This solicitation is for an HVAC upgrade and sterile storage humidity control project at a Department of Veterans Affairs medical center. The project includes plans and specifications to update the HVAC system for the Sterile Process Service area, provide swing space during construction, and replace the flooring. The solicitation involves the Veterans Health Administration and Veterans Integrated Service Network 21. Products and services required include HVAC system upgrades, temporary swing space facilities, and new flooring. Response and award dates are not provided.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VIEWING
CONTROL
G2575
EMG
DRESSING
G2543
CARDIAC CATH
PATIENT
CONSULTATION
G2541
UNISEX
TOILET
G2539
PORTABLE ECHO AND
EKG STORAGE
G2563
CARDIAC CATH
SUPPORT SPACES
G2559B
CARDIAC CATH
SYSTEM
COMPONENT
ROOM
G2559A
G2559
CARDIAC CATH LAB
C2310A
MENS RM
C2306
DRY GOODS
STORAGE
C2294
WAITING
C2290
REFR
C2295
BLOOD DRAW
STORAGE
CLOSET
CORRIDOR
1C-C1
IR SUPPORT
SPACES
G2569
IR SYSTEM
COMPONENT
ROOM
G2589A
PATIENT
PREPARATION
G2567
CORRIDOR
G2C06
IR SPECIAL
PROCEDURES
G2589
E
F
G
5 1
CORRIDOR
F2C05
CLEAN
F2489
EXAM RM
F2486
EXAM RM
F2488
MEDS
F2491
CORRIDOR
F2C03
EXAM RM
F2490
EXAM RM
F2492
C
REFLECTED CEILING LEGEND
SOFFIT/CEILING
CEILING HEIGHT
EQ. A EQ. A
E Q
B
E Q
B
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
PENDANT
DOWN LIGHT
FIXTURE
CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF EACH
ROOM. AVOID USE OF LESS-THAN 6" TILES.
A.F.F.
PERIMETER
RECESSED WALL
SLOT LIGHT
FIXTURE
FIRE ALARM
STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
SMOKE DETECTOR
FIRE ALARM /
HORN /
STROBE LIGHT -
WALL MOUNTED
FIRE ALARM / HORN
/ STROBE LIGHT -
CEILING MOUNTED
SPRINKLER HEAD
SPRINKLER HEAD
2'x4' LAY-IN
RETURN GRILL
LIGHT FIXTURE
HEAT DETECTOR
ACCESS PANEL
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
KEY NOTES:
FULLY SPRINKLERED
BID SET
20-375
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
G
B
SECOND FLOOR
N
TRUE
NORTH
KEY PLAN
AREA OF
WORK
MAIN ENTRANCE
1 SOUTH
1A SOUTH
1 CENTER
1A NORTH
1 NORTH
1D
MRI
WAREHOUSE
REFLECTED CEILING DEMOLITION PLAN - G2559B
Scale: 1/4" = 1'-0"
NORTH
REFLECTED CEILING DEMOLITION PLAN - C2294
Scale: 1/4" = 1'-0"
NORTH
REFLECTED CEILING DEMOLITION PLAN - G2569
Scale: 1/4" = 1'-0"
NORTH
A. CONTRACTOR SHALL VERIFY PRESENCE OF
ASBESTOS PER ASBESTOS REPORT/DRAWINGS
ATTACHED TO SPECIFICATION SECTION 02 82 13.32.
B. CONTRACTOR TO ENSURE ALL FIRE SPRINKLER
PIPES AND HEADS ARE INSTALLED AT CORRECT
HEIGHTS INTO NEW CEILINGS PER NFPA 13.
C. ALL NEW ACT CEILING HEIGHTS WILL BE AT SAME
ELEVATION AFF AS THE CEILING SYSTEM THAT WAS
REMOVED FROM THE SPACE UNO IN THE
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO COORDINATE INSTALLATION OF
NEW CEILING WITH NEW+EXISTING EQUIPMENT
HEIGHTS AND THE TOP OF DOORS. CEILING HEIGHT
CAN BE ADJUSTED TO MATCH EXISTING CONDITIONS.
E. ASBESTOS IS PRESENT IN THE BUILDINGS (FLOOR
MASTIC, PIPING COMPONENTS, ETC.) ABATE ALL
ASBESTOS THAT IS DISTURBED AS A RESULT OF
WORK PER SPECIFICATION SECTION 02 82 11.
F. DASHED LINES ON REFLECTED CEILING PLAN
REPRESENT THE APPROXIMATE SIZE AND LOCATION
OF CEILING REMOVAL REQUIRE FOR ABOVE CEILING
WORK. CONTRACTOR TO DETERMINE EXACT SIZE
AND LOCATION.
G. ICRA BARRIERS INSTATED IN WORKING SPACE OR
CORRIDORS MUST PROVIDE ADEQUATE SPACE FOR
ACCESS/PASSAGE REQUIRED WITHIN THESE AREAS.
4'-0" CLEAR REQUIRED IN CORRIDOR.
REFLECTED CEILING DEMOLITION PLAN - F2489
Scale: 1/4" = 1'-0"
NORTH
1. REMOVE CEILING TILE GRID, SUPPORTS, ETC. AS
NECESSARY TO ACCESS EQUIPMENT. SALVAGE ACT
CEILING FOR RE-INSTALLATION AFTER COMPLETION
OF HVAC WORK.
2. CUT GYPSUM BOARD FOR 2' X 2' OPENING FOR
INSTALLATION OF NEW ACCESS PANEL, IF NOT
PROVIDED AND REQUIRED FOR EQUIPMENT
ACCESS, SEE SPEC SECTION 083113.
3. REMOVE DIFFUSER TO BE REPLACED WITH NEW
DIFFUSER PER MECHANICAL DRAWINGS.
4. NO CEILING WORK IN THIS AREA.
5. LOCATION OF ABOVE CEILING MECHANICAL
EQUIPMENT OUTSIDE STORAGE SPACE.
6. PER ASBESTOS SURVEY, APRIL 14, 2014, ASBESTOS
WAS NOTED TO BE PRESENT IN THE PIPE
INSULATION ABOVE CEILINGS. CONTRACTOR TO
ABATE ASBESTOS IF PIPING IS DISRUPTED BEFORE
PROCEEDING WITH WORK.
