This document package includes construction plans and specifications for upgrading the HVAC system and flooring in the Sterile Process Service at the VA Medical Center in Reno, Nevada. The project will update the HVAC system and replace the flooring in SPS while also providing swing space for the service during construction. Drawings include demolition plans, new construction plans, schedules, details and notes outlining infection control precautions for the project. Specifications are separated into plans for the HVAC system and flooring replacement. The solicitation number is 36C26122R0053 and is issued by the Department of Veterans Affairs Veterans Health Administration VISN 21 for the project located at 1000 Locust St, Reno, Nevada. Bids are due on June 1, 2022 according to the cover sheet.

View the file

Other files

File Type Posted
S02 - RFI FORM.docx DOCX document
DIVISION CONSTRUCTION COSTS- SPS HVAC 654-21-103.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part2.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part11.pdf PDF
654-22-003A -Replace SPS Flooring-Bid Docs-Specs.pdf PDF
654-22-003A -Replace SPS Flooring-Bid Docs-Plans.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part10.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part3.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part9.pdf PDF
Wage Determination NV20220040 07.08.22.pdf PDF
Key Personnel Attachment for Evaluation 02.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
G. Infection Control Risk Assesment-SPS Flooring Replacement.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part6.pdf PDF
DIVISION CONSTRUCTION COSTS- SPS Flooring 654-22-003.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part5.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part7.pdf PDF
Total Combined Specs - 20220610.pdf PDF
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part4.pdf PDF
36C26122R0053.docx DOCX document
90205 - Trailer MOD Combined Set - 20220601-FINAL_Part8.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STERILE PROCESSING SERVICE - HVAC UPGRADE

VA SIERRA NEVADA HEALTH CARE SYSTEM

975 KIRMAN AVENUE

RENO, NEVADA 89502

VA PROJECT #: 654-21-103 DAVENERGY SOLUTIONS PROJECT #: 90205

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

Department of Veteran Affairs

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

P

M

ACG Project Number

FULLY SPRINKLERED

BID SET

20-375

APOGEE PROJECT #: 20-375

DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E

5/3/2022

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved:

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Floor No.

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text

1000 LOCUST ST, RENO, NEVADA

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA

AutoCAD SHX Text

VA SIERRA NEVADA SPS UPGRADES

AutoCAD SHX Text 654-21-103

AutoCAD SHX Text 03/01/2022

AutoCAD SHX Text 03/08/2022

AutoCAD SHX Text

35% DD ISSUED FOR VA REVIEW

AutoCAD SHX Text 04/15/2022

AutoCAD SHX Text

95% CD ISSUED FOR VA REVIEW

AutoCAD SHX Text 05/02/2022

AutoCAD SHX Text

BID SET

AutoCAD SHX Text G-001

AutoCAD SHX Text

HM

AutoCAD SHX Text

TJM

AutoCAD SHX Text

COVER

AutoCAD SHX Text

AutoCAD SHX Text

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

PLAN

PLAN

DRAWING LIST

GENERAL

G-001 COVER 1

G-002 GENERAL INFORMATION 2

G-003 INFECTION CONTROL RISK ASSESSMENT DETAILS 3

ARCHITECTURAL

AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1

AD101 OVERALL FIRST FLOOR DEMOLITION PLAN 2

AD101A REFLECTED CEILING DEMOLITION PLANS - FIRST FLOOR - SPS 3

AD101B REFLECTED CEILING DEMOLITION PLANS - FIRST FLOOR 4

AD104 OVERALL FOURTH FLOOR DEMOLITION PLAN

AD104A REFLECTED CEILING DEMOLITION PLAN - FOURTH FLOOR

AD105 OVERALL FIFTH FLOOR DEMOLITION PLAN

GENERAL SYMBOL LEGEND

G-004 PRE-CONSTRUCTION RISK ASSESSMENT FORMS

GL101

INFECTION CONTROL RISK ASSESSMENT FLOOR PLAN - SPS

G-101A

INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - FIRST FLOOR - VARIOUS AREAS

G-102A

INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - THIRD FLOOR - VARIOUS AREAS

G-103A

OVERALL FIRST FLOOR LIFE SAFETY PLAN

G-101B

INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - SECOND FLOOR - VARIOUS AREAS

