU
THRUOUT
TK BD
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TPH
TR
TRANS
TRANS WD FIN
TRTD
TS
TSTAT
TV
TYP
T
TREAD
TONGUE AND GROOVE
TIME AND MATERIALS
THROUGH BOLT OR TOWEL BAR
TILE COUNCIL OF AMERICA
TELEPHONE CONTROL PANEL TEMPERATURE
TRAFFIC CONTROL PLAN
TOWEL DISPENSER
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
TERRAZZO
THREAD
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TACKBOARD
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MANSORY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TOILET PAPER HOLDER
TOWEL BACK
TRANSOM
TRANSPARENT WOOD FINISH
TREATED
TENSILE STRENGHTH OR TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
W
W
WEST
XFMR
X BRACE
XPS
X
TRANSFORMER
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
(INSULATION)
YD
YR
Y
YARD
YEARHB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HR HOUR
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCAND INCANDESCENT
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
IVT INTRAVENOUS TRACK
JST JOIST
JT JOINT
KIT KITCHEN
KPL KICK PLATE
KS KNEE SPACE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LH LEFT HAND
LHR LEFT HAND REVERSE
LIB LIBRARY
S
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MB
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MED
MEK
MEL
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MH
MIC
MID
MIL STD
MIN
MIRR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
PAR
PARA
PART
PAT
PA
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PED
PEN
PEND
PERF
PERM
PERIM
PERP
PGBD
PHAR
PHOTO
PHS
PKG
PI
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
PO
POLY
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PVC
PVG
PWR
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUBLIC ADDRESS
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND
CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERMANENT
PERIMETER
PERPENDICULAR
PEGBOARD
PHARMACY
PHOTOGRAPH
PHILLIPS HEAD SCREW
PACKAGE
POINT OF INTERSECTION
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE PURCHASE ORDER
PURCHASE ORDER POST OFFICE
POLYETHYLENE (PLASTIC)
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PAINT, PNEUMATIC TUBE, OR
PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RESIL RESILIENT
RET RETURN
REV REVISION
RF RESILIENT FLOORING
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RWL RAIN WATER LEADER
UC
U
UNDER COUNTER
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL
UCD
UGND
ULT
UNFIN
UR
UV
UTILITY
UNDERCUT DOOR
UNDERGROUND
UNTIMATE
UNFINISH
URINAL
ULTRAVIOLET
W/ WITH
W/O WITHOUT
WC WATER CLOSET OR WALL COVERING
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WCHR WHEELCHAIR
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM
WARR
WBL
WC WL HNG
WCL WL MTD
WF
WFAB
WFR
WFS
WH
WHSE
WLD
WP
WPD
WPM
WS
WELDED WIRE MESH
WARRANTY
WOOD BLOCKING
WATER CLOSET, WALL HUNG
WATER COOLER, WALL HUNG
WIDE FLANCE
WALL FABRIC
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WELDED
WATERPROOFING
WATER PRESSURE DROP
WATERPROOF MEMBRANE
WEATHERSTRIP
CCR CARD CONTROL READER
BLDG BUILDING
CT CERAMIC TILE
F
F/F FACE TO FACE
FA FIRE ALARM
FAS FIRE ALARM STATION OR FASCIA
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FF FINISH FACE
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FHY FIRE HYDRANT
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF OR FINISHED OPENING
FSB FOLDING SHOWER BENCH
FSTNR FASTENER
FT FOOT, FEET
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
OVHD
O
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER OUTSIDE
DIMENSION
OUTSIDE DIMENSION OUTSIDE
DIAMETER
OWNER FURNISHED/CONTRACTOR
INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF
DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH
ADMINSTRATION
OUTLET
OUNCE
OVERHEAD
VAC
V
VACUUM
VB VALVE BOX
VCT VINYL COMPOSITION TYLE
VERT VERTICAL
VEST VESTIBULE
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
VWC VINYL WALL COVERING
ABBREVIATIONS SYMBOLS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
HSS HOLLOW STRUCTURAL STEEL
SYMBOLS LEGENDS
SHEET
NORTH IDENTIFIER
ELEVATION
IDENTIFIER
KEY NOTE TAG
GRID LINES
CALL-OUT IDENTIFIER
? PHOTOGRAPH
LOCATIONS
+? CEILING TAG
? WALL TYPE TAG
SHEET #
REF # ON SHEET
WINDOW TAG
DOOR TAG?