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text
ROOF-10
AutoCAD SHX Text
ROOF BELOW
AutoCAD SHX Text
AD102A
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
REFLECTED CEILING DEMOLITION PLANS - SECOND FLOOR
AutoCAD SHX Text
AutoCAD SHX Text 1D & 1S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
CORRIDOR
H3C03
MALE REST
RM
ELECTRICAL
EQUIP
SHOWER
NURSE WORK STATION
TOILET
TOILET
FEMALE REST
RM
HAC
TANK STORAGE
CORRIDOR
CORRIDOR
CORRIDOR
EXAM RM EXAM RM EXAM RM EXAM RM
EXAM RMEXAM RM
REST RM
REST RM
CORRIDOR
CORRIDOR
ELEVATOR
LOBBY ELEVATOR LOBBY
WORK/ HOUSE
STAFF
TOILET
TOILET
MED PREPARATION AREA
STAIR-1FMS STORAGE
SILVER
ELEVATOR
GOLD
ELEVATOR
GOLD
ELEVATOR
SILVER
ELEVATOR
LINEN CHUTE
HOUSE/ STAFF RESIDENT
OFFICE
STORAGE
DEMONSTRATION CLASS
STAFF LOUNGE
TOILET
LOCKER
WOMEN
LOCKERTOILET
DAY/RECREATION VISITOR LOUNGE
VESTIBULE
2-BED RM
BATH
2-BED RM
BATH
2-BED RM
BATH BATH
2-BED RM
CLINICAL NURSE
SPECIALIST
ELEVATOR LOBBY
CORRIDOR
BLUE
ELEVATOR
BLUE
ELEVATOR
CORRIDOR
GREEN
ELEVATOR
GREEN
ELEVATOR
CORRIDOR
CORRIDOR
PATIENT REST
RM
PATIENT
REST RM
CLEAN
SUPPLY
CART LIFT
TOILET
MENS CHANGING
TOILET
CYSTO 2
CONTROL
RM/OMNICELL
EQUIPMENT
STORAGE
MECH
OFFICE
OFFICE
GENERAL
STORAGE
STERILE
SUPPLY
STERILE SUPPLY
CLEAN
SUPPLY
HOUSE KEEPING
ANEST OFFICE
EQUIPMENT
STORAGE TOILET
EQUIPMENT
STORAGE
EQUIPMENT
STORAGE
STAIR
SCRUB AREA
SCRUB
AREA OR-1
OR-2OR-3
OMNICELL,STERILE
SUPPLY
GENERAL
STORAGE
OR-4
CORRIDOR
UTILITY
TANK STORAGE
STORAGE
TOILET
TEL
CORRIDOR
CORRIDOR
CONFERENCE RM
EQUIPMENT STORAGE
EQUIPMENT
STORAGE
SOILED
UTILITY
STAIRWAY
UTILITY
MECH
MECH RM
EQUIPMENT
STORAGE
EQUIPMENT
STORAGE
VACANT
OFFICE
ELECTRICAL
ICU HEAD NURSE
SOILED
RMHAC
BREAK RM
STAIR
STORAGE
MENS
BATH
STORAGE
PURPLE
ELEVATOR
PURPLE
ELEVATOR
GENERAL
STORAGE
PURPLE
ELEVATOR
STAIR
TOILET
MENS BATH
CORRIDOR
OFFICE OFFICE
OFFICE
STAIR
OFFICE
STORAGE
STORAGEOFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
IT CLOSET
OFFICE
OFFICE
OFFICE
CORRIDOR
HAC
STORAGE
ON CALL
CORRIDOR
OFFICE OFFICE
STAIR
CONFERENCE RM
STAIR
OFFICE
OFFICE WAITING
RM
STAIR
TOILET
TOILET
CLOSET
CORRIDOR
CLOSET
STORAGE
TOILET
CLOSET
CLOSET
CORRIDOR
CORRIDOR
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
EQUIPMENT
PRE -OP
HOLDING
STAIR
CORRIDOR
HAC
STAIR
C3376
G3543G3653
B3259
B3263C
G3624A
G3659B
G3549-1
C3352
G3575A
G3C06
B3C10
3286 3284 C3282 C3280
CS5
32813283
C3C04
B3C08
B3ESV B3EGD
B3245
C3316
C3314
C3312
B3241
B3102
B3100
B3243
BS1B3258
S8 P11
P12S9
B3260
C3304
B3255
B3261A
B3261
C3313
C3301
C3300
C3302
B3263E
B3263
B3263A B3263B
B3104
B3250
2C150
B3250A
B3248
B3248A
B3246
B3246A B3244A
B3244
B3240
G3EBL
G3C01
S7S6
G3C02
G3C07
G3560 P9 P10
G3C04
G3C05
G3573
G3553
G3570
G3561G3571
G3563
G3564
G3582
G3585
G3590
G3601A
G3601
G3592G3602
G3603
G3594G3595G3603A
G3540
G3552
G3551 G3541
G3544
G3554
G3555
G3547
G3556
G3558
G3557 G3548A
G3548
G3549
G3586
G3587 G3576 G3566
G3568G3578
G3596G3606
G3607
G3C08
G3610
G3611
G3612
G3C09
G3613
G3613A G3614
G3615
G3616
G3C10
G3617
G3C11
G3C12
G3620
G3621
G3622
G3623
G3624
G3633
G3634
G3625
G3626G3636
G3637
G3619G3628
G3629AG3639A
G3629G3639
G3648G3649
G3650
G3651A
G3652
G3640
G3641
G3642
G3643
G3654
G3644
G3645
G3646
G3647
G3656 G3657
G3659A
G3659
C3326
C3324
C3322
C3318
P2 P3
C3356
C3328
P4
CS6
C3360
C3364
C3336 C3338
C3342
C3343
C3344C3337
C3335
C3331
C3317
C3321
C3325
C3327
C3329
C3329A
C3351
C3353
C3355
C3357
C3361
C3365
C3C01
C3370
C3368
C3366
C3372 C3406
C3C02
C3404 C3402 C3400 C3398 C3396 C3394 C3392 C3390
CS2
C3391C3397 C3401C3403C3405C3374
CS1
C3378
C3380
C3369
C3371
C3371A
C3373
C3375 C3375A
C3377
C3381
UTILITY RM
B3263D
C3364A
G3542 G3590A
G3562
C3334
OFFICE MED CTR
DIRECTOR OFFICE ASSOC DIR
FOR PCS
CLOSET
OFFICE ADMIN
ASSIST 1
CORRIDOR
OFFICE CHIEF OF
STAFF
CLOSET
CONFERENCE/
CLASS RM
OFFICE ADMIN
ASSIST 5
WORK RM
OPEN
OFFICE
OFFICE
ADMIN
ASSIST 7
OFFICE FEE SERV
SUPV
SOUTH STAIR
AREA OF
REFUGE
HAC
KITCHENETTE
ELECTRICAL
CLOSET
OFFICE ADMIN
ASSIST 3
OFFICE ADMIN
ASSIST 4
NORTH STAIR
ORANGE
ELEVATOR
ELEV EQUIP
RM
WOMENS
TOILET
MENS
TOILET
OFFICE
ADMIN
ASSIST 6
HALL
WAITING
ELEVATOR
LOBBY
CORRIDOR
CORRIDOR
OFFICE MED CTR
ASSOC DIR
OFFICE ADMIN
ASSIST 2
OFFICE MGMT
SPEC 1
OFFICE
SECY
STAFF
BREAK RM
MENS
RESTRM
WOMENS
RESTRM
SCHEDULING
CORRIDOR
WAITING RM
A
WAITING RM
B
RECEPTION
NURSES WORK RM
OFFICE
CORRIDOR
D3467 D3466
D3465
D3461
D3464
D3460
D3002
D3459
D3457
D3455
D3453
D3447
D3441 D3440
D3439
D3428
D3433
DS2
D3442
D3444
D3448
D3449
D3458
D3456
DS1
P1 DS3
D3429
D3427
D3426
D3000
D3446
D3EOR
D3C02
D3C01
G3651
G3609 G3599
ELEVATOR LOBBY
CORRIDOR
WOMENS
CHANGING
C3311
C3307
C3309
C3295
C210
C3294 C3292
C3293 C3291
C3290
C211
OFFICE
GENERAL
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
ELECTRICAL
OFFICE
HAC
ELECTRICAL
OFFICE
OFFICE
GS1D4
B3CD01
G3CD06
G3CD05G3CD04
G3CD03
G3CD02
GENERAL
STORAGE
DS1D4
C3CD01
CS1D5
CS6D3
NURSE STATION
GS3D2 GS2D3
REST
ROOM
G3CD10
H3CD02
EQUIPMENT STORAGE
WAITING RM
G3CD11
OMNICELL AND
SUPPLY
ANTE RM
DS3D1
D3CD02
D3CD03
DS2D2
C3CD04
OMNICELL
AND
SUPPLY
CS5D2
GS3D3
ANTE RM
G3EGR
C3CD02
C3330 C3332
G3539
C3395
C3333
HS1
G3600
CS3
CS4
GS3 GS2
GS1
C3340
G3575
C3C05
LOCKER RM
OFFICE
1 PATIENT RM
B3CD02
BS1D4
B3CD05
G3580
CS2D3
C3XD01
HS1D7
G3CD09
G3CD08
G3CD01
ELEVATOR LOBBY
OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
