JA39_Past_Performance_Information.pdf
PDF 188 KB Posted
- Attached to
- Utilities Privatization - Privatization of the Electric Utility System at Norfolk Naval Shipyard, VA
- Solicitation number
- SP060025R0800
- Issued by
-
Defense Logistics Agency Energy
About this file
This is a Past Performance Project Information template for a DOD Utilities Privatization contract, version February 2020. The form is designed to capture detailed past performance information from potential contractors, with comprehensive sections requesting specifics about previous utility infrastructure projects. The template requires offerors to provide extensive details including contract information, project descriptions, completion dates, points of contact, technical unique areas, significant problems encountered, small business goals, and a detailed matrix documenting ownership, operation, maintenance, and on-site status for various utility systems such as electrical distribution, power generation, natural gas distribution, water systems, wastewater systems, and thermal systems. The form includes granular questions about system capacities, linear feet of infrastructure, number of facilities served, meters maintained, and capital improvements made, providing a comprehensive view of a contractor's prior utility infrastructure management experience.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE PROJECT INFORMATION DOD UTILITIES PRIVATIZATION
VERSION FEBRUARY 2020
ATTACHMENT JA39
PAST PERFORMANCE PROJECT INFORMATION
Provide the information requested in this form for each project/program being described. Provide frank, concise comments regarding your performance on the contracts/work you identify.
A. OFFEROR NAME (COMPANY/DIVISION) AND LOCATION (CITY/STATE):
NOTE:
- If the company or division (i.e. management personnel, subcontractor, parent/subsidiary/affiliate, etc.) performing this effort is different than the Offeror, or the relevance of this effort to the acquisition is impacted by any company/corporate organizational changes; note those differences/changes and explain in detail why this past performance should be attributed to the Offeror.
B. PROJECT/PROGRAM TITLE:
C. DESCRIPTION:
1. Contract Number:
2. Contract Type:
3. Period of Performance:
4. Original Contract $ Value:
5. Current Contract $ Value:
NOTES:
- If describing a service account rather than a discrete project or contract, provide account number, type of account/work, and total value over the period of performance.
- If amounts for items 4 and 5 above are different, provide a brief description of the reasons for the difference.
D. BRIEF DESCRIPTION OF OFFEROR’S DUTIES AS PRIME CONTRACTOR,
SUBCONTRACTOR, OR SERVICE PROVIDER:
(Please highlight portions considered most relevant to the current solicitation)
E. COMPLETION DATE:
1. Original Contractual Date:
2. Current Scheduled Completion Date:
3. Estimated Date of Completion:
4. How Many Times Changed:
5. Primary Cause(s) of Change:
F. PRIMARY AND SECONDARY POINTS OF CONTACT:
(Please provide current information on all individuals)
1. Primary POC: Name:
Company:
Job Title:
Office:
Address:
Telephone:
E-mail:
Fax:
Relationship to Project:
2. Secondary POC: Name:
Company:
Job Title:
Office:
Address:
Telephone:
E-mail:
Fax:
Relationship to Project:
G. ADDRESS ANY TECHNICAL (OR OTHER) AREAS ABOUT THIS PROJECT/PROGRAM
CONSIDERED UNIQUE:
H. SPECIFY BY NAME ANY KEY INDIVIDUAL(S) WHO PARTICIPATED IN THIS
PROJECT/PROGRAM AND IS/ARE PROPOSED TO SUPPORT THIS ACQUISITION.
ALSO, INDICATE THEIR ROLES FOR BOTH THE PROVIDED PROJECT/PROGRAM
AND FOR THIS ACQUISITION:
I. ADDRESS SIGNIFICANT PROBLEMS ENCOUNTERED ON THIS PROJECT/PROGRAM
AND YOUR SOLUTIONS TO THOSE PROBLEMS:
J. IDENTIFY IF A SMALL BUSINESS OR DISADVANTAGED BUSINESS PLAN OR GOAL
WAS REQUIRED FOR THIS PROJECT/PROGRAM. IF SO, IDENTIFY IN TERMS OF A
PERCENTAGE THE PLANNED VERSUS ACHIEVED GOAL DURING THE
PROJECT/PROGRAM. PLEASE EXPLAIN IF THE ABOVE GOALS WERE NOT MET:
K. DESCRIBE THE RELEVANCY OF THE SERVICES YOU PROVIDED ON THIS
PROJECT/PROGRAM TO THE WORK BEING SOLICITED UNDER THIS RFP:
L. PLEASE COMPLETE THE FOLLOWING:
General
1. Indicate (yes or no) if you owned, operated, maintained the system for the referenced customer.
Indicate (yes or no) if the systems were located on the customer’s site.