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT
AAMA
AIR CONDITIONING UNIT
AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACST ACOUSTIC
ACS PNL ACESS PANEL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADH ADHESIVE
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGC ASSOCIATED GENERAL CONTRACTORS
AGA AMERICAN GAS ASSOCIATION
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
ALT ALTERNATE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
BLKT BLANKET
BLVD BOULEVARD
BM
BR
BEAM OF BENCHMARK
BEDROOM
BRCG
BRDG
BRACING
BRIDGING
BOT BOTTOM
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT–UP ROOFING
C CELCIUS CHANNEL
C CONC CAST CONCRETE
C TO C
CBB
CENTER TO CENTER
CEMENTITIOUS (BACKER) BOARD
CC
CCW
CUBIC CENTIMETER
COUNTERCLOCKWISE
CAC CEILING ATTENUATION CLASS
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI
CF/OI
CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
C LABEL CLASS C DOOR
CFLG
CFM
COUNTERFLASHING
CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CNR
CNTR
CO
CONC FLR
COND
CONF
CORR
CMP
CRS
CRSI
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST–IN–PLACE
CIRLCE
CIRCULAR
CORNER
COUNTER
CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CORRIDOR
CRITICAL PATH METHOD
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CPRS COMPRESSIBLE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK
CSWK
COUNTER SUNK
CASEWORK
CTB
CTF
CERAMIC TILE BASE
CERAMIC TILE FLOOR
CSMT CASEMENT
CTG
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
COATING
CTRL CONTROL
CU FT
CU IN
CUBIC FEET
CUBIC INCH
CTR CENTER CONTOUR
CU YD CUBIC YARD
CURT
CYL
CURTAIN
CYLINDER
CYL L CYLINDER LOCK
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEL DELETE
DIR DIRECTION
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DSGN DESIGN
DW DISHWASHER
DWTR DUMBWATER
E EAST
E LABEL CLASS E DOOR
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EJ EXPANSION JOINT
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTRYRENE BOARD
(INSULATION)
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESMT EASEMENT
ESP ESPECIALLY
ETC ET CETERA
EW EACH WAY
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR
EXTINGUISHER
EXT GR EXTERIOR GRADE
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
F FAHRENHEIT OR FEMALE
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FDTN FOUNDATION
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD
FIG FIGURE
FIL FILLET
FIN FINISH
FHP FULL HEIGHT PARTITION
FLG FLOORING
FLR FLOOR
FIN WD FINISH WOOD
FIXT FIXTURE
FLDG FOLDING
FL FLOORLINE
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FRZ FREEZER
FM–G FACTORY MUTUAL GLOBAL
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MANSORY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR
FIBERGLASS REINFORCED PLASTIC
FR SINK FLUSHING RIM SINK
FS FEDERAL SPECIFICATION
FURG FURRING
FWC FABRIC WALLCOVERING
FUT FUTURE
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GL GLASS
GI GRAB BAR OR GALVANIZED IRON
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GL BLK GLASS BLOCK
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HCWD HOLLOW CORE WOOD DOOR
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HO HOLD OPEN
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS) OR
HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT
OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KD KILN DRIED
KO KNOCKOUT
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MACHINE BOLT
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL MEDIUM
MEDIUM MEDICAL
METHYL ETHYL KETONE
MELAMINE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MANHOLE
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM MINUTE
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
MASONRY OPENING OR MOTOR
OPERATED
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MACHINE SCREW OR MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
RCVT
RLG
RS
RT
RV
RVS
RFI
RFP
RECEIVER
RAILING
ROUGH OPENING
RIGHT
ROOF VENT
REVERSE
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
STUD WIDTH PARTITION WIDTHPARTITION TYPE DESIGNATION = 'X'
NON-RATED PARTITION = N
ACOUSTICAL RATED PARTITION = A
SHAFT PARTITION = S
FURRED PARTITION = F
REFER TO PARTITION DETAIL FOR COMPLETE LEGEND & FURTHER INFORMATION.