EXAM RM
CLEAN
SUPPLY/MEDS
ELECTRICAL
1 PATIENT RM 1 PATIENT RM
1 PATIENT RM 1 PATIENT RM
1 PATIENT RM 1 PATIENT RM
1 PATIENT RM
1 PATIENT RM
1 PATIENT RM
ICU NURSES
STATION
1 PATIENT RM
1 PATIENT RM
STORAGE
CYSTO 1
CORRIDOR
STAFF LOUNGE
PACU PHASE 1
RECOVERY
PACU PHASE 2
RECOVERY
SCRUB AREA
CORRIDOR
CORRIDOR
CORRIDOR
OFFICE
OFFICE
EQUIPMENT
STORAGE
EQUIPMENT STORAGE
CHAIR
STATION
C3356A
C3288
C3EPR
C3305
C3303
TOILET
B3C01
C3393
STORAGE
DIALYSIS
G3C03
B3C09
STAFF
LOUNGE
RESTROOM
PATIENT
LOCKERS
MENS
RESTROOM
UNISEX
LOCKERS
WOMENS
HAC
PROCEDURE
WORK RM PROCEDURE WORK RM PROCEDURE
H3696
PRE-OP
PRE-OP
CONSULTATION
H3698
H3694
RECEPTION
H3692
WAITING
H3690
RESTROOM WOMEN
H3688
RESTROOM
MEN
H3686
SIM
COMMUNICATION
ALCOVE
H3682
IT
CLOSET
H3680
NURSE PHONE ALCOVE
H3674
RECOVERY
H3672
RECOVERY
H3670
CORRIDOR
H3668
H3664
CORRIDOR
H3662
RESTROOM
PATIENT
H3660
STORAGE
H3704
ALCOVE
H3705
CORRIDORALCOVE
H3706
ALCOVE
H3706A
CORRIDOR
H3663A
H3702H3700
UTILITY
SOILED
H3C04
RECOVERY RECOVERY
H3C02
RECOVERY
H3665
H3677
H3679
H3C01 H3681
H3676
H3C05
H3697
H3691
H3699 H3701
H3703
ALCOVE
H3684
NURSE STATION
H3663
H3CD01
MH
ELEVATOR
P8
ELEVATOR ROOF
KPEMH
ALCOVE
NURSE SUPPLY 1/2
B3125
HAC/EMS
B3124
WARD CLERK
B3122
RT WORKROOM
B3126
CLEAN
UTILITY
B3128
SOILED
UTILITY
B3130
BG/RT
STORAGE
B3132
NOUR
B3134
ALCOVE
CRASH
B3CO3A
ALCOVE
CRASH
B3CO7A
MED
B3138
LINEN
B3136
TEAM
WORKROOM
B3140
ALCOVE
STR/XRAY
B3CO6A
CORRIDOR
B3CO5
DS
B3181B
NURSE SUPPLY
11/12 B3177
DS
B3179B
NURSE 10
B3177A
ANTE
B3175
BG/RT
OFFICE
B3171
GAS
BR3173
GAS
BR3173A
IT
B3167
TELEMETRY
CLOSET
B3165
NURSE
SUPPLY
8/9 B3159
DS
B3161B
MENS
TOILET
B3157A
WOMENS
TOILET
B3157B
DS
B3155B
STAFF LOUNGE
B3157C
TOILET 7
B3155A
TOILET 6
B3153A
STORAGE
B3149
OFFICE
B3147
OFFICE
MANAGER
B3145
TOILET
B3181A
TOILET
B3179A
PATIENT 11
B3179
PATIENT 9
B3163
TOILET 9
B3163A
TOILET 10
B3175B
CONSULTATION
B3169
CORRIDOR
B3CO5C
TOILET 8
B3161A
PATIENT 8
B3161
STAIR-2
BS2
LOCKER
B3157
NURSE SUPPLY 6/7
B3151
DS
B3143B
NURSE SUPPLY 4/5
B3139
ELEC
B3137
DS
B3141B
STORAGE
B3133
TOILET 5
B3143A
TOILET 4
B3141A
NURSE 3
B3125A
DS
B3129B
PATIENT 3 ISO
B3131A
TOILET 3
B3131B
TOILET
FAM
B3135A
TOILET 2
B3129A
TOILET 1
B3127A
PATIENT 7
B3155
PATIENT 6
B3153
DS
B3153B
ALCOVE
B3CO7B
CORRIDOR
B3CO7
DS
B3163B
PATIENT 12
B3181
CORRIDOR
B3CO57 PATIENT 5
B3143
PATIENT 4
B3141
ANTE
B3131
FAMILY LOUNGE /
PANTRY
B3135
BARIATRIC
PATIENT 2
B3129
BARIATRIC
PATIENT 1
B3127
PATIENT 10 ISO
B3175A
CORRIDOR
B3C02
CORRIDOR
B3C07
CORRIDOR
B3CO3
CORRIDOR
B3CO6
DS
B3127B
CORRIDOR
B3CO4
OFFICE
BED STATION
G
EQUIPMENT
STORAGE
G-103A
AD103A
AD103A
G-103A
G-103A
AD103A
G-103A
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
FULLY SPRINKLERED
BID SET
20-375
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
G
THIRD FLOOR
N
TRUE
NORTH
KEY PLAN
AREA OF
WORK
MAIN ENTRANCE
1 SOUTH
1A SOUTH
1 CENTER
1A NORTH
1 NORTH
1D
MRI
WAREHOUSE
OVERALL THIRD FLOOR DEMOLITION PLAN
Scale: 1/32" = 1'-0"
NORTH
A. THE CONTRACTOR IS RESPONSIBLE TO VERIFY
ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK. NOTIFY THE VA COR OF ANY CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
B. ALL ITEMS BEING REMOVED SHALL REMAIN THE
PROPERTY OF THE VA MEDICAL CENTER UNTIL
CONFIRMATION HAS BEEN MADE BY THE VA COR
AS TO WHETHER THE VA WILL RETAIN SUCH
ITEMS. ALL ITEMS NOT BEING RETAINED BY THE
VA COR OR DESIGNATED ON THE DRAWINGS TO
BE REMOVED FROM THE SITE BY CONTRACTOR.
C. REFER TO MECHANICAL DRAWINGS AND
ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
D. COORDINATE WORKING HOURS ALLOWED FOR
DEMOLITION WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
E. REPAIR OR REPLACE ITEMS DAMAGED DURING
CONSTRUCTION ACTIVITIES AT NO ADDITIONAL
COST TO THE VA. IF DAMAGED, REPAIR,
RE-PATCH, SAND SMOOTH AND REFINISH TO
MATCH EXISTING.
F. KEY NOTES AND DRAWINGS ARE INTENDED TO
GRAPHICALLY REPRESENT GENERAL WORK AND
DO NOT PORTRAY FULL SCOPE OF THE PROJECT.
SEE SPECIFICATIONS FOR DETAILED
REQUIREMENTS.
G. REFER TO SPECIFICATIONS SECTION 01 00 00
FOR GENERAL REQUIREMENTS DURING
DEMOLITION, INCLUDING DISPOSAL OF ITEMS TO
BE REMOVED OFF-SITE, OR ITEMS TO BE
RETURNED TO THE VA.
H. THE INFORMATION CONTAINED IN THESE
DEMOLITION DOCUMENTS DEFINES GENERAL
SCOPE ONLY AND DOES NOT RELIEVE THE
CONTRACTOR OF THE RESPONSIBILITY OF
PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE WORK.
I. THE CONTRACTOR SHALL, BEFORE THE START
OF WORK, IDENTIFY ANY REQUIRED DEMOLITION
BEYOND THE IDENTIFIED PROJECT SCOPE
WHETHER ABOVE, BELOW, INSIDE EXISTING
WALLS BEING DEMOLISHED, OR OUTSIDE
PROJECT AREA. THE CONTRACTOR SHALL
PROVIDE DEMOLITION OF THESE AREAS AND
PATCH OF SAME AS A PART OF THE SCOPE OF
THE PROJECT. CONTRACTOR SHALL NOTIFY AND
COORDINATE THIS WORK WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE.
J. ALL DEMOLITION WORK SHALL BE PERFORMED
WITH DUE CARE AND DILIGENCE IN ORDER TO
PREVENT ARBITRARY DAMAGE OR
INTERRUPTION OF SERVICE OR CONCEALED
UTILITIES INTENDED TO REMAIN IN SERVICE.
K. REFER TO SPECIFICATION DIVISION 02 FOR
ADDITIONAL DEMOLITION WORK REQUIRED FOR
ASBESTOS ABATEMENT.
L. CONTRACTOR IS RESPONSIBLE TO REMOVE OR
REWORK PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS HIDDEN IN WALLS SHOWN
TO BE DEMOLISHED. REFER TO ELECTRICAL OR
MECHANICAL PLANS FOR ADDITIONAL
INFORMATION.