OWN OPERATE MAINTAIN ON SITE
Overhead Electrical Distribution System
Underground Electrical Distribution System
Power Generation Facility Substations Natural Gas Distribution System
Water Lines Pump Stations
Water Storage Tanks Water Treatment Plants Sewer Lines Lift Stations
WWTP
Industrial WWTP Chilled Water Generation and Distribution System
Steam Generation and Distribution System
Electrical System
1. What is the voltage of the system you operate/maintain?
2. How many facilities are served by the system you operate/maintain?
3. How many linear feet of overhead distribution system do you operate/maintain?
4. How many linear feet of underground distribution system do you operate/maintain?
5. How many meters do you operate/maintain?
6. What is the dollar value of the capital improvements you made to the system during the total period of time that service has been rendered?
Time (yrs) $
Natural Gas System
1. How many linear feet of distribution lines do you operate/maintain?
2. How many facilities are served by the system you operate/maintain?
3. How many meters do you operate/maintain?
4. What is the dollar value of the capital improvements you made to the system during the total
Water System
1. What is the average daily flow (gallons per day) for the referenced system?
2. What type of treatment occurs at the Water Treatment Plant?
3. What is the capacity of the Water Treatment Plant?
4. How many pump stations do you operate/maintain?
5. How many linear feet of water lines do you maintain?
6. How many meters do you operate/maintain?
7. What type of storage tanks do you operate/maintain (ground/elevated, capacity)?
8. What is the dollar value of the capital improvements you made to the system during the total
Wastewater System
1. What is the average daily flow (gallons per day) for the referenced system?
2. What is the capacity of the WWTP?
3. What is the capacity of the Industrial WWTP?
4. How many lift stations do you operate/maintain?
5. How many linear feet of wastewater lines do you maintain?
6. How many meters do you operate/maintain?
7. What is the dollar value of the capital improvements you made to the system during the total
8. Have capital improvements you completed directly or indirectly reduced the amount of Inflow/Infiltration for the system?
Capital Improvements $ Inflow/Infiltration Reduction %
Thermal System
1. What is the capacity (pound per hour) of the steam generation and distribution system you operate/maintain?
2. What is the electrical generation capacity (MW) of the central power plant you operate/maintain?
3. What is the capacity (tons) of the chilled water and distribution system you operate/maintain?
4. How many linear feet of the distribution system(s) do you operate/maintain?
5. How many meters do you operate/maintain?
6. What is the dollar value of the capital improvements you made to the system during the total period of time service has been rendered?
| A. OFFEROR NAME (COMPANY/DIVISION) AND LOCATION (CITY/STATE): |
| B. PROJECT/PROGRAM TITLE: |
| C. DESCRIPTION: |
| D. BRIEF DESCRIPTION OF OFFEROR’S DUTIES AS PRIME CONTRACTOR, SUBCONTRACTOR, OR SERVICE PROVIDER: |
| E. COMPLETION DATE: |
| F. PRIMARY AND SECONDARY POINTS OF CONTACT: |
| G. ADDRESS ANY TECHNICAL (OR OTHER) AREAS ABOUT THIS PROJECT/PROGRAM CONSIDERED UNIQUE: |
| H. SPECIFY BY NAME ANY KEY INDIVIDUAL(S) WHO PARTICIPATED IN THIS PROJECT/PROGRAM AND IS/ARE PROPOSED TO SUPPORT THIS ACQUISITION. ALSO, INDICATE THEIR ROLES FOR BOTH THE PROVIDED PROJECT/PROGRAM AND FOR THIS ACQUISITION: |
| I. ADDRESS SIGNIFICANT PROBLEMS ENCOUNTERED ON THIS PROJECT/PROGRAM AND YOUR SOLUTIONS TO THOSE PROBLEMS: |
| J. IDENTIFY IF A SMALL BUSINESS OR DISADVANTAGED BUSINESS PLAN OR GOAL WAS REQUIRED FOR THIS PROJECT/PROGRAM. IF SO, IDENTIFY IN TERMS OF A PERCENTAGE THE PLANNED VERSUS ACHIEVED GOAL DURING THE PROJECT/PROGRAM. PLEASE EXPLAIN IF THE ABOVE GOALS ... |
| K. DESCRIBE THE RELEVANCY OF THE SERVICES YOU PROVIDED ON THIS PROJECT/PROGRAM TO THE WORK BEING SOLICITED UNDER THIS RFP: |
| L. PLEASE COMPLETE THE FOLLOWING: |
| General |
| Electrical System |
| Natural Gas System |
| Water System |
| Wastewater System |
| Thermal System |
| ON SITE |
| MAINTAIN |
| OPERATE |
| OWN |
| Overhead Electrical Distribution System |
| Underground Electrical Distribution System |
| Power Generation Facility |
| Substations |
| Natural Gas Distribution System |
| Water Lines |
| Pump Stations |
| Water Storage Tanks |
| Water Treatment Plants |
| Sewer Lines |
| Lift Stations |
| WWTP |
| Industrial WWTP |
| Chilled Water Generation and Distribution System |
| Steam Generation and Distribution System |
File details come from the government source that posted it. Updated .