AD105A REFLECTED CEILING DEMOLITION PLAN - FIFTH FLOOR

Department of Veteran Affairs

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

P

M

ACG Project Number

FULLY SPRINKLERED

BID SET

20-375

MECHANICAL

M-001 MECHANICAL COVER SHEET 1

G-104A

AD102

AD102A

AD103

AD103A

OVERALL SECOND FLOOR DEMOLITION PLAN

REFLECTED CEILING DEMOLITION PLANS - SECOND FLOOR

OVERALL THIRD FLOOR DEMOLITION PLAN

REFLECTED CEILING DEMOLITION PLANS - THIRD FLOOR

M-101 MECHANICAL 1ST FLOOR OVERALL SITE PLAN

M-101A MECHANICAL 1ST FLOOR ENLARGED PLANS

M-101B MECHANICAL 1ST FLOOR ENLARGED PLANS

M-101C MECHANICAL 1ST FLOOR ENLARGED PLANS

M-102A MECHANICAL 2ND FLOOR ENLARGED PLANS

M-103 MECHANICAL 3RD FLOOR OVERALL SITE PLAN

M-103A MECHANICAL 3RD FLOOR ENLARGED PLANS

M-104 MECHANICAL 4TH FLOOR OVERALL SITE PLAN AND ENLARGED PLANS

M-105

M-106 MECHANICAL 6TH FLOOR OVERALL SITE PLAN

M-401A MECHANICAL SCHEDULES

M-501 MECHANICAL DETAILS

INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - FOURTH FLOOR

INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - FIFTH FLOOR

G-105A

AD400 SECOND AND THIRD FLOOR DEMOLITION PLANS

AE400 SECOND AND THIRD FLOOR PLANS - NEW WORK

AE601 DOOR SCHEDULE, TYPES AND DETAILS

15 18

PHASING PLAN

GC401

INFECTION CONTROL RISK ASSESSMENT FLOOR PLANS - SIXTH FLOOR

G-106A

AD106 OVERALL SIXTH FLOOR DEMOLITION PLAN

AD106A REFLECTED CEILING DEMOLITION PLAN - SIXTH FLOOR

AE801 THIRD FLOOR FINISH PLAN - ROOMS G3636 + G36A

FIRE PROTECTION

F-001 FIRE SUPPRESSION SYMBOLS, ABBREVIATIONS, AND NOTES

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES

F-101 FIRST FLOOR FIRE SUPPRESSION PLANS

FIRE SUPPRESSION SYMBOLS, ABBREVIATIONS, AND NOTES

F-103 THIRD FLOOR FIRE SUPPRESSION PLANS

E-101 OVERALL FIRST FLOOR ELECTRICAL PLAN

E-101A REFLECTED CEILING ELECTRICAL PLAN - FIRST FLOOR - SPS

E-101B

E-102

E-102A

E-103

E-103A

E-104

OVERALL SECOND FLOOR ELECTRICAL PLAN

OVERALL THIRD FLOOR ELECTRICAL PLAN

FOURTH FLOOR ELECTRICAL PLAN

REFLECTED CEILING ELECTRICAL PLAN - FIRST FLOOR

REFLECTED CEILING ELECTRICAL PLAN - SECOND FLOOR

REFLECTED CEILING ELECTRICAL PLAN - THIRD FLOOR

E-105

T-001

FIFTH FLOOR ELECTRICAL PLAN

TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS

T-102 SECOND FLOOR TECHNOLOGY PLAN

T-103 THIRD FLOOR TECHNOLOGY PLAN

M-102 MECHANICAL 2ND FLOOR OVERALL SITE PLAN

MECHANICAL 5TH FLOOR OVERALL SITE PLAN AND ENLARGED PLANS

M-401B MECHANICAL SCHEDULES 14

TECHNOLOGY

DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E

5/3/2022

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved:

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Floor No.

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text

1000 LOCUST ST, RENO, NEVADA

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA

AutoCAD SHX Text

VA SIERRA NEVADA SPS UPGRADES

AutoCAD SHX Text 654-21-103

AutoCAD SHX Text 03/01/2022

AutoCAD SHX Text 03/08/2022

AutoCAD SHX Text

35% DD ISSUED FOR VA REVIEW

AutoCAD SHX Text 04/15/2022

AutoCAD SHX Text

95% CD ISSUED FOR VA REVIEW

AutoCAD SHX Text 05/02/2022

AutoCAD SHX Text

BID SET

AutoCAD SHX Text G-002

AutoCAD SHX Text

HM

AutoCAD SHX Text

TJM

AutoCAD SHX Text

GENERAL INFORMATION

AutoCAD SHX Text

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

RENO SPS HVAC UPGRADE

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

PLEASE USE ALTERNATE EXITS AS MARKED

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

1'-5"

ALL SIGNAGE TO BE PLASTIC

OR LAMINATED. NO PAPER

SIGNAGE ALLOWED FOR

TEMPORARY ICRA SIGNAGE.