M. WHEREVER EXISTING EQUIPMENT, PIPING,
DUCTS, ETC., ARE REQUIRED TO BE REMOVED,
SUCH REMOVAL SHALL INCLUDE ALL ANCHORS,
HANGERS, BRACING, FOUNDATION, ETC.
N. INTERIOR FINISHES, INCLUDING FLOORS, WALLS,
AND CEILINGS, DAMAGED DURING REMOVAL OR
ABANDONMENT OF PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS SHALL BE PATCHED AND
REPAIRED TO MATCH ADJACENT SURFACES AND
FOR PREPARATION FOR NEW CONSTRUCTION.
O. ALL ICRA BARRIERS INDICATED ARE THE
SUGGESTED TYPE AND LOCATION BASED ON
THE EXISTING AND PROPOSED FLOOR PLANS.
THE CONTRACTOR IS RESPONSIBLE FOR
INFECTIOUS CONTROL DURING THE
CONSTRUCTION PROJECT DURATION AND CAN
MODIFY THE ICRA BARRIER AS REQUIRED TO
ACHIEVED THE INFECTION CONTROL REQUIRED.
COORDINATE ANY CHANGES WITH THE C.O.R.
P. PER THE ASBESTOS SURVEY PROVIDED BY THE
VA DATE APRIL 14, 2014 CONDUCTED BY SAFETY
ENVIRONMENTAL LABORATORIES AND
CONSULTING, INC. ASBESTOS MAY BE PRESENT
IN THIS FACILITY IN THE FLOOR TILE MASTIC AND
IN PIPE INSULATION. CONTRACTOR TO REFER TO
ASBESTOS SURVEY AND CONTACT COR IF
ASBESTOS DISCOVERED AND ABATE ANY AREAS
PRIOR TO CONTINUING WORK.
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text
DN
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
UNDER CONSTRUCTION
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text
AD103
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
OVERALL THIRD FLOOR DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/32"=1'-0"
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
64'
STERILE
SUPPLY
STERILE
SUPPLY
HOUSE KEEPING
CLOSET
G3544
G3554
G3555
G3556
CORRIDOR
G3C03
TOILET
EQUIPMENT
STORAGE
EQUIPMENT
STORAGE
SOILED
UTILITY
CORRIDOR
G3624A
G3C09
G3623
G3624
G3633
G3634
G3625
G3626
G3636
WAITING RM
OMNICELL AND
SUPPLY
OMNICELL AND
SUPPLY
OFFICE
EC
CORRIDOR
RESTROOM
PATIENT
STORAGE
ALCOVE
CORRIDOR
ALCOVE
H3C02
RECOVERY
H3665
H3677
H3679
H3C01
H3676
H3703
CLEAN SUPPLY
HOUSE KEEPING
ANEST OFFICE
EQUIPMENT
STORAGE TOILET
EQUIPMENT
STORAGE
EQUIPMENT
STORAGE
CLOSET
G3549-1
G3547
G3556
G3558
G3557 G3548A
G3548
G3549
CORRIDOR
G3C03
D
E
AA
F
G
E
1 9
1 9
1 9
8'-0" +/-
9'-0" +/-
1 9
1 8
1 8
1 3
REFLECTED CEILING LEGEND
SOFFIT/CEILING
CEILING HEIGHT
EQ. A EQ. A
E Q
B
E Q
B
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
PENDANT
DOWN LIGHT
FIXTURE
CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF EACH
ROOM. AVOID USE OF LESS-THAN 6" TILES.
A.F.F.
PERIMETER
RECESSED WALL
SLOT LIGHT
FIXTURE
FIRE ALARM
STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
SMOKE DETECTOR
FIRE ALARM /
HORN /
STROBE LIGHT -
WALL MOUNTED
FIRE ALARM / HORN
/ STROBE LIGHT -
CEILING MOUNTED
SPRINKLER HEAD
SPRINKLER HEAD
2'x4' LAY-IN
RETURN GRILL
LIGHT FIXTURE
HEAT DETECTOR
ACCESS PANEL
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
KEY NOTES:
FULLY SPRINKLERED
BID SET
20-375
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
G
THIRD FLOOR
N
TRUE
NORTH
KEY PLAN
AREA OF
WORK
MAIN ENTRANCE
1 SOUTH
1A SOUTH
1 CENTER
1A NORTH
1 NORTH
1D
MRI
WAREHOUSE
REFLECTED CEILING DEMOLITION PLAN - G3547
Scale: 1/4" = 1'-0"
NORTH
REFLECTED CEILING DEMOLITION PLAN - H3677
Scale: 1/4" = 1'-0"
NORTH
REFLECTED CEILING DEMOLITION PLAN - G3555
Scale: 1/4" = 1'-0"
NORTH
REFLECTED CEILING DEMOLITION PLAN - G3636 G3634 AND G3626
Scale: 1/4" = 1'-0"
NORTH
A. CONTRACTOR SHALL VERIFY PRESENCE OF
ASBESTOS PER ASBESTOS REPORT/DRAWINGS
ATTACHED TO SPECIFICATION SECTION 02 82 13.32.
B. CONTRACTOR TO ENSURE ALL FIRE SPRINKLER
PIPES AND HEADS ARE INSTALLED AT CORRECT
HEIGHTS INTO NEW CEILINGS PER NFPA 13.
C. ALL NEW ACT CEILING HEIGHTS WILL BE AT SAME
ELEVATION AFF AS THE CEILING SYSTEM THAT WAS
REMOVED FROM THE SPACE UNO IN THE
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO COORDINATE INSTALLATION OF
NEW CEILING WITH NEW+EXISTING EQUIPMENT
HEIGHTS AND THE TOP OF DOORS. CEILING HEIGHT
CAN BE ADJUSTED TO MATCH EXISTING CONDITIONS.
E. ASBESTOS IS PRESENT IN THE BUILDINGS (FLOOR
MASTIC, PIPING COMPONENTS, ETC.) ABATE ALL
ASBESTOS THAT IS DISTURBED AS A RESULT OF
WORK PER SPECIFICATION SECTION 02 82 11.
F. DASHED LINES ON REFLECTED CEILING PLAN
REPRESENT THE APPROXIMATE SIZE AND LOCATION
OF CEILING REMOVAL REQUIRE FOR ABOVE CEILING
WORK. CONTRACTOR TO DETERMINE EXACT SIZE
AND LOCATION.
G. ICRA BARRIERS INSTATED IN WORKING SPACE OR
CORRIDORS MUST PROVIDE ADEQUATE SPACE FOR
ACCESS/PASSAGE REQUIRED WITHIN THESE AREAS.
4'-0" CLEAR REQUIRED IN CORRIDOR.
1. REMOVE CEILING TILE GRID, SUPPORTS, ETC. AS
NECESSARY TO ACCESS EQUIPMENT. SALVAGE ACT
CEILING FOR RE-INSTALLATION AFTER COMPLETION
OF HVAC WORK.
2. REMOVE GYPSUM BOARD CEILING AS NECESSARY
FOR ACCESS TO EQUIPMENT IF REQUIRED FOR
REPLACEMENT OR RE-BALANCING IF ACCESS
PANELS NOT AVAILABLE.
3. PER ASBESTOS SURVEY APRIL 14, 2014, ASBESTOS
WAS NOTED TO BE PRESENT IN THE FLOOR BLACK
MASTIC. CONTRACTOR TO ABATE ASBESTOS IF
FLOORING IS DISRUPTED BEFORE PRECEDING WITH
WORK .
4. FIRE SPRINKLER HEADS TO REMAIN WHERE CEILING
SYSTEM REMOVED. SPRINKLER HEADS TO BE
TURNED UP TOWARDS STRUCTURE ABOVE WHILE
CEILING IS REMOVED.
5. EXISTING CEILING TO REMAIN, ACCESS TO
EQUIPMENT CAN BE ACCOMPLISHED WITHOUT
REMOVING SECTION OR ENTIRE CEILING.
6. NO CEILING WORK IN THIS AREA.
7. REMOVE AND MODIFY CEILING TILE AS NECESSARY
FOR ADDITION OF NEW DIFFUSER.
8. LOCATION OF ABOVE CEILING MECHANICAL
EQUIPMENT OUTSIDE STORAGE SPACE.
