This document package includes construction plans and specifications for upgrading the HVAC system and flooring in the Sterile Process Service at the VA Medical Center in Reno, Nevada. The project will update the HVAC system and replace the flooring in SPS while also providing swing space for the service during construction. Drawings include demolition plans, new construction plans, schedules, details and notes outlining infection control precautions for the project. Specifications are separated into plans for the HVAC system and flooring replacement. The solicitation number is 36C26122R0053 and is issued by the Department of Veterans Affairs Veterans Health Administration VISN 21 for the project located at 1000 Locust St, Reno, Nevada. Bids are due on June 1, 2022 according to the cover sheet.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STERILE PROCESSING SERVICE - HVAC UPGRADE
VA SIERRA NEVADA HEALTH CARE SYSTEM
975 KIRMAN AVENUE
RENO, NEVADA 89502
VA PROJECT #: 654-21-103 DAVENERGY SOLUTIONS PROJECT #: 90205
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
FULLY SPRINKLERED
BID SET
20-375
APOGEE PROJECT #: 20-375
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text G-001
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
COVER
AutoCAD SHX Text
AutoCAD SHX Text
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
PLAN
PLAN
DRAWING LIST
GENERAL
G-001 COVER 1
G-002 GENERAL INFORMATION 2
G-003 INFECTION CONTROL RISK ASSESSMENT DETAILS 3
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1
AD101 OVERALL FIRST FLOOR DEMOLITION PLAN 2
AD101A REFLECTED CEILING DEMOLITION PLANS - FIRST FLOOR - SPS 3
AD101B REFLECTED CEILING DEMOLITION PLANS - FIRST FLOOR 4
AD104 OVERALL FOURTH FLOOR DEMOLITION PLAN
AD104A REFLECTED CEILING DEMOLITION PLAN - FOURTH FLOOR
AD105 OVERALL FIFTH FLOOR DEMOLITION PLAN
GENERAL SYMBOL LEGEND
G-004 PRE-CONSTRUCTION RISK ASSESSMENT FORMS
GL101
INFECTION CONTROL RISK ASSESSMENT FLOOR PLAN - SPS
G-101A
INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - FIRST FLOOR - VARIOUS AREAS
G-102A
INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - THIRD FLOOR - VARIOUS AREAS
G-103A
OVERALL FIRST FLOOR LIFE SAFETY PLAN
G-101B
INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - SECOND FLOOR - VARIOUS AREAS
AD105A REFLECTED CEILING DEMOLITION PLAN - FIFTH FLOOR
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
FULLY SPRINKLERED
BID SET
20-375
MECHANICAL
M-001 MECHANICAL COVER SHEET 1
G-104A
AD102
AD102A
AD103
AD103A
OVERALL SECOND FLOOR DEMOLITION PLAN
REFLECTED CEILING DEMOLITION PLANS - SECOND FLOOR
OVERALL THIRD FLOOR DEMOLITION PLAN
REFLECTED CEILING DEMOLITION PLANS - THIRD FLOOR
M-101 MECHANICAL 1ST FLOOR OVERALL SITE PLAN
M-101A MECHANICAL 1ST FLOOR ENLARGED PLANS
M-101B MECHANICAL 1ST FLOOR ENLARGED PLANS
M-101C MECHANICAL 1ST FLOOR ENLARGED PLANS
M-102A MECHANICAL 2ND FLOOR ENLARGED PLANS
M-103 MECHANICAL 3RD FLOOR OVERALL SITE PLAN
M-103A MECHANICAL 3RD FLOOR ENLARGED PLANS
M-104 MECHANICAL 4TH FLOOR OVERALL SITE PLAN AND ENLARGED PLANS
M-105
M-106 MECHANICAL 6TH FLOOR OVERALL SITE PLAN