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

A P

P R

O X

A

F

F

INSTALL FIRE RATED

TEMPORARY HARD

DOOR AND RATED

FRAME WITH CLOSER

FOR CONSTRUCTION

ACCESS. REFER TO

LIFE SAFETY PLANS

FOR DOOR RATINGS

AND LOCATIONS.

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS VISIBLE

TO PUBLIC

COORDINATE WITH VA

COR AND ICRA OFFICER

ABOUT ICRA DIGITAL

MANOMETER LOCATION

TEMPORARY

DIGITAL

MANOMETER

GI001

SEALANT BOTH SIDES

A

1-HR RATED AND

SMOKE RATED

U.L. DESIGN NO. U404

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

5/8" FIRE RATED TYPE 'X'

GYPSUM BOARD - BOTH

SIDES

EXISTING

WALL

FIRE RESISTANT

SEALANT BOTH SIDES

3 5/8" METAL STUDS @

16" OC.

3 5/8" INSULATED WALL

WITH 16 GAUGE METAL

STUDS @ 16" OC WALL

TO EXTEND TO

UNDERSIDE OF DECK

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V I F

V

I F

V.I.F.

E X

I S

T I N

G

W

A L L

V I F

E X

I S

T I N

G

W

A L L

V I F

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X

D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

INSTALL FIRE RATED

TEMPORARY HARD DOOR

AND RATED FRAME WITH

CLOSER FOR

CONSTRUCTION ACCESS.

REFER TO LIFE SAFETY

PLANS FOR DOOR RATINGS

AND LOCATIONS.

COORDINATE WITH VA

COR AND ICRA OFFICER

ABOUT ICRA DIGITAL

MANOMETER LOCATION

5'-0"

MIN.

M I N

TEMPORARY DIGITAL

MANOMETER

GI001

1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove or isolation of HVAC system in areas where work was being performed.

1. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing

HEPA equipped air filtration unit.

4. Seal holes, pipes, conduits, and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and

Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.

1.

2.

3.

4.

5.

Do not remove barriers from work area until completed project is inspected by the owner's Safety Department and

Infection Control Department and thoroughly cleaned by the owner's Environmental Services Department.

Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

Vacuum work area with HEPA filtered vacuums.

Wet mop area with disinfectant

Remove isolation of HVAC system in areas where work is being performed.

1.

2.

3.

4.

5.

Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

Maintain negative air pressure within work site utilizing

HEPA-equipped air filtration units if indicated.

Contain construction waste before transport in tightly covered containers.

Cover transport receptacles or carts. Tape covers.

1.

2.

3.

4.

5.

6.

Provide active means to prevent airborne dust from dispersing into atmosphere.

Water mist work surfaces to control dust while cutting.

Seal unused doors with duct tape.

Block off and seal air vents.

Place dust mat at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1.

2.

3.

4.

Wipe work surfaces with disinfectant.

Contain construction waste before transport in tightly covered containers.

Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

Remove isolation of HVAC system in areas where work is being performed.

1.

2.

Execute work by methods to minimize raising dust from construction operations.

Immediately replace a ceiling tile displaced for visual inspection.

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet

- painting (but not sanding)

- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete cabling system

- new construction

Cardiology

Echocardiography

Endoscopy

Nuclear Medicine

Physical Therapy

Radiology / MRI

Respitory Therapy

CCU

Emergency Room

Labor & Delivery

Laboratories (specimen)

Newborn Nursery

Outpatient Surgery

Pediatrics

Pharmacy

Post Anesthesia Care Unit

Surgical Units

Any area caring for immunocompromised patients

Burn Unit

Cardiac Cath Lab

Central Sterile Supply

Intensive Care Units

Medical Unit

Negative pressure isolation rooms

Oncology

Operation rooms including C-section rooms

• Office Spaces

C L A

S

I V

C L A

I

C L A

C L A

S S

PATIENT RISK GROUPS

LOW Risk Group

MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

TYPE A TYPE B TYPE C TYPE D

I II II III/IV

I II III IV

I II III/IV IV

II III/IV I/IV IV

During Construction Project: Upon Completion of Project:

TYPE D

TYPE C

TYPE B

TYPE A

Group 1

Low Risk

Group 2

Medium Risk

Group 3

High Risk

Group 4

Highest Risk

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project ny Ptient Risk

Construction Project Type

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicated that

Class III or Class IV Control procedures are necessary.