9. PER ASBESTOS SURVEY, APRIL 14, 2014, ASBESTOS
WAS NOTED TO BE PRESENT IN THE PIPE
INSULATION ABOVE CEILINGS. CONTRACTOR TO
ABATE ASBESTOS IF PIPING IS DISRUPTED BEFORE
PROCEEDING WITH WORK.
10. NEW SUPPLY DIFFUSER TO BE INSTALLED INTO ACT
CEILING PER MECHANICAL DRAWINGS.
11. REMOVE CEILING TILE, GRID, SUPPORT, ETC AS
INDICATED ON FOR INSTALLATION OF NEW
PARTITION. REINSTALL CEILING COMPONENTS ON
G3636 SIZE OF NEW PARTITION AS NECESSARY TO
PROVIDE FINISHED CEILING IN THAT SPACE.
12. REMOVE ACT CEILING COMPLETELY INCLUDING ALL
LIGHT FIXTURES, DIFFUSERS AND OTHER CEILING
MOUNTED DEVICES. SALVAGE ALL LIGHT FIXTURES,
DIFFUSER AND OTHER CEILING MOUNTED DEVICES.
DISPOSE OF ALL ACT CEILING COMPONENTS.
13. REMOVE EMERGENCY LIGHT UNIT LOCATED ON
WALL AND SALVAGE FOR REINSTALLATION IN
REVISED SPACE.
14. REMOVE DIFFUSERS TO BE DELETED FROM CEILING
PER MECHANICAL DRAWINGS.
15. NEW RETURN DIFFUSER TO BE INSTALLED INTO ACT
CEILING PER MECHANICAL DRAWINGS.
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
AD103A
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
REFLECTED CEILING DEMOLITION PLANS
AutoCAD SHX Text
AutoCAD SHX Text 1 D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
WOMENS BATH
C4360
TOILET
C4351A
TOILET
C4329A
TOILET
ELECTRICAL
C4376
ELECTRICAL EQUIP
B4259
DOCTORS
CHARTING
B4126
BATH
B4131B
BATH
B4147A
BATH
B4204A
TOILET
C4311A
BATH
B4208A
LOCKSMITH STORAGE
C4302
ELEC RM
C4300
BATH
B4184A
MALE LOCKER
B4263D
ANTE
B4131
ANTE
B4135
ANTE
B4188
BATH
B4194A
BATH
B4192B
BATH
B4200A
BATH
B4206A
CRASH CART
BATH
B4244A
STAFF BATH
B4242
CORRIDOR
B4C09
CORRIDOR
B4C03
1-BED RM
B4194
CORRIDOR
B4C07
B4C06
WAITING RM
B4205
WARD CLERK
B4124
COMMUNICATION
CENTER
B4183
BATH
B4102
BATH
B4100
WAITING RM2
B4241
B4245
OFFICE
B4243
OFFICE
B4257
HAC
B4258
EXAM RM
B4255
STORAGE
B4262
COMP PENSION
B4240
2-BED RM
B4184
WAITING 1
B4104
ELEVATOR LOBBY
B4EGD
STAIR1
BS1
AUTOVALET STORAGE
B4260A
CORRIDOR
C4C04
KITCHEN
B4187
B4124A
EXAM RM
B4128
SUPPLIES
B4134
COMP PENSION
B4136
OFFICE
B4130
OMNICELL
STORAGE
B4189
DIETITIAN
B4191
EXAM
RM
B4144
KITCHEN
B4142
TOILET
B4197A
SOILED
UTILITY
B4140
BATH
B4197
SOILED UTILITY
B4199
BREAK RM
B4201
EQUIPMENT
STORAGE
B4203
1-BED RM ISOLATION
B4188A
BATH
B4188B STORAGE
B4190
ANTE
1-BED RM
ISOLATION
B4192A
TELE
EQUIP
B4196
HAC
B4198
1-BED RM
B4200
2-BED RM
B4204
STAIR
EXAM RM
B4127
BATH
B4127A EXAM RM
B4131A
OFFICE
B4133
EXAM RM
B4135A
BATH
B4135B
B4137A
EQUIP
ELECTRICAL
B4139
SPD
STORAGE
B4141
EXAM RM
B4137
EXAM RM
B4143
BATH
B4143A
EXAM RM
B4147
SLEEP STUDY RM
B4149
BATH
B4149A
BATH
B4150A
2-BED RM
B4206
EXAM RM
B4208
SLEEP STUDY RM
B4150
GOLD
ELEVATOR
P11
GOLD
ELEVATOR
P12
SILVER
ELEVATOR
S8
SILVER
ELEVATOR
S9
ELEVATOR LOBBY
B4ESV
PHARMACY RESIDENTS
C4301
STORAGE
C4303
LINEN CHUTE
B4260
LOCKSMITH RM
C4304
OFFICE
C4306
OFFICE
C4296
CONFERENCE RM
C4294
OFFICE
C4292
OFFICE
C4282
STAIR
CS5
TOILET
STORAGE
PHARMACY
STORAGE
C4297
MED SERVICE
WORK RM
C4310
GENERAL STORAGE
C4312
EMS
UTILITY
C4314A
HAC
C4316
C4307
EMS WORK RM
C4309
OFFICE
C4311
GROUP RM
C4313
BATH
B4246A
EXAM RM
B4244
EXAM RM
B4246
BATH
B4248A
EXAM RM
B4248
VESTIBULE
B4250
BATH
B4263E
STAFF LOUNGE
B4263
SHOWER
B4263C
BATH
B4263B
FEMALE
LOCKER
B4263A
BATH
B4250A
EXAM RM
B4250
CORRIDOR
G4C01
TOILET1
G4540
IR CONTROL RM
G4545
IR SPECIAL
PROCEDURES
G4550
STAIR
GREEN
ELEVATOR
P10
GREEN
ELEVATOR
P9
CONSULT
G4560
UTILITY
CLOSET
C4372
WAITING AREA
C4374
CORRIDOR
OFFICE
C4331
C4378 STAIR
CS1
LACTATION
RM
C4407
FILE RM
C4370
COPIER RM
C4406
C4366
OFFICE
C4369
SCHOOL OF PMEDICINE
DEPARTMENT POF SURGY
C4371
SURGICAL SVC
C4373
C4375
STORAGE
C4375A
OFFICE
C4377
OFFICE
C4379
OFFICE
C4381
EMPLOYEE FITNESS
RM
C4382
CORRIDOR
C4C02
BREAK
C4404
OFFICE
C4402
OFFICE
C4398
OFFICE
C4396 C4394
CONFERENCE
C4390
OFFICE
C4405
OFFICE
C4403
OFFICE
C4401
OFFICE
C4399
OFFICE
C4397
OFFICE
C4395 OFFICE
C4393 C4391
STAIR
CS2
ELEVATOR
LOBBY
C4EPR
OFFICE
C4351
C4328
C4326
OFFICE
C4324
MENS BATH
C4322
LADIES BATH
C4318
STAIR
CS6
OFFICE
C4329
OFFICE
C4353
IT CLOSET
COMMUNICATIONS
C4355
ONCOLOGY CLINICAL SPEC
C4357
OFFICE
C4361
BREAK RM
C4365
MENS BATH
C4364
CONFERENCE RM PATIENT CARE
SVC
C4356
PHARMACY SVC
STORAGE
C4354
PURPLE
ELEVATOR
P2
PURPLE
ELEVATOR
P3
CORRIDOR
C306
OFFICE
C4336
OFFICE
C4330 C4332
OFFICE
C4333
OFFICE
C4343
COPY RM
C4342
OFFICE
C4340
C4338BREAK RM
C4334
STAIR
CS4
PURPLE
ELEVATOR
P4
CLASS RM PATIENT CARE
SVC
C4325
INSTRUCTOR
C4323
BATH
NURSING EDUCATION
C4321
CORRIDOR
OFFICE
C4319
C4317
B4146
C4371A
ELEVATOR
PMACH RM
IT
CLOSET
CLOSET
C4364-1
GENERAL
STORAGE
C4368
C4314
B4261
BS2
GS1
C4400
CS2D4
C4CD01
CS1D6
C4CD05
C4CD04
C4CD03
GS1D5
CS5D3
B4CD06
B4CD05
B4CD01
BS1D5
BS2D6
B4CD03
B4CD04
B4CD02
CS6D4
C4XD02
C4XD01
C4290
CORRIDOR
C4C05
C4295
C4289
B4192
C4286C4C03
CORRIDOR
C4291
BIOMED SHOP
WORK AREA
EMS WORK RM
HAC
GENERAL
STORAGE
QUALITY MANAGENT OFFICE
OFFICE
STORAGE
STORAGE OFFICEOFFICE
COPIER
GENERAL
STORAGE
ALCOVE
C4CD02
INTAKE VITALS
OFFICE
OFFICE
ELEVATOR LOBBY
G4EGR
C4C01
CORRIDOR
B4C02
CORRIDOR
B4C08
CORRIDOR
B4C05
CORRIDOR
E4C04
CORRIDOR
B4C01
IR SYSTEM
COMPONENT RM
G4555
CHASE
CHASE
SOILED
UTILITY
C4305
G-104A
AD104A
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
FULLY SPRINKLERED
BID SET
20-375
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
FOURTH FLOOR
N
TRUE
NORTH
KEY PLAN
AREA OF
WORK
MAIN ENTRANCE
1 SOUTH
1A SOUTH
1 CENTER
1A NORTH
1 NORTH
1D
MRI
WAREHOUSE
OVERALL FOURTH FLOOR DEMOLITION PLAN
Scale: 1/32" = 1'-0"
NORTH
A. THE CONTRACTOR IS RESPONSIBLE TO VERIFY
ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK. NOTIFY THE VA COR OF ANY CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
B. ALL ITEMS BEING REMOVED SHALL REMAIN THE
PROPERTY OF THE VA MEDICAL CENTER UNTIL
CONFIRMATION HAS BEEN MADE BY THE VA COR
AS TO WHETHER THE VA WILL RETAIN SUCH
ITEMS. ALL ITEMS NOT BEING RETAINED BY THE
VA COR OR DESIGNATED ON THE DRAWINGS TO
BE REMOVED FROM THE SITE BY CONTRACTOR.