#X#
PARTITION
TYPE
STUD WIDTH
FIRE RATING
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
Author
GI-002
ABBREVIATIONS & SYMBOLS
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
ABBREVIATIONS
Rev. Date Description
06.17.2022 Issue for Bid
FENCE
ABCDEFG C1E9 C9E1
RAMP
RAMP DN
CART
RAMP DN
DN
SLOPE
WASH
DISPENSING WINDOW
MOTION ACTIVATED
AUTOMATIC ENTRANCE
DISPENSING WINDOW
TRANSFER SLOT WALL
C1XD18
H1XD04
K1XD01
UP
UP
DN
UP
OVER HEAD
FOLDING DOOR
DOOR
ROLL UP GRILLE
ROLL UP GRILLE
BS2D2
BS2D3
B1XD02
BGENXD1
BGENXD3
BGENXD2
BS1D2
B1XD01
B1CD01
C1CD04
C1CD05
C1XD16
GS1D2
GS1D1
G1XD01
GS2D1
G1CD09
G1XD03
J1CD03
J1CD04
G1CD01
J1CD01
J1CD02
J1XD03
J1XD02
J1CD01
J1CD02
J1XD01
H1XD05
HS1D3
HS1D2
HS1D4
H1CD01
H1XD01
H1XD02
H1XD03
C1XD15
D1XD05
C1XD17
3 PANEL SLIDING AUTODOOR
3 PANEL SLIDING AUTODOOR
C1XD20
C1XD19
G0XD01
C0XD07
B1XD04
C0XD10
B1XD03
G0XD02
J0XD01
K1XD02
K1XD04
K1XD03
AE-201
SPS
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
SO/AA
GI-003
ENLARGED REFERENCE PLAN
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
Rev. Date Description
06.17.2022 Issue for Bid
1/16" = 1'-0"
Enlarged Reference Plan
FD
FD
FD
FD
FD
GI-101
GI-101
GI-101
4 6
GI-101 8
GI-101 9
GI-101
TRITON 72
MEDIVATORS ADVANTAGE
STERILIZER-ENDOSCOPE
STERIS FH41 7053L
WASHER / DISINFECTOR
STERIS RACK
RETURN MODULE
STAINLESS STEEL SINK COUNTER
AMERIWATER
DE-IONIZER SET
MEDIVATOR VERISCAN
LT (ON ROLLING TABLE
WITH DRAWER)
PCI SOAK
STATION (ON
ROLLING TABLE)
FLAMMABLE STORAGE CABINET
ROLLING CARTS
WIRE RACKS
WIRE RACKS
WIRE RACKS
GI-101
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
SO/AA
GI-101
PHOTO REFERENCE PLAN
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
G1556 - Clean HAC Decontamination Room (West)
G1C04 - Decontamination Hallway
G1556B - Scope Washers
G1556 - Clean HAC Decontamination Room (South)
G1556A - Sterilizer
1/4" = 1'-0"
1st Floor Photo Reference Plan
G1545 - Triton Room
Triton Supply
Sterilizer Room Drain
Rev. Date Description
06.17.2022 Issue for Bid
G1558 - Floor Grating
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
TRITON 72
MEDIVATORS ADVANTAGE
STERILIZER-ENDOSCOPE
STERIS FH41 7053L
WASHER / DISINFECTOR
STERIS RACK
RETURN MODULE
STAINLESS STEEL SINK COUNTER
AMERIWATER
DE-IONIZER SET
MEDIVATOR VERISCAN
LT (ON ROLLING TABLE
WITH DRAWER)
PCI SOAK
STATION (ON
ROLLING TABLE)
FLAMMABLE STORAGE CABINET
116 SF
Sterilizer G1544
59 SF
Triton Room G1545
525 SF
Preparation Room G1546
58 SF
Mens Locker G1562
46 SF
Womens Toilet G1563
25 SF
HAC
G1565
58 SF
Mens Locker G1552
44 SF
Womens Toilet G1553
20 SF
Janitor G1554
60 SF
Womens Locker G1566
60 SF
Womens Locker G1555
134 SF
Mech Room G1540
189 SF
Mech Room G1542
31 SF
Tel G1550
64 SF
Sterilizer G1556A
488 SF
Clean HAC Decontamination
