JA-102 Annual UP KPI Report.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Utilities Privatization - Privatization of the Electric Utility System at Norfolk Naval Shipyard, VA
- Solicitation number
- SP060025R0800
- Issued by
-
Defense Logistics Agency Energy
About this file
This document is an Annual Utility Performance Key Performance Indicator (KPI) Report for the Electric Utility System at Norfolk Naval Shipyard, prepared as part of a utilities privatization contract. The report outlines five critical performance criteria for the electric utility system, including system availability (minimum 99.9772%), maximum system interruption duration (60 minutes), maximum interruption frequency (1 event per year), and service request response times for emergency (90% within 1 hour, 100% within 24 hours), urgent (90% within 5 working days), and routine (90% within 30 calendar days) service orders.
The report is associated with a Defense Logistics Agency Energy (DLA Energy) solicitation for privatizing the electric utility system at Norfolk Naval Shipyard, Virginia. The privatization effort, conducted under 10 U.S.C. 2688, seeks to transfer ownership and operational responsibility to a private utility company. The selected contractor will be responsible for owning, maintaining, and operating the electric utility system, including managing capital investments, ensuring environmental compliance, and providing continuous and reliable service to government and tenant connections within the service area.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. Cover Sheet
| Annual UP KPI Report | |
| Installation Name: | Norfolk Naval Shipyard |
| Utility System: | Electric |
| Contract No.: | |
| Contract Award Date: | |
| Contract Start Date: | |
| Total Customer Service Connections: | |
| KPI Reporting Year: | |
| Report Submittal Date: |
| Name | Phone | ||
| System Owner POC: | |||
| Contract Administering Officer: | |||
| Contracting Officer Representative: |
B. Annual Performance Summary
| Electric System | ||||||
| No. | Criteria | Performance Requirement | [Annual] Performance | Performance meets Navy requirement? (Y/N) | Corrective Action Plan if not meeting Navy requirement | Other Notes |
| 1 | Unplanned System Outages | System availability no less than 99.9772% | ||||
| 2 | System Average Interruption Duration Index (SAIDI) | Not to exceed 60 a minutes | ||||
| 3 | System Average Interruption Frequency Index (SAIFI) | Not to exceed 1 event per year | ||||
| 4 | Emergency Service Order | 90% of Emergency service requests are responded to within 1 hour and 100% of Emergency service requests are resolved within 24 hours | ||||
| 5 | Urgent Service Order | 90% of Urgent service requests are resolved within 5 working days | ||||
| 6 | Routine Service Order | 90% of Routine service requests are resolved within 30 calendar days |
C. Outages
Outage No. Date Time Quantity Estimate (gal) Type/Product (Ex: jp5, dfm, gas, min oil, hyd oil, lube oil) Responsible Party Cause Location Water/Land Weather Collection (No. drums turned in) Collection (Gallons in vac truck) Labor hours Sample Collected? (Y/N) [RESERVED] [RESERVED] [RESERVED] [RESERVED] Comments
D. Service Requests
| SO request received | SO on-scene arrival | Deficiency mitigation/arrest | Service restoration | |||||||||||||||||||
| Service Order No. | Priority | Date | Time | Date | Time | Date | Time | Date | Time | Response Time (minutes) | Resolve Time (minutes) | Service outage duration (minutes) | Total No. of customers with service interruption | No. of critical facilities with service interruption | Responsible Party | Cause | Location | [RESERVED] | [RESERVED] | [RESERVED] | [RESERVED] | Comments |
F. Additional Information
[RESERVED]
File details come from the government source that posted it. Updated .