C. REFER TO MECHANICAL DRAWINGS AND
ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
D. COORDINATE WORKING HOURS ALLOWED FOR
DEMOLITION WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
E. REPAIR OR REPLACE ITEMS DAMAGED DURING
CONSTRUCTION ACTIVITIES AT NO ADDITIONAL
COST TO THE VA. IF DAMAGED, REPAIR,
RE-PATCH, SAND SMOOTH AND REFINISH TO
MATCH EXISTING.
F. KEY NOTES AND DRAWINGS ARE INTENDED TO
GRAPHICALLY REPRESENT GENERAL WORK AND
DO NOT PORTRAY FULL SCOPE OF THE PROJECT.
SEE SPECIFICATIONS FOR DETAILED
REQUIREMENTS.
G. REFER TO SPECIFICATIONS SECTION 01 00 00
FOR GENERAL REQUIREMENTS DURING
DEMOLITION, INCLUDING DISPOSAL OF ITEMS TO
BE REMOVED OFF-SITE, OR ITEMS TO BE
RETURNED TO THE VA.
H. THE INFORMATION CONTAINED IN THESE
DEMOLITION DOCUMENTS DEFINES GENERAL
SCOPE ONLY AND DOES NOT RELIEVE THE
CONTRACTOR OF THE RESPONSIBILITY OF
PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE WORK.
I. THE CONTRACTOR SHALL, BEFORE THE START
OF WORK, IDENTIFY ANY REQUIRED DEMOLITION
BEYOND THE IDENTIFIED PROJECT SCOPE
WHETHER ABOVE, BELOW, INSIDE EXISTING
WALLS BEING DEMOLISHED, OR OUTSIDE
PROJECT AREA. THE CONTRACTOR SHALL
PROVIDE DEMOLITION OF THESE AREAS AND
PATCH OF SAME AS A PART OF THE SCOPE OF
THE PROJECT. CONTRACTOR SHALL NOTIFY AND
COORDINATE THIS WORK WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE.
J. ALL DEMOLITION WORK SHALL BE PERFORMED
WITH DUE CARE AND DILIGENCE IN ORDER TO
PREVENT ARBITRARY DAMAGE OR
INTERRUPTION OF SERVICE OR CONCEALED
UTILITIES INTENDED TO REMAIN IN SERVICE.
K. REFER TO SPECIFICATION DIVISION 02 FOR
ADDITIONAL DEMOLITION WORK REQUIRED FOR
ASBESTOS ABATEMENT.
L. CONTRACTOR IS RESPONSIBLE TO REMOVE OR
REWORK PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS HIDDEN IN WALLS SHOWN
TO BE DEMOLISHED. REFER TO ELECTRICAL OR
MECHANICAL PLANS FOR ADDITIONAL
INFORMATION.
M. WHEREVER EXISTING EQUIPMENT, PIPING,
DUCTS, ETC., ARE REQUIRED TO BE REMOVED,
SUCH REMOVAL SHALL INCLUDE ALL ANCHORS,
HANGERS, BRACING, FOUNDATION, ETC.
N. INTERIOR FINISHES, INCLUDING FLOORS, WALLS,
AND CEILINGS, DAMAGED DURING REMOVAL OR
ABANDONMENT OF PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS SHALL BE PATCHED AND
REPAIRED TO MATCH ADJACENT SURFACES AND
FOR PREPARATION FOR NEW CONSTRUCTION.
O. ALL ICRA BARRIERS INDICATED ARE THE
SUGGESTED TYPE AND LOCATION BASED ON
THE EXISTING AND PROPOSED FLOOR PLANS.
THE CONTRACTOR IS RESPONSIBLE FOR
INFECTIOUS CONTROL DURING THE
CONSTRUCTION PROJECT DURATION AND CAN
MODIFY THE ICRA BARRIER AS REQUIRED TO
ACHIEVED THE INFECTION CONTROL REQUIRED.
COORDINATE ANY CHANGES WITH THE C.O.R.
P. PER THE ASBESTOS SURVEY PROVIDED BY THE
VA DATE APRIL 14, 2014 CONDUCTED BY SAFETY
ENVIRONMENTAL LABORATORIES AND
CONSULTING, INC. ASBESTOS MAY BE PRESENT
IN THIS FACILITY IN THE FLOOR TILE MASTIC AND
IN PIPE INSULATION. CONTRACTOR TO REFER TO
ASBESTOS SURVEY AND CONTACT COR IF
ASBESTOS DISCOVERED AND ABATE ANY AREAS
PRIOR TO CONTINUING WORK.
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text
DN
AutoCAD SHX Text
ROOF
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text
AD104
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
OVERALL FOURTH FLOOR DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/32"=1'-0"
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
ANTE
B4188
COMMUNICATION
CENTER
B4183
KITCHEN
B4187
B4124A
EXAM RM
B4128
SUPPLIES
B4134
COMP PENSION
B4136
OFFICE
B4130
OMNICELL
STORAGE
B4189
DIETITIAN
B4191
OFFICE
B4133
COPIER
CORRIDOR
B4C05
2 3 4
REFLECTED CEILING LEGEND
SOFFIT/CEILING
CEILING HEIGHT
EQ. A EQ. A
E Q
B
E Q
B
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
PENDANT
DOWN LIGHT
FIXTURE
CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO BALANCE
BORDER WIDTHS AT OPPOSITE EDGES OF EACH
ROOM. AVOID USE OF LESS-THAN 6" TILES.
A.F.F.
PERIMETER
RECESSED WALL
SLOT LIGHT
FIXTURE
FIRE ALARM
STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
SMOKE DETECTOR
FIRE ALARM /
HORN /
STROBE LIGHT -
WALL MOUNTED
FIRE ALARM / HORN
/ STROBE LIGHT -
CEILING MOUNTED
SPRINKLER HEAD
SPRINKLER HEAD
2'x4' LAY-IN
RETURN GRILL
LIGHT FIXTURE
HEAT DETECTOR
ACCESS PANEL
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
KEY NOTES:
FULLY SPRINKLERED
BID SET
20-375
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
FOURTH FLOOR
N
TRUE
NORTH
KEY PLAN
AREA OF
WORK
MAIN ENTRANCE
1 SOUTH
1A SOUTH
1 CENTER
1A NORTH
1 NORTH
1D
MRI
WAREHOUSE
REFLECTED CEILING DEMOLITION PLAN - B4189
Scale: 1/4" = 1'-0"
NORTH
A. CONTRACTOR SHALL VERIFY PRESENCE OF
ASBESTOS PER ASBESTOS REPORT/DRAWINGS
ATTACHED TO SPECIFICATION SECTION 02 82 13.32.