Room G1556
127 SF
Receiving Room G1557
130 SF
Scope Washers G1556B
232 SF
Decon Hallway G1C04
ROLLING CARTS
104102
WIRE RACKS
WIRE RACKS
WIRE RACKS
AE-900
S L O
P E
U P
1st FLOOR -
SPS
DECONTAMINATION
59 SF
Triton Room G1545
58 SF
Mens Locker G1562
46 SF
Womens Toilet G1563
25 SF
HAC
G1563
58 SF
Mens Locker G1552
44 SF
Womens Toilet G1553
20 SF
Janitor G1554
60 SF
Womens Locker G1566
60 SF
Womens Locker G1555
134 SF
Mech Room G1540
189 SF
Mech Room G1542
31 SF
Tel G1550
64 SF
Sterilizer G1556A
488 SF
Clean HAC Decontamination
Room G1556
226 SF
Receiving Room G1557
130 SF
Scope Washers G1556B
232 SF
Decon Hallway G1C04
WSF
RES
TRITON 72
MEDIVATORS ADVANTAGE
STERILIZER-ENDOSCOPE
STERIS FH41 7053L
WASHER / DISINFECTOR
STERIS RACK
RETURN MODULE
STAINLESS STEEL SINK COUNTER
AMERIWATER
DE-IONIZER SET
MEDIVATOR VERISCAN
LT (ON ROLLING TABLE
WITH DRAWER)
PCI SOAK
STATION (ON
ROLLING TABLE)
FLAMMABLE STORAGE CABINET
ROLLING CARTS
WIRE RACKS
WIRE RACKS
WIRE RACKS
S L O
P E
U P
AE-900
AE-900
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
SO/AA
AE-201
DEMOLITION & RENOVATION PLANS
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
1/4" = 1'-0"
Demolition & FFE Plan
KEY PLAN
Key Notes
101 GENERAL NOTE: REMOVE ALL EXISTING FLOORING &
ASSOCIATED WALL BASE IN AREA NOTED.
102 EXISTING FLOOR DRAIN TO REMAIN. PROTECT IN PLACE TO
PREVENT DEBRIS COLLECTION DURING FLOORING
REPLACEMENT.
104 EXISTING PROCESSING SINK TO BE DISCONNECTED FROM
UTILITIES, REMOVED & STORED FOR REPLACEMENT.
105 EXISTING EQUIPMENT TO BE DISCONNECTED FROM
UTILITIES, REMOVED & STORED FOR REPLACEMENT.
109 EXISTING EQUIPMENT/CARTS TO BE REMOVED BY VA STAFF
AND STORED FOR REPLACEMENT.
110 GENERAL NOTE: ALL EXISTING VA EQUIPMENT TO BE
REMOVED & STORED BY CONTRACTOR SHALL BE SECURED
TO ACCEPTANCE OF VA CONTRACTING OFFICER or THEIR
REPRESENTATIVE, PHOTO DOCUMENTED AND LOGGED.
PRIOR TO RE-INSTALLATION OF EQUIPMENT, CONTRACTOR
SHALL SCRUB CLEAN ALL EQUIPMENT UNITS PER THEIR
RESPECTIVE MANUFACTURER SPECIFICATIONS.
111 INSTALL TEMPORARY INFECTION CONTROL CONSTRUCTION
BARRIER; MAINTAIN TILL CONSTRUCTION COMPLETION.
112 EXISTING GRATING AREA TO REMAIN; COVER AND
PROTECT FROM DEBRIS.
113 EXISTING METAL TRANSITION ASSEMBLY TO BE REMOVED
& SAVED FOR RE-INSTALLATION.
201 INSTALL NEW FLOORING & INTEGRAL WALL BASE (REFER
TO FINISH SCHEDULE).
202 EXISTING PROCESSING SINK TO BE RE-INSTALLED;
RECONNECT UTILITIES.
203 EXISTING EQUIPMENT TO BE RE-INSTALLED; RECONNECT
UTILITIES PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
204 GENERAL NOTE: EQUIPMENT/CARTS & FURNISHINGS
REMOVED BY VA STAFF WILL BE REPLACED VA STAFF
AFTER CONSTRUCTION COMPLETION.
206 GENERAL NOTE: PATCH & PAINT WALLS WHERE DAMAGED
DURING CONSTRUCTION ACTIVITIES (MATCH EXISTING
FINISHES).