It's the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area

Class Designation

Type of Construction Project activity (Type A-D)

INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR

CONSTRUCTION AND RENOVATION

1.

2.

3.

4.

5.

6.

A.

B.

EXISTING PANELS, SPRINKLERS AND OTHER DEVICES NOT BEING REMOVED MUST BE PROTECTED

WITH PLASTIC SHEETING.

DAILY WET MOPPING MUST BE PERFORMED TO AVOID DAMAGE TO EXISTING EQUIPMENT.

PROVIDE ICRA BARRIERS IN ALL LOBBIES.

CONTRACTOR SHALL USE ISOLATION CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT

OF THE PROJECT.

THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING

AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE

AIR PRESSURE SYSTEM WITHIN THE ENCLOSURES TO REMOVE DUST SHALL PASS AIR THROUGH

AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF FILTRATION RATS OF 300-800 CUBIC

FEET PER MINUTE (FT 3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC.

IF EXHAUST INTO A ROOM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST.

FOR ELEVATOR ASSOCIATED CONSTRUCTION WORK IN THE LOBBIES

DRILLING INTO LEAD CONTAINING YELLOW GLAZED TILE ACTIVITIES WILL BE USING AN

IMPACT DRILL WITH INTEGRAL HEPA FILTER VACUUM.

WITH ANY DRYWALL SANDING OR REPAIRING WORK PERFORMED WITH AN ELECTRONIC

SANDING MACHINE WITH A BUILT-IN HEPA FILTER VACUUM.

Department of Veteran Affairs

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

P

M

ACG Project Number

SHEET NOTES:

FULLY SPRINKLERED

BID SET

20-375

DUST CONTROL PLAN NOTES

A. THIS PROJECT INCLUDES CONSTRUCTION ENTRY

VESTIBULE - THEY SHALL BE USED WHEN GOING

INTO CONSTRUCTION AREA AND LEAVING THE

CONSTRUCTION AREA AND TIGHT SEALS SHALL

BE MAINTAINED AT THE FULL PERIMETER OF

WALLS AND WALL PENETRATIONS. ANY DUST

SHALL BE IMMEDIATELY CLEANED IF TRACKED

OUTSIDE OF THE CONSTRUCTION BARRIER.

UPON COMPLETION OF THE CONSTRUCTION

PHASE, DUST BARRIERS SHALL BE REMOVED

CAREFULLY AFTER VA COR'S APPROVAL TO

MINIMIZE SPREADING OF DUST AND THE

CONTRACTOR SHALL HAVE TEMPORARY DUST

PROTECTION IN PLACE BEFORE REMOVAL OF A

PERMANENT BARRIER.

B. TRAFFIC CONTROL: DESIGNATED ENTRY AND

EXIT PROCEDURES SHALL BE DEFINED. EGRESS

PATHS SHALL BE FREE OF DEBRIS; DESIGNATED

ELEVATORS SHALL BE USED DURING

SCHEDULED TIMES; AND ONLY AUTHORIZED

PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT

PEDESTRIAN TRAFFIC AWAY FROM THE

CONSTRUCTION AREA AND MATERIALS.

C. DEMOLITION DEBRIS: DEBRIS SHALL BE

REMOVED IN CARTS WITH TIGHTLY FITTED

COVERS. EFFORTS SHALL BE MADE TO MINIMIZE

USE OF ELEVATORS WITH AN EMPHASIS ON

TRANSPORT DURING THE LOWEST PERIOD OF

ACTIVITY. DEBRIS SHALL BE REMOVED DAILY

AND AT TIMES SPECIFIED BY THE C.O.R. THE

CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT

PRIOR APPROVAL OF THE C.O.R.

D. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE

CONSTRUCTION AREA SHALL BE NEGATIVE WITH

RESPECT TO SURROUNDING AREAS AND WITH

NO DISRUPTION OF AIR SYSTEMS OF ADJACENT

AREAS. USE OF THE NEGATIVE AIR PRESSURE

SYSTEM WITHIN THE ENCLOSURE TO REMOVE

DUST SHALL PASS AIR THROUGH AN INDUSTRIAL

GRADE PORTABLE HEPA FILTER CAPABLE OF

FILTRATION RATES OF 300-800 CUBIC FEET PER

MINUTE (9FT3/MIN), OR EXHAUST AIR DIRECTLY

TO THE OUTSIDE IF APPROVED BY COR. IF

EXHAUST SHALL BE TIED INTO A RE-CIRCULATED

AIR SYSTEM, PRE-FILTER AND HEPA FILTER

SHALL BE USED BEFORE EXHAUST TO PREVENT

CONTAMINATION OF THE DUCTS.

