This document is a Bid Schedule for the JFSD201151 Repair (R&M) Bunch Hall Dorm 221 at Grand Forks AFB, ND federal contract opportunity. The Bid Schedule outlines the various construction work items required, organized by CSI division, and provides a breakdown for bidders to submit pricing. The total bid is to be provided for Bid Items 1, 2, and 3, which cover the general construction work, water utility privatization, and electric utility privatization, respectively. The contract will be a Firm-Fixed-Price award by the Department of the Air Force Air Mobility Command. A site visit is scheduled for August 8, 2024 and the solicitation number is FA465924R0005.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.:
Contract No.:
BID SCHEDULE
BID ITEM 1
Item Description Bid
1A Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 1 General Requirements.
1B
Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 2 - Site Work, Division 31 – Earthwork, Division 32 – Exterior Improvements, and Division 33 – Utilities.
1C Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 3 – Concrete.
1D Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 4 – Masonry.
1E Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 5 – Metals.
1F Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 6 – Wood, Plastics and Composites.
1G Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 7 - Thermal and Moisture Protection.
1H Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 8 – Openings.
1I Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 9 – Finishes.
1J Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 10 - Specialties, Division 11 – Equipment, and Division 12 – Furnishings.
1K
Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 21 – Fire Suppression, Division 22 – Plumbing, Division 23 – Heating, Ventilating, and Air Conditioning, and Division 25 – Integrated Automation.
1L Perform all construction work as specified in the technical provisions and shown on the project drawings for Division 26 – Electrical, Division 27 – Communications, and Division 28 – Electronic Safety and Security.
BID ITEM 1 TOTAL $
BID ITEM 2
Item Description Bid
1 Water Utility Privatization $
BID ITEM 2 TOTAL $
JFSD201151
Repair Bunch Hall Dorm B221
BID ITEM 3
Item Description Bid
1 Electric Utility Privatization $
BID ITEM 3 TOTAL $
GRAND TOTAL OF BID ITEMS 1, 2, AND 3 $
NOTES:
ALL BID ITEMS WILL BE AWARDED.
SEE DRAWINGS FOR INFORMATION ON WORK TO INCLUDE IN BID ITEMS 2 AND 3.