207 REINSTALL EXISTING METAL TRANSITION ASSEMBLY.
208 KEEP TOP OF BASE LEVEL FLOOR INCLINE TRANSITION.
Rev. Date Description
06.17.2022 Issue for Bid
3 Wire Racks G1C04 Decon Hallway
1 Flammable Storage Cabinet
G1545 Triton Room 1 Triton 72 Ultrasonic Cleaning System
G1156B Scope Washers 2 Medivators Advantage Sterilizer Endoscope
G1156A Sterilizer 1 AmeriWater De-ionizer Set
1 Rolling table
1 Rolling table with drawer
1 PCI Disinfection Soak Station
1 Medivator Veriscan LT
2 Stainless Steel Sink Counter
1 Streris Rack Return Module
3 Rolling Carts
G1556
Clean HAC
Decontamination
Room
3 Steris FH41 7053L Washer/Disinfector
Room No. Room Name Qty Equipment
SPS Equipment List
1/4" = 1'-0"
Renovation Plan
FLOORING:
WSF WELDED SEAM SHEET FLOORING
MANUFACTURER: SHAW CONTRACT
COLLECTION: VITALITY SHEET
COLOR: WEL 5226 "UPLIFT"
RES-3 RESINOUS FLOORING
MANUFACTURER: STONHARD
COLLECTION: STONRES RTZ
COLOR: SOLITUDE
FINISH LEGEND:
BASE:
WSF WELDED SEAM SHEET FLOORING
MANUFACTURER: SHAW CONTRACT
COLLECTION: VITALITY SHEET
COLOR: WEL 5226 "UPLIFT"
REMARKS: 4" COVED BASE
RES-3 RESINOUS FLOOING
MANUFACTURER: STONHARD
COLLECTION: STONRES RTZ
COLOR: SOLITUDE
REMARKS: 6" BASE
FINISH SCHEDULE GENERAL NOTES:
1. ALL MATERIALS TO BE INSTALLED PER MANUFACTURE'S INSTRUCTIONS.
2. USE WATER-BASED EPOXY PAINT w/ SEMI-GLOSS FINISH AT TOILET ROOMS, SUB-STERILE CORE, OPERATING ROOMS, SOILED/CLEAN/UTILITY WORK ROOMS.
3. ALL INTEGRAL FLASH COVE BASES TO BE 4" HIGH & SUPPORTED BY A COVE SUPPORT STRIP. FINISH TOP OF COVE w/ ALUMINUM TRIM (SEAL ALL JOINTS TO WALL
SUBSTRATE). NOTED AS BASE TYPE SVB-#.
4. PROVIDE MATCHING WELD ROD AT ALL SHEET VINYL SEAMS.
5. PROVIDE CONCRETE SEALER AT ROOMS SCHEDULED WITH FLOORING TYPE SC-1.
6. PROVIDE BEVELED TRANSITION STRIPS AT FLOOR MATERIAL CHANGES SO THAT THE VERTICAL DIFFERENCE IN ELEVATION IS NOT GREATER THAN 1/2". FLOAT SUBSTRATE AS
NEEDED WHEN APPLICABLE.
7. MANUFACTURER’S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS. PRODUCTS OF OTHER MANUFACTURER’S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF TECHNICAL SPECIFICATIONS WILL BE ACCEPTABLE UPON APPROVAL IN WRITING BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR FINISH REQUIREMENTS.
SHEET VINYL COVE BASE
WELDED SEAM
FLOORING PER
SCHEDULE
PRE-FORMED COVE STRIP
(1-1/4" RADIUS MIN.)
ALUMN. COVE CAP
WATERPROOFING
MEMBRANE
RESINOUS FLOORING
(REFER TO FINISH SCHEDULE)
SEALANT AND BACKER ROD
EXISTING CONC. SLAB.
EXISTING FLOOR DRAIN
1/4" PER FT.
TYP. ALL SIDES
POLYURETHANE COATING
RESINOUS FLOORING
(REFER TO FINISH SCHEDULE)
EPOXY COATING
3/16" PLASTIC FLOOR STRIP
C O
V E
METAL COVE STRIP
IMPACT-RESISTANT MORTAR
GROUT COAT
1/4" PER FT. TYP.
SEALANT
RESINOUS FLOORING
(REFER TO FINISH SCHEDULE)
REDUCER TRANSITION STRIP
RESILIENT SHEET FLOORING
(REFER TO FINISH SCHEDULE)
1/8" RESILIENT FLOORING (VCT,
SHEET VINYL, STATIC
DISSIPATIVE TILE.
