This document outlines cost breakdown requirements for a federal construction project to address security deficiencies at a facility. It provides a template for bidders to list estimated costs by construction division for completing the project. Key work includes concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, equipment, electrical work, and security systems. Bidders must also account separately for other costs such as bonds, insurance, overhead, and profit. The related solicitation is for HVAC upgrades and flooring replacement at a Sterile Process Service facility within the Veterans Health Administration. Bidders should consult the separate plans and specifications for the HVAC, swing space accommodation during construction, and flooring work. The solicitation was issued by the Department of Veterans Affairs VISN 21.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26122R0053 654-22-003
SOLICITATION: 36C26122R0053 PROJECT: 654-22-003
Security Deficiencies
PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.
*If necessary, add additional lines for each Division applicable to this project.
**This document is to be used only for price analysis
| REF |
| DESCRIPTION |
| TOTAL |
00000
| DIVISION 0-SPECIAL SECTIONS |
| $ |
| 01000 |
| DIVISION 1-GENERAL REQUIREMENTS |
| $ |
| 02000 |
| DIVISION 2-EXISTING CONDITIONS |
| $ |
03000
| DIVISION 3-CONCRETE |
| $ |
04000
| DIVISION 4-MASONRY |
| $ |
05000
| DIVISION 5-METALS |
| $ |
06000
| DIVISION 6-WOOD AND PLASTIC |
| $ |
07000
| DIVISION 7-THERMAL AND MOISTURE PROTECTION |
| $ |
08000
| DIVISION 8-DOORS AND WINDOWS |
| $ |
09000
| DIVISION 9-FINISHES |
| $ |
10000
| DIVISION 10-SPECIALTIES |
| $ |
11000
| DIVISION 11-EQUIPMENT |
| $ |
12000
| DIVISION 12-FURNISHINGS |
| $ |
13000
| DIVISION 13-SPECIAL CONSTRUCTION |
| $ |
14000
| DIVISION 14-CONVEYING EQUIPMENT |
| $ |
21000
| DIVISION 21-FIRE SUPPRESSION |
| $ |
22000
| DIVISION 22-PLUMBING |
| $ |
23000
| DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING |
| $ |
26000
| DIVISION 26-ELECTRICAL |
| $ |
27000
| DIVISION 27-COMMUNICATIONS |
| $ |
28000
| DIVISION 28-ELECTRONIC SAFETY AND SECURITY |
| $ |
31000
| DIVISION 31-EARTHWORK |
| $ |
32000
| DIVISION 32-EXTERIOR IMPROVEMENTS |
| $ |
33000
| DIVISION 33-UTILITIES |
| $ |
34000
| DIVISION 34-TRANSPORTATION |
| $ |
SUB TOTAL:
OTHER
BONDS AND INSURANCE
OVERHEAD
PROFIT
TOTAL
| _______________________________________________ | ___________ |
| (Signature and Typed Name of Authorized Representative) | Date |
(Title of Authorized Representative)
** This form may be edited as required for proposal submission