B. CONTRACTOR TO ENSURE ALL FIRE SPRINKLER
PIPES AND HEADS ARE INSTALLED AT CORRECT
HEIGHTS INTO NEW CEILINGS PER NFPA 13.
C. ALL NEW ACT CEILING HEIGHTS WILL BE AT SAME
ELEVATION AFF AS THE CEILING SYSTEM THAT WAS
REMOVED FROM THE SPACE UNO IN THE
CONSTRUCTION DOCUMENTS.
D. CONTRACTOR TO COORDINATE INSTALLATION OF
NEW CEILING WITH NEW+EXISTING EQUIPMENT
HEIGHTS AND THE TOP OF DOORS. CEILING HEIGHT
CAN BE ADJUSTED TO MATCH EXISTING CONDITIONS.
E. ASBESTOS IS PRESENT IN THE BUILDINGS (FLOOR
MASTIC, PIPING COMPONENTS, ETC.) ABATE ALL
ASBESTOS THAT IS DISTURBED AS A RESULT OF
WORK PER SPECIFICATION SECTION 02 82 11.
F. DASHED LINES ON REFLECTED CEILING PLAN
REPRESENT THE APPROXIMATE SIZE AND LOCATION
OF CEILING REMOVAL REQUIRE FOR ABOVE CEILING
WORK. CONTRACTOR TO DETERMINE EXACT SIZE
AND LOCATION.
G. ICRA BARRIERS INSTATED IN WORKING SPACE OR
CORRIDORS MUST PROVIDE ADEQUATE SPACE FOR
ACCESS/PASSAGE REQUIRED WITHIN THESE AREAS.
4'-0" CLEAR REQUIRED IN CORRIDOR.
1. REMOVE CEILING TILE GRID, SUPPORTS, ETC. AS
NECESSARY TO ACCESS EQUIPMENT. SALVAGE ACT
CEILING FOR RE-INSTALLATION AFTER COMPLETION
OF HVAC WORK.
2. REMOVE GYPSUM BOARD CEILING AS NECESSARY
FOR ACCESS TO EQUIPMENT IF REQUIRED FOR
REPLACEMENT OR RE-BALANCING IF ACCESS
PANELS NOT AVAILABLE.
3. CUT GYPSUM BOARD FOR 2' X 2' OPENING FOR
INSTALLATION OF NEW ACCESS PANEL, IF NOT
PROVIDED AND REQUIRED FOR EQUIPMENT
ACCESS, SEE SPEC SECTION 083113.
4. FIRE SPRINKLER HEADS TO REMAIN WHERE CEILING
SYSTEM REMOVED. SPRINKLER HEADS TO BE
TURNED UP TOWARDS STRUCTURE ABOVE WHILE
CEILING IS REMOVED.
5. NO CEILING WORK IN THIS AREA.
6. ACCESS EQUIPMENT THROUGH ACCESS PANEL IF
PROVIDED.
7. LOCATION OF ABOVE CEILING MECHANICAL
EQUIPMENT OUTSIDE STORAGE SPACE.
8. PER ASBESTOS SURVEY, APRIL 14, 2014, ASBESTOS
WAS NOTED TO BE PRESENT IN THE PIPE
INSULATION ABOVE CEILINGS. CONTRACTOR TO
ABATE ASBESTOS IF PIPING IS DISRUPTED BEFORE
PROCEEDING WITH WORK.
DocuSign Envelope ID: EED5D8FB-C15D-46C9-8575-F1DE879EBA5E
5/3/2022
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building No.
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
STAMP:
AutoCAD SHX Text Floor No.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text DAV ENERGY SOLUTIONS 2207 GARNET AVE, SUITE 1 SAN DIEGO, CA 92109 619-770-8552 WWW.DAVENERGY.COM
AutoCAD SHX Text
1000 LOCUST ST, RENO, NEVADA
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - SIERRA NEVADA
AutoCAD SHX Text
VA SIERRA NEVADA SPS UPGRADES
AutoCAD SHX Text 654-21-103
AutoCAD SHX Text 03/01/2022
AutoCAD SHX Text 03/08/2022
AutoCAD SHX Text
35% DD ISSUED FOR VA REVIEW
AutoCAD SHX Text 04/15/2022
AutoCAD SHX Text
95% CD ISSUED FOR VA REVIEW
AutoCAD SHX Text 05/02/2022
AutoCAD SHX Text
BID SET
AutoCAD SHX Text
AD104A
AutoCAD SHX Text
HM
AutoCAD SHX Text
TJM
AutoCAD SHX Text
REFLECTED CEILING DEMOLITION PLAN - FOURTH FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
DATA CLOSET
STORAGE
IT CLOSET
ELECTRICAL
ELECTRICAL EQUIP
BATH
TOILET
LOCKER MALE
ELEC RM
BATH
WOMENS
BATH
FIRE EQUIP
LINEN CHUTE
BATH
BATH
BATH
BATH
SHOWER
TOILET
NURSE STATION
BATH
ANTE RM
CORRIDOR
CLEAN LINEN
CORRIDOR
ELEVATOR LOBBY
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
NURSE STATION
CORRIDOR
CORRIDOR
GREEN TEAM
UNION OFFICE
UNION OFFICE
OFFICE
UTILITY
COPIER RM
UNION OFFICE
UNION BREAK RM
OFFICE
GENERAL
STORAGE
CLOSET
STAIR-4
WAITING RM
RESIDENT OFFICE
STAIR-1
GOLD
ELEVATOR
GOLD
ELEVATOR
SILVER
ELEVATOR
SILVER
ELEVATOR
TOILET
TOILET
RESIDENT OFFICE
WARD CLERK
COMMUNICATION
CENTER
DRS
CHARTING
NURSE STATION
CORRIDOR
STAIR
GREEN
ELEVATOR
GREEN
ELEVATORSTORAGE
SECYOFFICECONFERENCE RM
SOCIAL WORKER
OFFICE
OFFICE
OFFICE
RESIDENT
OFFICE
STORAGE
CONFERENCE RM
STAFF LOUNGE
BATH
BATH FEMALE
LOCKER
BATH
PATIENT RM
BATH
PATIENT RM PATIENT RM
BATH BATH
TELEMETRY
PATIENT RM
PATIENT RM
BATH
ISOLATION RM
OFFICE
BATH
BATH
PATIENT RM
TELE EQUIP
HAC
PATIENT RM
MED STORAGE
STAIR-2
PATIENT RM
BATH
ISOLATION RM
ISOLATION RM
BATH
BATH
PATIENT RM
ELECTRICAL
EQUIP
SPD
STORAGE
PATIENT RM
BATH
BATH
PATIENT RM
PATIENT RM
BATH
PATIENT RM
GENERALSTORAGE
TAHOE CONFERENCE
CENTER
ELEVATOR
LOBBY
CORRIDOR
CORRIDOR
HAC
THERAPY
STAIR
COMPUTER TRAINING RM
STORAGE
WOMENS
BATH
IT CLOSET
OFFICE
OFFICE
MENS BATHRM
ASSESSMENT NURSING
PURPLE
ELEVATOR
PURPLE
ELEVATOR
ELECTRICAL
STAIR
PURPLE
ELEVATOR
STAIR
CONFERENCE RM
OFFICE
MENS BATH
OFFICE
OFFICE
TOILET
MHC CO-ORDR
OFFICE
PSYCHOLOGIST
OFFICE
OFFICE
OFFICE
OFFICE
SOCIAL WORKER
PSYCHIATRIC
HEALTH SCIENCE OFFICE
PSYCHIATRIST
TOILET
ELEC RM
B5CD04
B5CD01
BS1D6
CS7D1
GS1D6
G5CD01
C5CD04
C5CD03
C5CD01
CS1D7
CS6D5
C5XD01
C5CD02
CORRIDOR
STORAGE
CONFERENCE RM
OFFICE
BREAK RM
BREAK RM
STORAGE
STORAGE
OFFICE
WAITING AREA
HAC
SHOWER REMOVED
ELEVATOR
LOBBY
PATIENT RM
PATIENT RM
PATIENT RM
ISOLATION RM
STORAGE
AREA
CORRIDOR
TELEMETRY
ALCOVE
CORRIDOR
CORRIDOR
CORRIDOR
STORAGE
TOILET
GENERAL STORAGE
C5340
C5354
C5326