E. ADJACENT AREAS: THE STATUS OF SEALED

PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

F. AIR EXCHANGE RATES AND PRESSURE

RELATIONSHIPS: VAMC AND CONTRACTOR SHALL

VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY

AND ENSURE AIR IS NOT BEING RE-CIRCULATED

WITHOUT FILTRATION FROM THE CONSTRUCTION

AREA ELSEWHERE. PROVIDE AIR PRESSURE

TESTING THROUGHOUT THE PROJECT IN THE

G. WORK SITE CLOTHING: CONTRACTOR

PERSONNEL CLOTHING SHALL BE FREE OF

LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA. IF PROTECTIVE APPAREL

IS NOT WORN (E.G., COVERALLS, FOOTGEAR AND

HEADGEAR) A HEPA-FILTERED VACUUM SHALL

BE USED TO REMOVE DUST FROM CLOTHING

BEFORE LEAVING THE BARRICADE. ALL

EQUIPMENT, TOOLS, TOOL CARTS, AND

MATERIALS TRANSPORTED THROUGH OCCUPIED

AREAS SHALL BE MADE FREE FROM DUST AND

MOISTURE BY VACUUMING AND WET WIPING

BEFORE THEIR REMOVAL FROM THE

CONSTRUCTION ZONE OR WORK AREA.

H. POST CONSTRUCTION: DO NOT REMOVE

BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION

SITE.

I. PROVIDE RATED BARRIERS AS INDICATED ON

DRAWINGS. BARRIERS SHALL BE INSPECTED BY

VA PRCA STAFF PRIOR TO START OF

CONSTRUCTION. MAINTAIN NEGATIVE

PRESSURE VENTILATION IN THE CONSTRUCTION

SPACE.

J. USE MOBILE CONTAINMENT CART FOR ALL WORK

ABOVE CEILINGS.

K. PROVIDE STICKY MAT AT EACH CONSTRUCTION

POINT IN ALL PHASES.

L. VA REQUIRES THAT ALL APPLICABLE PERMITS BE

COMPLETED AND APPROVED PRIOR TO

BEGINNING ANY WORK ON STATION.

M. PERMITS INCLUDE: ICRA, PCRA, ILSM, ABOVE

CEILING, FIRE/SMOKE WALL, UTILITY, FIRE

SPRINKLER, FIRE ALARM SYSTEM, MEDICAL

GASES, CONFINED SPACE, HOT WORK, AND

BUILDING CODE.

N. CONTRACTOR CAN USE A REUSABLE ICRA WALL

SYSTEM AND ACCESS FOR THIS PROJECT (EX.

STARC WALL SYSTEM - TEMPORARY WALL

SYSTEM) IF ACCEPTABLE TO THE VA COR.

CROSS SECTION 'A'

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 1/2" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 3/4" = 1'-0"

ILSM SIGNAGE

Scale: 6" = 1'-0"

ELEVATION

Scale: 1/2" = 1'-0"

ILSM TEMPORARY BARRIER TAG

Scale: 12" = 1'-0"

DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E

5/3/2022

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved:

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building No.

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

STAMP:

AutoCAD SHX Text Floor No.

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM

AutoCAD SHX Text

1000 LOCUST ST, RENO, NEVADA

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA

AutoCAD SHX Text

VA SIERRA NEVADA SPS UPGRADES

AutoCAD SHX Text 654-21-103

AutoCAD SHX Text 03/01/2022

AutoCAD SHX Text 03/08/2022

AutoCAD SHX Text

35% DD ISSUED FOR VA REVIEW

AutoCAD SHX Text 04/15/2022

AutoCAD SHX Text

95% CD ISSUED FOR VA REVIEW

AutoCAD SHX Text 05/02/2022

AutoCAD SHX Text

BID SET

AutoCAD SHX Text G-003

AutoCAD SHX Text

HM

AutoCAD SHX Text

TJM

AutoCAD SHX Text

INFECTION CONTROL RISK ASSESSMENT DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

AutoCAD SHX Text 1/2"=1'-0"

AutoCAD SHX Text 1'

AutoCAD SHX Text 2'

4'

20-375_Gen_DWG-Bid
Sheets and Views
G-001

File details come from the government source that posted it. Updated .