M-401A MECHANICAL SCHEDULES
M-501 MECHANICAL DETAILS
INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - FOURTH FLOOR
INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - FIFTH FLOOR
G-105A
AD400 SECOND AND THIRD FLOOR DEMOLITION PLANS
AE400 SECOND AND THIRD FLOOR PLANS - NEW WORK
AE601 DOOR SCHEDULE, TYPES AND DETAILS
15 18
PHASING PLAN
GC401
INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - SIXTH FLOOR
G-106A
AD106 OVERALL SIXTH FLOOR DEMOLITION PLAN
AD106A REFLECTED CEILING DEMOLITION PLAN - SIXTH FLOOR
AE801 THIRD FLOOR FINISH PLAN - ROOMS G3636 + G36A
FIRE PROTECTION
F-001 FIRE SUPPRESSION SYMBOLS, ABBREVIATIONS, AND NOTES
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES
F-101 FIRST FLOOR FIRE SUPPRESSION PLANS
FIRE SUPPRESSION SYMBOLS, ABBREVIATIONS, AND NOTES
F-103 THIRD FLOOR FIRE SUPPRESSION PLANS
E-101 OVERALL FIRST FLOOR ELECTRICAL PLAN
E-101A REFLECTED CEILING ELECTRICAL PLAN - FIRST FLOOR - SPS
E-101B
E-102
E-102A
E-103
E-103A
E-104
OVERALL SECOND FLOOR ELECTRICAL PLAN
OVERALL THIRD FLOOR ELECTRICAL PLAN
FOURTH FLOOR ELECTRICAL PLAN
REFLECTED CEILING ELECTRICAL PLAN - FIRST FLOOR
REFLECTED CEILING ELECTRICAL PLAN - SECOND FLOOR
REFLECTED CEILING ELECTRICAL PLAN - THIRD FLOOR
E-105
T-001
FIFTH FLOOR ELECTRICAL PLAN
TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS
T-102 SECOND FLOOR TECHNOLOGY PLAN
T-103 THIRD FLOOR TECHNOLOGY PLAN
M-102 MECHANICAL 2ND FLOOR OVERALL SITE PLAN
MECHANICAL 5TH FLOOR OVERALL SITE PLAN AND ENLARGED PLANS
M-401B MECHANICAL SCHEDULES 14
TECHNOLOGY
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text G-002
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
GENERAL INFORMATION
AutoCAD SHX Text
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
RENO SPS HVAC UPGRADE
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
PLEASE USE ALTERNATE EXITS AS MARKED
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
1'-5"
ALL SIGNAGE TO BE PLASTIC
OR LAMINATED. NO PAPER
SIGNAGE ALLOWED FOR
TEMPORARY ICRA SIGNAGE.
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
A P
P R
O X
A
F
F
INSTALL FIRE RATED
TEMPORARY HARD
DOOR AND RATED
FRAME WITH CLOSER
FOR CONSTRUCTION
ACCESS. REFER TO
LIFE SAFETY PLANS
FOR DOOR RATINGS
AND LOCATIONS.
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
COORDINATE WITH VA
COR AND ICRA OFFICER
ABOUT ICRA DIGITAL
MANOMETER LOCATION
TEMPORARY
DIGITAL
MANOMETER
GI001
SEALANT BOTH SIDES
A
1-HR RATED AND
SMOKE RATED
U.L. DESIGN NO. U404
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
5/8" FIRE RATED TYPE 'X'
GYPSUM BOARD - BOTH
SIDES
EXISTING
WALL
FIRE RESISTANT
SEALANT BOTH SIDES
3 5/8" METAL STUDS @
16" OC.
3 5/8" INSULATED WALL
WITH 16 GAUGE METAL
STUDS @ 16" OC WALL
TO EXTEND TO
UNDERSIDE OF DECK
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V I F
V
I F
V.I.F.
E X
I S
T I N
G
W
A L L
V I F
E X
I S
T I N
G
W
A L L
V I F
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X
D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
INSTALL FIRE RATED
TEMPORARY HARD DOOR
AND RATED FRAME WITH
CLOSER FOR
CONSTRUCTION ACCESS.
REFER TO LIFE SAFETY
PLANS FOR DOOR RATINGS
AND LOCATIONS.
COORDINATE WITH VA
COR AND ICRA OFFICER
ABOUT ICRA DIGITAL
MANOMETER LOCATION
5'-0"
MIN.
M I N
TEMPORARY DIGITAL
MANOMETER
GI001
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove or isolation of HVAC system in areas where work was being performed.
1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing
HEPA equipped air filtration unit.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and
Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
1.
2.
3.
4.
5.
Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and
Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.
Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
Vacuum work area with HEPA filtered vacuums.
Wet mop area with disinfectant
Remove isolation of HVAC system in areas where work is being performed.
1.
2.
3.
4.
5.
Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
Maintain negative air pressure within work site utilizing
HEPA-equipped air filtration units if indicated.
Contain construction waste before transport in tightly covered containers.
Cover transport receptacles or carts. Tape covers.
1.
2.
3.
4.
5.
6.
Provide active means to prevent airborne dust from dispersing into atmosphere.
Water mist work surfaces to control dust while cutting.
Seal unused doors with duct tape.
Block off and seal air vents.
Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1.
2.
3.
4.
Wipe work surfaces with disinfectant.
Contain construction waste before transport in tightly covered containers.
Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
Remove isolation of HVAC system in areas where work is being performed.
1.
2.
Execute work by methods to minimize raising dust from construction operations.
Immediately replace a ceiling tile displaced for visual inspection.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
Cardiology
Echocardiography
Endoscopy
Nuclear Medicine
Physical Therapy
Radiology / MRI
Respitory Therapy
CCU
Emergency Room
Labor & Delivery
Laboratories (specimen)
Newborn Nursery
Outpatient Surgery
Pediatrics
Pharmacy
Post Anesthesia Care Unit
Surgical Units
Any area caring for immunocompromised patients
Burn Unit
Cardiac Cath Lab
Central Sterile Supply
Intensive Care Units
Medical Unit
Negative pressure isolation rooms
Oncology
Operation rooms including C-section rooms
• Office Spaces
C L A
S
I V
C L A
I
C L A
C L A
S S
PATIENT RISK GROUPS
LOW Risk Group
MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1
Low Risk
Group 2
Medium Risk
Group 3
High Risk
Group 4
Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project ny Ptient Risk
Construction Project Type
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicated that
Class III or Class IV Control procedures are necessary.
It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area
Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
1.
2.
3.
4.
5.
6.
A.
B.
EXISTING PANELS, SPRINKLERS AND OTHER DEVICES NOT BEING REMOVED MUST BE PROTECTED
WITH PLASTIC SHEETING.
DAILY WET MOPPING MUST BE PERFORMED TO AVOID DAMAGE TO EXISTING EQUIPMENT.
PROVIDE ICRA BARRIERS IN ALL LOBBIES.
CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT
OF THE PROJECT.
THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING
AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURES TO REMOVE DUST SHALL PASS AIR THROUGH
AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATS OF 300-800 CUBIC
FEET PER MINUTE (FT 3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC.
IF EXHAUST INTO A ROOM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST.
FOR ELEVATOR ASSOCIATED CONSTRUCTION WORK IN THE LOBBIES
DRILLING INTO LEAD CONTAINING YELLOW GLAZED TILE ACTIVITIES WILL BE USING AN
IMPACT DRILL WITH INTEGRAL HEPA FILTER VACUUM.
WITH ANY DRYWALL SANDING OR REPAIRING WORK PERFORMED WITH AN ELECTRONIC
SANDING MACHINE WITH A BUILT-IN HEPA FILTER VACUUM.
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
FULLY SPRINKLERED
BID SET
20-375
DUST CONTROL PLAN NOTES
A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY
VESTIBULE - THEY SHALL BE USED WHEN GOING
INTO CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA AND TIGHT SEALS SHALL
BE MAINTAINED AT THE FULL PERIMETER OF
WALLS AND WALL PENETRATIONS. ANY DUST
SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER.
UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED
CAREFULLY AFTER VA COR'S APPROVAL TO
MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND
EXIT PROCEDURES SHALL BE DEFINED. EGRESS
PATHS SHALL BE FREE OF DEBRIS; DESIGNATED
ELEVATORS SHALL BE USED DURING
SCHEDULED TIMES; AND ONLY AUTHORIZED
PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
C. DEMOLITION DEBRIS: DEBRIS SHALL BE
REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS. EFFORTS SHALL BE MADE TO MINIMIZE
USE OF ELEVATORS WITH AN EMPHASIS ON
TRANSPORT DURING THE LOWEST PERIOD OF
ACTIVITY. DEBRIS SHALL BE REMOVED DAILY
AND AT TIMES SPECIFIED BY THE C.O.R. THE
CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT
PRIOR APPROVAL OF THE C.O.R.
D. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH
NO DISRUPTION OF AIR SYSTEMS OF ADJACENT
AREAS. USE OF THE NEGATIVE AIR PRESSURE
SYSTEM WITHIN THE ENCLOSURE TO REMOVE
DUST SHALL PASS AIR THROUGH AN INDUSTRIAL
GRADE PORTABLE HEPA FILTER CAPABLE OF
FILTRATION RATES OF 300-800 CUBIC FEET PER
MINUTE (9FT3/MIN), OR EXHAUST AIR DIRECTLY
TO THE OUTSIDE IF APPROVED BY COR. IF
EXHAUST SHALL BE TIED INTO A RE-CIRCULATED
AIR SYSTEM, PRE-FILTER AND HEPA FILTER
SHALL BE USED BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
E. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
F. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL
VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY
AND ENSURE AIR IS NOT BEING RE-CIRCULATED
WITHOUT FILTRATION FROM THE CONSTRUCTION
AREA ELSEWHERE. PROVIDE AIR PRESSURE
TESTING THROUGHOUT THE PROJECT IN THE
G. WORK SITE CLOTHING: CONTRACTOR
PERSONNEL CLOTHING SHALL BE FREE OF
LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL
IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND
HEADGEAR) A HEPA-FILTERED VACUUM SHALL
BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED
AREAS SHALL BE MADE FREE FROM DUST AND
MOISTURE BY VACUUMING AND WET WIPING
BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
H. POST CONSTRUCTION: DO NOT REMOVE
BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION
SITE.
I. PROVIDE RATED BARRIERS AS INDICATED ON
DRAWINGS. BARRIERS SHALL BE INSPECTED BY
VA PRCA STAFF PRIOR TO START OF
CONSTRUCTION. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE CONSTRUCTION
SPACE.
J. USE MOBILE CONTAINMENT CART FOR ALL WORK
ABOVE CEILINGS.
K. PROVIDE STICKY MAT AT EACH CONSTRUCTION
POINT IN ALL PHASES.
L. VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO
BEGINNING ANY WORK ON STATION.
M. PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE
CEILING, FIRE/SMOKE WALL, UTILITY, FIRE
SPRINKLER, FIRE ALARM SYSTEM, MEDICAL
GASES, CONFINED SPACE, HOT WORK, AND
BUILDING CODE.
N. CONTRACTOR CAN USE A REUSABLE ICRA WALL
SYSTEM AND ACCESS FOR THIS PROJECT (EX.
STARC WALL SYSTEM - TEMPORARY WALL
SYSTEM) IF ACCEPTABLE TO THE VA COR.
CROSS SECTION 'A'
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 1/2" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 3/4" = 1'-0"
ILSM SIGNAGE
Scale: 6" = 1'-0"
ELEVATION
Scale: 1/2" = 1'-0"
ILSM TEMPORARY BARRIER TAG
Scale: 12" = 1'-0"
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text G-003
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
INFECTION CONTROL RISK ASSESSMENT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/2"=1'-0"
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
4'
| 20-375_Gen_DWG-Bid |
| Sheets and Views |
| G-001 |
File details come from the government source that posted it. Updated .