VINYL REDUCER - JOHNSONITE
SSR-XX-B, BINDER BAR EDGING
FOR 1/16" TO 1/8" RESILIENT
FLOORING. COLOR: T.B.D.
CONCRETE
AREA of WORK PUBLIC AREA
CONT. METAL 'J' TRACK
w/ (1) #8 SMS @ 24" O.C.
FIRE-RESISTANT CORRUGATED
PLASTIC SHEETING o/ 2-1/2" MTL.
STUDS @ 24" O.C.
CONT. METAL 'J' FLOOR TRACK
SET IN ADHESIVE SEALANT
ADHESIVE TAPE @
PERIMETERS AND SEAMS
ADHESIVE TAPE @ PERIMETERS
AND SEAMS
(E) CEILING SYSTEM
TAPE & FINISH
CUT GYPSUM BOARD PATCH
TO FIT SNUG INTO OPENING
(TEXTURE & PAINT TO MATCH
ADJACENT)
SEALANT PER SCHEDULE
(E) PARTITION
/4
M
IN
1-1/4" TYPE S SCREWS @
8" O.C. MAX.
SECTION VIEW
(E) BOTTOM TRACK
METAL L STRIP SHOULDERED
ON CONCRETE
ELASTOMETRIC JOINT FILLER
BETWEEN L STRIPS
EPOXY FLOORING PER
SCHEDULE
EPOXY ADHESIVE
FULL LENGTH OF STRIP
/2
METAL L STRIP SET IN EPOXY,
SHOULDERED ON CONCRETE
EPOXY FLOORING PER
SCHEDULE
EPOXY ADHESIVE
FULL LENGTH OF STRIP
/2
EPOXY FLOORING PER
SCHEDULE
(E) CONCRETE SUBSTRATE
ENGINEERING FABRIC
STONPROOF CT5
CRACK (ROUTED OUT)
1 1/2"
VINYL FLOORING PER
SCHEDULE
(E) CONCRETE SUBSTRATE
VA Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
Bldg 1D
REPLACE SPS FLOORING
SO/AA
AE-900
ROOM FINISH SCHEDULE & DETAILS
654-22-003 (A)
SMc
VA Sierra Nevada Healthcare System 975 Kirman Avenue, Reno, NV 89502
06.17.2022
100% Contract Documents Issue for Bid
FULLY
SPRINKLERED
2165 A
FINISH SCHEDULE (EXISTING)
Room
Number Room Name Area Existing Floor Existing Base G1556 Clean HAC Decontamination Room 488 RES RES
G1556A Sterilizer 64 RES RES
G1545 Triton Room 59 RES RES
G1556B Scope Washers 130 RES RES
G1C04 Decontamination Hallway 232 WSF WSF
FINISH SCHEDULE (RENOVATION)
Room
Number Room Name Area (N) Floor (N) Base G1556 Clean HAC Decontamination Room 488 RES-3 RES-3
G1556A Sterilizer 64 RES-3 RES-3
G1545 Triton Room 59 RES-3 RES-3
G1556B Scope Washers 130 RES-3 RES-3
G1C04 Decontamination Hallway 232 WSF WSF
3" = 1'-0"
TYP. SHEET VINYL COVING
3" = 1'-0"
EPOXY @ DRAIN
3" = 1'-0"
EPOXY COVE BASE
12" = 1'-0"
RESINOUS TO SHEET FLOORING TRANSITION
12" = 1'-0"
RESILIENT FLOORING TO CONC.
3" = 1'-0"
TEMPORARY CONSTRUCTION BARRIER
3" = 1'-0"
GYP. BD. PATCH @ BASE
12" = 1'-0"
CONTRACTION JOINT
12" = 1'-0"
CONTRACTION JOINT DETAIL - ALT
6" = 1'-0"
CRACK TREATMENT
6" = 1'-0"
FLOORING TRANSITION
Rev. Date Description
06.17.2022 Issue for Bid
| GI-000 - COVER SHEET |
| GI-001 - APPLICABLE STANDARDS & PROJ. GEN. NOTES |
| GI-002 - ABBREVIATIONS & SYMBOLS |
| GI-003 - ENLARGED REFERENCE PLAN |
| GI-101 - PHOTO REFERENCE PLAN |
| AE-201 - DEMOLITION & RENOVATION PLANS |
| AE-900 - ROOM FINISH SCHEDULE & DETAILS |
File details come from the government source that posted it. Updated .