C5376
B5259
B5206A
C5307A
B5263D
C5302
B5200A
C5316
B5260
B5131B
B5188B
B5204A
B5149A
B5263C
C5311-1
B5150A
B5188
C5300
B5C04
B5133
B5C05
B5EGD
B5ESV
B5C08
B5C03
B5146
C4A
B5C07
C5C03
C5307
C5309
C5311
C5313 C5314
C5312
C5310
C5308
C5306
C5304
C5304A
CS7
B5104
B5245
B5243
B5258
BS1
P11
P12S9
S8
B5100
B5102 B5241
B5124
B5183
B5126
B5185
B5187
B5128
B5130
B5189
B5134
B5136
B5191
B5140
B5197A
B5199
G5C01
P10P9B5560
B5540B5550
B5555
C5305
C5303
C5301
B5255
B5261A
B5261
B5263E
B5263B B5263A
B5250A
B5250
B5248A
B5248 B5246
B5246A B5244A
B5240
B5244
B5184 B5184A
B5188A
B5192A
B5190
B5194A
B5192B
B5194
B5196
B5198
B5200
B5204
B5201
B5203
B5144
BS2
B5127
B5127A
B5131A
B5135A
B5137A
B5135B
B5137
B5139
B5141
B5143
B5147A
B5143A
B5147
B5149
B5142
B5150
B5208
B5208A
B5206
C5358B
C5358A
C5331
C5330
C5EPR
C404
C5C01
C5366
C5368
C5370
C5374
C5378
CS1
C5380
C5375
C5375A
C5367
C5359
C5365
C5364
C5358
C5356
P3P2
C5328
CS4
P4
CS6
C5324
C5322
C5318
C5353
C5329
C5351A
C5317
C5319
C5321
C5323
C5325
C5327
C5351
C5369
C5371
C5373
C5377
C5379
C5A
C5318A
C5367A
C5355
C5C02
GSI
G5EGR
C7A
B5C02
B5545
B5263
C5B
B5197
B5C09
B5C06
B5C01
B5260A
ANTE
RM
B5131
ANTE
RM
B5135
ANTE
RM
B5192
STERILE STOR.
G-105A
AD105A
Department of Veteran Affairs
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
© COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
P
M
ACG Project Number
SHEET NOTES:
FULLY SPRINKLERED
BID SET
20-375
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
FIFTH FLOOR
N
TRUE
NORTH
KEY PLAN
AREA OF
WORK
MAIN ENTRANCE
1 SOUTH
1A SOUTH
1 CENTER
1A NORTH
1 NORTH
1D
MRI
WAREHOUSE
OVERALL FIFTH FLOOR DEMOLITION PLAN
Scale: 1/32" = 1'-0"
NORTH
A. THE CONTRACTOR IS RESPONSIBLE TO VERIFY
ALL EXISTING CONDITIONS PRIOR TO BEGINNING
WORK. NOTIFY THE VA COR OF ANY CONFLICTS
PRIOR TO PROCEEDING WITH DEMOLITION.
B. ALL ITEMS BEING REMOVED SHALL REMAIN THE
PROPERTY OF THE VA MEDICAL CENTER UNTIL
CONFIRMATION HAS BEEN MADE BY THE VA COR
AS TO WHETHER THE VA WILL RETAIN SUCH
ITEMS. ALL ITEMS NOT BEING RETAINED BY THE
VA COR OR DESIGNATED ON THE DRAWINGS TO
BE REMOVED FROM THE SITE BY CONTRACTOR.
C. REFER TO MECHANICAL DRAWINGS AND
ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
D. COORDINATE WORKING HOURS ALLOWED FOR
DEMOLITION WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
E. REPAIR OR REPLACE ITEMS DAMAGED DURING
CONSTRUCTION ACTIVITIES AT NO ADDITIONAL
COST TO THE VA. IF DAMAGED, REPAIR,
RE-PATCH, SAND SMOOTH AND REFINISH TO
MATCH EXISTING.
F. KEY NOTES AND DRAWINGS ARE INTENDED TO
GRAPHICALLY REPRESENT GENERAL WORK AND
DO NOT PORTRAY FULL SCOPE OF THE PROJECT.
SEE SPECIFICATIONS FOR DETAILED
REQUIREMENTS.
G. REFER TO SPECIFICATIONS SECTION 01 00 00
FOR GENERAL REQUIREMENTS DURING
DEMOLITION, INCLUDING DISPOSAL OF ITEMS TO
BE REMOVED OFF-SITE, OR ITEMS TO BE
RETURNED TO THE VA.
H. THE INFORMATION CONTAINED IN THESE
DEMOLITION DOCUMENTS DEFINES GENERAL
SCOPE ONLY AND DOES NOT RELIEVE THE
CONTRACTOR OF THE RESPONSIBILITY OF
PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE WORK.
I. THE CONTRACTOR SHALL, BEFORE THE START
OF WORK, IDENTIFY ANY REQUIRED DEMOLITION
BEYOND THE IDENTIFIED PROJECT SCOPE
WHETHER ABOVE, BELOW, INSIDE EXISTING
WALLS BEING DEMOLISHED, OR OUTSIDE
PROJECT AREA. THE CONTRACTOR SHALL
PROVIDE DEMOLITION OF THESE AREAS AND
PATCH OF SAME AS A PART OF THE SCOPE OF
THE PROJECT. CONTRACTOR SHALL NOTIFY AND
COORDINATE THIS WORK WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE.
J. ALL DEMOLITION WORK SHALL BE PERFORMED
WITH DUE CARE AND DILIGENCE IN ORDER TO
PREVENT ARBITRARY DAMAGE OR
INTERRUPTION OF SERVICE OR CONCEALED
UTILITIES INTENDED TO REMAIN IN SERVICE.
K. REFER TO SPECIFICATION DIVISION 02 FOR
ADDITIONAL DEMOLITION WORK REQUIRED FOR
ASBESTOS ABATEMENT.
L. CONTRACTOR IS RESPONSIBLE TO REMOVE OR
REWORK PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS HIDDEN IN WALLS SHOWN
TO BE DEMOLISHED. REFER TO ELECTRICAL OR
MECHANICAL PLANS FOR ADDITIONAL
INFORMATION.
M. WHEREVER EXISTING EQUIPMENT, PIPING,
DUCTS, ETC., ARE REQUIRED TO BE REMOVED,
SUCH REMOVAL SHALL INCLUDE ALL ANCHORS,
HANGERS, BRACING, FOUNDATION, ETC.
N. INTERIOR FINISHES, INCLUDING FLOORS, WALLS,
AND CEILINGS, DAMAGED DURING REMOVAL OR
ABANDONMENT OF PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS SHALL BE PATCHED AND
REPAIRED TO MATCH ADJACENT SURFACES AND
FOR PREPARATION FOR NEW CONSTRUCTION.
O. ALL ICRA BARRIERS INDICATED ARE THE
SUGGESTED TYPE AND LOCATION BASED ON
THE EXISTING AND PROPOSED FLOOR PLANS.
THE CONTRACTOR IS RESPONSIBLE FOR
INFECTIOUS CONTROL DURING THE
CONSTRUCTION PROJECT DURATION AND CAN
MODIFY THE ICRA BARRIER AS REQUIRED TO
ACHIEVED THE INFECTION CONTROL REQUIRED.
COORDINATE ANY CHANGES WITH THE C.O.R.
P. PER THE ASBESTOS SURVEY PROVIDED BY THE
VA DATE APRIL 14, 2014 CONDUCTED BY SAFETY
ENVIRONMENTAL LABORATORIES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .